26.12.2012 Views

Bannockburn Town Centre Investment Strategy - Golden Plains Shire

Bannockburn Town Centre Investment Strategy - Golden Plains Shire

Bannockburn Town Centre Investment Strategy - Golden Plains Shire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Bannockburn</strong> <strong>Town</strong> <strong>Centre</strong> <strong>Investment</strong> <strong>Strategy</strong> <strong>Golden</strong> <strong>Plains</strong> <strong>Shire</strong> Council<br />

7.4 Future Road Network<br />

On the basis of development and natural growth through <strong>Bannockburn</strong> <strong>Town</strong> <strong>Centre</strong>, 10 year traffic<br />

volumes on major roads through the study area have been calculated in Table 7.7 where existing<br />

volumes are available.<br />

Table 3.7: Estimated 2007 Daily Traffic Volumes<br />

Street Location Estimated 2007<br />

Daily Traffic<br />

Volumes<br />

[1]<br />

High Street<br />

High St Service<br />

Rd – nth-bound<br />

High St Service<br />

Rd – sth-bound<br />

McPhillips<br />

Road<br />

Development<br />

Traffic<br />

Additional<br />

Through Traffic<br />

2017<br />

2017 Traffic<br />

Volumes<br />

South of McPhillips<br />

Rd<br />

4550 7000 1700 13,250<br />

South of Milton St 5450 3100 1700 10,250<br />

South of Pope St 4700 1800 1700 8200<br />

Btw Milton &<br />

McPhillips Rd<br />

150 1600 - 1750<br />

Btw Pope & Milton<br />

St<br />

250 300 - 550<br />

Btw Milton &<br />

McPhillips Rd<br />

500 400 - 900<br />

South east of High<br />

St<br />

1150 100 - 1250<br />

North west of High<br />

St<br />

550 700 - 1900 - 1250 - 2450<br />

Milton Street South east of High<br />

St<br />

Pope Street South east of High<br />

St<br />

[1] Estimated daily volumes from Existing Conditions Report<br />

7.5 Road Infrastructure Requirements<br />

7.5.1 Future Road Hierarchy<br />

1000 800 - 1800<br />

900 1500 - 2400<br />

Based on the likely development traffic and future traffic volumes through <strong>Bannockburn</strong> a road<br />

hierarchy has been identified and is illustrated within Figure 8.1(see over).<br />

FILE P:\PES\31081.001 BANNOCKBURN TCIS\FINAL STRATEGY\FINAL AMENDED DRAFT REV5.DOC ⏐ MARCH 13 2008 ⏐ PAGE 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!