Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
Provincial Waste Management Plan Styria - Abfallwirtschaft - Abfall ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Provincial</strong> <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> <strong>Styria</strong> - 2005<br />
Construction 23 requires the builder to separate all generated waste volumes exceeding a determined<br />
quantity according to material groups and to keep records on the waste volumes generated. The<br />
applied qualifying quantities per construction activity are listed in Table 9.<br />
Material group Qualifying quantity per construction activity [t]<br />
Mineral construction waste 40<br />
Concrete waste 20<br />
Excavated soil 20<br />
Construction site waste 10<br />
Asphalt waste and road construction<br />
waste<br />
<strong>Waste</strong> wood 5<br />
<strong>Waste</strong> metal 2<br />
<strong>Waste</strong> plastic 2<br />
Tab. 9: Qualifying quantities for the separate collection of demolition and construction waste<br />
The collection is mainly performed in containers of private waste disposal companies, which are<br />
placed directly at the construction site. Small waste quantities generated during renovation and home<br />
remodeling activities are also accepted in community waste material collection centers.<br />
23 Federal Law Gazette No. 259/1991<br />
5<br />
Page 37