Fall Protection Plan – Roofers

Usually, during the development, many crews will be able to furnish the roofing system of building (Azhar,

Behringer, Sattineni & Maqsood, 2012). Starting with above trusses of roof of building with fastening screws,

it will directly install a corrugated metal roof decking system (Azhar, Behringer, Sattineni & Maqsood, 2012).

Usually, the roof will be built in two different way fusing membrane sheeting on top of the decking with rigid

insulation and then consisting of decking the roof (Zhang, Sulankivi, Kiviniemi, Romo, Eastman, & Teizer,

2015). This whole operation is using augment reality to view any safety problem around the building (Ji, Kim

& Jun 2017). To brief to all the workers that working on the roof which is exposed to from risk of falling while

the roof structure is changing, usage of these augment reality (simulation) animations is needed (Khan, Ali,

Skibniewski, Lee & Park, 2019). The starting points will follow to allow workers to chain-back and forth from

the original of their work to safely move from either side of the roof, as the metal decking process will continue

across the building’s footprint (Peng & Chua, 2017).

Emergency Response Plan

Building Information Modelling (BIM) provides a detailed 3D geometrical model with rich semantics that

go beyond the standard Computer-Aided Design approach. In contrast, Geography Information Science (GIS)

offers powerful spatial analytical tools (Boguslawski, Mahdjoubi, Zverovich, Fadli, & Barki, 2015). The Five

categories (internal) to all the construction workers by using the emergency response plan which is; the severe

weather precautions, labelled zones of the building, delivery and construction directions, emergency situation

precaution and temporary facilities and job trailer locations (Boguslawski, Mahdjoubi, Zverovich, Fadli, & Barki,

2015). For the workers to communicate the emergency response plan, from BIM model it’s generated a 3D

render (Azhar, Behringer, Sattineni & Maqsood, 2012).

RESULTS AND DISCUSSIONS

All To achieve the study objectives, a survey has been administered to field engineers, safety and health

officer, contractor and other construction personnel. The sample consists of 300 construction personnel. The

survey was designed to extract information about the potential of BIM implementation in improving safety

performance.

Demographic Information

One hundred nineteen usable responses were received before the survey was closed (37% response

rate). The responses show that majority of the respondents are between 36-45 years old (45%). Regarding

work experience, forty-six percent of the respondents have more than 20 years of construction experience.

Meanwhile, sixty-four percent have involved in BIM-Based project and majority of them (52%) participated in

1-2 BIM-Based project.

BIM Implementation to Improve Safety Performance

11 areas in BIM have been identified through literature review which related to safety performance in

construction industry. Respondents were asked to give their opinion based on their experiences, knowledge

ISrJ Vol. 11 - 2022, Session 2022/2023 10