information to solve the problem. Any action must be properly dealt with if the act involves any party. The

conservationists need to have a good relationship with certain parties, to facilitate this process. If there is a

problem in relation to the party, it will give rise to a problem, for example time delay in the conservation process.

This becomes critical if the process is slowly resolved and will interfere with other parties in completing this

conservation project.

Table 3. Recommendations to facilitate the conservation process on bas-relief and mural in heritage buildings in

Malaysia.

Problem and issues encountered during conservation

Solution and recommendation

work on bas-relief and mural

Time constraint during conservation work

1. Carrying out the conservation work due to

unforeseen circumstances. Like new

deterioration found on bas-relief and mural

2. Climate factor especially rain hinder conservation

work on external element

Lack of previous documentation

1. Lack of information color coding for bas-relief and

mural

1. Conduct comprehensive site visit and observation

in order to identify the potential deterioration

2. Make a discussion with certain parties in the

conservation project to solve problems that

suddenly happen

3. Knowledge and experience are important to

handle any conservation work

4. The information about conservation need to well

prepared to face any unpredictable issues

happen

1. To practice documentation the project for

conservation work on bas-relief and mural for

future conservation references

2. Any documentation about conservation work

need to disseminate to the public.

REFERENCES

1. Ahmad, A.G. (1999). The Architectural styles of mosques in Malaysia: from vernacular to modern structures.

2. Nasir, A.H. (1984) Masjid-masjid di Semenanjung Malaysia. Berita publishing.

3. Aziz, A.A. (2016). Masjid-Selected mosque and musollas in Malaysia. ATSA Architect Sdn Bhd

4. Burden, E. (2004). Illustrated dictionary of architectural preservation: Restoration, renovation, rehabilitation and reuse.

McGraw Hill, New York.

5. Esaak, S. (2018, Jan 21). Bas Relief. Retrieved from https://www.thoughtco.com/bas-relief-183192

6. Fielden, B.M. (2000). Conservation of Historic Buildings. Oxford: Architectural Press.

7. Fielden, B.M. (2003). “Conservation Historic Building.” Great Britain: MPG Books Ltd.

8. Hamsah, E. (2006). Pemeliharaan Kawasan Warisan – Kajian Kes Zon Pemuliharaan dan Pemugaran, Bengkel

Konservasi Monumen dan Tapak Tanah Bersejarah, 27-29 November 2006, Hotel Mahkota, Melaka.

9. Idid, S.Z.A. (1995). Pemeliharaan Warisan Rupa Bandar: Panduan mengenali Warisan Rupa Bandar berasaskan

Inventori Bangunan Warisan Malaysia. Kuala Lumpur: Badan Warisan Malaysia.

10. Rasdi, M., Tajuddin, M. (2007) Mosque architecture in Malaysia: Classification of styles and possible influence. Jurnal

Alam Bina

11. National Heritage Department (JWN) (2008). Historic Cities of The Straits of Malacca: Melaka and George Town

Towards World Heritage Listing. Kementerian Perpaduan, Kebudayaan, Kesenian dan Warisan Malaysia, Kuala

Lumpur.

12. Othman, M.I. (2006). Garispanduan Konservasi Monumen Warisan Negeri Melaka, Bengkel Konservasi Monumen

dan Tapak Tanah Bersejarah, 27-29 November 2006, Hotel Mahkota, Melaka.

13. Perbadanan Muzium Melaka (PERZIM) (2006). Pengenalan bengkel konservasi monumen dan tapak tanah

bersejarah. Perbadanan Muzium Melaka (PERZIM), Melaka.

14. Harun, S.N. (2010), Pemuliharaan Bangunan Bersejarah, Shah Alam.

ISrJ Vol. 11 - 2022, Session 2022/2023 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!