29.12.2012 Views

Implementation of the Water Framework Directive and other ...

Implementation of the Water Framework Directive and other ...

Implementation of the Water Framework Directive and other ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Wastewater treatment <strong>and</strong> WFD 1 st December 2005<br />

implementation in CEE Danube countries Bratislava, Slovakia<br />

In <strong>the</strong> following I will concentrate on <strong>the</strong> <strong>Water</strong> <strong>Framework</strong> <strong>Directive</strong> (WFD) <strong>and</strong> on <strong>the</strong><br />

Urban Waste-<strong>Water</strong> <strong>Directive</strong> (UWWD).<br />

2 KEY ELEMENTS OF THE WFD AND THE UWWD<br />

The WFD<br />

The central objective <strong>of</strong> <strong>the</strong> WFD is to achieve a good status <strong>of</strong> all bodies <strong>of</strong> water defined<br />

in article 4 WFD:<br />

• Good surface water status means a good chemical <strong>and</strong> a good ecological status. Instead<br />

<strong>of</strong> <strong>the</strong> latter aim, for water bodies designated as artificial or heavily modified <strong>the</strong><br />

objective is to achieve a good ecological potential.<br />

• Good groundwater status means a good quantitative <strong>and</strong> a good chemical status.<br />

The requirements for <strong>the</strong> good status are listed in annex V WFD. Exceptions (article 4<br />

WFD) are an integrated part <strong>of</strong> <strong>the</strong> environmental objectives.<br />

The key instrument <strong>of</strong> <strong>the</strong> WFD for achieving <strong>the</strong>se objectives is a single basin wide<br />

coordinated River Basin Management Plan for each River Basin District including a<br />

Programme <strong>of</strong> Measures as <strong>the</strong> crucial part. The process <strong>of</strong> planning follows a defined very<br />

strict timeframe:<br />

• End <strong>of</strong> 2003: Legal implementation <strong>of</strong> <strong>the</strong> WFD<br />

• End <strong>of</strong> 2004: Review <strong>of</strong> <strong>the</strong> current status <strong>of</strong> <strong>the</strong> river basins.<br />

• End <strong>of</strong> 2006: Monitoring programmes are established<br />

• End <strong>of</strong> 2009: River Basin Management Plans with Programmes <strong>of</strong> Measures are<br />

established<br />

• End <strong>of</strong> 2012: Programmes <strong>of</strong> Measures are made operational<br />

• End <strong>of</strong> 2015: The objectives <strong>of</strong> <strong>the</strong> WFD are achieved<br />

There are several essential regulations in <strong>the</strong> WFD concerning waste water treatment:<br />

• <strong>the</strong> good status as environmental objective including exceptions (article 4)<br />

• a review <strong>of</strong> <strong>the</strong> impact <strong>of</strong> human activities (article 5)<br />

• monitoring <strong>of</strong> <strong>the</strong> quality <strong>of</strong> waters (recipients <strong>of</strong> sewage!) (article 8)<br />

• recovery <strong>of</strong> costs for water services (article 9)<br />

• <strong>the</strong> combined approach (article 10)<br />

• <strong>the</strong> programme <strong>of</strong> measures (article 11), particularly <strong>the</strong> basic measures such as<br />

o reference on o<strong>the</strong>r relevant directives as <strong>the</strong> UWWD or <strong>the</strong> sewage sludge<br />

directive<br />

o water pricing<br />

o efficient <strong>and</strong> sustainable water use (recycling <strong>of</strong> water, closed circuits <strong>of</strong> industrial<br />

waste water, ...)<br />

o prior authorisation for discharge <strong>of</strong> waste water laying down emission controls for<br />

<strong>the</strong> pollutants concerned, periodically reviewed <strong>and</strong> where necessary updated<br />

o prohibition <strong>of</strong> direct discharge <strong>of</strong> pollutants into <strong>the</strong> groundwater<br />

o prevention <strong>of</strong> significant losses <strong>of</strong> pollutants from technical installations<br />

<strong>and</strong> supplementary measures such as<br />

o economic or fiscal instruments<br />

o emission controls<br />

• strategies against pollution <strong>of</strong> water (article 16), particularly establishing a list <strong>of</strong> priority<br />

substances (already done by <strong>the</strong> Commission – list <strong>of</strong> 33 substances ) including proposals<br />

<strong>of</strong> control (not yet done) <strong>and</strong> identifying <strong>the</strong> priority hazardous substances to be phased<br />

out in 20 years.<br />

- 85 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!