29.12.2012 Views

United States Agency for International Development - (PDF, 101 mb ...

United States Agency for International Development - (PDF, 101 mb ...

United States Agency for International Development - (PDF, 101 mb ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ATTACHMENT 3. EVALUATION RESULTS<br />

NATlONAL BlODlVERSlN CONSERVAVON PRlORlTYSETTlNG WORKSHOP<br />

Regional Consultation <strong>for</strong> Luzon<br />

Punta Baluarte, Calatagan Batangas<br />

Septe<strong>mb</strong>er 27 - 29.2000<br />

1 EVALUATlON<br />

I<br />

1. The NBCPSW process was well explained.<br />

2. In general, the regional consultation objectives (as indicated in the program) were<br />

successfully met.<br />

Objective #l<br />

Objective #2<br />

13. The workshops in my working group<br />

I a had sufficient time <strong>for</strong> discuuions (relative to the objective and schedule)<br />

I<br />

b. were well-facilitated<br />

c. enriched my insights<br />

d. provided opportunities <strong>for</strong> expanding linkages<br />

I<br />

14. The provisions were satisfactory <strong>for</strong><br />

I a. meals and snacks<br />

I b. lodging<br />

I c the venue<br />

1 d. workshop support materials<br />

( e. communication<br />

I<br />

TOTAL<br />

5. What are your suggestions to ensure better planning and preparation <strong>for</strong> the next<br />

regional consultations?<br />

5.1 Arthropods working group needs some resource persons <strong>for</strong> <strong>for</strong>ested areas and mountain<br />

systems, as well as <strong>for</strong> river systems and tributaries to allow us to link with<br />

habitats of arthropods;<br />

5.2 Arrange the lodging such that me<strong>mb</strong>ers of a working group are billeted in the same room;<br />

5.3 Next venue should be in a place where e-mail and internet connection can be easily set<br />

up;<br />

5.4 Use of workshop secretariat and to work on the preparation at least 2 months;<br />

5.5 Rooms should accommodate only 2-3 persons and 2 tables to work our assignment;<br />

5.6 Strictness on time;<br />

5.7 Prepare background materials and distribute sufficient copies to participants;<br />

5.8 Send official invitations at least two weeks in advance;<br />

5.9 Make arrangements <strong>for</strong> special food requirements (e.g. vegetarian meals <strong>for</strong> non-pork<br />

eating participants, etc.)<br />

5.10 l mprove audio-visual materials and presentations;<br />

5.11 Thematic maps should have the appropriate title and should reflect only the necessary<br />

in<strong>for</strong>mation. For example, small river systems should be excluded and base line info.<br />

should be present in all maps <strong>for</strong> reference;<br />

5.12 Invitations did not reach the regional officelconcerned personnel (but received ver-<br />

bal in<strong>for</strong>mation from PAWB)<br />

5.1 3 Time management in the delivery of activities in the program;<br />

5.1 4 More socio-econ experts (given the extensive date needed);<br />

5.1 5 As much as possible those who have attended previous meetings should also be invited<br />

to attend the subsequent meetings to have continuity of thoughts on whatever decisions<br />

are to be integrated in the final report;<br />

5.16 In case of government agencies the communication should be specific on what dataldo-<br />

curnents that will be brought to the workshop, specifically to the field officers or<br />

personnel;<br />

5.17 More experts. More background paper;<br />

5.18 Preparation of available literature - needs more<br />

5.19 "Ang gagaling nilang lahal' (personal communication of Joks with Noel Dumaup)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!