Marble - Colorado Geological Survey
Marble - Colorado Geological Survey
Marble - Colorado Geological Survey
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Production Calculations<br />
Cubic Feet<br />
Assume 6,000 cf from open quarry 1st month; 30,000 cf all additional months<br />
Underground quarry develped during 1990, production starts in 1991 at 1000 cf/mo,<br />
4000 cf/mo in 1992<br />
1990 1991 1992 and after<br />
4 months<br />
Open<br />
UG<br />
Total<br />
5 months<br />
Open<br />
UG<br />
Total<br />
6 months<br />
Open<br />
UG<br />
Total<br />
96,000<br />
0<br />
96,000<br />
126,000<br />
0<br />
126,000<br />
156,000<br />
0<br />
156,000<br />
120,000<br />
4,000<br />
124,000<br />
150,000<br />
5,000<br />
155,000<br />
180,000<br />
6,000<br />
186,000<br />
120,000<br />
16,000<br />
136,000<br />
150,000<br />
20,000<br />
170,000<br />
180,000<br />
24,000<br />
204,000<br />
Tiles<br />
Assume: 1) send to custom fabricator who demands pre-cut "planks"<br />
4.5 in. x 13 in. x 3-4 ft, 2) come from broken blocks of 100 cf<br />
Block sawed into 4 planks deep<br />
13 + 13 + 13 + 13 = 52 in.<br />
by 13 planks wide<br />
4.5 in. + .25 in." (kerf) x 13 = 61.75 in.<br />
4 x 13 = 52, -10% break or imperfect = 47<br />
7 tiles wide .375 in. + .25 in.) x 7 = 4.375 in.<br />
by average 3.5 tiles long = 24 tiles<br />
24 tiles x 47 planks = 1128 tiles/block<br />
assume 17% waste tiles = 940 tiles/block<br />
Months of Production 1990 1991 1992+<br />
116,560 4 127,840 months<br />
5 months<br />
6 months<br />
90,240<br />
118,440<br />
146,640<br />
145,700 159,800<br />
174,840 191,760