02.01.2013 Views

Marble - Colorado Geological Survey

Marble - Colorado Geological Survey

Marble - Colorado Geological Survey

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Production Calculations<br />

Cubic Feet<br />

Assume 6,000 cf from open quarry 1st month; 30,000 cf all additional months<br />

Underground quarry develped during 1990, production starts in 1991 at 1000 cf/mo,<br />

4000 cf/mo in 1992<br />

1990 1991 1992 and after<br />

4 months<br />

Open<br />

UG<br />

Total<br />

5 months<br />

Open<br />

UG<br />

Total<br />

6 months<br />

Open<br />

UG<br />

Total<br />

96,000<br />

0<br />

96,000<br />

126,000<br />

0<br />

126,000<br />

156,000<br />

0<br />

156,000<br />

120,000<br />

4,000<br />

124,000<br />

150,000<br />

5,000<br />

155,000<br />

180,000<br />

6,000<br />

186,000<br />

120,000<br />

16,000<br />

136,000<br />

150,000<br />

20,000<br />

170,000<br />

180,000<br />

24,000<br />

204,000<br />

Tiles<br />

Assume: 1) send to custom fabricator who demands pre-cut "planks"<br />

4.5 in. x 13 in. x 3-4 ft, 2) come from broken blocks of 100 cf<br />

Block sawed into 4 planks deep<br />

13 + 13 + 13 + 13 = 52 in.<br />

by 13 planks wide<br />

4.5 in. + .25 in." (kerf) x 13 = 61.75 in.<br />

4 x 13 = 52, -10% break or imperfect = 47<br />

7 tiles wide .375 in. + .25 in.) x 7 = 4.375 in.<br />

by average 3.5 tiles long = 24 tiles<br />

24 tiles x 47 planks = 1128 tiles/block<br />

assume 17% waste tiles = 940 tiles/block<br />

Months of Production 1990 1991 1992+<br />

116,560 4 127,840 months<br />

5 months<br />

6 months<br />

90,240<br />

118,440<br />

146,640<br />

145,700 159,800<br />

174,840 191,760

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!