Turuk Ramabong - Schemes of Rural Sikkim
Turuk Ramabong - Schemes of Rural Sikkim
Turuk Ramabong - Schemes of Rural Sikkim
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Step 3: Find out solutions for the problems<br />
Solutions<br />
Village Development Action Plan – 23 <strong>Turuk</strong> Ramabung GPU<br />
Water Harvesting tanks to be constructed at places.<br />
Awareness and training camps to be held for the farmers in modern farming techniques.<br />
Proper and effective soil testing to be carried out and the farmers briefed in the type <strong>of</strong><br />
farming the area is conducive for.<br />
Over grazing in the khasmals and areas near the water sources to be banned. Strict penalty to<br />
be imposed on defaulters.<br />
To curb the menace <strong>of</strong> animal encroachment, the concerned department should identify a<br />
more viable solution other than fencing.<br />
Step 4: Identify relevant activities to tackle the problems or to expand the success<br />
stories (Attention: it is important to rank the priority <strong>of</strong> the activities)<br />
Activity Unit Quantity Location<br />
Water harvesting<br />
tanks construction<br />
10000<br />
ltrs<br />
Soil testing - -<br />
Awareness on modern<br />
farming techniques<br />
Forest patrolling -<br />
- 3<br />
100<br />
2 people<br />
Whole<br />
G.P.U<br />
Whole<br />
G.P.U<br />
GPK/VLW<br />
Office<br />
Contribution Priority<br />
Village External 1 to 5<br />
<strong>Rural</strong> Management and Development Department, Government <strong>of</strong> <strong>Sikkim</strong> 5<br />
-<br />
- -<br />
Materials,<br />
Expertise<br />
- Expertise 2<br />
- Expertise 3<br />
Appointment<br />
<strong>of</strong> forest<br />
personnel<br />
1<br />
4