MUST - IBM
MUST - IBM
MUST - IBM
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Migration Steps<br />
<strong>IBM</strong> Training - 2008 Systems Technical Conference<br />
� When the destination server receives the last modified pages, the<br />
migration is complete<br />
� In the final steps, all resources are returned to the source and<br />
destination systems and the mobile partition is restored to its fully<br />
functional state<br />
� The channel between MSPs is closed<br />
� The VASI channel between MSP and PHYP is closed<br />
� VSCSI adapters on the source MSP are removed<br />
� The HMC informs the MSPs that the migration is complete and all<br />
migration data can be removed from their memory tables<br />
� The mobile partition and all its profiles are deleted from the source<br />
server<br />
� You can now add dedicated adapters to the mobile partition via DLPAR<br />
as needed, or put it in an LPAR workload group<br />
16 20-Aug-08<br />
© 2008 <strong>IBM</strong> Corporation