17<br />

Major Achievements<br />

� Shortest construction <strong>of</strong> any NPP in China from 1 st concrete to In-Service (54 months)<br />

� Shortest duration to construct perimeter wall (14 days)<br />

� Best integrated leak rate <strong>of</strong> all CANDU 6 nuclear power plants<br />

� 70 heavy lifts <strong>of</strong> equipment with the VHL crane<br />

� Steam generator installed in 8 hours<br />

� Fuel channels installed in 64 days<br />

� Excellent performance <strong>of</strong> Chinese contractors with experience (50% less NCRs for Unit 2 in<br />

comparison with Unit 1)<br />