• Unit 1 <strong>Dec</strong>lared in service 43 days early.<br />

Qinshan Success<br />

• Unit 1 Criticality Sept. 20th, <strong>2002</strong>, ahead <strong>of</strong> schedule<br />

• Open Top and on site modularization methods resulted in effective execution.<br />

• Large Civil Modules Fabrication/Installation near work face<br />

• Unit 2 Criticality April 29th, <strong>2003</strong>, 52 days ahead <strong>of</strong> schedule<br />

• Great success with 3D CADDS as a production tool and use <strong>of</strong> electronic data<br />

management system<br />

• Training <strong>of</strong> Contractor to Western Construction Methods<br />

• Buy in by contractors <strong>of</strong> Quality philosophy <strong>of</strong> doing it right the first time. (It made<br />

economic sense)<br />

• Aggressive QA & QS programs praised by Chinese Regulator<br />