45<br />
Localization<br />
• All construction performed by Romanian contractors with only some specialty foreign<br />
contractors<br />
• Structural steel sections fabricated with plates welded to form required sections<br />
• All civil materials with the exception <strong>of</strong> epoxy finishes fabricated by Romanian contractors<br />
• Site engineering performed by Romanian with supervision by expatriate staff<br />
• Large number <strong>of</strong> BOP equipment (tanks, pumps, motors, water treatment plant) provided by<br />
Romanian industry<br />
• Fuel Fabrication; 100% localized due to use <strong>of</strong> natural uranium fuel<br />
• Heavy Water Supply: 100% localized<br />