Table of Contents<br />

iv<br />

August 2010<br />

4.3.7 Fire Rated Constructions ............................................................................................57<br />

4.3.8 Routing Through Masonry Material ............................................................................57<br />

4.3.9 <strong>Installation</strong> Within a Chase........................................................................................57<br />

4.4 Strike Protection ..........................................................................................................58<br />

4.4.1 Strike Plates ............................................................................................................58<br />

4.4.2 Steel Conduit ............................................................................................................60<br />

4.5 Meter ..........................................................................................................................60<br />

4.6 Appliance ....................................................................................................................61<br />

4.6.1 Moveable Appliance ..................................................................................................61<br />

4.6.2 Direct Connection – Non-Moveable Appliances ..............................................................62<br />

4.6.3 Gas Convenience Outlet ..............................................................................................62<br />

4.6.4 Special Applications ..................................................................................................63<br />

4.7 Manifold ......................................................................................................................67<br />

4.8 Pressure Regulator........................................................................................................68<br />

4.8.1 Introduction ..............................................................................................................68<br />

4.8.2 Sizing Instructions ....................................................................................................68<br />

4.8.3 <strong>Installation</strong> ..............................................................................................................70<br />

4.8.4 Performance ..............................................................................................................71<br />

4.8.5 Regulator Outlet Pressure Adjustment ..........................................................................71<br />

4.8.6 Over-Pressurization Protection ....................................................................................71<br />

4.9 Underground <strong>Installation</strong>s............................................................................................72<br />

4.10 Electrical Bonding of Gastite ®/FlashShield CSST ....................................................73<br />

SE<strong>CT</strong>ION 5.0 INSPE<strong>CT</strong>ION, REPAIR AND REPLACEMENT<br />

5.1 Minimum Inspection Requirements ............................................................................74<br />

5.2 <strong>Installation</strong> Checklist Description ................................................................................75<br />

5.3 Repair of Damaged CSST ............................................................................................76<br />

5.3.1 Determine Damage ....................................................................................................76<br />

5.3.2 Method of Repair ......................................................................................................76<br />

SE<strong>CT</strong>ION 6.0 PRESSURE/LEAKAGE TESTING<br />

6.1 General <strong>Guide</strong>lines for Pressure Testing........................................................................77<br />

6.2 Elevated Pressure Systems ............................................................................................77<br />

6.3 Appliance Connection Leakage Check Procedure ..........................................................78<br />

SE<strong>CT</strong>ION 7.0 SIZING TABLES AND PRESSURE DROP CHARTS<br />

7.1 CSST Capacity Tables - Natural Gas ............................................................................79<br />

7.2 CSST Capacity Tables - Natural Gas - Elevated Pressure ..............................................83<br />

7.3 CSST Capacity Tables - Propane Gas ............................................................................85<br />

7.4 CSST Capacity Tables - Propane Gas - Elevated Pressure ..............................................88<br />

7.5 Gastite ® <strong>and</strong> FlashShield CSST Pressure Drop Tables ................................................89<br />

7.6 Iron Pipe Capacity Tables ............................................................................................93<br />

7.7 Iron Pipe Pressure Drop Tables ....................................................................................94<br />

7.8 Reference Data ............................................................................................................98<br />

SE<strong>CT</strong>ION 8.0 DEFINITIONS ......................................................................................................99<br />

SE<strong>CT</strong>ION 9.0 DIMENSIONAL AND TECHNICAL REFERENCE DATA ............................................101<br />

9.1 Gastite ® Dimensional <strong>and</strong> Technical Reference Data ..................................................101<br />

9.2 FlashShield Dimensional <strong>and</strong> Technical Reference Data............................................102<br />

SE<strong>CT</strong>ION 10.0 WARRANTY ....................................................................................................105<br />

FREQUENTLY ASKED QUESTIONS............................................................................................106<br />

FLEXIBLE GAS PIPING TRAINING PROGRAM TEST<br />

Gastite Division<br />

603 Hendee Street / Springfield, MA 01104<br />

800.662.0208 / www.gastite.com / gastite@gastite.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!