16.01.2013 Views

Columbia River Project Water Use Plan - BC Hydro

Columbia River Project Water Use Plan - BC Hydro

Columbia River Project Water Use Plan - BC Hydro

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CLBMON-3 Kinbasket and Revelstoke Reservoirs Ecological Productivity Monitoring<br />

2009 Progress Report<br />

Table 3. Summary of Kinbasket and Revelstoke Reservoirs field sampling program 2009.<br />

Stations<br />

Tribs<br />

REV<br />

Forebay<br />

REV<br />

Middle<br />

REV<br />

Upper<br />

KIN Mid<br />

Pool<br />

KIN<br />

Col<br />

Reach<br />

KIN<br />

Wood<br />

Arm<br />

KIN<br />

Canoe<br />

Method Depths KIN<br />

Forebay<br />

Sampling<br />

Frequency<br />

Parameter<br />

(Parameter)<br />

Rev<br />

Dam<br />

crest<br />

Mica<br />

dam<br />

crest<br />

Fixed data<br />

logger<br />

Hourly/Daily<br />

Weather<br />

(temp, ppt, bp,<br />

RH, PAR, wind<br />

√ √ √ √ √ √ √ √<br />

0 to 60m+<br />

(to within 5 m of<br />

bottom)<br />

Seabird<br />

Jun-Oct<br />

Monthly (5)<br />

(missed May)<br />

√ √ √ √ √ √ √<br />

2,5,10,15,20,<br />

60m and 5m off<br />

bottom<br />

Bottle,<br />

integrated<br />

tube<br />

May-Oct<br />

Monthly (6)<br />

0-20m for Si<br />

Surface grab √<br />

Bucket,<br />

bottle<br />

One freshet<br />

sampling in July.<br />

Five reference<br />

tribs once in<br />

A/S/O/N and twice<br />

speed, direction)<br />

Profiles<br />

(DO, temp, cond,<br />

chl a, PAR,<br />

turbidity)<br />

<strong>Water</strong> Chem -<br />

Reservoir<br />

(TP, SRP, TDP,<br />

cond, NO2+NO3,<br />

alk, pH, turb)<br />

(silica on<br />

integrated)<br />

Secchi disk<br />

<strong>Water</strong> Chem -<br />

Tributary<br />

(TP, SRP, TDP,<br />

cond, NO2+NO3,<br />

pH, alk, turb,<br />

temp)<br />

0-20m √ √ √ √ √ √ √<br />

Integrated<br />

tube<br />

in M/J/J<br />

May-Oct<br />

Monthly (6)<br />

Chl a<br />

√ √ √ √ √ √ √<br />

0-10m (2,5,10) &<br />

10-20m<br />

(12,15,20)<br />

Composites<br />

AND<br />

Bottle<br />

May-Oct<br />

Monthly (6)<br />

Phytoplankton<br />

2,5,10,15,20m<br />

May-Oct<br />

0-10m &10-20m<br />

Bacteria<br />

Bottle<br />

√ √ √ √ √ √ √<br />

Monthly (6)<br />

composites<br />

May-Oct<br />

Wisconsin<br />

Zooplankton<br />

0-30m √ √ √ √ √ √ √<br />

Monthly (6) net 3 hauls<br />

Primary<br />

June-Sep<br />

3 size 2,5,10,15,20m<br />

√* √ √<br />

Production Monthly (4) fractions TBD on site<br />

*Note that station for PP is farther out towards the main pool than the regular sampling station in the forebay.<br />

3<br />

<strong>BC</strong> <strong>Hydro</strong><br />

<strong>Water</strong> Licence Requirements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!