Garrad Hassan and Partners Ltd Document: 3914/BR/01 Issue: C FINAL<br />

Component Anticipated bottlenecks (2008-2010) Governmental actions required Impact on 1 GW/annum<br />

objective assuming those<br />

actions are undertaken<br />

Turbines None specific to <strong>of</strong>fshore Stable environment for wind power<br />

generally<br />

None<br />

Towers and foundations None None None<br />

supply<br />

Submarine cable supply Medium voltage (200kV) submarine cable supply<br />

26 <strong>of</strong> 30<br />

Stable investment environment with<br />

3 to 5 year timeframe<br />

Offshore substations None specific to <strong>of</strong>fshore None None<br />

Onshore electrical<br />

works<br />

High voltage infrastructure (consents - not technical) Ensure maximum usage and possible<br />

upgrade <strong>of</strong> existing infrastructure;<br />

provide time for new-build; hasten<br />

Construction ports Thames Estuary Zone has only a few options. Development <strong>of</strong><br />

new or existing facilities will likely be needed. New build<br />

Turbine and foundation<br />

installation<br />

Submarine cable<br />

installation<br />

(e.g. <strong>of</strong> a T-Jetty) may be a preferred option in any instance.<br />

Requires investment over a 3 to 5 year time<strong>scale</strong> in :<br />

upgrade <strong>of</strong> existing inshore vessels<br />

new custom-build<br />

conversions <strong>of</strong> existing vessels<br />

potential redeployment and modification <strong>of</strong> existing<br />

<strong>of</strong>fshore DP, heavy lift and semi-submersible for larger<br />

sites far <strong>of</strong>fshore<br />

There is one area where options are limited and that is in<br />

shallow water working close to the landfall point. However, it<br />

is possible to largely address that issue with land-based<br />

construction methods.<br />

consenting (if possible)<br />

Stable investment environment with<br />

3 to 5 year timeframe<br />

Stable investment environment with<br />

3 to 5 year timeframe<br />

None<br />

None<br />

None<br />

None<br />

None None<br />

Table 3.2 Anticipated supply chain “bottlenecks” for construction <strong>of</strong> circa 1 GW/annum under UK Round 2.