Item Sub-item Unit rate [£k] UK Round 1 Project<br />

Unit Quantity Cost [£k] Subtotals [£k]<br />

Development expenses<br />

PR 250 Project 1 250<br />

Environmental Impact Assessment (incl. EIS) 1,000 Project 1 1,000<br />

Consenting 250 Project 1 250<br />

Wind monitoring 500 Project 1 500<br />

Site surveys (geophys, etc.) 250 Project 1 250<br />

Technical and commercial management 500 Project 1 500<br />

Preliminary and management works<br />

Further site surveys 500 Project 1 500<br />

Construction management 2,000 Project 1 2,000<br />

Insurances 2,000 Project 1 2,000<br />

Financing costs 2,000 Project 1 2,000<br />

2,750 2%<br />

6,500 5%<br />

Wind turbine, transformer and tower supply 1,600 Turbines 30 48,000 48,000 40%<br />

Foundation supply 1.50 Ton. Steel 15000 22,500 22,500 19%<br />

Offshore electrical supply<br />

On-site 33kV submarine cables (incl. comms) 0.15 m 15000 2,213<br />

Site-shore 33kV submarine cables (incl. comms) 0.18 m 30000 5,250<br />

Offshore substation 5,000 substation 0 -<br />

Wind farm monitoring system supply<br />

SCADA system 25 Turbines 30 750<br />

Instrumented met mast and foundation 400 Mast 1 400<br />

Installation<br />

Onshore electrical works<br />

Mob and demob 75 Days 10 750<br />

Foundations and met mast 75 Days 120 9,000<br />

Wind turbines 75 Days 60 4,500<br />

Cable lay 45 Days 100 4,500<br />

Seabed prep and scour protection 100 Turbines 30 3,000<br />

Weather downtime 20% 4,350<br />

Cabling 300 km 3 900<br />

Grid Connection Agreement 5,000 Project 1 5,000<br />

7,463 6%<br />

1,150 1%<br />

26,100 22%<br />

5,900 5%<br />

Grand total 120,363 100%<br />

Specific cost per installed MW 1,204<br />

Cost breakdown<br />

Calc sheet rev B.xls<br />

10/12/2003