Incident No.1 – Near Miss<br />
• A 15MVA 132/33kV transformer was taken out of service<br />
for a scheduled tap changer maintenance during a<br />
weekend. When the maintenance was completed, the<br />
transformer was re-commissioned and put back on load.<br />
Minutes after taking load, smoke was seen coming out of<br />
the diverter chamber of the transformer.<br />
• The investigation revealed that the transition resistors<br />
were heating the oil, because the resistors were<br />
continually in the circuit due to incorrect wiring.