Incident No.1 – Near Miss<br />

• A 15MVA 132/33kV transformer was taken out of service<br />

for a scheduled tap changer maintenance during a<br />

weekend. When the maintenance was completed, the<br />

transformer was re-commissioned and put back on load.<br />

Minutes after taking load, smoke was seen coming out of<br />

the diverter chamber of the transformer.<br />

• The investigation revealed that the transition resistors<br />

were heating the oil, because the resistors were<br />

continually in the circuit due to incorrect wiring.