Incident No.2 – Reduced Capability<br />

• A 500MVA 275/132/22kV autotransformer was taken out of<br />

service for a scheduled tap changer maintenance over a<br />

weekend. This transformer had a design where the diverter is<br />

physically sitting on top of the 132kV bushing. During<br />

inspection, problems were identified on the diverter switches.<br />

• Instead of removing only the diverter switch, the contractor<br />

removed the complete set of bushing and diverter. In attempting<br />

to re-install, the equipment was mishandled and the bushing got<br />

damaged. No spares could be found for this old design.<br />

• The transformer was then modified to run on a fixed tap<br />

position.