isinG eleCtriCity demAnd<br />
nsW is australia’s most populous state.<br />
peak energy demand in nsW has been<br />
growing at a faster rate than the average<br />
demand and this trend has resulted in an<br />
increasing demand for electrical services<br />
across all sectors of the economy. in<br />
particular, the developments in the<br />
residential sector and the increase in<br />
business centres located primarily in<br />
sydney, newcastle and Wollongong has<br />
required increased transmission capability<br />
to support them.<br />
on 28 july 2008, <strong>TransGrid</strong> recorded a<br />
peak winter demand of 14,274MW. This<br />
was followed by a peak summer demand<br />
of 14,106MW on 6 february 2009.<br />
To meet this increasing demand, <strong>TransGrid</strong> is<br />
embarking on a large capital works program<br />
that will see a 24 percent increase in the<br />
value of its assets over the next regulatory<br />
period. This is expected to include about<br />
1000 kilometres of new high voltage<br />
transmission lines and 13 new substations.<br />
although <strong>TransGrid</strong>’s success in managing<br />
its assets is reflected in its reliability of<br />
over 99.999 per cent, it will be important<br />
for <strong>TransGrid</strong> to continue to improve its<br />
asset management and maintenance<br />
techniques in order to produce the best<br />
results from its changing asset base.<br />
10% POE Projection (MW)<br />
50% POE Projection (MW)<br />
90% POE Projection (MW)<br />
Actual<br />
19000<br />
18000<br />
17000<br />
16000<br />
15000<br />
14000<br />
13000<br />
12000<br />
11000<br />
10000<br />
19000<br />
18000<br />
17000<br />
16000<br />
15000<br />
14000<br />
13000<br />
12000<br />
11000<br />
10000<br />
2001/02<br />
scheduled demand (MW) scheduled demand (MW)<br />
2002/03<br />
20 PlAnninG A Future network > <strong>TransGrid</strong> annual reporT 2009<br />
2001/02<br />
Summer Peak Demand (2001/02 – 2018/19)<br />
2003/04<br />
2004/05<br />
2005/06<br />
2006/07<br />
2007/08<br />
2008/09<br />
2009/10<br />
2010/11<br />
2011/12<br />
Winter Peak Demand (2001/02 – 2018/19)<br />
2002/03<br />
2003/04<br />
2004/05<br />
2005/06<br />
2006/07<br />
2007/08<br />
2008/09<br />
2009/10<br />
2010/11<br />
2011/12<br />
2012/13<br />
2012/13<br />
2013/14<br />
2013/14<br />
2014/15<br />
2014/15<br />
2015/16<br />
2015/16<br />
2016/17<br />
2016/17<br />
2017/18<br />
2017/18<br />
2018/19<br />
2018/19<br />
2019/20<br />
1<br />
5<br />
9<br />
A<br />
1<br />
5<br />
9<br />
A