Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel
Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel
Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
39. The contrac<strong>to</strong>r should clearly understand and comply with the <strong>Mines</strong> Act and relieve the FEMALE WORKERS from<br />
their work site within the restricted working hours prescribed therein the Act.<br />
40. The following deductions per Workman deployed c<strong>at</strong>egory-wise shall be made from the bills / amounts due <strong>to</strong><br />
the Contrac<strong>to</strong>r as applicable for the work done and such deducted amounts shall be released as below :<br />
S.No. Component<br />
Recovery amount per Labour<br />
per every WORKING DAY (in<br />
UN-<br />
SKILLED<br />
Rupees) To be released when<br />
SEMI-<br />
SKILLED<br />
SKILLED<br />
01 Notice pay 18.19 20.59 24.28 After the Contrac<strong>to</strong>r makes payment <strong>to</strong><br />
02<br />
03<br />
Retrenchment<br />
compens<strong>at</strong>ion<br />
Leave with<br />
wages<br />
09.10 10.30 12.14<br />
11.19 12.67 14.94<br />
Sub-<strong>to</strong>tal 38.48 43.56 51.36<br />
04 Bonus 11.55 11.55 11.55<br />
Grand <strong>to</strong>tal (To be paid<br />
<strong>to</strong> the Labourer)<br />
10% <strong>to</strong>ward profit and<br />
overheads of Contrac<strong>to</strong>r<br />
50.03 55.11 62.91<br />
05.00 05.51 06.29<br />
Total recovery amount 55.03 60.62 69.20<br />
NOTE<br />
the workmen in the presence of<br />
Engineer I/c and CLC represent<strong>at</strong>ives. A<br />
certific<strong>at</strong>e <strong>to</strong> this effect is <strong>to</strong> be enclosed<br />
with pre-final bill. (<strong>to</strong> be paid with pre-<br />
final bill)<br />
After the Contrac<strong>to</strong>r makes payment <strong>to</strong><br />
the workmen in the presence of<br />
Engineer I/c and CLC represent<strong>at</strong>ives.<br />
A certific<strong>at</strong>e <strong>to</strong> this effect is <strong>to</strong> be<br />
enclosed with RA bill / pre-final bill. (<strong>to</strong><br />
be paid with RA bill / pre-final bill as<br />
and when paid by the Contrac<strong>to</strong>r)<br />
i The above recovery r<strong>at</strong>es are effective from 01.10.2010. In case of any st<strong>at</strong>u<strong>to</strong>ry revision in<br />
minimum wages payable <strong>to</strong> contract workmen as notified by the Regional Labour Commissioner<br />
(Central), Hyderabad from time <strong>to</strong> time, the above recovery amounts for workmen c<strong>at</strong>egory-wise<br />
will be revised by RINL / VSP and will be notified accordingly.<br />
ii Payment against the above components is <strong>to</strong> be made <strong>to</strong> the workmen based on effective wages<br />
of last drawn pay.