24.01.2013 Views

Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel

Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel

Repair to BT roads at Jaggayyapet Lime Stone Mines. - Vizag Steel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

39. The contrac<strong>to</strong>r should clearly understand and comply with the <strong>Mines</strong> Act and relieve the FEMALE WORKERS from<br />

their work site within the restricted working hours prescribed therein the Act.<br />

40. The following deductions per Workman deployed c<strong>at</strong>egory-wise shall be made from the bills / amounts due <strong>to</strong><br />

the Contrac<strong>to</strong>r as applicable for the work done and such deducted amounts shall be released as below :<br />

S.No. Component<br />

Recovery amount per Labour<br />

per every WORKING DAY (in<br />

UN-<br />

SKILLED<br />

Rupees) To be released when<br />

SEMI-<br />

SKILLED<br />

SKILLED<br />

01 Notice pay 18.19 20.59 24.28 After the Contrac<strong>to</strong>r makes payment <strong>to</strong><br />

02<br />

03<br />

Retrenchment<br />

compens<strong>at</strong>ion<br />

Leave with<br />

wages<br />

09.10 10.30 12.14<br />

11.19 12.67 14.94<br />

Sub-<strong>to</strong>tal 38.48 43.56 51.36<br />

04 Bonus 11.55 11.55 11.55<br />

Grand <strong>to</strong>tal (To be paid<br />

<strong>to</strong> the Labourer)<br />

10% <strong>to</strong>ward profit and<br />

overheads of Contrac<strong>to</strong>r<br />

50.03 55.11 62.91<br />

05.00 05.51 06.29<br />

Total recovery amount 55.03 60.62 69.20<br />

NOTE<br />

the workmen in the presence of<br />

Engineer I/c and CLC represent<strong>at</strong>ives. A<br />

certific<strong>at</strong>e <strong>to</strong> this effect is <strong>to</strong> be enclosed<br />

with pre-final bill. (<strong>to</strong> be paid with pre-<br />

final bill)<br />

After the Contrac<strong>to</strong>r makes payment <strong>to</strong><br />

the workmen in the presence of<br />

Engineer I/c and CLC represent<strong>at</strong>ives.<br />

A certific<strong>at</strong>e <strong>to</strong> this effect is <strong>to</strong> be<br />

enclosed with RA bill / pre-final bill. (<strong>to</strong><br />

be paid with RA bill / pre-final bill as<br />

and when paid by the Contrac<strong>to</strong>r)<br />

i The above recovery r<strong>at</strong>es are effective from 01.10.2010. In case of any st<strong>at</strong>u<strong>to</strong>ry revision in<br />

minimum wages payable <strong>to</strong> contract workmen as notified by the Regional Labour Commissioner<br />

(Central), Hyderabad from time <strong>to</strong> time, the above recovery amounts for workmen c<strong>at</strong>egory-wise<br />

will be revised by RINL / VSP and will be notified accordingly.<br />

ii Payment against the above components is <strong>to</strong> be made <strong>to</strong> the workmen based on effective wages<br />

of last drawn pay.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!