2.5.4.1 Equipment:<br />
The primer distribu<strong>to</strong>r shall be equipped for spraying the m<strong>at</strong>erial uniformly <strong>at</strong> the<br />
specified r<strong>at</strong>es and temper<strong>at</strong>ures.<br />
2.5.4.2 Prepar<strong>at</strong>ion of road surface:<br />
The surface <strong>to</strong> be primed shall be swept clean, free from dust and shall be dry. It shall be<br />
shapes <strong>to</strong> the specified grades and section. It shall also be free from cuts, any other<br />
irregularities and segreg<strong>at</strong>e m<strong>at</strong>erials. Minor depressions and pot holes may be ignored until<br />
the surface is primed, after which they shall be p<strong>at</strong>ched with a suitable premix m<strong>at</strong>erial<br />
prior <strong>to</strong> the surface tre<strong>at</strong>ment.<br />
2.5.4.3. Applic<strong>at</strong>ion of bituminous primer:<br />
The bituminous primer shall be sprayed/distributed uniformly over the dry surface as per<br />
Clause 2.5.4.2 using either self propelled or <strong>to</strong>wed pressure sprayer with self he<strong>at</strong>ing<br />
arrangement and spraying nozzle capable of spraying primer <strong>at</strong> a specified r<strong>at</strong>es and<br />
temper<strong>at</strong>ure so as <strong>to</strong> provide a uniformly unbroken spread of primer. The primer shall<br />
be applied <strong>at</strong> the r<strong>at</strong>e as specified in Table No.10.<br />
TABLE 10<br />
QUANTITY OF BITUMINOUS PRIMERS<br />
GRADE OF PRIMER QUANTITY PER 10 SQM IN KGs.<br />
Primer for surfaces of low porosity 7.3 <strong>to</strong> 9.8<br />
Primer for surfaces of medium porosity 9.8 <strong>to</strong> 12.2<br />
Primer for surfaces of high porosity 12.2 <strong>to</strong> 14.6<br />
Temper<strong>at</strong>ure of applic<strong>at</strong>ion of a primer need only be high enough <strong>to</strong> permit the primer <strong>to</strong><br />
be effectively sprayed through the jets of the spray bar and <strong>to</strong> cover the granular base<br />
surface uniformly.<br />
The temper<strong>at</strong>ure of the bituminous cut back primer <strong>at</strong> the time of applic<strong>at</strong>ion may vary<br />
from 40oC <strong>to</strong> 80oC and th<strong>at</strong> of bitumen emulsion between 10oC <strong>to</strong> 60oC. The quantity of<br />
primer as given in Table 10 can vary + 1.5 Kg. as directed by Engineer where specifically<br />
required.<br />
Any pools of excess primer left on any part of the surface should be swept out over the<br />
adjacent surface and then a light spreading of sand or s<strong>to</strong>ne grit shall be applied.<br />
The primer co<strong>at</strong> shall be applied only on the <strong>to</strong>p most w<strong>at</strong>er bound macadam or any<br />
granular layer, over which the bituminous base course/wearing course is <strong>to</strong> be laid.<br />
2.5.4.4. Curing of primer and opening <strong>to</strong> Traffic: It shall always be ensured th<strong>at</strong> while opening <strong>to</strong><br />
any kind traffic, the primed surface is fully cured and is not sticky <strong>to</strong> avoid being picked<br />
up by traffic. Normally, the primed surface shall be allowed <strong>to</strong> cure for not less than 24<br />
hours and during this period no traffic of any kind shall be permitted.<br />
2.5.4.5 Laying of bituminous course over primed surface:<br />
Bituminous base course or wearing course shall be laid over the primed w<strong>at</strong>er bound<br />
macadam or any other granular base course, in the usual manner as per relevant<br />
specific<strong>at</strong>ion for the same including the requirement of tack co<strong>at</strong> as per clause 2.6.<br />
2.6 TACK COAT:<br />
2.6.1 Scope:<br />
This work shall consist of applic<strong>at</strong>ion of a single co<strong>at</strong> of low viscosity liquid bituminous<br />
m<strong>at</strong>erial <strong>to</strong> an existing road surface prepara<strong>to</strong>ry <strong>to</strong> another bituminous construction over it.<br />
2.6.2. M<strong>at</strong>erials:<br />
Binder: The binder used for tack co<strong>at</strong> shall be bitumen of a suitable grade appropri<strong>at</strong>e <strong>to</strong><br />
the region, traffic, rain fall and other environmental conditions as directed by the Engineer<br />
and conforming <strong>to</strong> IS:73, 217 or 454, as applicable, or any other approved cut back.<br />
2.6.3 Construction Oper<strong>at</strong>ion: