Name of work: <strong>Repair</strong> <strong>to</strong> <strong>BT</strong> <strong>roads</strong> <strong>at</strong> t <strong>Jaggayyapet</strong> <strong>Lime</strong> S<strong>to</strong>ne <strong>Mines</strong><br />

Sl.<br />

No.<br />

BILL OF QUANTITES<br />

Description Unit Quantity R<strong>at</strong>e<br />

(in `)<br />

01 Providing and laying 20mm consolid<strong>at</strong>ed thick pre-mix<br />

carpet including seal co<strong>at</strong> , surfacing using 0.27 cum. Of<br />

s<strong>to</strong>ne aggreg<strong>at</strong>e (granite) per 10 sqm of road surface ,<br />

comprising of 0.18 cum. Of aggreg<strong>at</strong>es of 13.2mm size<br />

passing IS 22.4 mm sieve and retained on IS 11.2 mm<br />

sieve and 0.09cum. aggreg<strong>at</strong>e of 11.2mm size passing<br />

through 13.2mm sieve and retained on 6.6mm sieve<br />

premixed with hot bitumen <strong>at</strong> 52 Kg per cum of 13.2mm<br />

size aggreg<strong>at</strong>e and 66kg per cum of 11.2mm size<br />

aggreg<strong>at</strong>e and providing a tack with hot bitumen @7.5kg<br />

/10sqm. , including consolid<strong>at</strong>ion with a 8 <strong>to</strong> 10 <strong>to</strong>nne<br />

power roller and/or simultaneously providing seal co<strong>at</strong><br />

over the pre mixed carpet using 0.09 cum of crushed s<strong>to</strong>ne<br />

chippings 6.7mm size defined as 1005 passing through<br />

11.2mm size and retained on 2.36mm sieve , crushed<br />

granite chips per 10 sqm with <strong>to</strong>tal quantity of 9.8kg hot<br />

bitumen per 10 sqm including rolling with 8 <strong>to</strong> 10 <strong>to</strong>nne<br />

power roller all m<strong>at</strong>erials, <strong>to</strong>ols , plant and labour<br />

complete as per IRC specific<strong>at</strong>ion and or as directed by<br />

the Engineer.<br />

02 Preparing the base , repairing the cracked surfaces,<br />

assessing the extent of undul<strong>at</strong>ion and laying the leveling<br />

course for forming the road <strong>to</strong> specified lines ,grade and<br />

cross section by bituminous macadam leveling course<br />

with aggreg<strong>at</strong>e(granite) conforming <strong>to</strong> grading as per<br />

Table 13 of the specific<strong>at</strong>ion and 3% bitumen of 80/100<br />

grade by weight of the <strong>to</strong>tal mix and compacting with road<br />

roller and vibra<strong>to</strong>ry roller <strong>to</strong> the finished thickness all as<br />

per specific<strong>at</strong>ions and drawings using hot mix plant and<br />

mechanical pavers as per specific<strong>at</strong>ion and /as directed by<br />

the Engineer and providing a tack co<strong>at</strong> of 7.5 Kg/10 Sqm<br />

area as per specific<strong>at</strong>ion, all m<strong>at</strong>erials, <strong>to</strong>ols, equipments<br />

and labour complete and as directed by the Engineer.<br />

Sqm<br />

Cum<br />

4100<br />

30<br />

193.06<br />

5620.29<br />

TOTAL<br />

Amount<br />

(in `)<br />

.<br />

791546.00<br />

168608.70<br />

960154.70<br />

(Rupees Nine Lakhs Sixty thousand One hundred Fifty Four and Seventy paise only)<br />