BUILDING ON SUCCESS<br />

FY 20<strong>10</strong> – 20<strong>14</strong><br />

FIVE-YEAR CAPITAL PLAN<br />

PROPOSED 2013 AMENDMENT<br />

February 2013


COVER ART is the postcard for PS Architecture 2008 – an exhibition of architectural<br />

photography that was on view during October and November 2008 at the Center for Architecture.<br />

The photographs are of New York City public schools taken by New York City public school<br />

students. Pentagram, one of PS Architecture’s sponsors, designed the cover art.<br />

The 20 images are the winning photographs from the New York City Department of Education’s<br />

first-ever citywide architectural photography competition that was open to New York City public<br />

school students from pre-K through twelfth grade. Almost 500 students submitted photographs of<br />

their schools and a jury of art and architecture professionals selected winners in three<br />

categories: elementary, middle, and high school.<br />

2


Table of Contents<br />

EXECUTIVE SUMMARY _____________________________________________________ 5<br />

Introduction ______________________________________________________________________7<br />

FY2005 – 2009 Capital Plan Summary _______________________________________________17<br />

Structure of the 20<strong>10</strong> – 20<strong>14</strong> Capital Plan_____________________________________________20<br />

Capacity ________________________________________________________________________21<br />

Capital Investment________________________________________________________________22<br />

CAPACITY ________________________________________________________________ 25<br />

Capacity Program ________________________________________________________________27<br />

Introduction ___________________________________________________________________________ 27<br />

New Capacity Program ____________________________________________________________28<br />

Charter and Partnership Schools____________________________________________________37<br />

Facility Replacement Program ______________________________________________________39<br />

CAPITAL INVESTMENT ____________________________________________________ 41<br />

Capital Improvement Program _____________________________________________________43<br />

Introduction ___________________________________________________________________________ 43<br />

Exteriors ______________________________________________________________________________ 45<br />

Interiors_______________________________________________________________________________ 46<br />

Children First Initiatives___________________________________________________________49<br />

Technology Enhancements _________________________________________________________49<br />

Facility Enhancements ____________________________________________________________53<br />

Facility Restructuring ____________________________________________________________________ 56<br />

Safety and Security______________________________________________________________________ 58<br />

Science Lab Upgrades ___________________________________________________________________ 59<br />

Accessibility ___________________________________________________________________________ 59<br />

Physical Fitness Upgrades and Transportable Classroom Unit Removal_____________________________ 59<br />

Library Upgrades_______________________________________________________________________ 60<br />

Auditorium Upgrades ____________________________________________________________________ 60<br />

Mandated Programs ______________________________________________________________61<br />

Introduction ___________________________________________________________________________ 61<br />

Remediation/Code Compliance Program _____________________________________________61<br />

Asbestos Abatement _____________________________________________________________________ 62<br />

Lead Abatement ________________________________________________________________________ 62<br />

Emergency Lighting _____________________________________________________________________ 63<br />

Code Compliance _______________________________________________________________________ 63<br />

Fixed Programs __________________________________________________________________63<br />

Building Condition Surveys _______________________________________________________________ 64<br />

Wrap-Up Insurance______________________________________________________________________ 64<br />

Prior Plan Completion Cost _______________________________________________________________ 64<br />

Emergency, Unspecified & Miscellaneous____________________________________________________ 64<br />

FINANCING STRATEGY ____________________________________________________ 65<br />

Capital Plan Funding _____________________________________________________________67<br />

PROPOSED FIVE-YEAR PLAN PREPARATION _______________________________ 69<br />

New Capacity ____________________________________________________________________71<br />

Current Utilization ______________________________________________________________________ 71<br />

Enrollment Projections ___________________________________________________________________ 71<br />

New Capacity Needs Assessment ____________________________________________________72<br />

Existing Facilities _________________________________________________________________72<br />

Background____________________________________________________________________________ 72<br />

Methodology___________________________________________________________________________ 73<br />

Key Steps and Dates for Approval of the Proposed Plan____________________________ 74<br />

Appendices Table of Contents _________________________________________________ 75<br />

3


EXECUTIVE SUMMARY<br />

5


Introduction<br />

The Department of Education’s Five-Year Capital Plan of $11.3 billion for Fiscal Years (FY) 20<strong>10</strong><br />

– 20<strong>14</strong> was adopted by the City Council in June 2009 and went into effect for the Fiscal Year that<br />

began July 1, 2009. In June 2011, the City Council approved the second amendment to this plan.<br />

The Adopted 2011 Amendment reflected the City and the State’s continuing struggle with the<br />

sustained economic downturn and included a $700 million decrease in funding from the February<br />

20<strong>10</strong> Adopted Amendment. In June 2012, the City Council approved the third amendment to this<br />

plan. The proposed February Amendment reflects an increase of $290 million. Given the sluggish<br />

economy and soft construction market, the City proposed an advance of $290 million in funding<br />

from later years in its capital plan. The advance would maximize the potential impact of the<br />

funding given current economic and market conditions. This amendment also includes an increase<br />

of $200 million in funding from the City to address damage due to Hurricane Sandy. The<br />

Department is still in the process of assessing the repairs required; this amendment provides an<br />

overview of the buildings impacted, however details of the scope of work for each are still in<br />

development.<br />

When this Capital Plan was first released in 2008, it reflected the economic realities of the time<br />

and was funded at a level approximately $2 billion dollars less than the FY2005 – 2009 Capital<br />

Plan. The dramatic increase in construction costs over the years preceding its formulation also<br />

adversely affected the scope of the FY20<strong>10</strong> – 20<strong>14</strong> Plan. Actual construction inflation rates<br />

experienced exceeded 8% per year. The net result of these economic factors was a budget that has<br />

significantly reduced spending power to slightly more than half of the original, $13.1 billion<br />

funding in the FY2005 – 2009 Capital Plan.<br />

Our capital planning process has continued to include an annual review of our system’s needs. In<br />

this era of severely constrained finances, the Department is faced with a growing student<br />

population and an aging infrastructure. Given the current economic conditions, needs must be<br />

prioritized to ensure the most critical issues are addressed first. The Department and the School<br />

Construction Authority (SCA) annually undertake a comprehensive assessment of alternatives to<br />

address the need to balance the City’s severe economic conditions with the projected growing<br />

demand for public school education. Realignment strategies such as increasing the utilization of<br />

existing facilities, grade truncations and adjustments to local school zones are some of the tools<br />

identified to achieve the most efficient use of our existing buildings. The above strategies and<br />

construction of new facilities are designed to address the most critical existing and anticipated<br />

capacity needs with priority given to existing overcrowding at the neighborhood or district level.<br />

In November 20<strong>10</strong>, the Department identified an increase in the demand for new capacity. After<br />

eight years of decline, enrollment in public schools increased. The increase was based on several<br />

factors, including more students coming into and staying in our public schools, the continuing<br />

impact from new housing, and growing births in some districts. Based on current trends, the<br />

proposed February Amendment continues to state the need for approximately 50,000 seats<br />

citywide. The seats are primarily for elementary and middle school students<br />

The proposed Amendment also reflects funds that have been made available by the City Council<br />

and Borough Presidents. The Amendment maintains the same format as the Adopted Plan and<br />

features the following proposed investments:<br />

7


• $4.46 billion for Capacity. The Capacity Program has been expanded to include all<br />

elements of the plan that result in new or replacement capacity for our system. The<br />

three elements of this category are:<br />

o $3.56 billion for New Capacity – As in the previous Plan, the Department<br />

committed to reevaluate the capacity needs annually and to reflect any sustained<br />

changes in trends through the amendment process. This amendment reaffirms<br />

the additional need first identified in November 20<strong>10</strong>. We continue to<br />

experience lower than expected costs for construction of large projects and site<br />

specific conditions. In addition, the Department continues to capitalize on lower<br />

cost leasing options. As a result of these efficiencies, the Department is<br />

proposing to fund more than 1,480 additional seats in this Plan. Other changes<br />

to the capacity section of the Plan include the deferral of the 738 seats<br />

associated with the Willits Point development. Consistent with the City’s<br />

announcement of the delay in this development project these seats are being<br />

deferred to a future plan. The Willits Point Development project was at no cost<br />

to the Department of Education’s capital program. The Department is now<br />

estimating the $3.6 billion allocated for new capacity will fund the construction<br />

of approximately 32,300 seats. The additional seats will strengthen our response<br />

to ongoing demographic growth in targeted neighborhoods. Funding will also<br />

allow for the design of over 2,500 more seats where construction will be funded<br />

by the FY 15-19 Plan. The total seats to be funded in this Plan increases from<br />

33,888 in the 2012 Adopted Amendment to 34,819. This Proposed Amendment<br />

also provides an update on siting of the proposed school facilities under this<br />

Plan.<br />

o $690 million for a Facility Replacement Program – This program funds the<br />

replacement of several facilities where leases will expire during this Plan. In<br />

some instances, a landlord may refuse to renew a lease despite our best efforts<br />

to offer a market rate renewal. In other instances, we may choose to replace a<br />

space that we have determined as not satisfactory for instruction and cannot be<br />

improved. The Facility Replacement Program is being reduced by<br />

approximately $60 million in the February Amendment due to the continuing<br />

trend of landlords renewing leases on reasonable terms. The savings within the<br />

Facility Replacement Program will supplement funding for additional new<br />

capacity.<br />

o $2<strong>10</strong> million for Charter Partnership – The interest generated by the Charter<br />

and Partnership program in the FY2005 – 2009 Plan demonstrates the desire of<br />

private partners to establish relationships with the DOE to meet the demand for<br />

new school facility development and high quality educational options. Partners<br />

provide valuable private-sector resources to support the construction of<br />

buildings supporting public school students. Indeed, in the FY2005 – 2009<br />

Plan, the DOE paid only 73 cents on the dollar for the construction of these<br />

schools. Given the synergy developed during the FY2005 – 2009 Plan, DOE<br />

will continue exploring ways to extend the successes created through the<br />

Charter and Partnership Program by aligning charter school development to<br />

areas of capacity need and community interest where possible.<br />

• $7.37 billion for Capital Investment. The Capital Investment portion of this Plan<br />

includes three main categories:<br />

8


o $3.16 billion for the Capital Improvement Program (CIP), which includes<br />

exterior and interior building upgrades and other necessary capital repairs to our<br />

buildings. The June 2009 Adopted Plan showed specific Capital Improvement<br />

Program (CIP) projects for the first two years (FY20<strong>10</strong> and 2011) and the<br />

schools we were monitoring and anticipate will receive CIP work in the third,<br />

fourth and fifth years. The February 20<strong>10</strong> and April 2011 Adopted Amendments<br />

each identified an additional year of specific CIP projects. The November 2011<br />

Proposed Amendment identified the final year of projects under the Plan. The<br />

list of proposed CIP projects provides specific information through FY20<strong>14</strong>.<br />

This proposed amendment also includes a look into the first year of the FY2015<br />

– 2019 Capital Plan CIP needs. A total of $171 million was added in the April<br />

2011 Adopted Amendment to the CIP program to begin to address the<br />

environmental issues associated with older lighting fixtures within our schools<br />

and to advance the work associated with making our building more energy<br />

efficient.<br />

$260 million of the $290 million being advanced from the City’s out-year<br />

budgets will be used to address various CIP work. The work will include<br />

replacement of lighting fixtures, antiquated fire alarms, elevator repairs and<br />

other capital upgrades to our buildings.<br />

o $1.62 billion for Children First Initiatives designed to enhance the<br />

educational opportunities for our children. This category includes funding to<br />

support technology enhancements, realignment of existing facilities to better<br />

suit instructional needs, large campus restructuring, physical fitness projects,<br />

science labs, accessibility and other necessary improvements. It also includes<br />

funding for the PlaNYC playground program that was carried over from the last<br />

Plan. An additional $30 million is being allocated from the $290 million in<br />

increased funding to assist in creating and expanding school based health<br />

centers throughout the City.<br />

o $1.97 billion for Mandated Programs such as remediation and building code<br />

compliance projects, insurance, and emergencies.<br />

o In addition, funding in the amount of approximately $620 million has been<br />

provided from the City Council, Borough President, and Mayor/Council<br />

sources.<br />

TROPICAL STORM SANDY UPDATE: The devastating effects of tropical storm Sandy<br />

continue to be felt throughout the City, State and Northeast Region. Many of our school buildings<br />

sustained varying degrees of damage as a result of this storm. The Division of School Facilities<br />

(DSF) personnel undertook efforts in several buildings to address the storm damage. In more<br />

severely damaged buildings, emergency work was performed by the SCA. These efforts enabled<br />

the Department to reopen these buildings to our school children, many of whom were displaced<br />

from their homes. While this work allowed us to ensure the buildings were safe for occupancy,<br />

many buildings will require more extensive work in order to repair all the damage incurred. We<br />

are in the process of assessing the full scope of work required at each building and will establish a<br />

plan to address these issues once the evaluations are completed. We continue to work with the<br />

Federal Emergency Management Agency to obtain assistance for the restoration of the<br />

infrastructure of the Sandy affected buildings. The following is a list of 70 buildings where<br />

emergency work was performed by the SCA:<br />

9


Geo<br />

Dist<br />

Building<br />

ID<br />

Building Name Emergency Work / Temporary Repairs<br />

1 M061 P.S. 61 1. Dewatering/pump-out of basement via submersible pumps and generators<br />

4 M112 P.S. 112 - MANHATTAN<br />

1. Provide temporary boiler/fuel tank, electric, dewatering<br />

2. Bridging/barricades and security fencing<br />

7 X790<br />

BRONX LEADERSHIP<br />

ACADEMY II HS<br />

1. Restoration of curtain wall panel. No Permanent work yet.<br />

8 X075 P.S. 75 - BRONX 1. Repaired netting, sidewalk bridge<br />

8 X405 HERBERT H. LEHMAN HS - X 1. Temporary boilers/oil tank installed<br />

9 X117 I.S. 117 - BRONX 1. Repaired sidewalk bridge<br />

9 X400<br />

BRONX LEADERSHIP<br />

ACADEMY II HS<br />

1. Repaired sidewalk bridge and netting<br />

<strong>10</strong> X007 P.S. 7 - BRONX 1. Repaired fence and netting<br />

<strong>10</strong> X056 P.S. 56 - BRONX 1. Repaired sidewalk bridge<br />

<strong>10</strong> X086 P.S. 86 - BRONX 1. Restored sidewalk bridge<br />

<strong>10</strong> X115 P.U.L.S.E. HS - BRONX 1. Repaired netting<br />

<strong>10</strong> X970 I.S. 241 - BRONX 1. Restoration of curtain wall panel. No Permanent work yet.<br />

11 X189<br />

PEACE & DIVERSITY ACAD -<br />

BRONX<br />

1. Curtainwall (Kalwall) was permanently restored<br />

11 X194 P.S./I.S. 194 - BRONX 1. Repaired fence, netting, scaffolding and sidewalk bridge<br />

12 X006 P.S. 6 - BRONX 1. Restored fence and sidewalk bridge<br />

1. Supplied temp generator (already removed)<br />

2. Installed temp oil tank<br />

3. Install fuel/vent piping<br />

4. Installed temp fence<br />

5. Clean out #4 fuel from oil tanks<br />

15 K015 P.S. 15 - BROOKLYN<br />

6. Ran piping to the existing oil storage tanks<br />

7. Repaired oil transfer pumps<br />

8. Reset oil tanks on cradles in basement<br />

9. Removed damaged walls and rebuilt in basement by crawl space<br />

<strong>10</strong>. Repaired cracked wall in basement<br />

11. Replace capstone covers & flashing & replace with new<br />

12. IEH cleaned up oil spill in tank room<br />

1. Installed temp oil tank & boiler and installed stack<br />

18 K211 I.S. 211 - BROOKLYN<br />

2. Installed temp fence and bridge @ temp boiler/tank<br />

3. Clean switch gear & energize power to building<br />

4. Probe drywall walls for mold in first flr classroom/library<br />

1. Clean switchgear, change cable from CT’s to distribution panel & energize<br />

18 K276 P.S. 276 - BROOKLYN<br />

2. Install temp boiler/oil tank & pipe & stack<br />

3. Install temp fence/bridge by temp boiler<br />

4. Rebuild interior masonry wall at storage room<br />

1. Fill in sink holes @ various locations on exterior of bldg<br />

2. Clean switch gear and replace cables then energize power & change out CT's<br />

3. Install temp boiler/oil tank & stack<br />

4. Install temp fence/bridging @ temp boiler<br />

5. Replace vacuum, sump and air compressor pumps for htg sys<br />

6. Replace hot water heater and disinfect pipes<br />

18 K279 P.S. 279 - BROOKLYN 7. Clean out damaged material from bsmt<br />

8. Rebuild damaged walls @ store rooms<br />

9. Provide temp generator for a week while service was worked on<br />

<strong>10</strong>. Service damaged RTU’s to new bldg wing<br />

11. Repair plumbing clean out cap in basement<br />

12. Reset tank on cradle and repipe fuel supply and vent<br />

13. IEH abated and clean oil tank room<br />

1. Installed temp boiler and piping<br />

2. Install temp stack<br />

21 K043 I.S. 98 - BROOKLYN<br />

3. Clean out #4 fuel from existing tank and pipe fill & vent lines to temp boiler<br />

4. Installed temp fence and bridging @ temp boiler<br />

5. Removed gym floor on 1st floor<br />

6. Installed gas piping for pilot for temp boiler<br />

<strong>10</strong>


Geo<br />

Dist<br />

Building<br />

ID<br />

21 K090 P.S. 90 - BROOKLYN<br />

21 K188 P.S. 188 - BROOKLYN<br />

21 K239 I.S. 239 - BROOKLYN<br />

21 K253 P.S. 253 - BROOKLYN<br />

21 K288 P.S. 288 - BROOKLYN<br />

Building Name Emergency Work / Temporary Repairs<br />

1. Installed temp boiler and oil tank with piping & stack<br />

2. Removed 3 walls in storage/paint room in bsmt and rebuild?<br />

3. Pumped out water from elevator pit in basement<br />

4. Pumped out water from crawl space in basement<br />

5. Provide micro traps & fan ventilation for crawl space<br />

6. Repaired wall tiles in 1st floor vestibule which buckled from moisture<br />

7. Cleaned electrical switchgear and energized electrical service<br />

8. Replace cables from CT’s to distribution panel<br />

9. Cleaned out #6 oil from tanks in bsmt<br />

<strong>10</strong>. Reset oil tanks on cradle in bmst and repipe (1 new Cradle installed)<br />

11. Installed Sidewalk Bridge and temp fence<br />

12. Cleaned out wet materials from bsmt<br />

13. Replace sump, air compressor & condensate pump for htg system<br />

<strong>14</strong>. Provide probes for ground water infiltration by cracked wall<br />

15. Provide blowers to dry out basement<br />

16. IEH cleaned up oil spill tank room and abated pipes<br />

1. Filled in sink hole & concrete on outside of building<br />

2. Installed temp fence by sink hole<br />

3. Filled in sink hole in basement<br />

4. Removed 2 ft sand from entire basement<br />

5. Clean out and depose of damaged material/debris from entire bsmt and sub bsmt<br />

6. Cleaned switchgear and energized electric service<br />

7. Install cabling from CT’s to distribution panel<br />

8. Installed temp boiler & oil tank & piping<br />

9. Install temp stack<br />

<strong>10</strong>. Replace vacuum, circulation & sump pump for htg sys<br />

11. Replace maxxon valve, gas line & burner for hot water heater<br />

12. Install temp fence and bridge in rear yard around boiler<br />

13. Repaired damaged roll up door for boiler room<br />

<strong>14</strong>. Cleaned out sand and mud from interior of duct work for auditorium & repair<br />

15. Remove damage wall by Custodian locker room and rebuild<br />

16. Repaired hot water heater in boiler room<br />

17. Repaired air compressor in boiler room for climate control<br />

18. Cleaned sand from play yard<br />

19. Remove & replace damage slab in bsmt by corridor to sub bsmt<br />

20. Removed gym floor from 1st floor of new gym<br />

1. Back fill sink holes around perimeter outside of bldg<br />

2. Back fill sink hole in basement of bldg<br />

3. Install temp boiler/oil tank and piping<br />

4. Install temp fence/bridging at temp boiler<br />

5. Clean out debris/sand from entire basement, clean out vault<br />

6. Clean out/repair ductwork to both Aud & Gym<br />

7. Remove & rebuild damaged oil tank wall and store room<br />

8. Reset oil tanks & repair flue, fill & vent lines<br />

9. Fuel oil and gas piping (pilot) to temp boiler<br />

1. Install temp boiler, oil tank and piping & stack<br />

2. Install Temp fence & bridging at temp boiler<br />

3. Clean switch gear and energize power<br />

4. Install new temp gas burner/controls @ existing boiler<br />

1. Remove switch gear cabinet, distribution panels/CT cabinets<br />

2. Remove & replace electrical cables to property line box then energize power<br />

3. Install temp switch gear<br />

4. Install new wiring to all panels in bsmt<br />

5. Install temp generator<br />

6. Install temp boiler, stack and temp fencing/bridging<br />

7. Clean out # 6 fuel and reset tanks on cradle<br />

8. Repipe oil tanks for temp boilers and reuse tanks<br />

9. Replace vacuum, sump & air compressor pumps for htg sys<br />

<strong>10</strong>. Rebuild masonry walls at oil tank room and basmt entrance<br />

11. Clean out debris from entire basement<br />

12. Paint boiler room and oil tank room to cover oil stains on walls<br />

13. Clean and reinstall matting in the play yard<br />

<strong>14</strong>. Remove 2 ft of existing peg boards and repair wall in classrooms<br />

15. Remove all wood cabinet bases & clean/disinfect inside base in classrooms<br />

16. Remove & repair all base molding in all rooms on first flr<br />

17. Remove concrete around perimeter of exterior building @ replace<br />

18. Repair cracked walls & ceiling in Custodian on first floor, repaint oil stain walls<br />

11


Geo<br />

Dist<br />

Building<br />

ID<br />

21 K303 I.S. 303 - BROOKLYN<br />

21 K329 P.S. 329 - BROOKLYN<br />

21 K400<br />

21 K4<strong>10</strong><br />

21 K540<br />

21 K620<br />

Building Name Emergency Work / Temporary Repairs<br />

INTERNATIONAL HIGH<br />

SCHOOL - K<br />

ABRAHAM LINCOLN HS -<br />

BROOKLYN<br />

JOHN DEWEY HS -<br />

BROOKLYN<br />

WILLIAM E. GRADY VOC HS -<br />

K<br />

22 K195 P.S. 195 - BROOKLYN<br />

22 K254 P.S. 254 - BROOKLYN<br />

1. Fill in sink hole in front of building<br />

2. Clean switch gear and energize power<br />

3. Install temp boiler/oil tank & piping & stack<br />

4. Install temp temp fence/bridge @ temp boiler<br />

5. Replace vacuum & condensate pumps<br />

6. Clean oil tanks and repipe to temp boiler<br />

7. Remove debris/material from basement storage areas<br />

8. Remove wood floor in dance studio<br />

9. IEH abated VAT in all spaces lower wing<br />

1. Install temp boiler/oil tank and pipe<br />

2. Install temp fence/bridge @ temp boiler<br />

3. Install temp chimney<br />

4. Remove wood floors from gym & dance studio & dispose of wood from Aud<br />

5. Fill in sink hole on exterior 29th side and interior of building crawl space<br />

6. Remove sand & garbage container from crawl space<br />

7. Provide blowers for crawl space<br />

8. Repair damaged storm/sewer pipe at interior and exterior by sink hole<br />

9. Clean & power wash mud/silt/sand from play yard & reinstall mats<br />

<strong>10</strong>. Clean switch gear and CT cabinet and energize<br />

11. Provide temp generator for clean up<br />

12. Replace 1st floor panel feeders and elevator feed cables<br />

13. Test and replace elec outlets on 1st floor<br />

<strong>14</strong>. Replace floor outlets in 2 computer rm on 1st floor<br />

15. Replace vacuum, sump, condensate and air compressor pump for htg sys<br />

16. Remove all wood built in cabinets and furnishings on 1st floor<br />

17. Remove & Install temp sinks& counters in 12 classrooms on 1st floor<br />

18. Install VCT where cabinet were removed, replaster walls & paint<br />

19. Remove & replace vinyl base throughout 1st flr<br />

20. Remove peg boards & repair wall in the Principl office<br />

21. Remove damage material/furniture from first floor and basement<br />

22. IEH - VAT removal and reinstallation of tiles in various areas through out the 1st floor<br />

1. Provide temp boiler/oil tank & pipe<br />

2. Provide temp stack<br />

3. Provide temp fence and bridge at temp boiler<br />

4. Install temp burner/controller on 1 existing boiler<br />

5. Repair vacuum & sump pumps<br />

1. Disconnect power for IEH clean up in pool area<br />

2. Provide heaters and blowers to ventilate weight room<br />

3. Remove and reinstall damaged gyp board & insulation in weight room<br />

4. Remove wires from electrical panels and outlets & rewire in weight rm<br />

5. Remove electrical panel guts and replace in weight room<br />

6. Clean up all plaster walls with water damage<br />

1. Remove damaged switchear and replace with temp switch gear due to fire<br />

2. Remove damaged wires from service box 500 feet away<br />

3. Repair damaged service conduit inside and outside of building<br />

4. Install 2 temp generators and oil tanks (1 generator was returned)<br />

5. Install temp stack<br />

6. Clean wall floors ceilings of service room, corridor and crawl space<br />

7. Paint walls, floors & ceilings of crawl space where fire damage occurred<br />

8. Pulled wires from damaged panels due to fire & reinstall<br />

9. Replaced damaged lights in corridor and service room<br />

1. Install temp boiler/oil tank and piping & stack<br />

2. Install temp fencing and bridging at temp boiler<br />

3. Replace vacuum, condensate, sump and air compressor pumps for htg sys<br />

4. Clear basement classroom of damage material/debris<br />

5. Remove & rebuild damaged walls in basement perimeter @ classroom/offices<br />

6. Ran gas piping for temp boiler pilot<br />

1. Provided dehumidifiers in auditorium<br />

2. Replace damaged stairs for stage in auditorium<br />

3. Cleaned mold & disinfect underside of stage<br />

1. Install temp boiler<br />

2. Pipe to existing oil tank<br />

3. Install temp fence/bridge @ temp boiler<br />

4. Clean switchgear and energize service<br />

12


Geo<br />

Dist<br />

Building<br />

ID<br />

Building Name Emergency Work / Temporary Repairs<br />

22 K849 P.S. 134 - BROOKLYN<br />

1. Install sidewalk bridging and temp fence @ front & rear of building<br />

2. Provide man lift to access damage to sloped roof<br />

3. Temp repair of partial sloped roof with a 60 mil EPDM material<br />

24 Q153 P.S. 153 - QUEENS 1. Temporary generator and lighting for voting<br />

24 Q600 QUEENS VOC HS - Q 1. Repair work was performed.<br />

1. Temp boiler/oil tank/hot water heater<br />

2. Temp generator<br />

3. Removal of debris and sand in basement<br />

4. New switchgear and repair to the electrical service<br />

5. Repair of sink holes in the yard<br />

27 Q042 P.S. 42 - QUEENS<br />

6. New rat slab in the basement<br />

7. Replacement of control panel for HVAC equipment in the basement<br />

8. Clean duct work in the basement<br />

9. Restoration of HVAC units in the basement for all PA spaces<br />

<strong>10</strong>. Repair of elevators<br />

11. Replacement of subsystem for boiler operation<br />

1. Temp boiler/oil tank/hot water heater<br />

2. Temp generator<br />

27 Q043 P.S. 43 - QUEENS<br />

3. Repair to the electrical service<br />

4. Temporary fencing to separated the damaged playground<br />

5. Repair of elevators<br />

6. Minor sheetrock repair for general office and mail room<br />

1. Replacement of boiler<br />

27 Q047 P.S. 47 - QUEENS<br />

2. Temp generator<br />

3. Repair of the elevator<br />

27 Q053 I.S. 53 - QUEENS 1. Temporary generator and temporary lighting<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 - QUEENS<br />

1. Temporary lighting<br />

2. Temporary generator<br />

1. Removal of oil and water from basement and crawl spaces<br />

2. Temp boiler/oil tank/hot water heater<br />

3. Temp generator<br />

4. Removal of debris and sand in crawl space<br />

5. Repair to the electrical service<br />

6. Repair of sink holes in the yard<br />

7. New rat slab in the crawl space<br />

27 Q<strong>10</strong>5 P.S. <strong>10</strong>5 - QUEENS<br />

8. Replacement of control panel for HVAC equipment in the fan room<br />

9. Clean duct work in the basement<br />

<strong>10</strong>. Restoration of HVAC units in the basement for all PA spaces<br />

11. Repair of all water and drainage piping damaged by storm<br />

12. Removal of all wet/oil soaked insulation and replacement of insulation<br />

13. Replacement of sump pumps damaged by storm<br />

<strong>14</strong>. Temporary fencing for boiler and oil tank<br />

15. Replacement of boiler related subsystems for proper temporary boiler operation<br />

1. Temporary hot water heater<br />

2. Temporary generators (main building, TCU and mini-building)<br />

27 Q<strong>10</strong>6 P.S. <strong>10</strong>6 - QUEENS<br />

3. Removal of debris in mini-building<br />

4. Repair to the electrical services (main building, TCU and mini-building)<br />

5. Temporary sump pump and replacement of sump pump damaged by storm<br />

6. Replacement/repair of boiler related subsystems for proper boiler operation<br />

1. Removal of water from the basement and crawl spaces<br />

2. Temp boiler/oil tank/hot water heater<br />

3. Temp generator<br />

4. Removal of debris and sand in crawl space<br />

5. Repair to the electrical service and all damaged subpanels<br />

6. Replacement of control panel for HVAC equipment in the crawl space<br />

7. Clean duct work in the basement/crawl space<br />

8. Restoration of HVAC units in the basement/crawl space for all PA spaces<br />

9. Repair of all water and drainage piping damaged by storm<br />

27 Q1<strong>14</strong> P.S. 1<strong>14</strong> - QUEENS<br />

<strong>10</strong>. Removal of all wet insulation and replacement of insulation<br />

11. Replacement of sump pumps damaged by storm<br />

12. Temporary fencing for boiler and oil tank<br />

13. Replacement of boiler related subsystems for proper temporary boiler operation<br />

<strong>14</strong>. Replacement of damaged gym floor<br />

15. Replacement of stage floor in the auditorium<br />

16. Repair of damaged wall and plaster in the auditorium<br />

17. Repair of PA system in the stage<br />

18. Replacement of damaged floor tiles in various areas in the school<br />

19. Repair of elevator and man lifts<br />

13


Geo<br />

Dist<br />

Building<br />

ID<br />

Building Name Emergency Work / Temporary Repairs<br />

27 Q<strong>14</strong>6 P.S. <strong>14</strong>6 - QUEENS<br />

1. Backfill of sink hole next to transformer pad/new transformer pad<br />

2. Reconnection of transformer to the main switch board/minor repair to the main switchboard<br />

1. Temporary boiler/oil tank/hot water heater<br />

2. Temporary generator<br />

3. Removal of debris and sand in crawl space<br />

4. Repair to the electrical service and all floor outlets<br />

5. Clean duct work in the crawl space<br />

6. Repair of all water and drainage piping damaged by storm<br />

7. Removal of all wet insulation and replacement of insulation in crawl space<br />

27 Q180 J.S. 180<br />

8. Temporary fencing for boiler and oil tank<br />

9. Replacement of boiler related subsystems for proper Temporary boiler operation<br />

<strong>10</strong>. Replacement of damaged gym floor<br />

11. Removal of folding partition<br />

12. Replacement of stage floor in the auditorium<br />

13. Repair of damaged wall and plaster in the auditorium<br />

<strong>14</strong>. Repair of PA system in the stage<br />

15. Replacement of damaged floor tiles in various areas in the school<br />

16. Removal of all built-in furniture/partitions and closets in the classrooms<br />

1. Repair of boilers<br />

27 Q183 P.S. 183 - QUEENS<br />

2. Temp generator<br />

3. Repair of subsystems related to boilers<br />

4. Repair of electrical service for permanent power connection<br />

27 Q197 P.S. 197 - QUEENS 1. Temporary generator and temporary lighting<br />

1. Temporary boiler/oil tank/hot water heater<br />

2. Temporary generator<br />

3. Removal of debris and sand in crawl space<br />

4. Repair to the electrical service and all sub panels<br />

27 Q198 P.S. 333 - QUEENS<br />

5. Clean duct work in the crawl space<br />

6. Repair of all water and drainage piping damaged by storm<br />

7. Removal of all wet insulation and replacement of insulation in crawl space<br />

8. Temporary fencing for boiler and oil tank<br />

9. Replacement of boiler related subsystems for proper temporary boiler operation<br />

1. Removal of oil and water from the basement and crawl spaces<br />

2. Temp boiler/oil tank/hot water heater<br />

3. Temp generator<br />

4. Removal of debris and sand in crawl space<br />

5. Repair to the electrical service<br />

6. Repair of sink holes in the yard<br />

7. Replacement of control panel for HVAC equipment in basement and crawl space<br />

27 Q207 P.S. 207 - QUEENS<br />

8. Clean duct work in the basement/crawl space<br />

9. Restoration of HVAC units in the basement for all PA spaces<br />

<strong>10</strong>. Repair of all water and drainage piping damaged by storm<br />

11. Removal of all wet/oil soaked insulation and replacement of insulation<br />

12. Replacement of sump pumps damaged by storm<br />

13. Temporary fencing for boiler and oil tank<br />

<strong>14</strong>. Replacement of boiler related subsystems for proper temporary boiler operation<br />

15. Replacement of stage front, wood molding and wall in the auditorium<br />

16. Replacement of VCT in gym and various areas damaged by storm<br />

27 Q215 P.S. 215 - QUEENS 1. Temporary generator<br />

1. Repair of boilers<br />

27 Q225 P.S. 317 - QUEENS<br />

2. Temp generator<br />

3. Repair of subsystems related to boilers<br />

4. Repair of electrical service for permanent power connection<br />

27 Q253 P.S. 253 - QUEENS 1. Temporary generator<br />

1. Removal of water and oil from basement and crawl spaces<br />

2. Temp boiler/oil tank<br />

3. Temp generator<br />

4. Removal of debris and sand in crawl space<br />

5. Repair to the electrical service<br />

6. Repair of sink holes in the yard<br />

27 Q4<strong>10</strong><br />

BEACH CHANNEL HS -<br />

QUEENS<br />

7. Replacement of control panel for HVAC equipment in basement and crawl space<br />

8. Clean duct work in the basement/crawl space<br />

9. Restoration of HVAC units in the basement for all PA spaces<br />

<strong>10</strong>. Repair of all water and drainage piping damaged by storm<br />

11. Removal of all wet/oil soaked insulation and replacement of insulation<br />

12. Replacement of sump pumps damaged by storm<br />

13. Temporary fencing for boiler and oil tank<br />

<strong>14</strong>. Replacement of boiler related subsystems for proper temporary boiler operation<br />

15. Replacement of stage front in the auditorium<br />

<strong>14</strong>


Geo<br />

Dist<br />

Building<br />

ID<br />

Building Name Emergency Work / Temporary Repairs<br />

27 Q465<br />

FREDERICK DOUGLASS<br />

ACADEMY VI<br />

1. Temporary generator and lighting<br />

1. Removal of water from the basement<br />

2. Temp boiler/oil tank/hot water heater<br />

3. Temp generator<br />

4. Removal of debris in the basement<br />

27 Q816 Q256 SPED - QUEENS<br />

5. Repair to the electrical service and all damaged sub panels<br />

6. Repair of all water and drainage piping damaged by storm<br />

7. Replacement of sump pumps damaged by storm<br />

8. Temporary fencing for boiler and oil tank<br />

9. Replacement of boiler related subsystems for proper temporary boiler operation<br />

<strong>10</strong>. Replacement of damaged multi-propose room wall and floor in various areas in the school<br />

1. Temporary generator<br />

2. Replacement of two 50 gal water heaters<br />

27 Q907 P.S. 43 - QUEENS<br />

3. Repair of sheetrock wall damaged from flooding<br />

4. Repair of the damaged storm line in the play yard<br />

5. Repair of the FA system<br />

6. Repair of elevator<br />

27 Q920 P.S. 43 - QUEENS<br />

1. Temp generator/temporary fencing for temporary generator<br />

2. Repair to the electrical service<br />

28 Q040 P.S. 40 - QUEENS 1. Repair work was performed.<br />

28 Q277 P.S. 182 - QUEENS 1. Kitchen vent fan repair<br />

28 Q440 FOREST HILLS HS - QUEENS 1. Repair work was performed.<br />

29 Q490<br />

MATH, SCI., RESEARCH &<br />

TECH. H<br />

1. Repair work was performed.<br />

30 Q171 P.S. 171 - QUEENS 1. Repair work was performed.<br />

30 Q800 D.O.T. - QUEENS 1. Repair work was performed.<br />

1. Removal of water and oil from basement<br />

2. Temp generator<br />

3. Removal of debris in basement<br />

30 Q801<br />

BUREAU OF SUPPLIES -<br />

QUEENS<br />

4. Repair to the electrical service<br />

5. Repair of all water and drainage piping damaged by storm<br />

6. Removal of all wet/oil soaked insulation and replacement of insulation<br />

7. Replacement of sump pumps damaged by storm<br />

8. Replacement of boiler related subsystems for proper temporary boiler operation<br />

30 Q868 P.S. 78 - QUEENS 1. Replacement of sheetrock wall in the first floor of the entire school<br />

1. Temporary Boiler/Oil Tank<br />

2. Temp Generator<br />

31 R002 I.S. 2 - STATEN ISLAND<br />

3. Temporary switch gear, electrical distribution panels<br />

4. Starters/motors for air handling equipment<br />

5. Temporary hot water heaters<br />

6. Temporary condensate pumps<br />

1. Temporary boiler/oil tank<br />

2. Switch gear and electrical distribution panels<br />

31 R052 P.S. 52 - STATEN ISLAND 3. Motor starters and motors for air handling units<br />

4. Temporary generator<br />

5. Temporary hot water heaters<br />

31 R450 CURTIS HS - STATEN ISLAND 1. Repair scafold due to wind<br />

31 R816 P.S. 38 - STATEN ISLAND<br />

1. Repair floor, subfloor, walls & re insulate<br />

2. Replace water damaged exterior electrical panels and buried wiring<br />

15


FINANCING THE PLAN: Funding for the proposed Plan is structured in the same manner as the<br />

FY2005 – 2009 Capital Plan. Half of the required funding is provided by the City and the other<br />

half is being provided by New York State. Additional resources will be provided through<br />

partnerships, federal grants, elected officials and private contributions<br />

BUILDING ON PROGRESS: The FY2005 – 2009 Capital Plan employed a wide range of<br />

approaches to maximize our ability to expand the capacity of our school system, provide<br />

instructional enhancements necessary to support the Children First Initiatives, and accomplish<br />

urgently needed upgrades to our aging infrastructure. Some of these approaches have included the<br />

revitalization of the Education Construction Fund (ECF), the expansion of leasing agreements, and<br />

the development of public/private partnerships for new schools and upgrades to existing school<br />

facilities. Revitalization of ECF and expansion of leasing agreements has allowed the Department<br />

and the SCA to build seats in districts and neighborhoods where finding new construction sites has<br />

proven to be difficult.<br />

As outlined in the FY2005-2009 plan, approximately 55,000 new capacity seats were completed or<br />

are in process, 25 large and underperforming high schools were transformed into campuses<br />

housing over <strong>10</strong>0 high performing schools, and over 4,000 capital projects were undertaken to<br />

provide needed upgrades in our existing buildings. The Department has expanded the technology<br />

infrastructure in schools as part of the upgrades and also partnered with outside organizations to<br />

increase the number of small schools available to our students.<br />

BUILDING FOR SUSTAINABILITY: The SCA’s pilot project for the design and construction<br />

of a Net Zero Energy School Building in Staten Island is well under way. P.S. 62 is scheduled to<br />

open in September 2015. Recognizing New York City’s commitment to sustainability and energy<br />

conservation, we are going beyond building code and City design standards to realize innovative<br />

energy and carbon reduction that exceeds our current achievement levels. We are pushing the<br />

envelope on a unique advanced energy and green design project which will act as our<br />

“sustainability lab”. Not all of the lessons learned from the exercise will be applicable on a broad<br />

scale, however, the exploration into ultimate sustainability and the subsequent evaluation will<br />

provide benefits to the entire school design program that would otherwise not be realized.<br />

PUBLIC REVIEW: As a result of Mayoral control of the Department of Education, the capital<br />

plan process was revised to include annual amendments that require public review and City<br />

Council approval. The process for public input implemented under the FY2005 - 2009 Plan<br />

increased transparency and resulted in expanded review and dialogue through the Plan’s five year<br />

duration. The process accommodates public comment and recommendations on the content of the<br />

plan and provides for annual updates to reflect this input. In addition, actual costs and completion<br />

dates for finished projects, changes to schedules and estimates for on-going projects, and potential<br />

modifications to capacity needs as a result of constantly evolving demographics are reflected in the<br />

annual updates. Under this process, a draft plan amendment with proposed changes is released in<br />

November. The public review period extends from November to the end of January, during which<br />

time the DOE/SCA meets with Community Education Councils (CEC), Community Boards,<br />

Council Borough Delegations and other elected officials. An update incorporating the results of<br />

the meetings is released in February. The Panel for Education Policy reviews the Plan<br />

Amendment and if approved, it is forwarded to the Mayor and the City Council for review and<br />

approval as part of the City’s annual budget adoption process.<br />

16


These briefings highlighted several concerns, including school overcrowding in specific<br />

neighborhoods that were not directly addressed through the district capacity efforts, the need for<br />

additional physical education space, growing special education needs and the “greening” of our<br />

schools. As a result, several related improvements were incorporated in the FY20<strong>10</strong> – 20<strong>14</strong><br />

Capital Plan. The adopted FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan uses a new methodology for capacity<br />

analysis and several new initiatives designed to respond to the issues raised.<br />

The FY20<strong>10</strong> – 20<strong>14</strong> Plan Amendment is submitted to the CECs each November for review. The<br />

Department requests that the Councils review, conduct public hearings, and make<br />

recommendations on the Plan Amendment to the Department by early January. In addition,<br />

several Community Planning Boards hold hearings on the proposed Plan and the Department briefs<br />

each City Council delegation, the Borough Presidents, and other elected officials.<br />

The public review and comment period continues to be very helpful to the Department. CEC<br />

members, elected officials and other community members provide feedback on many elements of<br />

the proposed Plan. The feedback includes comments and identification of critical concerns at<br />

many of our schools. Using an electronic form which allows for the identification of priorities, the<br />

CECs and the City Council submit requests for many of the schools in their districts. The top<br />

priorities from each submission are reviewed by the Department. To date, over 220 requests have<br />

been incorporated.<br />

As in the past, the proposed November Amendment was submitted to the Community Education<br />

Councils for review, public hearings, and comment. In addition, the City Council was briefed on<br />

the proposed changes and given an opportunity to identify their priorities. This February 2013<br />

Amendment reflects the CEC review process and will be submitted to the Panel for Educational<br />

Policy for review and approval. After the Panel’s review, the Chancellor will submit the proposed<br />

amendment to the Mayor. The Mayor will submit it to the City Council as part of the Mayor’s<br />

Capital Budget. This Amendment to the FY20<strong>10</strong> – 20<strong>14</strong> Five Year Capital Plan will go into effect<br />

for the new fiscal year that begins on July 1, 2013.<br />

FY2005 – 2009 Capital Plan Summary<br />

The FY2005 – 2009 Capital Plan, first adopted in June 2004, provided $13.1 billion in funding for<br />

three major initiatives: Restructuring Current School Spaces; New Capacity and Investing in<br />

Existing Assets. Through an historic agreement, the Plan was funded in equal parts by the City<br />

and the State.<br />

The Plan was reviewed and updated annually to reflect the latest information on project budgets,<br />

schedules and status. Each amendment underwent an extensive public review process prior to<br />

approval by the City Council.<br />

Through effective management initiatives, the DOE was able to value engineer the standards by<br />

which new construction is performed, thereby reducing the cost per square foot significantly.<br />

These changes were implemented without adversely affecting the integrity of our buildings and<br />

tempered the effects of the staggering inflation and construction cost growth experienced by New<br />

York City over the last five years. As the Capital Plan came to a close, we began seeing the<br />

impact our efforts had on the educational environment of our school children.<br />

17


Accomplishments include:<br />

• 55,000 of the 63,000 new capacity seats funded under this Plan have been completed or<br />

are in process. Between September 2004 and September 2012, more than 54,200 seats<br />

funded by the FY2005 - 2009 Plan have become available in schools across all five<br />

boroughs. Next year, the last 609 seats funded under the FY2005 – 2009 Plan will be<br />

made available:<br />

16,000<br />

<strong>14</strong>,000<br />

12,000<br />

<strong>10</strong>,000<br />

8,000<br />

6,000<br />

4,000<br />

2,000<br />

0<br />

1,500<br />

3,071<br />

2,459<br />

3,864<br />

FY 2005 - 2009 Capital Plan<br />

Capacity Completion<br />

Data as of February 1, 2011<br />

<strong>10</strong>,207<br />

12,713<br />

13,745<br />

September 2004 September 2005 September 2006 September 2007 September 2008 September 2009 September 20<strong>10</strong> September 2011 September 2012 September 2013<br />

• An additional 3,400 replacement seats are in process or have been created under this<br />

Plan. These seats replace seats lost primarily through expiring leases that were not<br />

renewed.<br />

• Over 4,700 seats have been funded through the Charter/Partnership Program. These<br />

include:<br />

o Bronx Lighthouse Charter School<br />

o Achievement First –Clinton Hill, Brooklyn<br />

o Carl C. Icahn Charter School and Carl C. Icahn Bronx North Charter School<br />

o Crown Heights Charter High School, Crown Height Brooklyn,<br />

o Harlem Village Academy<br />

• More than 290 new small schools or charter school organizations were created between<br />

2005 and 2009; many of them in newly opened buildings or buildings that have<br />

undergone capital restructuring projects.<br />

• Twenty-five large high schools were transformed into campuses that now contain<br />

hundreds of smaller schools. The smaller schools are serving students that were 8 –<br />

<strong>10</strong>% more likely to be below English and Math standards when they entered high<br />

school, but are now graduating at more than 12% higher rates than the City average.<br />

18<br />

2,520<br />

4,137<br />

609


• All active schools have had their classrooms cabled for Internet access as well as<br />

having wireless technology in the classrooms.<br />

• As of June 30, 2009, Internet Protocol Digital Video Surveillance (IPDVS) had been<br />

successfully implemented in 163 buildings serving 323 schools with a total of 7,418<br />

cameras online. By June 30, 2009, installation was in progress at an additional <strong>14</strong>2 sites<br />

serving 233 schools.<br />

• 55 schools were funded to provide full program accessibility. An additional 11 schools<br />

were funded to be made partially accessible.<br />

• Approximately 5,700 projects were undertaken in over 1,180 of our buildings.<br />

• System-wide utilization of school buildings has dropped by <strong>10</strong>.3 percent, while the<br />

percentage of overcrowded buildings has dropped by 11 percentage points at the<br />

Elementary level, 24 points at the Middle School Level, and 23 points at the High<br />

School Level<br />

% of School<br />

Buildings That<br />

Exceed Capacity<br />

19<br />

2002-03<br />

School<br />

Year<br />

2008-2009<br />

School<br />

Year<br />

Elementary 38.9% 28.0%<br />

Middle 35.9% 12.0%<br />

High 59.7% 37.0%<br />

These changes in the instructional environment have helped support and enable the academic<br />

progress the DOE has made since 2002. Over the course of this administration, the City’s<br />

graduation rate has increased by 16 points—up to 67 percent in 2009 from 51 percent in 2002.<br />

Since 2002, the percentage of students meeting or exceeding State standards is up by more than 20<br />

points in both 4th and 8 th grade math. In ELA, the percentage of students meeting or exceeding<br />

standards is up more than ten points in both 4 th and 8 th grade.<br />

Given the time it takes to design and complete school buildings, the last of the capacity projects<br />

created by the FY2005 – 2009 Capital Plan will be coming on-line in September 2013.<br />

Because the City has stretched budgets for capital projects beyond their original time horizons, the<br />

construction start for approximately 8,000 seats was shifted to the FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan.<br />

The Final Report for the FY2005 – 2009 Capital Plan provided a reconciliation of the number of<br />

seats created under that Plan and the number shifted to the FY20<strong>10</strong> – 20<strong>14</strong> Plan. The following<br />

table provides an update of the seats that were carried over to the FY20<strong>10</strong> - 20<strong>14</strong> Plan:


District<br />

2005 – 2009<br />

Capital Plan<br />

Seats Sited-<br />

2005 - 2009<br />

Seats Carried<br />

Over<br />

2 3,150 3,0<strong>10</strong> <strong>14</strong>0*<br />

8 440 122 318<br />

9 1,890 1,501 389<br />

<strong>10</strong> 2,520 1,765 755<br />

15 1,071 609 462<br />

20 5,448 4,166 1,282<br />

22 1,260 944 316<br />

24 5,220 5,137 83<br />

25 630 441 189<br />

26 441 299 <strong>14</strong>2<br />

27 2,331 1,380 951<br />

28 2,520 2,020 500<br />

30 1,260 91 1,169<br />

31 1,700 1,262 438<br />

Q HS 9,912 8,566 1,346<br />

Total 8,480<br />

*Number of seats anticipated to carry over in District 2 has decreased since the Plan was adopted<br />

because the FY2005 – 2009 Plan funded 361 more District 2 seats than anticipated when the FY20<strong>10</strong><br />

– 20<strong>14</strong> Plan was first proposed.<br />

The FY2005 – 2009 Capital Plan is historic in many ways. It is the largest Department of<br />

Education Capital Plan ever funded. Through value engineering and stringent adherence to new<br />

standards, the DOE reduced the cost per square foot for new construction significantly from the<br />

previous Plan. Stringent Green Design Standards were incorporated in all capacity projects starting<br />

design after January 1, 2007. It was the first Plan that was established based on needs identified<br />

through technical evaluation of the capacity resources, demographic projections and current state<br />

of repair of all DOE facilities. It is the first Plan to undergo an Annual Amendment process that<br />

included a public review and approval process. The planning process is an evolving process and,<br />

as such, the FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan incorporates the most successful elements of this last<br />

Plan and expands upon those successes.<br />

Structure of the 20<strong>10</strong> – 20<strong>14</strong> Capital Plan<br />

The Adopted FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan enhances the structure of the FY2005 – 2009 Capital<br />

Plan by combining all programs under two major categories. The enhancement provides a more<br />

comprehensive view of the proposed initiatives. Capacity includes all initiatives that create new<br />

school facilities and Capital Investment includes all programs undertaken to improve and<br />

upgrade existing facilities. The Capital Investment category includes the Capital Improvement<br />

Program, the Children First Initiatives, which were established to adjust and improve the<br />

instructional capabilities of our existing buildings, and Mandated Programs.<br />

As in the FY2005 – 2009 Plan, the proposed new Capacity projects are identified for all five years.<br />

Projects that renovate existing buildings, however, were identified only for the first two years of<br />

the plan (FY20<strong>10</strong> - 2011), with funding allocations for the remaining three years. Each annual<br />

plan amendment identified individual projects for the two succeeding years. Under the 2012<br />

Adopted Amendment, the final year, FY20<strong>14</strong>, capital investment projects were identified. This<br />

20


proposed amendment includes a look ahead into the first year of the FY2015 – 2019 Capital Plan<br />

CIP needs. The annual amendment process allows the Department to reassess priorities and take<br />

into account shifts in enrollments, variations in housing growth, changes in building conditions,<br />

new educational initiatives, adjustments in the construction marketplace, and incorporates any<br />

impact from financial changes implemented by the City or State. This annual review has proven to<br />

be the most effective way to make the Capital Plan a living, working plan that, within budgetary<br />

constraints, keeps pace with the needs of the educational system.<br />

In each section, you will find a summary table showing the proposed funding for each category of<br />

the Plan. The Five Year Plan proposal dollars are adjusted for projected inflation.<br />

Capacity<br />

The Capacity Category of the adopted FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan includes all programmatic<br />

elements related to creating, expanding or replacing school buildings, or capacity in our school<br />

system. Major elements of the Capacity Category in this Plan include accommodating residual<br />

overcrowding and projected enrollment growth at the neighborhood level within certain districts.<br />

Given the proposed funding constraints, the Department has prioritized the reduction of existing<br />

pockets of overcrowding.<br />

The seat need identified in the Adopted FY2005 – 2009 Capital Plan was based on an analysis of<br />

capacity, enrollment projections and housing at the district level. Through the public review<br />

process and feedback from parents and community leaders, we recognized that this type of analysis<br />

was not sufficient to address all of the needs within our districts. As a result, the analysis for this<br />

Plan includes a multi-dimensional review and analysis of localized capacity and enrollment<br />

patterns within each district. The result is a set of recommendations for each district that takes into<br />

account the needs within each area of the district. These recommendations will be reviewed<br />

annually based on updated enrollment projections, capacity changes and housing information.<br />

The February 2012 Adopted Amendment funded 33,888 seats for design and/or construction. This<br />

proposed February 2013 Amendment includes adjustments to the capacity recommendations based<br />

on our annual analysis of demographic trends and reaffirms the need identified in the November<br />

20<strong>10</strong> Proposed Amendment for approximately 50,000 seats. This proposed amendment identifies<br />

the ability to build more seats based on several factors experienced during the first three years of<br />

the Plan. The funding levels remain unchanged for this proposed Amendment, however, because<br />

of favorable market and construction conditions. The favorable market and construction conditions<br />

will allow the Department to increase the number of seats funded for design and/or construction to<br />

34,819. Projects that have been sited in areas of severe and persistent overcrowding are prioritized<br />

for construction in this Plan. Projects that have been sited but cannot be funded for construction<br />

will be designed in this Plan and constructed in the FY2015 – 2019 Plan. The Department will<br />

continue to review its demographics annually and adjust projects based on shifts in enrollment<br />

needs.<br />

Under this proposed Amendment, the New Capacity Program includes a $3.6 billion investment<br />

for the construction of approximately 71 new buildings, adding almost 32,300 seats citywide.<br />

The program includes:<br />

• 47 small Primary school buildings, Grades Pre-Kindergarten – 5<br />

• 20 Primary/Intermediate school buildings, many of which will be Grades Pre-Kindergarten<br />

– 8<br />

21


• 4 Intermediate/High school buildings, which will range in grades 6 – 12.<br />

• An additional 2,500 seats will be funded for design in this plan and construction in the next<br />

plan.<br />

This new capacity coupled with strategies to align current facilities with enrollment needs will<br />

assist the DOE in:<br />

• Reducing localized overcrowding within districts<br />

• Strategically reducing our reliance on temporary instructional spaces as new capacity opens<br />

• Supporting efforts to reduce class size experienced by students in instructional classrooms<br />

Continuing the practice initiated under the FY2005 – 2009 Plan, the grade structure for the larger<br />

PS/IS facilities to be built will provide the flexibility to program spaces for grades PreK through 8<br />

instruction. The actual grades to be served can be configured given the specific needs of the<br />

community. In order to meet the growing demand, PS and PS/IS facilities to be constructed will<br />

include PreK classrooms and special education facilities designed to serve both the local district<br />

and District 75 special education students.<br />

The Capacity Category also includes the Charter/Partnership Program ($2<strong>10</strong> million), which was<br />

grouped under Restructuring Current School Space in the FY2005 – 2009 Capital Plan. This<br />

program will extend the reach of our capacity budget by providing additional resources through<br />

which expanded educational opportunities can be made available to our children.<br />

The final element of our Capacity Category, the Facility Replacement Program ($690 million)<br />

continues the initiative begun under the FY2005 – 2009 Plan to provide replacement sites for those<br />

schools or administrative facilities that must vacate their current locations. It is anticipated that<br />

approximately 5,000 seats may have to be replaced under this Plan. The savings of approximately<br />

$60 million dollars from favorable market and construction conditions is being shifted to<br />

supplement capacity funding.<br />

Capital Investment<br />

The Capital Investment Category ($7.37 billion) includes the Capital Improvement Program<br />

(CIP) ($3.16 billion), which provides for critical infrastructure work in our existing buildings. Our<br />

current inventory of facilities is mainly comprised of older assets and includes over 150 buildings<br />

that are at least <strong>10</strong>0 years old. The needs identified under this Plan are based on several factors,<br />

including the annual Building Condition Assessment Survey which provides an evaluation of the<br />

condition of our building systems. We use this evaluation in conjunction with recommendations<br />

from facility personnel, school administration and the community in developing the projects to be<br />

included in this Capital Plan. We will continue to maintain our focus on ensuring that buildings<br />

are watertight and safe and have included additional funding from the City.<br />

Under the 2011 Adopted Amendment, the City added $<strong>14</strong>1 million to the Department’s budget to<br />

begin addressing the condition of the lighting systems in our school buildings. In addition, $30<br />

million was transferred from the technology budget to assist in addressing this issue. The funding<br />

will allow the Department to begin converting older lighting systems to energy efficient systems<br />

that include occupancy sensors in compliance with Local Law 87. A portion of the additional<br />

$290 million provided by the City will be used to increase the number of buildings that can be<br />

addressed under this Capital Plan.<br />

22


The second initiative under Capital Investment, Children First Initiatives ($1.62 billion), builds<br />

on the progress achieved through the FY2005 - 2009 Plan. The three main programs in this<br />

category are: Technology, Safety Enhancements and Facility Enhancements. Technology<br />

enhancements include expansion of the wireless network, broadband connectivity, school and<br />

classroom-based hardware incorporation and upgrade, and implementation of a more robust data<br />

management system and learning platforms. These enhancements are critical to building and<br />

expanding key initiatives that harness the power of technology to personalize learning. The<br />

Innovation Zone, which includes an online learning platform for students, teachers, and<br />

administrators, and the online Partnership for Assessment of Readiness for College and Careers<br />

system for ELA and Math, which is a key component of New York City’s Common Core<br />

Standards adoption, depend on schools having the infrastructure and capacity to support<br />

technology-rich learning models and assessments. Additional funding is being provided to support<br />

the implementation of this program. The Safety Enhancements Program continues to implement a<br />

comprehensive strategy to promote and sustain a climate of safety in all New York City public<br />

schools. Facility Enhancements expand the large campus, Pre-Kindergarten and science lab<br />

programs as well as provide funding for new initiatives related to creating space necessary to<br />

advance alternative learning programs. In addition, this category includes upgraded physical<br />

fitness spaces, expanded accessibility in schools and upgrades for libraries and auditoriums. The<br />

Facility Enhancement Program also provides pilot funding for new initiatives such as<br />

environmental enhancements and school based health centers. A portion of the increased funding<br />

will be used to expand the school based health center program.<br />

The third initiative under Capital Investment, Mandatory Programs ($1.97 billion), includes nondiscretionary<br />

costs such as remediation/code compliance work, prior plan completion costs,<br />

emergency work, building condition assessments (mandated by SED) and contractor insurance.<br />

23


25<br />

CAPACITY


Capacity Program<br />

Introduction *<br />

Summary<br />

Proposed<br />

Amendment<br />

$4,458.5 mm<br />

2012 Adopted<br />

Amendment<br />

$4,463.5 mm<br />

The Capacity Category now encompasses all aspects of creating new seats<br />

necessary to provide for the expansion of our system and the replacement of<br />

seats no longer available. This new capacity provides the infrastructure<br />

necessary to continue advancing the precepts of the Children First<br />

Initiatives: equity and achievement. In doing this, the City will meet local<br />

enrollment demands, strategically and sufficiently grow facilities to meet<br />

future demand, and reduce reliance on temporary facilities.<br />

This proposed Amendment provides funding for the construction of<br />

approximately 32,300 seats and funding for the design of over 2,500 seats<br />

which will begin construction in the next Plan. The instructional models for<br />

these schools will continue to be flexible to ensure that the appropriate grade<br />

configurations that best meet the needs of the surrounding communities can<br />

be easily accommodated now and in the future. And, as is standard practice,<br />

the schools and programs to inhabit these facilities will be decided on the<br />

basis of extensive discussions with community stakeholders. Details<br />

regarding the need for new schools and the ability to provide input can be<br />

found at http://schools.nyc.gov/community/planning/default.htm<br />

The Department will continue to employ, wherever possible, the strategies<br />

undertaken in the FY2005 – 2009 Plan to create new capacity. These<br />

strategies were designed to maximize our resources and included<br />

revitalization of the Education Construction Fund (ECF), expansion of<br />

leasing as a means to create seats in districts and neighborhoods where<br />

finding new construction sites has proven to be difficult and developing<br />

public/private partnerships for new schools and upgrades to existing school<br />

facilities. In addition, the Department will continue to work closely with<br />

other City agencies to ensure that major residential developments provide<br />

appropriate resources to assist in mitigating the impact created by these<br />

projects. Consistent with the FY2005 – 2009 Plan, and the FY20<strong>10</strong> – 20<strong>14</strong><br />

Adopted Plan this February Proposed Amendment anticipates providing<br />

75% of the overall new capacity by constructing new schools and additions<br />

to existing schools. The remaining 25% of the facilities would be created by<br />

leasing private spaces.<br />

As part of the Capacity Program, the DOE has allocated $2<strong>10</strong> million, for<br />

the support and development of charter public schools and DOE public new,<br />

small schools opened in partnership with outside organizations. The Charter<br />

and Partnership Schools allocation supports targeted capital investments in<br />

areas of distinct educational need, and the investments are executed in<br />

partnership with outside organizations who share the DOE’s goals for<br />

improved school leadership, empowerment and accountability. Charter and<br />

27


Partnership facilities will be incorporated in the New Capacity Program<br />

whenever possible to further maximize the application of our resources.<br />

Under the Replacement Program of the Capacity Category, the Department<br />

is proposing the creation of approximately 5,000 new seats. This will<br />

provide replacement sites for leased schools and schools that must vacate<br />

their current locations. These sites will be included in the Plan as they are<br />

identified.<br />

New Capacity Program<br />

Summary<br />

Proposed Amendment<br />

$3,559.0 mm<br />

2012 Adopted<br />

Amendment<br />

$3,504.6 mm<br />

The creation of additional capacity is directly connected with the Children<br />

First goals of student achievement and equity. In the service of these goals,<br />

the Department has determined prospective investments by gathering the<br />

best possible information about capacity needs in local communities and the<br />

available resources in the system to meet those needs.<br />

Such a process starts with understanding challenges in the system that can<br />

be solved through structural and systems solutions. Such challenges might<br />

include school quality, current learning conditions such as overcrowding,<br />

patterns of student enrollment, and unmet demand for particular types of<br />

schools or programs within schools. The City will seek solutions to these<br />

challenges first, given the resources that already exist within the Department<br />

of Education. Thus, where the Department proposes future investment in<br />

this Plan, it does so having assessed its ability to change structures, and<br />

having concluded that capital investment is the optimal – perhaps only –<br />

means by which to address current or future needs.<br />

There are areas where growth is projected to continue or where overenrollment<br />

persists. These are local conditions, requiring truly local<br />

analysis. In creating this plan, therefore, the Department has analyzed<br />

current capacity figures, capacity scheduled to become available over the<br />

next several years, long-term enrollment and housing projections. The<br />

Department further assessed spaces far below maximum utilization –<br />

building by building – to determine the viability of plans to change the<br />

instructional usage or enrollment constraints for those spaces. Such analysis<br />

yields understanding of both problems – such as over-enrollment or lack of<br />

student choice – and solutions; be that solution a capital investment or the<br />

repurposing of current resources.<br />

This type of local analysis and planning is ongoing and will be continually<br />

responsive to local enrollment and facilities conditions, just as the capital<br />

plan is amended annually.<br />

The Department of Education has a longstanding commitment to class size<br />

reduction. This effort has been supported over the years by various funding<br />

streams, including tax levy dollars and Contract for Excellence (C4E) funds<br />

that became available in the fall of 2007. It is important to note that class<br />

size reduction is a complex and multifaceted issue – the class size facing any<br />

28


individual student is a function not only of the classrooms available, but also<br />

the number of quality teachers, and the way that classroom and student<br />

schedules are arranged. The Class Size plan includes the use of one or<br />

several strategies, depending on the economic situation at a given moment:<br />

increased school budgets, subsidized teaching resources, guidance and<br />

coaching to schools in reducing class size, key policy adjustments in<br />

admissions and facility use to reinforce reduced class size, new school<br />

construction, collaborative team teaching, and reporting and tracking of<br />

class size information.<br />

Although the financial difficulties facing the City and the State make the<br />

level of continued investment of capital and operating funds uncertain, the<br />

proposed amendment to the FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan continues to<br />

support the ongoing implementation of the Class Size Reduction Plan albeit<br />

over a longer timeframe.<br />

First, the proposed Capital Plan amendment continues to adjust calculations<br />

to accommodate lower maximum classroom capacity sizes at the middle and<br />

high school levels. The Proposed Capital Plan amendment continues the<br />

FY2005 – 2009 Capital Plan’s capacity calculations. New classroom space<br />

is planned assuming a maximum of 750 square feet. It is important to<br />

understand two critical facts about middle and high school programming:<br />

first, that these are targeted maximums – averages will be lower, particularly<br />

if schools use classrooms more efficiently than assumed in the capacity<br />

formula; and second, that most schools in the system are and will be at less<br />

than <strong>10</strong>0% utilization, which they can choose to reflect in reduced class<br />

sizes should tax levy funds be available. The capacity formulas for middle<br />

and high schools assume general education classrooms are used seven out of<br />

eight periods each day and specialty rooms such as science, music or art<br />

rooms are used five out of eight periods of the day. More efficient use of<br />

these spaces will allow a school to implement class sizes that are lower than<br />

the maximum classroom capacities.<br />

The second way that the proposed Capital Plan amendment supports class<br />

size reduction efforts is through an emphasis on local neighborhoods, in<br />

both capital construction and in facility realignment. In most cases,<br />

overcrowding and larger class sizes are very local phenomena, reflecting<br />

school admissions zones that are poorly designed for the building, and or<br />

reflecting deeply popular schools into which the press of parents creates<br />

larger class size. Local neighborhood planning will help identify and solve<br />

these issues, in particular so that low performing schools with large class<br />

size – the priority of the class size reduction plan – can be given enrollment<br />

relief.<br />

It is a requirement of the Contract for Excellence law and regulation that the<br />

Five Year Class Size Reduction Plan be aligned to the City’s capital<br />

plan. The original Five Year Class Size Reduction Plan accounted for and<br />

planned on all the new construction identified in the FY2005 - 2009 Capital<br />

Plan. The dollars are committed or have already actually been spent for<br />

construction of the additional classrooms per the original Class Size<br />

Reduction Plan. However, delays in the availability of appropriate sites<br />

29


created a risk to the creation of all seats proposed in the FY05-FY09 Capital<br />

Plan by the beginning of school year 2013. Construction of new seats as<br />

outlined in the proposed FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan amendment<br />

continues.<br />

The February 23, 20<strong>10</strong> letter from former Commissioner Steiner to former<br />

Chancellor Klein recognized that given the severe financial constraints of<br />

the State and City budgets, the class size targets outlined in the amended<br />

2008-2009 Class Size Reduction Plan are not achievable. Consequently, the<br />

Class Size Reduction Plan requirements for a reduction in district-wide<br />

average class sizes have been temporarily suspended and replaced by<br />

requirements pertaining to class size in 75 Targeted Schools.<br />

In the current distressed economic situation in which State Foundation Aid<br />

for education was cut in FY<strong>10</strong> and FY11 and the date of implementation of<br />

the full funding to be made available under the Campaign for Fiscal Equity<br />

settlement has been pushed out from FY2011 to as far out potentially as<br />

FY2017, schools will not have the funding to increase the number of<br />

teachers and to cover the other operating costs needed to reach the original<br />

class size targets.<br />

The New York City Department of Education is committed to lowering the<br />

relative class sizes of the Target 75 schools as provided in the February 23,<br />

20<strong>10</strong> Amendment. Also, the Capacity Program included in the adopted<br />

FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan as amended will continue to include the<br />

following:<br />

• Class size reduction efforts which will focus on those schools and<br />

communities that have new buildings opening, and or where facility<br />

realignment strategies will enable enrollment relief to currently<br />

overcrowded buildings.<br />

• Coaching and guidance in class size reduction will continue to<br />

highlight the ways that schools can utilize their buildings, particularly given<br />

new capacity calculations, to achieve class size reduction<br />

• Targeting of neighborhood planning to communities that are overutilized,<br />

have large class size, and where there are low performing schools<br />

The capacity included in the FY 20<strong>10</strong> – 20<strong>14</strong> Capital Plan adopted in June<br />

2009 was based on projections that incorporated historical trends reflective<br />

of the declining enrollment experienced in most districts at the time. It<br />

should be noted, however, that some districts were experiencing growth<br />

within this period. The commitment to evaluate capital needs annually has<br />

allowed the Department to react to changing trends and modify this Plan to<br />

reflect new data.<br />

Based on the demographic trends at the time, the 20<strong>10</strong> Adopted Amendment<br />

increased the number of seats funded for either design or design and<br />

construction to 30,377. The 2011 Adopted Amendment which included a<br />

$700 million decrease in funding from the 20<strong>10</strong> Adopted Amendment,<br />

identified 26,552 seats for design and construction and an additional 2,3<strong>14</strong><br />

seats for design only in this Plan.<br />

30


The 2012 adopted Amendment increased the number of seats funded for<br />

construction or design to 33,888. This Proposed Amendment increases the<br />

number of seats funded for construction or design to 34,819. This increase<br />

re-affirmed the November 2011 Amendment which identified a total need of<br />

over 50,000 seats. The Department must strategically address how and<br />

when this need is met. We must ensure our existing space is used<br />

effectively and efficiently. We must target our resources for new capacity to<br />

meet the most pressing needs. We must build our new facilities to support<br />

current instructional models with flexibility and to incorporate emerging<br />

technologies for future generations while ensuring our buildings are energy<br />

efficient and sustainable. Finally, we must steward the resources available<br />

to address these challenges as effectively as possible.<br />

Enrollment increased in the 2009/<strong>10</strong>, 20<strong>10</strong>/11 and 2012/13 school years. It<br />

is anticipated the audited registers for the 2013/<strong>14</strong> school year will<br />

demonstrate additional but slightly slower growth. Areas within several<br />

districts demonstrate continued growth. Other areas and districts are<br />

showing no growth or declining slightly. Based on the trends demonstrated<br />

in areas of current or projected overcrowding, this proposed Amendment<br />

restates the need for approximately 50,000 seats citywide first identified by<br />

the Department in November 20<strong>10</strong>. These are primarily elementary and<br />

middle school seats.<br />

As we approach the end of this FY 20<strong>10</strong> – 20<strong>14</strong> Capital Plan, construction<br />

contracts for large projects continue to be awarded approximately eight to<br />

ten percent below estimated cost. Many of the properties identified for new<br />

capacity in this plan have lower than anticipated site specific costs. In<br />

addition, the Department has capitalized on lower cost leasing options. As a<br />

result of these efficiencies, the Department is proposing to fund more than<br />

1,480 additional seats for construction in this Plan. The additional seats will<br />

be funded in areas of greatest need with the highest likelihood of being sited<br />

and construction undertaken during this Plan. The Department also<br />

exercised its option for an additional 15,000 square feet of space at the<br />

Riverside Center Development project which will add 212 seats. This<br />

project is funded for design in this Plan and construction in the next. Based<br />

on the City’s announcement of the delay in the Flushing/Willets Point<br />

development, capacity project #2 @ Willets Point (738 seats) has been<br />

moved from this plan. The project was in response to the need anticipated<br />

from the development and was to be provided by the developer at no cost to<br />

the Department. The Department will continue to monitor spending and<br />

needs on an ongoing basis throughout the current and final year of the Plan.<br />

31


The chart below identifies the capacity currently funded in the Plan and the<br />

additional need by district for elementary and middle schools and by<br />

borough for high schools. The chart also includes the status of the seats in<br />

process.<br />

Total February<br />

February 2012 February 2013 Additional Number of Number of Seats<br />

2012 Identified April 2011 Additional Seats Additional Seats Need<br />

Seats In In Construction/<br />

District Sub-districts<br />

Need Funded Seats (Funded) (Funded) (Unfunded) Scope/Design Completed<br />

Tribeca/Village 1,301 712 825<br />

2<br />

Chelsea/ Midtown West *<br />

Flatiron/Gramercy/Murray Hill<br />

4,624<br />

1,127<br />

738<br />

236<br />

0<br />

722<br />

321<br />

640<br />

Upper East Side 500 500<br />

3 Upper West Side * 480 480 0 212 0 692<br />

8<br />

Soundview<br />

Pelham Bay / Edgewater Park / Throgs Neck<br />

1,201<br />

0<br />

0<br />

700<br />

0<br />

501<br />

9<br />

South Highbridge<br />

Highbridge<br />

1,<strong>14</strong>8<br />

0<br />

391<br />

0<br />

0<br />

757<br />

391<br />

<strong>10</strong><br />

Spuyten Duyvil / Riverdale / Fieldston / North<br />

Riverdale<br />

Kingsbridge / Norwood / Bedford Park<br />

2,897<br />

416<br />

640<br />

350<br />

0<br />

1,491<br />

350 640<br />

Fordham / Belmont 0<br />

11<br />

Van Nest / Pelham Parkway<br />

Woodlawn / Williamsbridge<br />

3,004<br />

1,476<br />

0<br />

700<br />

0<br />

828<br />

1,1<strong>14</strong><br />

350<br />

379<br />

13 DUMBO/ Navy Yard/ Fort Greene 360 360 0 -27 27 333<br />

<strong>14</strong> Williamsburg/ Greenpoint * 612 612 0 0 0<br />

Sunset Park 1,495 1,089<br />

15 Park Slope 4,251<br />

738 0<br />

0<br />

2,018<br />

256<br />

Carroll Gardens/Gowanus/Red Hook 0<br />

Owls Head Park, Bay Ridge 1,476 240 1,075<br />

20 Dyker Heights 5,317<br />

416 0<br />

480<br />

2,945<br />

256<br />

Borough Park / Kensington / Bensonhurst 0<br />

22 Flatlands/ Midwood 1,154 1,154 0 59 0 1,213<br />

North Corona, South Corona, Lefrak City, Elmhurst 3,123 1,581 1,530<br />

24 Maspeth, south of Woodside 7,096<br />

612 700<br />

<strong>14</strong>8<br />

1,757<br />

716<br />

Glendale, Ridgewood 756 472 756<br />

25<br />

Beechhurst, College Point, Whitestone<br />

Flushing, Murray Hill, Willets Point<br />

2,171<br />

232<br />

738<br />

750<br />

-738** 1,189<br />

350<br />

232<br />

26 Bayside and Auburndale 416 416 0 0 0<br />

Howard Beach, Lindenwood * 416<br />

27 Ozone Park, South Ozone Park, Richmond Hill,<br />

Woodhaven<br />

832<br />

416<br />

0<br />

28<br />

0<br />

444<br />

28<br />

South Jamaica / Rochdale / Kew Gardens<br />

Rego Park, Forest Hills, Kew Gardens, Jamaica<br />

1,645<br />

0<br />

757<br />

426<br />

0<br />

462<br />

350<br />

833<br />

29<br />

Cambria Heights / St. Albans<br />

Hollis<br />

1,822<br />

0<br />

738<br />

350<br />

15<br />

719<br />

372<br />

731<br />

East Elmhurst / Jackson Heights 1,553 1,305<br />

30 Woodside / Sunnyside 4,341<br />

832 0<br />

754<br />

624<br />

822 508<br />

Long Island City / Ravenswood 578 578<br />

South Shore 444 444<br />

31 New Dorp 3,218<br />

844 0<br />

0<br />

1,5<strong>14</strong><br />

844<br />

North Shore 416 372<br />

Brooklyn 1,202 1,202 0 0 0 1,202<br />

Queens 2,283 1,473 8<strong>10</strong> 0 0 1,473<br />

TOTAL 50,074 28,866 5,022 931 15,554 <strong>10</strong>,194 17,097<br />

*Districts include projects funded for design only.<br />

** Project is deferred to a future plan in response to the delay in the Willets Point development.<br />

Notes: 2,526 seats identified above are funded for design in this plan and construction in<br />

the next plan.<br />

Net total seat increase from February 2012 Adopted is 931.<br />

32


The new school buildings funded for construction in the proposed<br />

Amendment are:<br />

• 47 small Primary school buildings, Grades PreK – 5<br />

• 20 Primary/Intermediate school buildings, many of which will be<br />

Grades PreK – 8<br />

• 4 Intermediate/High school buildings, which will range in grades 6 –<br />

12.<br />

Although the current financial conditions have resulted in adjustments to the<br />

proposed number of new capacity seats, the Department believes strategic<br />

implementation of these seats will assist DOE in continuing to:<br />

• Ameliorate localized overcrowding within districts<br />

• Promote the ability of schools to opt for lower class sizes by<br />

lowering the maximum classroom capacity as follows:<br />

o Grades 4 – 8 to 28<br />

o Grades 9 – 12 to 30<br />

• Expand the Pre-Kindergarten resources available throughout the City<br />

• Increase the new capacity throughout the City for special education<br />

students by over 3,<strong>10</strong>0 seats<br />

• Reduce reliance on temporary instructional spaces as new capacity<br />

opens.<br />

The Plan provides for the creation of seats in every borough. This includes 8<br />

PS/IS school buildings in Manhattan, 12 in the Bronx, <strong>14</strong> in Brooklyn, 29 in<br />

Queens, and 4 in Staten Island. Of the 4 IS/HS school buildings proposed, 1<br />

will be located in Brooklyn and 3 in Queens. In addition, over 2,500 seats<br />

are funded for design in this plan and construction in the next plan.<br />

33


Small PS And PS/IS Buildings<br />

IS/HS<br />

BLDGS<br />

New Capacity Program Overview<br />

District<br />

No.* of<br />

Buildings. TOTAL Seats TOTAL Cost**<br />

2 +<br />

9 3,902 $297.06<br />

3 +<br />

1 692 $4.65<br />

8 2 700 $63.35<br />

9 1 391 $46.52<br />

<strong>10</strong> 3 1,406 $133.30<br />

11 6 2,176 $212.06<br />

13 1 333 $24.31<br />

<strong>14</strong> +<br />

1 612 $0.90<br />

15 5 2,233 $284.47<br />

20 6 2,372 $322.28<br />

22 2 1,213 $163.97<br />

24 <strong>10</strong> 5,339 $573.41<br />

25 3 982 $<strong>14</strong>6.99<br />

26 1 416 $84.08<br />

2 860 $62.67<br />

27 +<br />

28 2 1,183 $124.97<br />

29 3 1,<strong>10</strong>3 $<strong>10</strong>1.07<br />

30 9 3,717 $365.98<br />

31 4 1,704 $197.45<br />

Bklyn 1 1,202 $99.77<br />

Queens 3 2,283 $188.80<br />

TOTAL*** 75 34,819 $3,498.05<br />

+ District includes seats that are funded for design in this Plan and construction in the next Plan.<br />

* May vary depending upon availability and configuration of sites and appropriate leased spaces<br />

** All dollar amounts are represented in millions<br />

*** Excludes $60.97 mm for potential site specific/environmental/code costs. Total with all<br />

funding is $3,559.02 mm.<br />

The table on page 26 provides a breakdown of the number of seats currently<br />

in design or construction/completed by sub-district. The demands are great<br />

and the financial resources have become very limited. The Department has<br />

prioritized need based on severe and persistent overcrowding as well as<br />

strong growth patterns. It will continue to evaluate the demographics and<br />

housing patterns annually, and where warranted and pending availability of<br />

resources, will adjust the proposed capacity need accordingly.<br />

The following tables provide more specific detail on the new capacity<br />

projects:<br />

34


New Capacity Summary by Borough<br />

SMALL PS PS/IS IS/HS TOTAL<br />

District<br />

MANHATTAN<br />

# BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST<br />

1 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

2* 3 598 $11.93 6 3,304 $285.13 0 0 $0.00 9 3,902 $297.06<br />

3* 0 0 $0.00 1 692 $4.65 0 0 $0.00 1 692 $4.65<br />

4 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

5 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

6 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

Manhattan TOTAL 3 598 $11.93 7 3,996 $289.78 0 0 $0.00 <strong>10</strong> 4,594 $301.71<br />

BRONX<br />

7 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

8 2 700 $31.07 0 0 $0.00 0 0 $0.00 2 700 $31.07<br />

9 0 0 $0.00 1 391 $46.52 0 0 $0.00 1 391 $46.52<br />

<strong>10</strong> 2 766 $63.97 1 640 $69.33 0 0 $0.00 3 1,406 $133.30<br />

11 6 2,176 $179.78 0 0 $0.00 0 0 $0.00 6 2,176 $179.78<br />

12 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

HS 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

Bronx TOTAL<br />

BROOKLYN<br />

<strong>10</strong> 3,642 $274.82 2 1,031 $115.85 0 0 $0.00 12 4,673 $390.67<br />

13 0 0 $0.00 1 333 $24.31 0 0 $0.00 1 333 $24.31<br />

<strong>14</strong>* 0 0 $0.00 1 612 $0.90 0 0 $0.00 1 612 $0.90<br />

15 3 994 $67.70 2 1239 $152.22 0 0 $0.00 5 2,233 $219.92<br />

16 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

17 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

18 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

19 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

20 5 1,664 $186.58 1 708 $71.15 0 0 $0.00 6 2,372 $257.73<br />

21 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

22 1 456 $47.83 1 757 $83.86 0 0 $0.00 2 1,213 $131.69<br />

23 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

32 0 0 $0.00 0 0 $0.00 0 0 $0.00 0 0 $0.00<br />

HS 0 0 $0.00 0 0 $0.00 1 1,202 $99.77 1 1,202 $99.77<br />

Brooklyn TOTAL 9 3,1<strong>14</strong> $302.11 6 3,649 $332.44 1 1,202 $99.77 16 7,965 $734.32<br />

35


New Capacity Summary by Borough (cont.)<br />

District<br />

QUEENS<br />

# BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST<br />

24 6 2,032 $249.<strong>14</strong> 4 3,307 $324.27 0 0 $0.00 <strong>10</strong> 5,339 $573.41<br />

25 3 982 $1<strong>14</strong>.71 0 0 $0.00 0 0 $0.00 3 982 $1<strong>14</strong>.71<br />

26 1 416 $51.80 0 0 $0.00 0 0 $0.00 1 416 $51.80<br />

27* 2 860 $62.67 0 0 $0.00 0 0 $0.00 2 860 $62.67<br />

28 1 350 $34.59 1 833 $90.38 0 0 $0.00 2 1,183 $124.97<br />

29 3 1,<strong>10</strong>3 $<strong>10</strong>1.07 0 0 $0.00 0 0 $0.00 3 1,<strong>10</strong>3 $<strong>10</strong>1.07<br />

30 7 2,716 $233.74 2 1,001 $99.96 0 0 $0.00 9 3,717 $333.70<br />

HS 0 0 $0.00 0 0 $0.00 3 2,283 $156.52 3 2,283 $156.52<br />

Queens TOTAL 23 8,459 $847.72 7 5,<strong>14</strong>1 $5<strong>14</strong>.61 3 2,283 $156.52 33 15,883 $1,518.85<br />

STATEN ISLAND<br />

SMALL PS PS/IS IS/HS TOTAL<br />

31 3 860 $111.07 1 844 $86.38 0 0 $0.00 4 1,704 $197.45<br />

Staten Island TOTAL 3 860 $111.07 1 844 $86.38 0 0 $0.00 4 1,704 $197.45<br />

SMALL PS PS/IS IS/HS TOTAL<br />

District<br />

CITYWIDE<br />

# BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST # BLDGS # SEATS COST<br />

CITYWIDE TOTAL 48 16,673 $ 1,547.65 23 <strong>14</strong>,661 $ 1,339.06 4 3,485 $ 256.29 75 34,819 $3,<strong>14</strong>3.00<br />

CITYWIDE SITE<br />

ACQUISITION COSTS<br />

GRAND TOTAL<br />

$ 355.05<br />

INCLUDING SITE<br />

ACQUISITION*<br />

$ 3,498.05<br />

*District which include seats that are funded for design in this Plan and construction in the next Plan.<br />

Notes: Number of buildings may vary depending upon availability and configuration of sites and appropriate leased spaces.<br />

All dollar amounts are represented in millions.<br />

Excludes $60.97 mm for potential site specific/environmental/code costs. Total with all funding is $3,559.02 mm.<br />

36


In recent years, our special education population has been increasing. This is true<br />

of students served by District 75 and those included in district-based programs<br />

located in schools that serve both general education and special education<br />

students. The FY2005 – 2009 Capital Plan set aside approximately ten percent of<br />

the seats in newly constructed buildings for District 75 use as well as<br />

approximately 1,700 seats for district-based programs. In the FY 2005 - 2009<br />

Capital Plan approximately 2,000 seats of the approximately 55,000 seats<br />

completed or in progress are for District 75 use.<br />

To further strengthen the DOE’s responsiveness to the enrollment growth in<br />

special education, we have amended our school construction programs so that<br />

D75 programs can be included in smaller elementary schools and in many<br />

annexes. We also have modernized our programs in larger buildings to better<br />

customize classrooms for today’s special education population and in doing so we<br />

have created more classrooms per building than in the past. In this proposed<br />

February Amendment, we project that of the approximately 34,800 seats funded,<br />

3,<strong>10</strong>0 will be for special education students.<br />

Charter and Partnership Program<br />

SUMMARY<br />

Proposed Amendment<br />

$2<strong>10</strong>.0 mm<br />

2012 Adopted<br />

Amendment<br />

$2<strong>10</strong>.0 mm<br />

The Charter and Partnership Program allocation supports targeted capital<br />

investments in areas of distinct educational need, and the investments are executed<br />

in partnership with outside organizations who share the Department’s goals for<br />

improved school leadership, empowerment and accountability.<br />

Forging partnerships has been a central tenet of the Mayor and Chancellor's<br />

Children First reform agenda. Leveraging the social and financial capital that nonprofit<br />

and private organizations bring to the public sector, the Chancellor has<br />

encouraged collaborations across the department in areas of school creation,<br />

facilities, accountability and leadership training. Attracting individual, community<br />

and financial resources to the public school system fuels innovative solutions to<br />

meet the needs of all students. The Capital Plan allocation recognizes the<br />

importance of both the partnerships in DOE public schools and charter schools, and<br />

brings the energy of those partnerships into facility construction.<br />

Charter schools are public schools governed by their own not-for-profit boards of<br />

directors, which operate on the terms of five-year performance contracts known as<br />

charters. The State University of New York and the New York State Board of<br />

Regents are authorized to approve and renew charter schools in New York. These<br />

public entities also monitor each school to ensure that it is meeting the terms<br />

outlined in its charter and is in compliance with applicable state and federal laws.<br />

The key principles underlying the Children First reform agenda – strong leadership,<br />

empowerment of principals, autonomy, performance-based accountability, and<br />

promoting choice for parents and students – are the defining characteristics of<br />

37


charter schools, which promote excellence and innovation by bringing new leaders,<br />

resources, and ideas into public education.<br />

Around the country, numerous studies and practical experience have shown that<br />

paying for and securing a facility is one of the biggest challenges charter schools<br />

face. In New York State, legally designated charter funding support does not<br />

include facilities support. Thus, the Mayor has made it a priority of his<br />

administration to support facilities for charter schools in New York City<br />

To follow through on this commitment, the DOE has made public school space<br />

available for charter schools wherever possible, so that New York City students and<br />

families have as many strong educational options as possible available to them. As<br />

of September 2012, there are 159 charter schools operating in New York City. <strong>10</strong>7<br />

of the 159 charter schools are currently housed in DOE-provided facilities.<br />

In November 2005, the Department created the Charter Facilities Matching Grant<br />

Program in order to engage viable private developers, charter entities, and<br />

community-based organizations (“Charter Partners”) to provide matching grants to<br />

support charter school facility development through the SCA and the Department.<br />

The program has been met with great enthusiasm throughout the charter school<br />

community. The Charter Partners propose specific development projects, towards<br />

which they make a capital contribution up to fifty percent of the total project cost.<br />

The partner is responsible for the acquisition of the site and the management of any<br />

design and facility construction, subject to SCA guidelines and review. New York<br />

City owns the site and the Charter Partner receives a lease interest in the facility<br />

with a term based on their level of contribution. The Request for Proposals that was<br />

issued with the new Capital Plan gave priority to projects that submitted by January<br />

20<strong>10</strong>. In addition to the two projects approved in the FY2005-2009 Capital Plan<br />

that were not begun, an additional three projects have been approved for this capital<br />

plan.<br />

Under the charter school legislation, charter schools give priority in their lottery to<br />

students from the community school district in which the charter schools are<br />

located. This change in admissions procedures began in 2008 and begins to more<br />

closely tie charter schools to the needs of local districts within New York City. As<br />

a result the benefits of charters will be more focused in the communities where they<br />

are located. In certain circumstances, charter public schools can absorb students<br />

who would otherwise contribute to overcrowding in Department of Education<br />

public schools and these facilities may be constructed with funding from our New<br />

Capacity Program. In these instances, charter schools must demonstrate community<br />

support for the construction of a charter school facility to be approved for this<br />

program.<br />

Mayor Bloomberg and the Chancellor have also made school creation an essential<br />

element of New York City’s education reform strategy and have opened a total of<br />

352 new district schools between 2003 and 20<strong>10</strong>. Through strategic partnerships in<br />

new school creation, a diverse group of partners, including intermediary<br />

organizations, collaborate in the planning and development of these schools.<br />

Partner organizations commit social and financial investment in the schools through<br />

38


external funding, provide engagement and enrichment activities to schools, and<br />

foster an “outside-inside” leadership strategy, in which external constituencies<br />

develop a deep stake in the school’s ongoing success. Portions of the Charter and<br />

Partnership Program allocation are also directed to support the construction of<br />

innovative schools aligned with partners in areas where there is educational need<br />

for high quality instructional options. In the FY2005 - 2009 Capital Plan eight<br />

projects were funded as partnership projects under the Charter and Partnership<br />

Allocation. In the FY20<strong>10</strong> - 20<strong>14</strong> Capital Plan, the completion of an existing<br />

partnership project for Columbia Secondary School for Math, Science and<br />

Engineering will be funded. Ultimately this school will serve 567 students in grades<br />

6-12 in Upper Manhattan.<br />

The interest generated by the Partnership and Charter Program allocation<br />

demonstrates the desire of private partners to establish relationships with the DOE<br />

to meet the demand for new school facility development as well as an aligned<br />

commitment to educational goals. Partners provide private-sector resources to help<br />

identify sites, provide design and construction management and often bring direct<br />

philanthropic contributions to support NYC schools. With this context, the DOE<br />

continues to explore if and how to extend this successful practice of involving<br />

aligned partners in new school facility development. To date, the following<br />

projects have been authorized to proceed under the FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan:<br />

Project Name District Number of Seats<br />

KIPP HIGH SCHOOL 7 800<br />

DREAM CHARTER SCHOOL/HARLEM RBI 4 450<br />

ICAHA CHARTER SCHOOLS 4 & 5 11 924<br />

HARLEM CHILDREN'S ZONE PROMISE<br />

ACADEMY 5 1,200<br />

PAVE ACADEMY CHARTER SCHOOL 15 350<br />

COLUMBIA SECONDARY SCHOOL 6 567<br />

TEACHER'S COLLEGE COMMUNITY SCHOOL 5 247<br />

Facility Replacement Program<br />

SUMMARY<br />

Proposed Amendment<br />

$689.5 mm<br />

2012 Adopted<br />

Amendment<br />

$748.9 mm<br />

The Facility Replacement Program allocates $690 million to provide for<br />

development of new sites for leased schools and schools that must vacate<br />

their current locations. This funding was decreased by approximately $60<br />

million in this November Amendment based on an assessment of lease<br />

replacements costs required over the remaining years of this Plan. The<br />

savings will supplement funding for additional new capacity.<br />

The remaining funding will provide for the replacement of approximately<br />

5,000 seats over the term of this Plan. As sites are identified, the locations<br />

will be included in the Capital Plan. The seats will be provided through new<br />

construction or alternative leasing opportunities similar to new capacity.<br />

Our leasing program has been extremely successful in identifying sites for<br />

new school build-outs in districts where finding new school construction<br />

39


sites has been extraordinarily difficult. However, leases do eventually expire<br />

and, despite our policy to offer market rate lease renewals for all leases that<br />

are in satisfactory condition and for which we need the capacity, some<br />

landlords choose to terminate our leases. In these instances, or when we<br />

determine that a site with an expiring lease is in unsatisfactory condition, we<br />

will have to pursue a replacement site. The replacement site could be either<br />

another lease or a newly constructed building depending on what real estate<br />

is available. The Replacement Program includes funding for PS 51M, PS<br />

51X, All City Leadership School, high school seats at Broadway<br />

Educational Campus, Middle College High School, Beacon High School<br />

and Eagle Academy for Young Men of Southeast Queens.<br />

40


CAPITAL INVESTMENT<br />

41


Capital Improvement Program<br />

Introduction<br />

SUMMARY<br />

Proposed Amendment<br />

$3,163.7mm<br />

2012 Adopted<br />

Amendment<br />

$2,639.1 mm<br />

The capital improvements for existing facilities included in the adopted<br />

FY20<strong>10</strong> – 20<strong>14</strong> Five-Year Plan continue the DOE’s effort to provide a safe<br />

and comfortable learning environment which helps to maximize every<br />

student’s opportunity to learn. The Capital Improvement Program (CIP)<br />

consists of a wide range of construction projects, including building repairs,<br />

system replacements, and reconfiguration of existing school buildings.<br />

The emphasis of the FY2005 - 2009 Five-Year Plan was on exteriors, to<br />

safeguard existing buildings from water infiltration and interior<br />

improvements necessary to facilitate the Children First reforms. Because of<br />

the size and age of our inventory, the efforts to safeguard existing buildings<br />

from water infiltration will continue and, to the extent our funding allows,<br />

additional resources will be provided to fund interior improvements.<br />

Judging the success of this effort is difficult, in part because of the size of<br />

our inventory. The annual Mayor’s Management Report outlines school<br />

building ratings. The chart below, from the September 2012 Report, shows<br />

that the percentage of schools in the “Fair to Good” category is increasing at<br />

about the same rate as the “Fair” category is decreasing. Other categories<br />

remain relatively stable.<br />

September 2012 Mayor's Management Report<br />

Category FY 2006 FY 2007 FY 2008 FY 2009 FY 20<strong>10</strong> FY 2011<br />

School building ratings - Good condition (%) 2.8% 2.9% 2.4% 1.7% 1.7% 1.3%<br />

- Fair to good condition (%) 28.4% 32.4% 37.1% 46.2% 47.2% 50.0%<br />

- Fair condition (%) 68.6% 64.6% 60.3% 52.0% 51.0% 48.5%<br />

- Fair to poor condition (%) 0.2% 0.2% 0.1% 0.2% 0.1% 0.1%<br />

- Poor condition (%) 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%<br />

The ratings above provide general trends on the overall conditions of the<br />

Department’s inventory but are not necessarily indicative of the<br />

improvements occurring at the building level. For example, if we look at the<br />

work performed on parapets during the last Plan, we can see that the specific<br />

ratings for parapets in those buildings having work has improved<br />

significantly but because of the size of the inventory, the impact on the<br />

overall rating is less dramatic. The buildings that did not have parapet work<br />

generally worsened slightly over time which had a stronger influence on the<br />

overall rating for all parapets.<br />

43


Condition Rating (1 - Good; 5 Poor)<br />

5<br />

4<br />

3<br />

2<br />

1<br />

0<br />

Parapet Work<br />

2004/05 2005/06 2006/07 2007/08 2008/09<br />

Year of Survey<br />

1,116 Buildings in Common<br />

118 with work<br />

998 w/o work<br />

Our efforts to improve the quality of our school buildings has been effective<br />

but the size of our inventory drives the continuing need to invest,<br />

specifically in exterior elements. Funding has also been incorporated from<br />

the PlaNYC Initiatives to enhance playgrounds, upgrade lighting and begin<br />

the conversion of boilers that are currently using number 4 or 6 fuel oil.<br />

These conversions are targeted for schools in areas having high asthma<br />

rates.<br />

This February 2013 Amendment includes a Five Year Capital Improvement<br />

Program for existing buildings totaled $3.2 billion. This funding allows<br />

DOE to address essentially only the most critical building elements, those<br />

rated a “5” (poor) by the Building Condition Assessment Survey (BCAS). In<br />

addition, a small number of building elements that were rated “3” (fair) or<br />

“4” (fair to poor), but have deficiencies that may adversely impact life safety<br />

or the structure of the building, will also be included. Exterior building<br />

components rated “3” or “4” at schools that are slated for extensive exterior<br />

work will be included as well.<br />

44


Exteriors<br />

SUMMARY<br />

Proposed Amendment<br />

$1,721.9 mm<br />

2012 Adopted<br />

Amendment<br />

$1,541.7 mm<br />

Any building condition found to be potentially dangerous was immediately<br />

referred to the SCA for further evaluation. If necessary, sidewalk bridging<br />

was installed immediately as a safeguard for the entire school community. If<br />

any condition was found to need immediate attention, capital funding from<br />

the current Plan’s Emergency, Unspecified allocation was used to remedy<br />

the condition without delay.<br />

Capital Improvement Program Overview<br />

Program Proposed Amendment 2012 Adopted Amendment<br />

Exterior $1,721.9 mm $1,541.7 mm<br />

Interior $1,320.9 mm $967.6 mm<br />

Other $120.9 mm $129.8 mm<br />

TOTAL $3,163.7 mm $2,639.1 mm<br />

Water infiltration is the single greatest cause of accelerated deterioration of<br />

existing facilities. The costs stemming from water infiltration include<br />

measures needed to correct damage to interior walls, floors and ceilings, and<br />

also include related asbestos and lead abatement. The disruption of teaching<br />

and learning in classrooms damaged by water leaks is even more disturbing<br />

than the cost implications. For that reason, the last Five-Year Plan focused<br />

on making schools watertight. This Plan continues that important effort.<br />

The major components of the building exterior are roofs, parapets, windows,<br />

and masonry. If the BCAS ratings for any school indicated that any of these<br />

four major components were below “fair to poor” condition, then all the<br />

major exterior components rated “3” or worse will be included in the<br />

project.<br />

The proposed funding for exterior components is summarized below:<br />

Exteriors Overview<br />

Program<br />

45<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Exterior Modernization $1.0 mm $ 0.8mm<br />

Flood Elimination $176.5 mm $153.1 mm<br />

Reinforcing Support Elements $44.1mm $45.1 mm<br />

Reinforcing Cinder Concrete Slabs $13.7 mm $12.3 mm<br />

Roofs $282.7 mm $276.0 mm<br />

Parapets $280.6 mm $241.3 mm<br />

Exterior Masonry $663.8 mm $599.5 mm<br />

Windows $259.5 mm $213.6 mm<br />

TOTAL $1,721.9 mm $1,541.7 mm


Interiors<br />

SUMMARY<br />

Proposed Amendment<br />

$1,320.9 mm<br />

2012 Adopted<br />

Amendment<br />

$967.6 mm<br />

The Five-Year Plan for interiors includes capital work identified by the<br />

BCAS, work required to fulfill the educational needs and work funded under<br />

the PlaNYC initiatives.<br />

Interior improvements include a program to begin conversion of boilers that<br />

are currently using number 4 or 6 fuel oil. These conversions are targeted<br />

for schools in areas of high asthma rates and funded through the PlaNYC<br />

initiatives. Other components of the interior program include electrical<br />

upgrades, plumbing, low-voltage electrical systems, toilets, and mechanical<br />

system that may be replaced rather than repaired based on the age, condition<br />

and ability to repair.<br />

The 2011 Adopted Amendment allocated $171 million in funding allocated<br />

over the last three years of this Plan to begin addressing the issues<br />

associated with older lighting systems in our school buildings. An<br />

additional $<strong>10</strong>0 million is being allocated over the last two years of this Plan<br />

for this program from the funding advanced by the City. The City is in the<br />

second year of a comprehensive ten (<strong>10</strong>) year plan that commenced in July<br />

2011 to remove the older PCB-containing lighting ballasts in more than 700<br />

school buildings. The key next step in implementing this plan is to establish<br />

a program that increases the resource capacity to execute the plan<br />

efficiently.<br />

This plan combines the engagement of companies that provide energy<br />

performance contracting services and identifying additional companies to<br />

perform work under the traditional competitive bidding process. An<br />

expanded traditional program (i.e. lighting replacements only) will increase<br />

the available resources to facilitate the lighting replacements while using the<br />

competitive bid and award process to attract the best firms. Additionally,<br />

the City has procured the services of Energy Service Companies (ESCOs) to<br />

assist in replacing PCB containing lighting fixtures, while also conducting<br />

energy audits to make specific energy conservation recommendations.<br />

The Department continues to undertake periodic visual inspections of all<br />

lighting fixtures suspected of containing older magnetic ballasts that may<br />

have deteriorated and have visible leaks. As of January 2013, leaking<br />

fixtures have been identified from visual inspections in 198 buildings.<br />

The leaking fixtures have been replaced and the buildings have been<br />

prioritized for receiving building-wide lighting replacements. As additional<br />

leaks are identified, we will continue to inform school communities, update<br />

our records, and take appropriate action. The complete list of buildings with<br />

confirmed visual leaks can be found at:<br />

http://www.nycsca.org/Community/Programs/EPA-NYC-<br />

PCB/PCBDocs/CorrectiveActionforVisiblePCBBallastLeaks.pdf<br />

As of January 2013, 92 buildings have had comprehensive lighting<br />

replacement projects completed. The list of buildings can be found at<br />

46


http://www.nycsca.org/Community/Programs/EPA-NYC-<br />

PCB/PCBDocs/CompletedLightingFixtureReplacements.pdf<br />

Work is in progress in 165 buildings. The prioritization of the remaining<br />

buildings within the lighting replacement comprehensive plan will be based<br />

on Environmental Protection Agency guidance as follows:<br />

1. Buildings with visual leaks;<br />

2. Buildings constructed between 1950 and 1966 that house an<br />

elementary school;<br />

3. Buildings constructed between 1950 and 1966 that house a<br />

secondary school;<br />

4. Buildings constructed between 1967 and 1979 that house an<br />

elementary school;<br />

5. Buildings constructed between 1967 and 1979 that house a<br />

secondary school;<br />

6. Buildings constructed prior to 1950 that house an elementary<br />

school;<br />

7. Buildings constructed prior to 1950 that house a secondary school.<br />

In this capital plan we will only address buildings that have experienced<br />

visible leaks (i.e. Priority Group 1). A summary of the buildings by status is<br />

as follows:<br />

Number of<br />

Building Description Buildings<br />

Completed 92<br />

In Progress 165<br />

Remaining Buildings in<br />

Priority Group 1 88<br />

Remaining Buildings in<br />

Priority Group 2 85<br />

Remaining Buildings in<br />

Priority Group 3 27<br />

Remaining Buildings in<br />

Priority Group 4 47<br />

Remaining Buildings in<br />

Priority Group 5 18<br />

Remaining Buildings in<br />

Priority Group 6 157<br />

Remaining Buildings in<br />

Priority Group 7 58<br />

Total Buildings in<br />

Program 737<br />

47


Interior work in occupied buildings continues to be one of our most<br />

challenging undertakings. We have developed extensive protocols to<br />

perform the most intrusive work over the summer months, schedule work<br />

after normal school hours during the year and work closely with the school<br />

communities to schedule work during holidays. This is not always the most<br />

cost effective means of performing the required work but assures the safety<br />

of our students and teachers and minimizes the disruption to the<br />

instructional program. For major projects, “swing space” could potentially<br />

offer an economical means of providing relief to the school community<br />

undergoing the renovations.<br />

The major interior system need being addresses are summarized below:<br />

Interiors Overview<br />

Program Proposed Amendment<br />

2012 Adopted<br />

Amendment<br />

Interior Modernization $9.0 mm $8.9 mm<br />

Climate Control $80.6 mm $75.8 mm<br />

Low-Voltage Electrical System $229.6 mm $190.6 mm<br />

Lighting Fixtures $276.7 mm $183.2 mm<br />

Interior Spaces $17.6 mm $<strong>14</strong>.8 mm<br />

Cafeteria/Multipurpose Room $18.1 mm $<strong>14</strong>.3 mm<br />

Air Conditioning Retrofit $20.1 mm $13.4 mm<br />

Elevators & Escalators $38.2 mm $26.2 mm<br />

Floors $53.1 mm $34.1 mm<br />

Electrical Systems $93.2 mm $61.8 mm<br />

Heating Plant Upgrade $224.6 mm $<strong>10</strong>0.9 mm<br />

Boiler Conversions $<strong>14</strong>6.4 mm $168.8 mm<br />

Kitchen Upgrades $16.0 mm $18.5 mm<br />

Domestic Piping $41.9 mm $6.6 mm<br />

Toilets – Staff $0.1 mm $0.5 mm<br />

Toilets – Student $43.8 mm $38.5 mm<br />

Safety Systems $11.9 mm $<strong>10</strong>.7 mm<br />

TOTAL $1,320.9 mm $967.6 mm<br />

Funding reallocated from the Facility Replacement Program to the Capital Improvement<br />

Program will be used to begin to address the replacement of older fire alarm systems and critical<br />

projects identified through our public engagement process.<br />

48


Children First Initiatives<br />

SUMMARY<br />

Proposed Amendment<br />

$1,617.8 mm<br />

2012 Adopted<br />

Amendment<br />

$1,638.8 mm<br />

The Children First Initiatives have been refined to include Technology and<br />

Facility Enhancement Programs.<br />

Children First Initiatives<br />

Program<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Technology $926.8 mm $926.8 mm<br />

Facility Enhancements $691.0 mm $712.0 mm<br />

TOTAL $1,617.8 $1,638.8 mm<br />

Technology Enhancements<br />

SUMMARY<br />

Proposed Amendment<br />

$926.8 mm<br />

2012 Adopted<br />

Amendment<br />

$926.8 mm<br />

Technological Enhancements Summary<br />

Enhancement<br />

49<br />

Proposed<br />

Amendment<br />

2012 Adopted<br />

Amendment<br />

Classroom Hardware and Installation $345.0mm $345.0mm<br />

School Building and Classroom Connectivity<br />

Cabling; Schools’ Bandwidth Upgrade<br />

Schools Unified Communication Infrastructure<br />

School Network Equipment and Common Area<br />

Wiring; MDF/IDF Upgrade; Security<br />

$243.8mm $243.8mm<br />

Combined<br />

above<br />

Combined<br />

above<br />

$90.8mm $90.8mm<br />

Wireless Technology Upgrade $<strong>10</strong>3.8mm $<strong>10</strong>3.8mm<br />

School Application: Teacher/Student Class<br />

Relationships (Identity Management)<br />

$27.7mm $27.7mm<br />

Learning Systems/Platforms $43.5mm $43.5mm<br />

Business and Operations Applications $72.2mm $72.2mm<br />

TOTAL $926.8mm $926.8mm


While the City’s high school graduation rate is up by more than 33 percent,<br />

too few students who go on to college are fully prepared for the rigors of<br />

higher education and work in a knowledge economy. The State of New<br />

York recently acknowledged this, aligning performance standards down to<br />

the third grade with real college readiness benchmarks. The results<br />

demonstrate that while progress has been made, there is more to do.<br />

To meet the challenge of college and workplace readiness for all students,<br />

what’s called for is an even more fundamental change. Throughout time,<br />

America has met such challenges with the force of its ingenuity. In<br />

transportation, health care, energy, and information systems, Americans<br />

have re-invented the way business is done and have seen transformational<br />

gains as a result. But in education, a student in 19<strong>10</strong> would find little<br />

different were she transported to a school in 20<strong>10</strong>, where standardization<br />

remains schools’ core tenet: a standard school day, with standard teachers,<br />

in standard-size rooms and standard-sized classes. There is scant evidence of<br />

American innovation in the design of American public schools.<br />

To meet the challenge of college and work readiness, New York City will<br />

reinvent the way schooling is done. Using technology as a transformative<br />

tool, we can motivate children as never before, tailoring instruction to each<br />

child’s specific needs, and giving each child access to learning beyond the<br />

walls of their school building. This is the key challenge of our third term:<br />

making schools of the past into schools of today, and putting children first.<br />

In order to truly transform schools and support all the technologies in the<br />

learning space into the near future, school buildings will need a major<br />

upgrade of their existing infrastructure. By using technology to transform<br />

the vision for how students can learn we can improve the outcomes for<br />

every child. The proposed funding in the Capital Plan will allow the<br />

Department to continue to incorporate and maximize the impact of<br />

technology into all aspects of the students’ and educators’ everyday<br />

activities. The Plan’s technology initiatives will marry digital technologies<br />

with thoughtful architecture and learning solutions, challenging traditional<br />

ideas about where and how learning takes place. The technology initiatives<br />

will enable the effective use of the information and communications<br />

technology systematically embedded across the Department in policy and in<br />

practice – a move that is bound to position schools as leaders in the use of<br />

new technologies and empower teachers to tailor individualized instruction<br />

using technology.<br />

Today, the Department operates one of the largest networks within the<br />

education sector, and all the active New York City public school buildings<br />

are wired for the Internet and have wireless environments. To build on this<br />

complex technological foundation, a major share of the amended Plan<br />

50


allotment to technology initiatives will continue to fund the school<br />

buildings’ technology infrastructure build-out to support the new<br />

technological needs. The funding level in this proposed Amendment will<br />

support the Department’s basic need to continue the investments in the<br />

upgrade of schools and classrooms infrastructure that will shorten the timeto-adoption<br />

of enabling technologies in transforming traditional schools to<br />

personalized, technology-based learning environments. Central to the<br />

Department’s comprehensive infrastructure model for learning is to enable<br />

“always-on” learning resources and equitable access to learning experiences<br />

for all students and especially students in underserved populations – lowincome<br />

and minority students, students with disabilities, English language<br />

learners, preschool-aged children, educators, and administrators. The<br />

infrastructure build-out will include the necessary bandwidth upgrade for<br />

broadband access to the Internet of the less than 270 remaining school<br />

buildings that are on T-1 or Frame Relay technology. The infrastructure<br />

build-out will also include additional cabling of instructional spaces,<br />

installation of modern telecommunication systems, and the<br />

enhancement/upgrade of the wireless environment to meet increasing<br />

demand for wireless access and new industry standards. This funding<br />

ensures that the Department continues to work towards providing students<br />

and educators access to a robust and secure infrastructure for online<br />

learning.<br />

NY State, with support and input from NYC, has joined the Partnership for<br />

Assessment of Readiness for College and Careers (PARCC) assessment<br />

consortium in seeking Race –to-the-Top (RTTT) assessment funds. States<br />

participating in PARCC are proposing to launch a redesigned ELA and<br />

Math assessment program in the 20<strong>14</strong>-15 school year, with a majority of<br />

assessment conducted online. Ramp-up issues such as staff training and<br />

testing of equipment mean that implementation will need to begin in the<br />

near future.<br />

The consortium is proposing four assessments throughout the year in<br />

Literacy and Math including three task-based assessments (“through course<br />

assessments”) and a final assessment that will be machine scorable. The<br />

system of assessments is designed so that assessment of learning can take<br />

place closer in time to when key skills and concepts are taught, and states<br />

can provide teachers with actionable information about student learning on a<br />

more frequent basis. Overall, the assessment system will include a mix of<br />

constructed response items; performance tasks; and computer-enhanced,<br />

machine-scored items.<br />

Computer-based administration will be used whenever possible to enable<br />

use of innovative item types (e.g., use of multi-media prompts), allow<br />

for faster turnaround time, allow for distributed scoring and calibration<br />

techniques using multiple scorers, and reduce costs of administration<br />

over the long term.<br />

In the shorter term, system wide use of technology for administration<br />

and scoring will require a significant investment in hardware<br />

(computers, scanners), software (administration and workflow), and<br />

bandwidth.<br />

51


The vision of learning being embraced today puts the child at the center of<br />

the learning and works to ensure that students are college and career ready.<br />

Technology is integral to accomplishing this vision. The schools cannot be<br />

successful in preparing and developing the students with such attributes<br />

without the intensive use of technology in their daily activities. The<br />

Department is working to develop learning systems and school models that<br />

harness the power of technology to personalize learning. Despite the current<br />

fiscal constraints, the Department will allocate significant funds towards<br />

initiatives that will enhance the current foundation and further embed the<br />

new technologies such as an online learning platform as well as next<br />

generation wireless in the instructional space. Expanded use of technology<br />

will enable our schools to reorganize instruction to better focus on each<br />

student individual learning needs and their pace of learning, ensuring that<br />

every student develops the skills, knowledge and mindsets they need to be<br />

successful in life.<br />

New York City has a plan to develop 400 schools according to this vision.<br />

The schools –called the Innovation Zone – will take on a three-year process<br />

to fundamentally transform from standardized models to technology-rich<br />

personalized models.<br />

The Department is committed to ensuring that all students have access to<br />

more personalized learning opportunities through the use of technology and<br />

technology-based tools. The Department will provide an online learning<br />

platform for students, teachers and administrators to access. This platform<br />

will enable DOE to collaborate and conduct professional development<br />

online, as well as offer online AP courses, online credit recovery courses<br />

and blended classes for students. These new course offerings will expand<br />

opportunities for students, especially those who are excelling or struggling.<br />

By increasing the number of classes offered, students will be better able to<br />

find a course that suits their needs.<br />

The capital funding also allows the Department to continue to effectively<br />

leverage the federal Universal Service Fund (E-Rate) discount program. It<br />

was largely due to the Department’s ability to successfully leverage the E-<br />

Rate discount program that the Department has been able to jump start and<br />

make major strides on building a strong technology infrastructure to date.<br />

In addition, this Plan will also invest in various business oriented initiatives<br />

that will strengthen the Department’s ability to deliver and support school<br />

level operations. Such initiatives would include, but not be limited to the<br />

expansion of the point-of-sale system for schools’ cafeteria operations,<br />

network security and access management, and virtualization solution<br />

initiatives for school data/content storage, desktop, and the data center.<br />

52


Facility Enhancements<br />

SUMMARY<br />

Proposed Amendment<br />

$691.0 mm<br />

2012 Adopted<br />

Amendment<br />

$712.0 mm<br />

The Facilities Enhancement Program (FEP) funds facilities adjustments that<br />

enable changes to instructional offerings in particular buildings. This<br />

program complements new capacity investment by ensuring that space<br />

already in service is aligned with the goals of meeting demand, improving<br />

learning conditions, using resources efficiently, and improving student<br />

achievement.<br />

The DOE can improve student achievement and enhance equity through<br />

changes in the portfolio of instructional services, and thus through changes<br />

in the use of current instructional space. The DOE makes such changes<br />

based on specific considerations:<br />

• Family and student demand for particular school or program types<br />

• The improvement of learning conditions, such as the need to<br />

mitigate overcrowding<br />

• Efficient use of public resources so that they are spread equitably,<br />

across communities<br />

• School quality and performance<br />

In neighborhood-level instances where, for one of these reasons, there is a<br />

need for instructional space, the DOE will often pursue adjustments to<br />

existing DOE space rather than creating or procuring new facilities. To<br />

identify both opportunities for such adjustments – termed Facilities<br />

Realignment Strategies – and instances in which they are most needed, the<br />

DOE conducts ongoing assessments of demand for services, facilities<br />

utilization, student learning conditions, and community education priorities,<br />

by neighborhood, across the City. In light of some such assessments, the<br />

DOE may conclude that the objectives will be served through Facilities<br />

Realignment Strategies such as the following:<br />

• Opening new schools and programs within schools<br />

• Relocating currently existing schools or programs<br />

• Reconfiguring grade levels within a school<br />

• Adjusting enrollment conditions<br />

o Changes to rules governing student access (“screens”)<br />

o Zone line adjustments<br />

o Enrollment projection moderation<br />

In instances where such strategies require adjustments to facilities, the FEP<br />

will fund changes necessary to provide the planned instructional service<br />

based on an evaluation of the existing facility and a set of criteria for<br />

facilities investment. The following examples show how a specific<br />

consideration might result in a particular Facilities Realignment Strategy<br />

and thus a particular investment.<br />

53


Consideration Realignment Example<br />

Demand for Services Additional full-day prekindergarten<br />

classes where all<br />

classes are fully enrolled<br />

Improvement of Creating additional classrooms in<br />

Learning Conditions<br />

Efficient Use of<br />

Resources<br />

Quality and<br />

Performance<br />

over-enrolled facilities<br />

Relocation of small school<br />

sharing space from an overenrolled<br />

facility to an under-<br />

enrolled facility<br />

Creation of new small school in<br />

under-utilized space in<br />

neighborhood where only options<br />

are failing schools<br />

It is important to acknowledge that adjustments to school facilities currently<br />

in service require planning on the community, neighborhood, and/or school<br />

levels. The DOE assesses instructional space in conjunction with principals<br />

and School Leadership Teams. Further, the DOE assesses community<br />

education priorities and the feasibility of Facilities Realignment Strategies<br />

through work with DLTs. Finally, in advance of implementing Facilities<br />

Realignment Strategies, the DOE will provide an opportunity for public<br />

comment.<br />

The following table is a prospectus for realignment strategies the DOE will<br />

propose over the course of this Capital Plan specifically in order to solve the<br />

problem of over-enrollment. The chart shows district-level facilities and<br />

enrollment projections to establish a district-wide picture of available<br />

instructional space. However, because over-enrollment is more prevalent at<br />

the elementary level than at the middle school level, the analysis represented<br />

in the chart goes beyond the aggregate district view to highlight areas of<br />

acute elementary over-enrollment that may not be solved through additional<br />

capacity alone. The proposed strategies are based on 20<strong>10</strong>-2019 projections<br />

and 20<strong>10</strong> housing. The DOE is committed to reevaluating this need annually<br />

and making adjustment as necessary due to changes in the development of<br />

housing and other population changes. In these instances, if overenrollment<br />

has materialized or is likely to materialize, the DOE will propose<br />

the realignment strategies entailed in the prospectus.<br />

Examples of strategies that have already been implemented include:<br />

• Relocation of two District 2 middle schools from elementary school<br />

buildings (Greenwich Village Middle School from P.S.3 and Clinton<br />

School for Writers and Artists from P.S. 11), which allows the<br />

expansion of elementary enrollment in the existing buildings,<br />

• Phase out of a District 3 middle school, replaced by the K-8 Anderson<br />

School and a new elementary school.<br />

• Proposed grade truncation of several schools in District 24 from grades<br />

K-6 to grades K-5. Combined with middle school choice in District 24,<br />

overcrowded elementary schools will no longer enroll sixth grade<br />

students, and under-utilized middle schools will increase enrollment.<br />

54


Prospectus realignment strategies include some estimates of possibilities<br />

that have not yet been proposed, and in some cases are not certain to be<br />

achieved. Examples include rezoning in District 20’s Dyker Heights<br />

neighborhood in order to distribute student demand more evenly to underutilized<br />

buildings. Any rezoning must be approved by the local Community<br />

Education Council, in consultation with the local community. Other<br />

strategies might involve grade truncations or relocations similar to the<br />

examples given above but which have not yet been proposed to their<br />

communities.<br />

Note that this prospectus is not an exhaustive list of all realignments the<br />

DOE will propose over the duration of this Capital Plan; there are needed<br />

strategies in instances of low-performing schools, for instance, or in<br />

instances of schools where enrollment is in rapid decline. Instead, what<br />

follows is a prospectus of realignment strategies that complement capital<br />

investment in order to solve over-enrollment scenarios specifically.<br />

Prospectus for Facilities Realignment Strategies<br />

Elementary and Middle Schools<br />

Total<br />

Prospectus for<br />

Realignment In-Process or<br />

Dist Impact Completed Potential Areas for Facilities/Enrollment Realignment<br />

1 300 0 Lower East Side<br />

2 1,000 1,000 Upper East Side, West Village, Chelsea<br />

3 1,790 1,550 Upper West Side<br />

4 0 0<br />

5 180 0 West Harlem<br />

6 980 680 Washington Heights<br />

7 500 380 Western portion of district<br />

8 230 230 Hunts Point/Longwood or Soundview<br />

9 1,515 1,115 Mount Eden, Highbridge<br />

<strong>10</strong> 0 0<br />

11 300 300 Parkchester<br />

12 500 500 East Tremont, Belmont<br />

13 1,150 0 DUMBO/Navy Yard/Fort Greene, Bedford-Stuyvesant<br />

<strong>14</strong> 1,054 604 Williamsburg, Bedford Stuyvesant<br />

15 795 0 Carroll Gardens/ Gowanus/ Red Hook<br />

16 0 0<br />

17 600 0 Prospect Heights/Crown Heights<br />

18 0 N/A<br />

19 0 0<br />

20 0 N/A<br />

21 500 0 Coney Island, Gravesend, Bensonhurst<br />

22 0 N/A<br />

23 0 N/A<br />

24 1,275 975 North Corona, South Corona, Lefrak City, Elmhurst / Glendale, Ridgewood<br />

25 0 0<br />

26 0 0<br />

27 244 194 Far Rockaway, Ozone Park/Richmond Hill<br />

28 854 754 Rego Park, Forest Hills, Briarwood<br />

29 0 0<br />

30 350 0 Woodside, Hunter's Point<br />

31 0 0<br />

32 0 0<br />

Total 13,817 8,282<br />

55


The Facilities Enhancement Program also includes funding to expand the<br />

functional accessibility of our facilities, upgrade science, library, auditorium<br />

and physical fitness facilities.<br />

Facility Enhancements Overview<br />

Program<br />

Facility Restructuring<br />

SUMMARY<br />

Proposed Amendment<br />

$200.0 mm<br />

2012 Adopted<br />

Amendment<br />

$219.0 mm<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Facility Restructuring $200.0 mm $219.0 mm<br />

Safety & Security $<strong>10</strong>0.2 mm $80.2 mm<br />

Science Lab Upgrades $90.0 mm $95.0 mm<br />

Accessibility $75.0 mm $75.0 mm<br />

Physical Fitness Upgrades $163.1 mm $205.0 mm<br />

Library Upgrades $11.7 mm $8.0 mm<br />

Auditorium Upgrades $51.0 mm $29.8 mm<br />

TOTAL $691.0 mm $712.0 mm<br />

Over 600 DOE facilities house multiple school organizations. Dividing large<br />

school facilities for multiple purposes is one way in which the City has<br />

pursued family choice, learning conditions, and school quality. Since 2002,<br />

for example, the DOE has opened over 370 new small schools and 126<br />

charter schools. These schools have been placed in both new and existing<br />

buildings (some charter schools have established private facilities), and in<br />

many cases they have been placed in facilities constructed for use by<br />

students of a different age from those served by the new schools.<br />

Such changes of use are inherent in the work of ensuring equity and<br />

efficiency. In many instances, these new small schools have enabled us to<br />

use excess school capacity to alleviate over-enrollment in nearby areas. In<br />

other circumstances, these schools have replaced historically failing schools<br />

and offer new hope for the children attending them. Either way, in order to<br />

align the facilities with the City’s current need for their use – quality in the<br />

latter example, reducing over-enrollment in the former – some investment is<br />

required to tailor the facilities to their new instructional purposes.<br />

In addition, as new schools models are developed there will also be a need<br />

for the physical environment of the schools to reflect a school model<br />

focused on preparing students to thrive and succeed in the technologydriven,<br />

global economy. This new 21 st Century School Model that is being<br />

proposed includes an emphasis on flexible programs of requirements and<br />

conversion of physical space that provide the level of technology access<br />

necessary to integrate technology fully into the learning experience. The<br />

transformation is a movement away from a teacher-centered classroom to a<br />

learning environment that fosters interaction at all levels.<br />

56


In the adopted FY 20<strong>10</strong> - 20<strong>14</strong> Capital Plan the restructuring of existing<br />

buildings will thus include:<br />

• Creation of appropriate science lab facilities for middle schools<br />

placed in the Primary School buildings and for High Schools<br />

placed into Middle School and Primary School buildings, as<br />

required.<br />

• Conversion of defunct shops/extra-large classrooms to create more<br />

capacity. The effort here would be to create more flexible space<br />

(e.g. music rooms could be used more efficiently if they did not<br />

have tiered seating, home economics shops could become large<br />

spaces with sink facilities for use as either demonstration lab<br />

science classes or humanities classes)<br />

• Renovation of large campuses: When there is an intervention<br />

strategy used to improve the quality of a larger campus such as<br />

downsizing, closure or conversion to Small Learning<br />

Communities, significant investment may be needed.<br />

• Electrical upgrades to traditionally under-enrolled buildings seeing<br />

large increases in utilization rates that tax their electrical systems<br />

• Creation and expansion of school based health centers<br />

Career and Technical Education<br />

A result of the Mayor’s Task Force on Career and Technical Education<br />

(CTE) will be the creation over the next two years of up to five<br />

“demonstration sites,” historical CTE sites now redesigned to include new,<br />

instructionally innovative models. In addition to demonstration sites, the<br />

DOE will open small CTE schools with the continued focus on improving<br />

programs of study in current CTE schools and programs. This will require<br />

investment in CTE resources such as labs and technical equipment.<br />

Demonstration site and new school investment is in addition to continued<br />

investments in upgrades to current CTE facilities. Such investments will be<br />

made in facilities across all five boroughs.<br />

One-Year Suspension Centers<br />

To effectively serve students who have been suspended for a year, District<br />

79 runs suspension centers in each of the five boroughs for middle school<br />

and for high school students. When it is not possible to partner with nonprofits<br />

to run these centers, the DOE must identify stand alone buildings to<br />

serve these students.<br />

57


Safety and Security<br />

SUMMARY<br />

Proposed Amendment<br />

$<strong>10</strong>0.2mm<br />

2012 Adopted<br />

Amendment<br />

$80.2mm<br />

As part of Children First, the Department, in partnership with the New York<br />

City Police Department (NYPD) and the Mayor’s Office of the Criminal<br />

Justice Coordinator (CJC), is implementing a comprehensive strategy to<br />

promote and sustain a climate of safety in all New York City public schools.<br />

A key component of this strategy is to equip schools with state-of-the-art<br />

security technology. Enhancements have been implemented through the FY<br />

2005 - 2009 plan in the areas of network-based video surveillance, ID-card<br />

access control, radio communications, and metal detection.<br />

The plan for FY20<strong>10</strong> - 20<strong>14</strong> focuses on expanded deployment of digital<br />

video surveillance and ID-card access control. The Department plans to<br />

continue a steady rollout of Internet Protocol Digital Video Surveillance<br />

(IPDVS). As of November 15, 2012, this application has been successfully<br />

implemented in 445 buildings serving 7<strong>14</strong> schools with a total of 20,122<br />

cameras online.<br />

The IPDVS application allows authorized school officials to view live and<br />

archived camera images directly on their computer stations and provides<br />

remote viewing capability to authorized personnel from borough and,<br />

central offices. Using objective criteria, the Department, in consultation with<br />

NYPD, has determined the relative priority (high, medium, or lower) of all<br />

school buildings for receiving IPDVS. The FY 2005 - 2009 plan covered the<br />

“high priority” sites. During FY20<strong>10</strong> - 20<strong>14</strong>, the initiative will expand to<br />

“medium priority” sites.<br />

The NYC school system has deployed ID-card access control systems since<br />

the 1980s. Implementation of the current solution, the Comprehensive<br />

Attendance, Administration and Security System (CAASS) began in 2002<br />

and rapidly expanded through the FY 2005 - 2009 Plan. As of October 2008,<br />

the system was installed in 251 buildings serving approximately 400<br />

secondary schools. The Department issued a solicitation for competitive<br />

proposals for managing several functions that are keyed to a secure student<br />

identification device, collectively called Common-ID services (CIDS).<br />

During 2009, the CIDS evaluation committee reviewed multiple proposals<br />

and decided to continue the CAASS application. The solicitation resulted in<br />

two contract awards to 1) maintain the current CAASS infrastructure and 2)<br />

gradually transition to a next generation solution.<br />

The next generation of CAASS is an Application Service Provider (ASP)<br />

solution that offers greater functionality at reduced cost. The ASP solution<br />

eliminates the need for local servers in the schools. The next generation of<br />

CAASS will provide DOE with the capability to control student and visitor<br />

access and exit to school buildings and student access to school properties<br />

such as libraries, cafeterias, locker rooms, gymnasiums and classrooms. In<br />

addition, the next generation solution will offer possible extensions to other<br />

services such as student attendance collection, point of service food<br />

58


Science Lab Upgrades<br />

SUMMARY<br />

Proposed Amendment<br />

$90.0mm<br />

2012 Adopted<br />

Amendment<br />

$95.0mm<br />

Accessibility<br />

SUMMARY<br />

Proposed Amendment<br />

$75.0mm<br />

2012 Adopted<br />

Amendment<br />

$75.0mm<br />

purchases and tracking the circulation of assets such as library materials and<br />

textbooks.<br />

One of the priorities of Children First is to provide quality instruction in the<br />

sciences. Superior facilities are needed to support that effort. The goal of the<br />

FY2005 – 2009 Capital Plan was to ensure that every high school had access<br />

to appropriate science facilities. In the last two years of that Plan the goal<br />

was expanded to include middle schools. The adopted FY20<strong>10</strong> – 20<strong>14</strong> Plan<br />

will continue the effort to ensure that all middle and high schools have<br />

access to the appropriate facilities within their buildings. As the Facility<br />

Realignment Strategies are implemented placing middle or high schools in<br />

spaces we must ensure that appropriate science facilities are also created.<br />

The Department continues to strive to offer a physical environment that does<br />

not create additional challenges for persons with mobility impairments or<br />

other disabilities. In keeping with prior Plans, the Department will continue<br />

the program to provide additional accessible facilities throughout the City.<br />

An analysis of the need has identified seventeen schools to be made<br />

functionally accessible.<br />

Physical Fitness Upgrades and Transportable Classroom Unit<br />

Removal<br />

SUMMARY<br />

Proposed Amendment<br />

$163.1 mm<br />

2012 Adopted<br />

Amendment<br />

$205.0 mm<br />

The Department will continue the efforts started under the FY2005 – 2009<br />

Plan to expand the physical fitness opportunities for our school children.<br />

Partnering with Trust for Public Land, Out2Play and other non-profit<br />

organizations, the Department seeks to leverage limited resources and<br />

effectively increase the reach of this program.<br />

The PlaNYC open space initiative includes the creation of a playground<br />

within a <strong>10</strong> minute walk of every child. The Department was funded under<br />

the last Plan to upgrade over 30 facilities. This work will be completed in<br />

the early years of this Plan. In addition, the Parks Department redirected<br />

PlaNYC funding to the Department for the completion of twelve<br />

playgrounds being constructed by the Trust for Public Land. This work is<br />

also scheduled to be completed in this Plan.<br />

The Department will be integrating the removal of selected Transportable<br />

Classroom Units (TCU) while upgrading and expanding playground<br />

facilities or creating additions. TCU removal at P.S. 138 and P.S. <strong>14</strong>4 in<br />

the Bronx, P.S. 8 and P.S. 308 in Brooklyn as well as P.S. 34 in Queens are<br />

completed. Additional projects are underway that will result in the removal<br />

of over 30 additional units. Projects are selected based on the condition of<br />

59


Library Upgrades<br />

SUMMARY<br />

Proposed Amendment<br />

$11.7 mm<br />

2012 Adopted<br />

Amendment<br />

$8.0 mm<br />

Auditorium Upgrades<br />

SUMMARY<br />

Proposed Amendment<br />

$51.0 mm<br />

2012 Adopted<br />

Amendment<br />

$29.8 mm<br />

the TCUs, capacity constraints within the area and the desires of the local<br />

school community.<br />

Physical Education Upgrades Overview<br />

Proposed Amendment 2012 Adopted<br />

Program<br />

Amendment<br />

Athletic Fields $28.6 mm $23.0 mm<br />

Playground<br />

Redevelopment<br />

$75.2 mm $123.0 mm<br />

Swimming Pools $13.1 mm $8.0 mm<br />

Gymnasium Upgrades $46.2 mm $51.0 mm<br />

TOTAL $163.1 mm $205.0 mm<br />

Library Upgrades include work related to refurbishing existing library<br />

facilities within our schools. School libraries complement New York City<br />

public school reforms, providing the direct resources to support curriculum,<br />

instruction, and specialized efforts geared to improving student literacy.<br />

Auditorium upgrade projects include stage and auditorium lighting, sound<br />

system upgrades, replacement of seating, stage curtains and rigging, and<br />

renovation of the stage. These spaces serve an important function as central<br />

gathering places for the school population and often serve as a vital<br />

community resource for the surrounding neighborhood as well. As such,<br />

the resources identified in this category will have to be applied strategically<br />

to ensure the maximum benefit possible.<br />

60


Mandated Programs<br />

Introduction<br />

SUMMARY<br />

Proposed Amendment<br />

$1,974.7 mm<br />

2011 Adopted<br />

Amendment<br />

$1,974.9 mm<br />

The improvements detailed in this section address existing facility needs for<br />

which it is not possible or appropriate to allocate funds by Borough, District,<br />

or school. This area consists of two major categories; Remediation/Code<br />

Programs and Fixed Programs which include mandated environmental<br />

programs, building condition surveys, emergency lighting, code compliance,<br />

and insurance.<br />

Mandated Programs Overview<br />

Program<br />

61<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Remediation/Code Programs $245.9 mm $232.5 mm<br />

Fixed Programs $1,728.8 mm $1,742.4 mm<br />

TOTAL $1,974.7 mm $1,974.9 mm<br />

Remediation/Code Compliance Program<br />

SUMMARY<br />

Proposed Amendment<br />

$245.9 mm<br />

2011 Adopted<br />

Amendment<br />

$232.5 mm<br />

The Remediation/ Code Compliance Program includes funding to undertake<br />

required work in our existing facilities. The specific work included in this<br />

program is not directly related to capital projects that are undertaken during<br />

this Plan.<br />

Remediation/Code Programs Overview<br />

Program/Need<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Asbestos Abatement $159.6 mm $156.1 mm<br />

Lead Abatement $11.3 mm $12.5 mm<br />

Emergency Lighting $<strong>14</strong>.6 mm $<strong>14</strong>.5 mm<br />

Code Compliance $60.4 mm $49.4 mm<br />

TOTAL $245.9 mm $232.5 mm


Asbestos Abatement<br />

SUMMARY<br />

Proposed Amendment<br />

$159.6 mm<br />

2012 Adopted<br />

Amendment<br />

$156.1 mm<br />

Lead Abatement<br />

SUMMARY<br />

Proposed Amendment<br />

$11.3 mm<br />

2012 Adopted<br />

Amendment<br />

$12.5 mm<br />

The Department’s Asbestos Abatement program is federally mandated by<br />

the Asbestos Hazard Emergency Response Act (AHERA) of 1986. The Act<br />

requires that every public and private school building, Kindergarten – Grade<br />

12, be inspected once every three years, with a semi-annual surveillance.<br />

The location of any asbestos must be documented and a plan developed for<br />

the continuous management of the asbestos in the building.<br />

Asbestos abatement removes the potential health hazard presented by<br />

airborne asbestos fibers. Asbestos is found most commonly in schools in<br />

pipe and boiler insulation, plaster, floor tiles, and spray-on insulation. Only<br />

asbestos in a loosely bound or “friable” condition is dangerous and must be<br />

removed. Asbestos must be removed from construction areas prior to being<br />

disturbed during construction or maintenance activities.<br />

The cost of asbestos abatement is included in the individual project costs for<br />

building modernizations and individual interior and exterior upgrades where<br />

asbestos is present. This funding category provides for abatement of<br />

disturbed asbestos in buildings where no related major capital projects are<br />

planned.<br />

Lead paint abatement is mandated by US Environmental Protection Agency<br />

and New York City Department of Health and Mental Hygiene (DOHMH)<br />

regulations. The targeted population includes Pre-Kindergarten,<br />

Kindergarten, day care in schools, Special Education, and First Grade. To<br />

date, the Department has removed lead-containing materials in over 4,488<br />

classrooms. The Department continues to remediate areas identified by lead<br />

inspections and DOHMH referrals.<br />

Lead abatement is included as an integral part of individual capital projects<br />

that affect surfaces that may contain lead paint, e.g., window replacement<br />

and the removal of paint from exterior walls prior to re-pointing. This<br />

proposed funding provides for lead paint abatement in buildings where no<br />

related major capital projects are planned.<br />

In addition, the Department continues to test elementary schools for the<br />

presence of lead in drinking water and perform remediation when necessary.<br />

While all schools have had initial testing, additional testing will be<br />

necessary at some schools.<br />

62


Emergency Lighting<br />

SUMMARY<br />

Proposed Amendment<br />

$<strong>14</strong>.6 mm<br />

2012 Adopted<br />

Amendment<br />

$<strong>14</strong>.5 mm<br />

Code Compliance<br />

SUMMARY<br />

Proposed Amendment<br />

$60.4 mm<br />

2012 Adopted<br />

Amendment<br />

$49.4 mm<br />

Fixed Programs<br />

This category funds the Department’s continuing program to bring all<br />

school buildings into compliance with the emergency lighting requirements<br />

of Local Law 41/78 (Fire Safety in Places of Public Assembly), and Local<br />

Law 16/84 (Fire Safety in Buildings). These laws establish minimum<br />

standards for emergency lighting, exit lighting, emergency power and<br />

elevator safety. These local laws apply retroactively to most school<br />

buildings. All school buildings are assessed for compliance with these<br />

requirements and necessary upgrades are proposed. Documentation showing<br />

compliance is filed at the Department of Buildings when the assessments are<br />

completed.<br />

Similar to emergency lighting, this category is an ongoing program to bring<br />

all school buildings into conformance with safety-related regulations.<br />

Although many DOE schools are old enough to pre-date the New York City<br />

Building Code, code requirements relating to life and fire safety systems<br />

apply retroactively so that buildings that are not in compliance must be<br />

retrofitted accordingly. Local Law <strong>10</strong> (Owners’ Inspection of Building<br />

Facades) and its successor legislation, Local Law 11, require that the<br />

exterior masonry for buildings over a certain height be inspected every five<br />

years. If hazardous conditions are discovered during an inspection, a<br />

sidewalk shed must be installed immediately and plans to make the<br />

necessary repairs must be developed. At present, all repairs required by<br />

Local Law <strong>10</strong>/11 have been completed and a system of ongoing<br />

maintenance is in place.<br />

Local Law 5 (Fire Safety in High Rise Buildings) mandates the installation<br />

of fire alarm systems in buildings over a certain size so that the Fire<br />

Department can override the elevators’ operations in the event of an<br />

emergency. Other Code-related capital-eligible projects are also included in<br />

this category.<br />

The funding included in this Program is required to support efforts that are<br />

required in order to successfully execute the 20<strong>10</strong> – 20<strong>14</strong> Capital Plan.<br />

These efforts are described more fully below.<br />

Fixed Programs Overview<br />

Program/Need<br />

Proposed Amendment 2012 Adopted<br />

Amendment<br />

Building Condition Surveys $48.7 mm $49.5 mm<br />

Wrap-up Insurance $5<strong>14</strong>.9 mm $488.3 mm<br />

Prior Plan Completion Cost $858.6 mm $858.7 mm<br />

Emergency, Unspecified and<br />

Miscellaneous<br />

$306.6 mm $345.9 mm<br />

TOTAL $1,728.8 mm<br />

63<br />

$1,742.4 mm


Building Condition Surveys<br />

SUMMARY<br />

Proposed Amendment<br />

$48.7 mm<br />

2012 Adopted<br />

Amendment<br />

$49.5 mm<br />

Wrap-Up Insurance<br />

SUMMARY<br />

Proposed Amendment<br />

$5<strong>14</strong>.9 mm<br />

2012 Adopted<br />

Amendment<br />

$488.3 mm<br />

Prior Plan Completion Cost<br />

SUMMARY<br />

Proposed Amendment<br />

$858.6 mm<br />

2012 Adopted<br />

Amendment<br />

$858.7 mm<br />

Keeping the baseline data of building conditions in school facilities up-todate<br />

is essential to the Department’s ability to program capital improvement<br />

projects. The Department conducts annual facility inspections surveys, as<br />

well as extensive BCAS every five years in preparation of the next Five-<br />

Year Plan. These annual surveys are also required by State legislation.<br />

Since 1990, the SCA has maintained an Owner Controlled Insurance<br />

Program (OCIP) that provides insurance coverage for the SCA and<br />

contractors and subcontractors working on SCA projects. Rather than the<br />

traditional approach of having each contractor and subcontractor procure its<br />

own insurance, the SCA negotiates and purchases coverage for Workers<br />

Compensation and Employers Liability, General Liability, Excess Liability,<br />

and Builder’s Risk.<br />

Each pre-qualified SCA contractor is eligible to participate in the OCIP.<br />

Over 1,500 contractors working on hundreds of SCA projects are presently<br />

enrolled. The period of coverage of the current OCIP is January 1, 2011 –<br />

December 31, 2013; the annual cost will depend upon the ultimate loss<br />

experienced.<br />

Many projects funded in the last Five-Year Plan (FY 2005 - 2009) will still<br />

be in progress during this adopted Five-Year Plan period. This category<br />

provides the funding to complete these projects after the end of FY2009.<br />

The 2012 Adopted Amendment reflected the shift of $175 million of<br />

FY2012 funding and $25 million of FY2013 funding from this category to<br />

the appropriate Capital Improvement Categories in FY2013.<br />

Emergency, Unspecified & Miscellaneous<br />

SUMMARY<br />

Proposed Amendment<br />

$306.6 mm<br />

2012 Adopted<br />

Amendment<br />

$345.9 mm<br />

This lump sum funding allows the Department to respond to emergencies<br />

and unforeseeable needs without having to divert funds from other projects<br />

in the Borough or District in which the emergency occurs. Instead, funding<br />

is allocated from this category, which cannot exceed five percent of the total<br />

estimated cost of the Five-Year Plan by law.<br />

64


FINANCING STRATEGY<br />

65


Capital Plan Funding<br />

FUNDING<br />

SOURCE FY 20<strong>10</strong> FY 2011 FY 2012 FY 2013 FY 20<strong>14</strong> TOTAL<br />

CITY* 1.176 .923 1.338 1.720 1.324 6.481<br />

STATE 1.071 .803 1.249 1.025 1.205 5.353<br />

TOTAL 2.247 1.726 2.587 2.745 2.529 11.834<br />

Notes: $ in Billions<br />

*Includes PlaNYC, Borough President, Mayor or City Council Funding<br />

The FY 20<strong>10</strong> – 20<strong>14</strong> Five Year Capital Plan is funded equally by the City<br />

and State.<br />

The Plan’s total appropriation over $11.8 billion during its five-year term<br />

will support the Department’s goals of improving educational performance<br />

and sustaining its diverse portfolio of existing facilities in good repair.<br />

• 38% for the creation of almost 32,300 seats in 71 new facilities with an<br />

additional 5,000 seats to be created from replacing existing facilities and<br />

over 2,500 seats funded for design in this plan and construction in the<br />

next plan<br />

• 62% targeted toward capital investment in basic facility needs,<br />

enhancing school facilities, both system-wide and specifically to support<br />

instructional programs at underperforming schools, including improved<br />

technology, safety enhancements and other general improvements to the<br />

learning environments<br />

Funding for this Plan primarily comes from the City and State, with<br />

potential additional funding for specific projects from federal programs, the<br />

NYC Education Construction Fund (ECF), and privately raised funds. The<br />

Department, in collaboration with the Office of Management and Budget<br />

(OMB) and other City agencies, will continue to explore other financing<br />

sources to supplement the general obligation bonds of the City of New York<br />

to finance the Department’s capital needs over the next five years.<br />

To complement the Plan funding, both City and State elected officials<br />

generally allocate additional capital funds for specific projects at individual<br />

schools. These funds are targeted towards the specific schools’ needs in<br />

areas such as technology, science laboratories, sports/athletic fields,<br />

playgrounds, and other quality-of-life facility upgrades/enhancements. The<br />

City’s elected officials allocated, on average, $70m - $<strong>10</strong>0m annually during<br />

the prior 2005-2009 Plan period. Some State Assembly members have also<br />

sponsored capital projects in individual schools through the Community<br />

Capital Assistance Program (CCAP) and the Special Initiative Program<br />

(SIP).<br />

The Department will continue to work with ECF and its private partners to<br />

67


investigate appropriate financing options to supplement and/or leverage the<br />

City and State funding over the five-year Plan period. The Department will<br />

also continue to be diligent in its effort to pursue new federal programs<br />

pertaining to financing and funding for school building and technology<br />

infrastructure.<br />

68


PROPOSED FIVE-YEAR PLAN<br />

PREPARATION<br />

69


New Capacity<br />

Current Utilization<br />

Enrollment Projections<br />

The New Capacity portion of the plan is based upon an enormous volume of<br />

data that the Department collects and analyzes each year in order to<br />

accurately forecast when and where additional seats will be needed. This<br />

data includes the capacity of existing schools, i.e., “supply of seats,” as well<br />

as demographic projections of future student enrollment, including increased<br />

demand resulting from projected new housing, i.e., “demand for seats.”<br />

Ultimately, if the demand is greater than the supply, the school is deemed<br />

overcrowded.<br />

The first step in identifying new capacity needs is to assess existing school<br />

facilities. The Department maintains an inventory of the amount of space<br />

and utilization of every DOE facility. This allows the DOE to ensure that<br />

space is being used efficiently before proposing to spend capital funds on<br />

the creation of additional seats.<br />

Each fall the Department conducts an Annual Facilities Survey to update its<br />

information regarding the size, function, and use of each room in every<br />

school building. School Principals complete the surveys, which are then<br />

analyzed to determine capacity. (Building capacity is defined as the<br />

maximum number of students who can be accommodated reasonably in a<br />

facility without adversely affecting educational services and programs.) The<br />

utilization rate for each school building is then determined by comparing<br />

capacity with actual enrollment figures.<br />

The detailed results of this analysis on a school-by-school basis can be<br />

found on the NYC School Construction Authority website, http://nycsca.org,<br />

in the report entitled “Enrollment, Capacity, Utilization Report for School<br />

Year 2011–2012,” known as the “Blue Book.”<br />

The next task in developing the capacity program is to project the future<br />

demand for seats. For the past fifteen years, the Department has retained a<br />

demographic consulting firm to prepare enrollment projections for the entire<br />

school system. In 2004, the Department retained a second demographic firm<br />

also to prepare enrollment projections. This was done to confirm the validity<br />

of our projections. The enrollment projection process entails 128 separate<br />

demographic projections, taking into account the unique migration, birth and<br />

enrollment trends in each Community School District. These projections are<br />

used to develop total enrollment projections by District, Borough and the<br />

City as a whole. Projections are prepared for five years and ten years into<br />

the future in order to ensure that capital funds are not expended to meet only<br />

short-term anomalies in enrollment. For the February Proposed Amendment,<br />

the projection years were 20<strong>14</strong> and 2018.<br />

71


These detailed projections can be found on the NYC School Construction<br />

Authority website, http://nycsca.org in the report entitled “Enrollment<br />

Projections 2009 to 2018 New York City Public Schools.”<br />

New Capacity Needs Assessment<br />

Existing Facilities<br />

Background<br />

The enrollment projections for year 20<strong>14</strong> and 2018 were used to determine<br />

future utilization. This is in effect a supply and demand analysis. The<br />

future enrollment projections, i.e., the “demand,” are compared to the<br />

existing capacity of seats in school buildings, i.e., the “supply.” When<br />

demand exceeds supply, then additional seats must be provided or<br />

overcrowding will result. For the first time, this analysis was performed<br />

below the district level. Areas within each district were analyzed to<br />

determine need and recommendations were based accordingly.<br />

In order to project future utilization accurately, it is necessary to fine-tune<br />

the analysis. The cohort survival projection methodology used by the<br />

Department’s demographers, takes into account, either explicitly or<br />

implicitly, most of the factors that affect enrollment. These include<br />

migration within the City, in-migration to the City from outside, movement<br />

out of the City, births, transfers, long-term absences and dropouts. However,<br />

policy changes and international economic and political events can undo<br />

even the best projections. For example, dramatic economic trends or<br />

changes in federal immigration policy may result in unforeseeable increases<br />

or decreases in enrollment. In addition, new housing development projects<br />

can stress the local schools by introducing an influx of new students. The<br />

Department carefully tracks new housing starts and builds the expected<br />

increase in school-age population into projections.<br />

Policies aimed at improving educational quality can increase the need for<br />

new seats. For example, under this Capital Plan class size reduction is being<br />

extended through high school. In the prior Plan the class size for all<br />

kindergarten through third grade citywide was reduced from 25 seats to 20<br />

seats. Similarly, under this Plan the class size for third to eighth grade is<br />

being reduced to twenty-eight and high school grades are being reduced to<br />

thirty.<br />

Preparation of the Capital Improvement Program (CIP) begins with a<br />

baseline survey of the Department’s approximately 130,000,000 square feet<br />

of space, including school buildings, administrative buildings, leased<br />

facilities, annexes, mini-schools, temporary buildings, and field houses. This<br />

Building Condition Assessment Survey (BCAS) is mandated by the New<br />

York State Department of Education.<br />

72


Methodology<br />

A detailed visual inspection of each school facility was conducted by a fourperson<br />

team consisting of two architects, an electrical engineer and a<br />

mechanical engineer. Each team member carried a hand-held computer<br />

programmed with over 2000 possible deficient conditions. Averaging one<br />

school per day, the inspectors visually assessed each facility’s physical<br />

condition. The teams rated each building’s main systems and underlying<br />

components, identifying and quantifying any deficiencies.<br />

The condition of each building system is assessed in various ways beginning<br />

with interviewing building personnel, including the principal and custodian,<br />

quantifying the existing deficiencies through a visual inspection, reviewing<br />

violation information and assessing the remaining useful life. This<br />

assessment is performed at a component level and then the information is<br />

combined to present an evaluation of the overall system condition.<br />

After the building deficiencies were identified, a software program was used<br />

to assign order of magnitude costs to repair each deficiency. These data are<br />

then grouped into capital projects falling into one of 60 capital planning<br />

categories. Once the projects were created, an analysis was conducted to<br />

ensure that the project costs reflected the approximate budget necessary to<br />

accomplish the needed repair. An inflation factor was then added to the<br />

costs, and the projects were assigned to one of the five years in the Plan.<br />

The 2011-2012 BCAS Reports for every DOE school building can be found<br />

on the Department of Education website, http://schools.nyc.gov. These<br />

reports are located under the reports section of each school’s website.<br />

73


Key Steps and Dates for Approval of the Proposed Amendment<br />

November 2012 Proposed Amendment released<br />

November 2012<br />

– January 2013<br />

Meet with Community Education Councils and other community<br />

representatives<br />

February 2013 Issue a revised Amendment to the Panel for Educational Policy<br />

March 2013 Submit Panel-approved proposed Plan to Mayor and City Council<br />

June 2013 Adoption by City Council<br />

74


Appendices Table of Contents<br />

Plan Summary_____________________________________________________________ C-1<br />

Citywide Categories ________________________________________________________ C-5<br />

Accessibility Program ______________________________________________________ C-7<br />

Lighting Replacement Program ______________________________________________ C-8<br />

Science Lab Program ______________________________________________________ C-15<br />

Ansul Systems ____________________________________________________________ C-17<br />

Kitchen Areas – Walk-In Freezer Replacements _______________________________ C-18<br />

Classroom Connectivity____________________________________________________ C-19<br />

New/Retrofit Telephone Intercom Systems ____________________________________ C-74<br />

IP Surveillance Camera Installation _________________________________________ C-89<br />

Capacity Projects _________________________________________________________ C-94<br />

Replacement Projects _____________________________________________________ C-98<br />

FY 20<strong>10</strong> – FY 20<strong>14</strong> Capacity Program Site Locations ___________________________ C-99<br />

FY 2005 – FY 2009 Capacity Projects in Process ______________________________ C-<strong>10</strong>2<br />

Projects Advanced to FY 2009______________________________________________ C-<strong>10</strong>3<br />

Added Projects __________________________________________________________ C-115<br />

Cancelled Projects________________________________________________________ C-246<br />

Borough of Manhattan<br />

Borough Summary _________________________________________________________ M-1<br />

Capacity Projects __________________________________________________________ M-5<br />

Replacement Projects ______________________________________________________ M-6<br />

School Based Program ______________________________________________________ M-7<br />

Borough of Bronx<br />

Borough Summary _________________________________________________________ X-1<br />

Capacity Projects __________________________________________________________ X-5<br />

Replacement Projects ______________________________________________________ X-6<br />

School Based Program ______________________________________________________ X-7<br />

Borough of Brooklyn<br />

Borough Summary _________________________________________________________ K-1<br />

Capacity Projects __________________________________________________________ K-5<br />

Replacement Projects ______________________________________________________ K-6<br />

School Based Program ______________________________________________________ K-7<br />

75


Borough of Queens<br />

Borough Summary _________________________________________________________ Q-1<br />

Capacity Projects __________________________________________________________ Q-5<br />

Replacement Projects ______________________________________________________ Q-7<br />

School Based Program ______________________________________________________ Q-8<br />

Borough of Staten Island<br />

Borough Summary _________________________________________________________ R-1<br />

Capacity Projects __________________________________________________________ R-5<br />

School Based Program ______________________________________________________ R-6<br />

Preliminary View of FY2015 – 2019 Capital Plan _________________________________ 6-1<br />

76


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Plan Summary<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

0.00<br />

0.00<br />

7.<strong>10</strong><br />

0.45<br />

36.72<br />

3.78<br />

12.78<br />

0.00<br />

0.00<br />

25.77<br />

4.33<br />

12.57<br />

8.20<br />

50.04<br />

0.68<br />

2.20<br />

19.20<br />

9.82<br />

15.53<br />

23.66<br />

2.15<br />

73.26<br />

66.15<br />

0.00<br />

70.71<br />

181.62<br />

15.43<br />

50.20<br />

0.00<br />

0.00<br />

1.37<br />

0.29<br />

35.42<br />

38.87<br />

30.37<br />

0.00<br />

0.00<br />

18.56<br />

2.73<br />

7.12<br />

0.88<br />

39.07<br />

0.21<br />

1.30<br />

6.62<br />

2.29<br />

5.88<br />

9.30<br />

0.67<br />

69.86<br />

43.88<br />

0.00<br />

66.64<br />

175.75<br />

7.03<br />

29.58<br />

0.00<br />

0.00<br />

0.40<br />

0.25<br />

31.43<br />

32.58<br />

17.50<br />

0.00<br />

0.00<br />

30.53<br />

7.51<br />

5.86<br />

2.87<br />

40.64<br />

6.55<br />

1.80<br />

4.21<br />

1.65<br />

1.67<br />

9.17<br />

9.41<br />

77.66<br />

88.52<br />

0.00<br />

35.35<br />

<strong>14</strong>9.23<br />

17.74<br />

13.18<br />

0.00<br />

0.00<br />

0.11<br />

0.03<br />

28.00<br />

44.97<br />

13.25<br />

0.00<br />

0.00<br />

1<strong>10</strong>.23<br />

<strong>14</strong>8.92<br />

6.42<br />

1.<strong>14</strong><br />

36.00<br />

12.65<br />

3.00<br />

9.89<br />

2.90<br />

5.31<br />

8.18<br />

0.84<br />

51.95<br />

65.75<br />

0.00<br />

66.37<br />

118.71<br />

52.13<br />

131.24<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

28.00<br />

26.22<br />

6.71<br />

0.00<br />

0.00<br />

44.47<br />

113.20<br />

6.20<br />

0.60<br />

<strong>10</strong>.76<br />

0.00<br />

3.00<br />

4.13<br />

0.95<br />

0.17<br />

24.92<br />

0.00<br />

9.96<br />

16.29<br />

0.00<br />

20.43<br />

38.52<br />

0.87<br />

0.44<br />

0.00<br />

0.00<br />

8.98<br />

1.02<br />

159.57<br />

<strong>14</strong>6.42<br />

80.61<br />

0.00<br />

0.00<br />

229.56<br />

276.69<br />

38.17<br />

13.69<br />

176.50<br />

20.09<br />

11.30<br />

44.05<br />

17.60<br />

28.56<br />

75.23<br />

13.06<br />

282.70<br />

280.59<br />

0.00<br />

259.49<br />

663.84<br />

93.21<br />

224.65


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Plan Summary<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

4.49<br />

15.20<br />

0.05<br />

19.48<br />

17.51<br />

12.86<br />

2.12<br />

8.77<br />

0.13<br />

6.66<br />

<strong>10</strong>.16<br />

0.00<br />

0.00<br />

4.06<br />

0.55<br />

6.40<br />

0.06<br />

7.94<br />

8.39<br />

13.46<br />

2.40<br />

4.51<br />

0.03<br />

3.95<br />

1.48<br />

0.00<br />

0.00<br />

4.98<br />

1.90<br />

9.59<br />

0.01<br />

3.57<br />

5.86<br />

6.91<br />

0.78<br />

0.75<br />

0.01<br />

12.84<br />

<strong>10</strong>.62<br />

0.00<br />

0.00<br />

5.32<br />

23.23<br />

12.36<br />

0.00<br />

15.66<br />

7.44<br />

8.53<br />

0.54<br />

1.67<br />

0.00<br />

25.12<br />

<strong>14</strong>.24<br />

0.00<br />

0.00<br />

2.97<br />

I. State of Good Repair Total:<br />

11.71<br />

0.28<br />

0.00<br />

6.46<br />

0.00<br />

7.57<br />

0.00<br />

0.27<br />

0.00<br />

2.44<br />

9.75<br />

0.00<br />

0.00<br />

0.80<br />

793.82 647.85 643.88 1,029.74 395.11<br />

476.59<br />

33.20<br />

0.00<br />

21.91<br />

0.05<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

182.<strong>10</strong><br />

12.67<br />

0.00<br />

6.43<br />

0.04<br />

0.01<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

606.15<br />

77.48<br />

0.00<br />

46.36<br />

0.03<br />

0.01<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

474.16<br />

72.66<br />

0.00<br />

38.72<br />

0.03<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

738.85<br />

286.12<br />

0.00<br />

130.55<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

41.88<br />

43.83<br />

0.12<br />

53.11<br />

39.20<br />

49.33<br />

5.84<br />

15.97<br />

0.18<br />

51.00<br />

46.25<br />

0.00<br />

0.00<br />

18.<strong>14</strong><br />

3,5<strong>10</strong>.39<br />

2,477.86<br />

482.13<br />

0.00<br />

243.98<br />

0.<strong>14</strong><br />

0.01<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Plan Summary<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

65.66<br />

47.46<br />

0.00<br />

43.65<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

78.44<br />

40.42<br />

0.00<br />

11.05<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

66.74<br />

<strong>14</strong>0.34<br />

0.00<br />

29.78<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

<strong>10</strong>1.35<br />

46.43<br />

0.00<br />

24.25<br />

0.00<br />

II. System Expansion Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

42.86<br />

131.02<br />

0.00<br />

175.12<br />

0.00<br />

688.52 331.15 966.89 757.60 1,504.53<br />

49.00<br />

6.12<br />

24.67<br />

19.18<br />

11.54<br />

2.94<br />

2.31<br />

50.80<br />

7.72<br />

23.31<br />

8.33<br />

22.43<br />

2.04<br />

89.83<br />

358.60<br />

16.00<br />

16.40<br />

33.66<br />

18.05<br />

1.60<br />

63.06<br />

233.35<br />

23.75<br />

2.45<br />

34.07<br />

17.97<br />

3.58<br />

33.71<br />

235.00<br />

21.41<br />

8.17<br />

29.76<br />

20.01<br />

1.55<br />

21.11<br />

115.76 204.46 507.36 348.88 337.02<br />

3.91<br />

11.94<br />

1.08<br />

<strong>10</strong>.63<br />

III. Educational Enhancements Total:<br />

4.30<br />

16.<strong>10</strong><br />

0.36<br />

12.84<br />

1.38<br />

18.06<br />

0.19<br />

17.11<br />

1.21<br />

25.19<br />

6.50<br />

12.77<br />

1.07<br />

28.94<br />

6.50<br />

7.00<br />

27.57 33.61 36.74 45.67 43.50<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

355.05<br />

405.67<br />

0.00<br />

283.84<br />

0.00<br />

4,248.68<br />

926.75<br />

75.00<br />

75.00<br />

125.00<br />

90.00<br />

11.71<br />

2<strong>10</strong>.00<br />

1,513.47<br />

11.86<br />

<strong>10</strong>0.23<br />

<strong>14</strong>.64<br />

60.36<br />

187.09


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Plan Summary<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

8.30<br />

0.50<br />

0.70<br />

0.<strong>10</strong><br />

V. Ancillary Facilities Total:<br />

16.83<br />

8.30 0.50 0.70 0.<strong>10</strong> 16.83<br />

8.40<br />

6.50<br />

113.38<br />

26.92<br />

8.66<br />

0.00<br />

354.<strong>10</strong><br />

77.23<br />

15.53<br />

2.41<br />

11.<strong>10</strong><br />

7.30<br />

97.24<br />

37.88<br />

4.56<br />

0.00<br />

229.30<br />

97.<strong>14</strong><br />

20.70<br />

3.44<br />

9.20<br />

5.80<br />

97.24<br />

58.33<br />

3.16<br />

0.00<br />

137.20<br />

<strong>10</strong>0.55<br />

19.36<br />

0.30<br />

<strong>10</strong>.00<br />

7.00<br />

97.00<br />

62.88<br />

5.00<br />

0.00<br />

138.03<br />

204.41<br />

34.34<br />

4.67<br />

<strong>10</strong>.00<br />

7.00<br />

1<strong>10</strong>.00<br />

60.55<br />

5.00<br />

0.00<br />

0.00<br />

16.94<br />

9.85<br />

12.59<br />

613.12 508.66 431.<strong>14</strong> 563.32 231.92<br />

VI. Emergency, Unspecified and Misc. Total:<br />

Yearly Totals: 2,247.<strong>10</strong> 1,726.22 2,586.71 2,745.30 2,528.90<br />

Grand Total:<br />

26.43<br />

26.43<br />

48.70<br />

33.60<br />

5<strong>14</strong>.86<br />

246.55<br />

26.38<br />

0.00<br />

858.63<br />

496.26<br />

99.78<br />

23.40<br />

2,348.16<br />

$11,834.23


Program Category<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Citywide Categories<br />

(in millions)<br />

Code FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

ASBESTOS 1C1<br />

36.72 35.42 31.43 28.00 28.00 159.57<br />

KITCHEN CONVERSIONS 1C5<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

LEAD PAINT ABATEMENT 1C12<br />

2.20 1.30 1.80 3.00 3.00 11.30<br />

KITCHEN AREAS 1E15<br />

8.77 4.51 0.75 1.67 0.27 15.97<br />

CIP RESPONSE 1E20<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

TRANSPORTABLES 2A4<br />

0.05 0.04 0.03 0.03 0.00 0.<strong>14</strong><br />

TECHNOLOGY 3A1<br />

49.00 50.80 358.60 233.35 235.00 926.75<br />

ROOM CONVERSIONS/PARTITIONING 3A2<br />

6.12 7.72 16.00 23.75 21.41 75.00<br />

ACCESSIBILITY 3A3<br />

24.67 23.31 16.40 2.45 8.17 75.00<br />

SCHOOL IMPROVEMENT AND RESTRUCTURING 3A4<br />

19.18 8.33 33.66 34.07 29.76 125.00<br />

SCIENCE LAB UPGRADES 3A5<br />

11.54 22.43 18.05 17.97 20.01 90.00<br />

LIBRARY UPGRADES 3A6<br />

2.94 2.04 1.60 3.58 1.55 11.71<br />

CHARTER/INNOVATIVE SCHOOLS 3A7<br />

2.31 89.83 63.06 33.71 21.11 2<strong>10</strong>.00<br />

SCHOOL SAFETY 4A1a<br />

11.94 16.<strong>10</strong> 18.06 25.19 28.94 <strong>10</strong>0.23<br />

EMERGENCY LIGHTING AND FIRE SAFETY RETROFITS 4A2<br />

1.08 0.36 0.19 6.50 6.50 <strong>14</strong>.64<br />

CODE COMPLIANCE 4A3<br />

<strong>10</strong>.63 12.84 17.11 12.77 7.00 60.36<br />

ADMINISTRATIVE SUPPORT 5A1<br />

8.30 0.50 0.70 0.<strong>10</strong> 16.83 26.43<br />

BUILDING CONDITION SURVEYS 6A1<br />

8.40 11.<strong>10</strong> 9.20 <strong>10</strong>.00 <strong>10</strong>.00 48.70<br />

DOE ADMINISTRATION 6C1<br />

6.50 7.30 5.80 7.00 7.00 33.60<br />

WRAP-UP INSURANCE 6D1<br />

113.38 97.24 97.24 97.00 1<strong>10</strong>.00 5<strong>14</strong>.86<br />

EMERGENCY UNSPECIFIED 6E1<br />

26.92 37.88 58.33 62.88 60.55 246.55


Program Category<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Citywide Categories<br />

(in millions)<br />

Code FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

EMERGENCY STABILIZATION 6E2<br />

8.66 4.56 3.16 5.00 5.00 26.38<br />

EMERGENCY RESPONSE 6E3<br />

0.00 0.00 0.00 0.00 0.00 0.00<br />

PRIOR PLAN COMPLETION COST 6F1<br />

354.<strong>10</strong> 229.30 137.20 138.03 0.00 858.63<br />

CITY COUNCIL 6G1<br />

77.23 97.<strong>14</strong> <strong>10</strong>0.55 204.41 16.94 496.26<br />

MAYOR/COUNCIL PROGRAM 6H1<br />

2.41 3.44 0.30 4.67 12.59 23.40<br />

Grand Total 793.05 763.49 989.21 955.12 649.62 4,150.49


Borough<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Accessibility Program<br />

District<br />

Building<br />

ID Org ID School Name Project Description<br />

Bronx 09 X082 X232 I.S. 232 FULL PROGRAM ACCESSIBILITY<br />

Bronx <strong>10</strong> X009 X009 P.S. 9 (OLD 115) FULL PROGRAM ACCESSIBILITY<br />

Bronx <strong>10</strong> X080 X080 I.S. 80/P.S. 280 FULL PROGRAM ACCESSIBILITY<br />

Bronx 11 X083 X083 P.S. 83 FULL PROGRAM ACCESSIBILITY<br />

Brooklyn 17 K002 K002 I.S. 2 FULL PROGRAM ACCESSIBILITY<br />

Brooklyn 20 K<strong>10</strong>2 K<strong>10</strong>2 P.S. <strong>10</strong>2 FULL PROGRAM ACCESSIBILITY<br />

Brooklyn 21 K225 K225 P.S. 225 FULL PROGRAM ACCESSIBILITY<br />

Manhattan 01 M188 M188 P.S. 188 FULL PROGRAM ACCESSIBILITY<br />

Manhattan 04 M<strong>10</strong>1 M375 PS/IS 375 FULL PROGRAM ACCESSIBILITY<br />

Manhattan 78M M641 M721 M721 SPED FULL PROGRAM ACCESSIBILITY<br />

Queens 25 Q154 Q154 P.S. 154 FULL PROGRAM ACCESSIBILITY<br />

Queens 25 Q168 Q250 I.S. 250 FULL PROGRAM ACCESSIBILITY<br />

Queens 26 Q186 Q186 P.S. 186 FULL PROGRAM ACCESSIBILITY<br />

Queens 28 Q206 Q206<br />

P.S. 206 FIRST FLOOR ACCESSIBILITY<br />

ONLY.


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

01 M034 P.S. 34<br />

Manhattan 2013<br />

02 M002 P.S. 2<br />

Manhattan 2011<br />

02 M042 P.S. 42<br />

Manhattan 2013<br />

02 M126 P.S. 126<br />

Manhattan 2013<br />

02 M190 P.S. 290<br />

Manhattan 2012<br />

02 M198 P.S. 198<br />

Manhattan 2011<br />

02 M840 P.S. 150<br />

Manhattan 2013<br />

03 M076 P.S. 76<br />

Manhattan 2013<br />

03 M087 P.S. 87<br />

Manhattan 20<strong>14</strong><br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4)<br />

Manhattan 2013<br />

03 M163 P.S. 163<br />

Manhattan 2012<br />

03 M180 P.S. 180<br />

Manhattan 2012<br />

03 M191 P.S. 191<br />

Manhattan 2013<br />

03 M199 P.S. 199<br />

Manhattan 2011<br />

04 M007 P.S. 7<br />

Manhattan 2013<br />

04 M083 P.S. 83<br />

Manhattan 2013<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Manhattan 20<strong>14</strong><br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Manhattan 2011<br />

05 M092 P.S. 92<br />

Manhattan 2013<br />

05 M123 P.S. 123<br />

Manhattan 2013<br />

06 M128 P.S. 128<br />

Manhattan 2013<br />

06 M189 P.S. 189<br />

Manhattan 2011<br />

07 X018 P.S. 18<br />

Bronx<br />

2013<br />

07 X040 P.S. 220<br />

Bronx<br />

20<strong>14</strong><br />

07 X065 P.S. 65<br />

Bronx<br />

20<strong>10</strong><br />

07 X183 J.H.S. 203<br />

Bronx<br />

2013<br />

08 X052 I.S. 302<br />

Bronx<br />

2012<br />

08 X060 P.S. 333<br />

Bronx<br />

20<strong>14</strong><br />

08 X062 P.S. 62<br />

Bronx<br />

2011<br />

08 X062 P.S. 62<br />

Bronx<br />

20<strong>14</strong><br />

08 X<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Bronx<br />

2012<br />

08 X123 I.S. 123<br />

Bronx<br />

2013<br />

08 X131 I.S. 131<br />

Bronx<br />

2013<br />

08 X138 P.S. 138<br />

Bronx<br />

2012<br />

08 X192 I.S. 192<br />

Bronx<br />

20<strong>14</strong><br />

09 X011 P.S. 11<br />

Bronx<br />

20<strong>14</strong><br />

09 X042 P.S. 42<br />

Bronx<br />

20<strong>14</strong><br />

09 X063 P.S. 63<br />

Bronx<br />

20<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

09 X070 P.S. 70<br />

Bronx<br />

20<strong>14</strong><br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8)<br />

Bronx<br />

20<strong>14</strong><br />

<strong>10</strong> X007 P.S. 7<br />

Bronx<br />

2011<br />

11 X<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Bronx<br />

2011<br />

11 X127 I.S. 127<br />

Bronx<br />

20<strong>10</strong><br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4<br />

Bronx<br />

2013<br />

11 X153 P.S. 153<br />

Bronx<br />

20<strong>14</strong><br />

11 X178 P.S. 178<br />

Bronx<br />

2011<br />

11 X181 I.S. 181<br />

Bronx<br />

2012<br />

12 X006 P.S. 6<br />

Bronx<br />

20<strong>14</strong><br />

12 X067 P.S. 67<br />

Bronx<br />

20<strong>14</strong><br />

12 X150 P.S. 150<br />

Bronx<br />

2013<br />

13 K020 P.S. 20<br />

Brooklyn<br />

2012<br />

13 K054 P.S. 54<br />

Brooklyn<br />

20<strong>14</strong><br />

13 K056 P.S. 56<br />

Brooklyn<br />

2011<br />

13 K067 P.S. 67<br />

Brooklyn<br />

2012<br />

13 K113 I.S. 113<br />

Brooklyn<br />

2012<br />

13 K117 I.S. 117<br />

Brooklyn<br />

2013<br />

13 K256 P.S. 256<br />

Brooklyn<br />

2013<br />

13 K258 I.S. 258<br />

Brooklyn<br />

2013<br />

13 K265 I.S. 265<br />

Brooklyn<br />

2013<br />

13 K282 P.S. 282<br />

Brooklyn<br />

2013<br />

13 K305 P.S. 305<br />

Brooklyn<br />

2013<br />

<strong>14</strong> K016 P.S. 16<br />

Brooklyn<br />

20<strong>14</strong><br />

<strong>14</strong> K018 P.S. 18<br />

Brooklyn<br />

20<strong>14</strong><br />

<strong>14</strong> K023 P.S. 23<br />

Brooklyn<br />

2013<br />

<strong>14</strong> K034 P.S. 34<br />

Brooklyn<br />

20<strong>14</strong><br />

<strong>14</strong> K050 J.H.S. 50<br />

Brooklyn<br />

2013<br />

<strong>14</strong> K059 P.S. 59<br />

Brooklyn<br />

2013<br />

<strong>14</strong> K157 P.S. 157<br />

Brooklyn<br />

20<strong>14</strong><br />

<strong>14</strong> K257 P.S. 257<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K297 P.S. 297<br />

Brooklyn<br />

2013<br />

15 K001 P.S. 1<br />

Brooklyn<br />

20<strong>14</strong><br />

15 K0<strong>10</strong> P.S. <strong>10</strong><br />

Brooklyn<br />

2012<br />

15 K032 P.S. 32<br />

Brooklyn<br />

2012<br />

15 K038 P.S. 38<br />

Brooklyn<br />

2013<br />

15 K051 I.S. 51<br />

Brooklyn<br />

2013<br />

15 K058 P.S. 58<br />

Brooklyn<br />

2013


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

15 K124 P.S. 124<br />

Brooklyn<br />

20<strong>14</strong><br />

15 K130 P.S. 130<br />

Brooklyn<br />

2012<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2<br />

Brooklyn<br />

20<strong>14</strong><br />

15 K293 J.H.S. 293<br />

Brooklyn<br />

2013<br />

16 K021 P.S. 21<br />

Brooklyn<br />

2013<br />

16 K026 P.S. 26<br />

Brooklyn<br />

2013<br />

16 K040 P.S. 40<br />

Brooklyn<br />

2012<br />

16 K262 P.S. 262<br />

Brooklyn<br />

2013<br />

16 K304 P.S. 304<br />

Brooklyn<br />

20<strong>14</strong><br />

16 K308 P.S. 308<br />

Brooklyn<br />

20<strong>14</strong><br />

16 K309 P.S. 309<br />

Brooklyn<br />

2011<br />

16 K335 P.S. 335<br />

Brooklyn<br />

2013<br />

17 K161 P.S. 161<br />

Brooklyn<br />

20<strong>14</strong><br />

17 K189 P.S. 189<br />

Brooklyn<br />

20<strong>14</strong><br />

17 K221 P.S. 221<br />

Brooklyn<br />

20<strong>14</strong><br />

17 K316 P.S. 316<br />

Brooklyn<br />

2013<br />

17 K320 P.S. 375<br />

Brooklyn<br />

20<strong>14</strong><br />

18 K068 I.S. 68<br />

Brooklyn<br />

20<strong>14</strong><br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong><br />

Brooklyn<br />

2012<br />

18 K235 P.S. 235<br />

Brooklyn<br />

20<strong>14</strong><br />

18 K272 P.S. 272<br />

Brooklyn<br />

2011<br />

19 K065 P.S. 65<br />

Brooklyn<br />

20<strong>14</strong><br />

19 K213 P.S. 213<br />

Brooklyn<br />

2013<br />

19 K273 P.S. 273<br />

Brooklyn<br />

2012<br />

19 K328 P.S. 328<br />

Brooklyn<br />

2013<br />

20 K<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Brooklyn<br />

2013<br />

20 K160 P.S. 160<br />

Brooklyn<br />

20<strong>14</strong><br />

20 K163 P.S. 163<br />

Brooklyn<br />

20<strong>14</strong><br />

20 K170 P.S. 170 ADDITION<br />

Brooklyn<br />

20<strong>14</strong><br />

20 K186 P.S. 186<br />

Brooklyn<br />

20<strong>14</strong><br />

20 K223 I.S. 223<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K090 P.S. 90<br />

Brooklyn<br />

2013<br />

21 K095 P.S. 95<br />

Brooklyn<br />

2012<br />

21 K096 I.S. 96<br />

Brooklyn<br />

2013<br />

21 K097 P.S. 97<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K099 P.S. 99<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Brooklyn<br />

2011<br />

21 K128 P.S. 128 (TANDEM BROOKLYN STUDIO)<br />

Brooklyn<br />

20<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

21 K153 P.S. 153<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K177 P.S. 177<br />

Brooklyn<br />

2012<br />

21 K209 P.S. 209<br />

Brooklyn<br />

2013<br />

21 K212 P.S. 212<br />

Brooklyn<br />

2011<br />

21 K216 P.S. 216<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K225 P.S. 225<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K226 P.S. 226<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K238 P.S. 238<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K253 P.S. 253<br />

Brooklyn<br />

20<strong>14</strong><br />

21 K281 I.S. 281<br />

Brooklyn<br />

2012<br />

21 K288 P.S. 288<br />

Brooklyn<br />

2013<br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

22 K052 P.S. 52<br />

Brooklyn<br />

2013<br />

22 K078 I.S. 78<br />

Brooklyn<br />

2013<br />

22 K119 P.S. 119<br />

Brooklyn<br />

2011<br />

22 K193 P.S. 193<br />

Brooklyn<br />

20<strong>14</strong><br />

22 K194 P.S. 194<br />

Brooklyn<br />

20<strong>14</strong><br />

22 K198 P.S. 198<br />

Brooklyn<br />

20<strong>14</strong><br />

22 K207 P.S. 207<br />

Brooklyn<br />

2013<br />

22 K222 P.S. 222<br />

Brooklyn<br />

20<strong>14</strong><br />

22 K234 I.S. 234<br />

Brooklyn<br />

2013<br />

22 K236 P.S. 236<br />

Brooklyn<br />

2011<br />

22 K254 P.S. 254<br />

Brooklyn<br />

2013<br />

22 K255 P.S. 255<br />

Brooklyn<br />

2011<br />

22 K277 P.S. 277<br />

Brooklyn<br />

2013<br />

22 K278 I.S. 278<br />

Brooklyn<br />

20<strong>14</strong><br />

22 K312 P.S. 312<br />

Brooklyn<br />

2013<br />

22 K852 P.S. 326<br />

Brooklyn<br />

2013<br />

23 K055 I.S. 55<br />

Brooklyn<br />

2013<br />

23 K073 P.S. 73<br />

Brooklyn<br />

20<strong>14</strong><br />

23 K150 P.S. 150<br />

Brooklyn<br />

20<strong>14</strong><br />

23 K155 P.S. 155<br />

Brooklyn<br />

2013<br />

23 K165 P.S. 165<br />

Brooklyn<br />

2013<br />

23 K183 P.S. 183<br />

Brooklyn<br />

20<strong>14</strong><br />

23 K184 P.S. 184<br />

Brooklyn<br />

2013<br />

23 K271 I.S. 271<br />

Brooklyn<br />

2013<br />

23 K298 P.S. 298<br />

Brooklyn<br />

2013<br />

23 K327 P.S. 327 (TANDEM K396-D75)<br />

Brooklyn<br />

2013


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

23 K332 P.S. 332<br />

Brooklyn<br />

2013<br />

24 Q0<strong>14</strong> P.S. <strong>14</strong><br />

Queens<br />

2013<br />

24 Q061 I.S. 61<br />

Queens<br />

2013<br />

24 Q088 P.S. 88<br />

Queens<br />

20<strong>14</strong><br />

24 Q093 I.S. 93<br />

Queens<br />

20<strong>10</strong><br />

24 Q113 P.S./I.S. 113<br />

Queens<br />

20<strong>14</strong><br />

24 Q199 P.S. 199<br />

Queens<br />

2013<br />

25 Q032 P.S. 32<br />

Queens<br />

2012<br />

25 Q189 J.H.S. 189<br />

Queens<br />

20<strong>14</strong><br />

25 Q194 J.H.S. 194<br />

Queens<br />

2013<br />

26 Q018 P.S. 18<br />

Queens<br />

2013<br />

26 Q158 J.H.S. 158<br />

Queens<br />

2013<br />

26 Q162 P.S. 162<br />

Queens<br />

20<strong>14</strong><br />

26 Q221 P.S. 221<br />

Queens<br />

2012<br />

27 Q060 P.S. 60<br />

Queens<br />

2013<br />

27 Q090 P.S. 90<br />

Queens<br />

20<strong>14</strong><br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Queens<br />

20<strong>14</strong><br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4<br />

Queens<br />

2013<br />

27 Q<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Queens<br />

2012<br />

27 Q183 P.S. 183<br />

Queens<br />

2013<br />

27 Q197 P.S. 197<br />

Queens<br />

2013<br />

27 Q223 P.S. 223<br />

Queens<br />

20<strong>14</strong><br />

28 Q008 J.H.S. 8<br />

Queens<br />

2013<br />

28 Q030 P.S. 30<br />

Queens<br />

2012<br />

28 Q054 P.S. 54<br />

Queens<br />

2013<br />

28 Q072 J.H.S. 72<br />

Queens<br />

20<strong>14</strong><br />

28 Q099 P.S. 99<br />

Queens<br />

2013<br />

28 Q190 J.H.S. 190<br />

Queens<br />

2013<br />

28 Q220 P.S. 220<br />

Queens<br />

2013<br />

28 Q882 P.S. 182<br />

Queens<br />

2013<br />

29 Q037 P.S. 37<br />

Queens<br />

2012<br />

29 Q059 I.S. 59<br />

Queens<br />

2011<br />

29 Q095 P.S. 95<br />

Queens<br />

2012<br />

29 Q116 P.S. 116<br />

Queens<br />

20<strong>14</strong><br />

29 Q135 P.S. 135<br />

Queens<br />

20<strong>14</strong><br />

29 Q138 P.S. 138<br />

Queens<br />

20<strong>14</strong><br />

29 Q192 I.S. 192<br />

Queens<br />

2011<br />

30 Q017 P.S. 17<br />

Queens<br />

20<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

30 Q084 P.S. 84<br />

Queens<br />

2013<br />

30 Q150 P.S. 150<br />

Queens<br />

20<strong>14</strong><br />

30 Q152 P.S. 152<br />

Queens<br />

20<strong>14</strong><br />

30 Q204 I.S. 204<br />

Queens<br />

2013<br />

31 R003 P.S. 3<br />

Staten Island 2011<br />

31 R011 P.S. 11<br />

Staten Island 20<strong>14</strong><br />

31 R0<strong>14</strong> P.S. <strong>14</strong><br />

Staten Island 20<strong>14</strong><br />

31 R016 P.S. 16<br />

Staten Island 2013<br />

31 R018 P.S. 18<br />

Staten Island 20<strong>14</strong><br />

31 R022 P.S. 22<br />

Staten Island 2013<br />

31 R029 P.S. 29<br />

Staten Island 2011<br />

31 R032 P.S. 32<br />

Staten Island 20<strong>14</strong><br />

31 R041 P.S. 41<br />

Staten Island 2013<br />

31 R042 P.S. 42<br />

Staten Island 2013<br />

31 R048 P.S. 48<br />

Staten Island 2011<br />

31 R050 P.S. 50<br />

Staten Island 2013<br />

31 R055 P.S. 55<br />

Staten Island 2011<br />

31 R057 P.S. 57<br />

Staten Island 20<strong>14</strong><br />

31 R060 P.S. 60<br />

Staten Island 2013<br />

31 R060 P.S. 60<br />

Staten Island 20<strong>10</strong><br />

32 K075 K075 P.S. 75<br />

Brooklyn<br />

2011<br />

32 K111 I.S. 111<br />

Brooklyn<br />

2012<br />

32 K274 P.S. 274<br />

Brooklyn<br />

2013<br />

32 K296 I.S. 296<br />

Brooklyn<br />

2012<br />

32 K299 P.S. 299<br />

Brooklyn<br />

2013<br />

75K K396 P.S. 396 (TANDEM K327-D23)<br />

Brooklyn<br />

2013<br />

75K K834 P.S. 372 (OUR LADY OF PEACE)<br />

Brooklyn<br />

2013<br />

75K K857 P.S. 36 ANNEX<br />

Brooklyn<br />

2013<br />

75Q Q816 P.S. 256 ANNEX<br />

Queens<br />

2011<br />

75R R040 P.S. 373 (OLD P40)<br />

Staten Island 20<strong>14</strong><br />

78K K470 GEORGE W. WINGATE HS<br />

Brooklyn<br />

2013<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL)<br />

Brooklyn<br />

2012<br />

78K K721 BROOKLYN STUDIO (TANDEM K128)<br />

Brooklyn<br />

20<strong>14</strong><br />

78K K743 ADULT LRNG CTR (OLD GRLS HS)<br />

Brooklyn<br />

2013<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX<br />

Brooklyn<br />

2013<br />

78K K819 EAST NY FAMILY ACADEMY<br />

Brooklyn<br />

2013<br />

78K K932 HIGH SCHOOL SUSPENSION CENTER<br />

Brooklyn<br />

2013<br />

78M M435 MANHTN CT FOR MATH & SCI. HS<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Lighting Fixture Replacements<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M470 LOUIS D. BRANDEIS HS<br />

Manhattan 2012<br />

78Q Q415 BENJAMIN N. CARDOZO HS<br />

Queens<br />

2012<br />

78Q Q435 MARTIN VAN BUREN HS<br />

Queens<br />

2012<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X)<br />

Queens<br />

2013<br />

78Q Q460 FLUSHING HS<br />

Queens<br />

2012


Borough<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Science Lab Program<br />

District<br />

Building<br />

ID Org ID School Name Project Description<br />

Manhattan 01 M025 M509 MARTE VALLE HS SCIENCE LAB<br />

Manhattan 03 M009 M243 I.S. 243 SCIENCE DEMONSTRATION LAB<br />

Manhattan 03 M076 M076 P.S. 76 SCIENCE LAB UPGRADE<br />

Manhattan 03 M088 M860 J.H.S. 860 SCIENCE LAB UPGRADE<br />

Manhattan 03 M<strong>14</strong>5<br />

P.S. <strong>14</strong>5 SCIENCE LAB<br />

Manhattan 03 M180 M180 P.S. 180 SCIENCE LAB UPGRADES<br />

Manhattan 04 M112<br />

P.S. 112 (TANDEM M206) SCIENCE LAB<br />

Manhattan 04 M155 M377 I.S. 377 SCIENCE LAB<br />

Manhattan 05 M0<strong>10</strong><br />

I.S. <strong>10</strong> (TANDEM M200) ACID WASTE LINES<br />

Manhattan 05 M046 M046 P.S. 46 NEW MS DEMO LAB<br />

Manhattan 05 M195 M195 I.S. 195 (ECF) SCIENCE DEMO ROOM UPGRADE IN<br />

ROOMS <strong>14</strong>7,<strong>14</strong>9,247,249<br />

Bronx 07 X139 X334 INTERNATIONAL COMMUNITY HS NEW SCIENCE LAB SUITE<br />

Bronx 07 X<strong>14</strong>9 X223 I.S. 223 SCIENCE LAB<br />

Bronx 07 X162 X500 HOSTOS LINCOLN ACAD OF SCI HS SCIENCE LAB<br />

Bronx 07 X184 X379 JILL CHAIFETZ TRANSFER HIGH SCHOOL MOBILE SCIENCE CART<br />

Bronx 09 X082 X232 I.S. 232 SCIENCE LAB<br />

Bronx 12 X067 X372 I.S. 372 NEW SCIENCE LAB SUITE<br />

Bronx 12 X129 X129 I.S. 129 (PAIRED W P234) NEW SCIENCE DEMO ROOM (431)AND<br />

PREP ROOM (429)<br />

Brooklyn 13 K046 K046 P.S. 46 SCIENCE LAB UPGRADE<br />

Brooklyn 13 K256 K256 P.S. 256 SCIENCE LAB UPGRADE<br />

Brooklyn 13 K265 K265 I.S. 265 SCIENCE LAB<br />

Brooklyn 13 K287 K592 I.S. 592 SCIENCE LAB<br />

Brooklyn 13 K813 K751 ACADEMY OF HEALTH CAREERS MOBILE SCIENCE CARTS<br />

Brooklyn <strong>14</strong> K033 K322 FOUNDATIONS ACADEMY SCIENCE LAB UPGRADE<br />

Brooklyn 15 K088 K088 I.S. 88 SCIENCE LAB UPGRADES<br />

Brooklyn 16 K057 K688 BROOKLYN ACADEMY OF GLOBAL FINANCE NEW SCIENCE LAB SUITE<br />

Brooklyn 16 K262 K262 P.S. 262 CONVERT ROOMS 305 AND 307 INTO<br />

SCIENCE DEMO ROOMS WITH PREP<br />

AREA.<br />

Brooklyn 17 K002 K002 I.S. 2 SCIENCE DEMONSTRATION ROOM<br />

UPGRADE<br />

Brooklyn 17 K138 K138 P.S. 138 SCIENCE DEMONSTRATION ROOM<br />

UPGRADE<br />

Brooklyn 17 K316 K316 P.S. 316 SCIENCE LAB<br />

Brooklyn 17 K390 K334 M.S. 334 UPGRADE OF SCIENCE DEMO ROOMS<br />

222 AND 322<br />

Brooklyn 18 K860 K219 P.S. 219 SCIENCE LAB<br />

Brooklyn 18 K860<br />

P.S. 219 ANNEX MOBILE SCIENCE CART<br />

Brooklyn 19 K072 K678<br />

EAST NEW YORK MIDDLE SCHOOL OF<br />

EXCELLENCE<br />

SCIENCE LAB


Borough<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Science Lab Program<br />

District<br />

Building<br />

ID Org ID School Name Project Description<br />

Brooklyn 19 K218 K683 SCHOOL FOR CLASSICS NEW SCIENCE LAB SUITE<br />

Brooklyn 21 K303 K344 R. CARSON SCL OF COASTAL ST SCIENCE DEMONSTRATION LAB<br />

Brooklyn 23 K327 K327 P.S. 327 (TANDEM K396-D75) SCIENCE DEMONSTRATION LAB<br />

Queens 25 Q168 Q250 I.S. 250 SCIENCE LAB UPGRADE<br />

Queens 25 Q169 Q294 I.S. 294 SCIENCE LAB UPGRADE<br />

Queens 25 Q237 Q281 EAST SCIENCE LAB UPGRADE<br />

Queens 27 Q053 Q053 I.S. 53 SCIENCE LAB UPGRADE<br />

Queens 27 Q198 Q333 P.S. 333 CONVERTING ROOM 341 INTO A<br />

SCIENCE DEMO ROOM<br />

Queens 28 Q008 Q008 J.H.S. 8 SCIENCE LAB UPGRADE<br />

Queens 29 Q231 Q231 I.S. 231 (TANDEM Q251) SCIENCE LAB UPGRADE<br />

Queens 30 Q111<br />

P.S. 111 SCIENCE LAB<br />

Queens 30 Q204 Q204 I.S. 204 SCIENCE LAB<br />

Queens 30 Q204 Q301 ACAD FOR CAREERS IN TV AND FILM SCIENCE LAB<br />

Staten Island 31 R049<br />

I.S. 49 CEC REQUEST - SCIENCE DEMO<br />

ROOM UPGRADE<br />

Brooklyn 78K K175 K5<strong>14</strong> FREDERICK DOUGLAS ACAD VII HS SCIENCE LAB<br />

Brooklyn 78K K425 K425 JAMES MADISON HS SCIENCE LAB<br />

Brooklyn 78K K490 K490 FORT HAMILTON HS SCIENCE LAB<br />

Manhattan 78M M440 M313 JAMES BALDWIN SCHOOL SCIENCE LAB UPGRADE<br />

Manhattan 78M M460 M460 WASHINGTON IRVING HS SCIENCE DEMONSTRATION ROOM<br />

UPGRADE<br />

Queens 78Q Q475 Q475 RICHMOND HILL HS SCIENCE LAB U[PGRADES<br />

Staten Island 78R R450 R450 CURTIS HS SCIENCE LAB UPGRADE<br />

Bronx 78X X420<br />

JAMES MONROE CAMPUS SCIENCE LAB<br />

Bronx 78X X445 X445 BRONX HS OF SCIENCE SCIENCE LAB UPGRADE<br />

Bronx 78X X475 X475<br />

JOHN F. KENNEDY HS SCIENCE LAB UPGRADES


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Ansul Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

08 X052 I.S. 302<br />

Bronx<br />

2013<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Bronx<br />

2013<br />

75Q Q811 Q811 P.S. 811 (OLD 187)<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Walk-in Freezer Replacement<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

01 M022 M539 NEW EXPLORATIONS<br />

Manhattan 20<strong>10</strong><br />

02 M070 M312 NYC LAB MIDDLE SCHOOL<br />

Manhattan 20<strong>10</strong><br />

04 M045 M045 I.S. 45<br />

Manhattan 20<strong>10</strong><br />

05 M0<strong>10</strong> M499 FREDERICK DOUGLAS ACADEMY<br />

Manhattan 20<strong>10</strong><br />

05 M030 M030 P.S. 30<br />

Manhattan 2013<br />

06 M<strong>14</strong>3 M<strong>14</strong>3 I.S. <strong>14</strong>3<br />

Manhattan 20<strong>10</strong><br />

09 X064 X064 P.S. 64<br />

Bronx<br />

20<strong>10</strong><br />

09 X166 X166 I.S. 166<br />

Bronx<br />

20<strong>10</strong><br />

12 X044 X044 P.S. 44<br />

Bronx<br />

20<strong>10</strong><br />

12 X050 X050 P.S. 50<br />

Bronx<br />

20<strong>10</strong><br />

12 X116 X216 I.S. 216<br />

Bronx<br />

20<strong>10</strong><br />

12 X129 X129 I.S. 129 (PAIRED W P234)<br />

Bronx<br />

20<strong>10</strong><br />

17 K320 K375 P.S. 375<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K068 K068 I.S. 68<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K211 K211 I.S. 211<br />

Brooklyn<br />

20<strong>10</strong><br />

19 K218 K218 I.S. 218<br />

Brooklyn<br />

2011<br />

19 K292 K292 I.S. 292<br />

Brooklyn<br />

2011<br />

21 K043 K098 I.S. 98<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K281 K281 I.S. 281<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K303 K303 I.S. 303<br />

Brooklyn<br />

2013<br />

23 K055 K493 I.S. 493<br />

Brooklyn<br />

2011<br />

23 K271 K522 I.S. 522<br />

Brooklyn<br />

2011<br />

23 K275 K518 I.S. 518<br />

Brooklyn<br />

2011<br />

32 K296 K296 I.S. 296<br />

Brooklyn<br />

2011<br />

78K K425 K425 JAMES MADISON HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K480 K552 HIGH SCHOOL OF URBAN PLANNING<br />

Brooklyn<br />

2011<br />

78K K500 K500 CANARSIE HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K540 K540 JOHN DEWEY HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78M M445 M305 URBAN ASSEMBLY ACADEMY<br />

Manhattan 20<strong>10</strong><br />

78M M501 M469 CHOIR ACAD OF HARLEM<br />

Manhattan 20<strong>10</strong><br />

78M M625 M625 HS OF GRAPHIC COMMUNICATION ARTS<br />

Manhattan 20<strong>10</strong><br />

78R R435 R440 NEW DORP HS<br />

Staten Island 20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

01 M015 M015 P.S. 15<br />

Manhattan 2012<br />

01 M015 P.S. 15<br />

Manhattan 2012<br />

01 M015 P.S. 15<br />

Manhattan 2012<br />

01 M019 P.S. 19<br />

Manhattan 2012<br />

01 M019 M019 P.S. 19<br />

Manhattan 2011<br />

01 M019 M301 I.S. 301<br />

Manhattan 2011<br />

01 M020 M020 P.S. 20<br />

Manhattan 2012<br />

01 M022 M539 NEW EXPLORATIONS<br />

Manhattan 2012<br />

01 M022 M539 NEW EXPLORATIONS<br />

Manhattan 2011<br />

01 M025 J.H.S. 25<br />

Manhattan 2012<br />

01 M025 M509 MARTE VALLE HS<br />

Manhattan 2012<br />

01 M025 M515 LOWER EAST SIDE PREP HS<br />

Manhattan 2012<br />

01 M034 M034 P.S. 34<br />

Manhattan 2012<br />

01 M056 M292 J.H.S. 292<br />

Manhattan 2012<br />

01 M056 M345 I.S. 345<br />

Manhattan 2012<br />

01 M056 M332 I.S. 332<br />

Manhattan 2012<br />

01 M056 M292 J.H.S. 292<br />

Manhattan 2012<br />

01 M060 M450 EASTSIDE COMMUNITY HS<br />

Manhattan 2012<br />

01 M061 M315 P.S. 315<br />

Manhattan 20<strong>10</strong><br />

01 M063 M063 P.S. 63<br />

Manhattan 2012<br />

01 M064 M839 I.S. 839<br />

Manhattan 2012<br />

01 M064 P.S. 64 (OLD 71)<br />

Manhattan 2012<br />

01 M1<strong>10</strong> M1<strong>10</strong> P.S. 1<strong>10</strong><br />

Manhattan 2012<br />

01 M134 M134 P.S. 134<br />

Manhattan 2012<br />

01 M134 P.S. 134<br />

Manhattan 2012<br />

01 M137 M184 P.S. 184<br />

Manhattan 2012<br />

01 M<strong>14</strong>0 M<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Manhattan 2012<br />

01 M<strong>14</strong>2 M<strong>14</strong>2 P.S. <strong>14</strong>2<br />

Manhattan 2012<br />

01 M<strong>14</strong>2 M<strong>14</strong>2 P.S. <strong>14</strong>2<br />

Manhattan 2012<br />

01 M188 M094 M094 SPED<br />

Manhattan 2012<br />

01 M188 M188 P.S. 188<br />

Manhattan 2012<br />

02 M001 M001 P.S. 1<br />

Manhattan 2012<br />

02 M002 M002 P.S. 2<br />

Manhattan 2012<br />

02 M002 M002 P.S. 2<br />

Manhattan 2012<br />

02 M003 P.S. 3<br />

Manhattan 2012<br />

02 M003 M003 P.S. 3<br />

Manhattan 2012<br />

02 M003 P.S. 3<br />

Manhattan 2012<br />

02 M006 M006 P.S. 6<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

02 M006 M006 P.S. 6<br />

Manhattan 2011<br />

02 M006 M006 P.S. 6<br />

Manhattan 2012<br />

02 M011 P.S. 11<br />

Manhattan 2012<br />

02 M011 M011 P.S. 11<br />

Manhattan 2012<br />

02 M011 P.S. 11<br />

Manhattan 2012<br />

02 M017 M212 P.S. 212<br />

Manhattan 2012<br />

02 M017 M408 P.P.A.S.<br />

Manhattan 2011<br />

02 M017 M212 P.S. 212<br />

Manhattan 2011<br />

02 M033 M033 P.S. 33<br />

Manhattan 2012<br />

02 M033 P.S. 33<br />

Manhattan 2012<br />

02 M040 M040 P.S. 40<br />

Manhattan 2011<br />

02 M040 P.S. 40<br />

Manhattan 2012<br />

02 M040 P.S. 40<br />

Manhattan 2012<br />

02 M040 M040 P.S. 40<br />

Manhattan 2012<br />

02 M040 M255 I.S. 255<br />

Manhattan 2012<br />

02 M040 M040 P.S. 40<br />

Manhattan 2012<br />

02 M040 M255 I.S. 255<br />

Manhattan 2011<br />

02 M041 M041 P.S. 41<br />

Manhattan 2012<br />

02 M041 P.S. 41<br />

Manhattan 2012<br />

02 M041 M041 P.S. 41<br />

Manhattan 2012<br />

02 M041 M041 P.S. 41<br />

Manhattan 2011<br />

02 M042 M042 P.S. 42<br />

Manhattan 2012<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF)<br />

Manhattan 2012<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF)<br />

Manhattan 2012<br />

02 M047 M047 J.H.S. 47 (SCH FOR THE DEAF)<br />

Manhattan 20<strong>10</strong><br />

02 M051 M051 P.S. 51<br />

Manhattan 2011<br />

02 M059 P.S. 59 (TANDEM A&D HS)<br />

Manhattan 2012<br />

02 M070 M412 NYC LAB HS<br />

Manhattan 2012<br />

02 M070 M312 NYC LAB MIDDLE SCHOOL<br />

Manhattan 20<strong>10</strong><br />

02 M089 M289 I.S. 89<br />

Manhattan 2011<br />

02 M089 M089 P.S./I.S. 89<br />

Manhattan 2011<br />

02 M089 M089 P.S./I.S. 89<br />

Manhattan 2012<br />

02 M<strong>10</strong>4 M<strong>10</strong>4 I.S. <strong>10</strong>4<br />

Manhattan 2011<br />

02 M<strong>10</strong>4 M<strong>10</strong>4 I.S. <strong>10</strong>4<br />

Manhattan 2012<br />

02 M111 M111 P.S. 111<br />

Manhattan 2012<br />

02 M1<strong>14</strong> M1<strong>14</strong> EAST SIDE MIDDLE SCHOOL<br />

Manhattan 2012<br />

02 M116 M116 P.S. 116<br />

Manhattan 2011<br />

02 M116 M116 P.S. 116<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

02 M116 M116 P.S. 116<br />

Manhattan 2012<br />

02 M124 M124 P.S. 124 (ECF)<br />

Manhattan 2012<br />

02 M124 M124 P.S. 124 (ECF)<br />

Manhattan 2012<br />

02 M126 M126 P.S. 126<br />

Manhattan 2012<br />

02 M130 M130 P.S. 130<br />

Manhattan 2011<br />

02 M131 M131 I.S. 131<br />

Manhattan 2012<br />

02 M131 I.S. 131<br />

Manhattan 2012<br />

02 M158 M158 P.S. 158<br />

Manhattan 2012<br />

02 M158 M158 P.S. 158<br />

Manhattan 2012<br />

02 M167 M167 I.S. 167<br />

Manhattan 2012<br />

02 M183 M183 P.S. 183<br />

Manhattan 2012<br />

02 M183 M183 P.S. 183<br />

Manhattan 2012<br />

02 M183 M183 P.S. 183<br />

Manhattan 2011<br />

02 M190 M290 P.S. 290<br />

Manhattan 2011<br />

02 M190 M290 P.S. 290<br />

Manhattan 2012<br />

02 M190 M290 P.S. 290<br />

Manhattan 2012<br />

02 M198 P.S. 198<br />

Manhattan 2012<br />

02 M198 M077 P.S. 77<br />

Manhattan 2011<br />

02 M234 M234 P.S. 234<br />

Manhattan 2011<br />

02 M234 M234 P.S. 234<br />

Manhattan 2012<br />

02 M267 M059 P.S. 59<br />

Manhattan 2012<br />

02 M271 M217 P.S./I.S. 217<br />

Manhattan 2012<br />

02 M271 M217 P.S./I.S. 217<br />

Manhattan 2011<br />

02 M276 M276 P.S./I.S. 276<br />

Manhattan 2012<br />

02 M660 SCHL OF THE FUTURE (OLD BACON)<br />

Manhattan 2012<br />

02 M660 M413 SCHOOL OF THE FUTURE<br />

Manhattan 2011<br />

02 M660 M413 SCHOOL OF THE FUTURE<br />

Manhattan 2012<br />

02 M816 M151 P.S. 151<br />

Manhattan 20<strong>10</strong><br />

02 M824 MILLENNIUM HS<br />

Manhattan 2012<br />

02 M824 M418 MILLENNIUM HS<br />

Manhattan 2011<br />

02 M824 M418 MILLENNIUM HS<br />

Manhattan 2012<br />

02 M824 M418 MILLENNIUM HS<br />

Manhattan 2012<br />

02 M840 M150 P.S. 150<br />

Manhattan 2011<br />

02 M855 M416 ELEANOR ROOSEVELT HS<br />

Manhattan 2012<br />

02 M855 M416 ELEANOR ROOSEVELT HS<br />

Manhattan 2011<br />

02 M877 M551 NEW YORK HARBOR SCHOOL<br />

Manhattan 2012<br />

02 M887 BARUCH COLLEGE CAMPUS HS<br />

Manhattan 2012<br />

02 M971 M397 THE SPRUCE STREET EDUCATIONAL CAMPUS<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

03 M009 P.S. 9<br />

Manhattan 2012<br />

03 M009 M009 P.S. 9<br />

Manhattan 2012<br />

03 M009 M009 P.S. 9<br />

Manhattan 2011<br />

03 M009 M009 P.S. 9<br />

Manhattan 2012<br />

03 M009 M243 I.S. 243<br />

Manhattan 2012<br />

03 M009 M243 I.S. 243<br />

Manhattan 2011<br />

03 M044 M245 I.S. 245<br />

Manhattan 2012<br />

03 M054 M054 I.S. 54<br />

Manhattan 2011<br />

03 M054 M054 I.S. 54<br />

Manhattan 2012<br />

03 M075 P.S. 75<br />

Manhattan 2012<br />

03 M075 M250 I.S. 250<br />

Manhattan 2012<br />

03 M075 M075 P.S. 75<br />

Manhattan 2012<br />

03 M084 P.S. 84<br />

Manhattan 2012<br />

03 M084 P.S. 84<br />

Manhattan 2012<br />

03 M084 M084 P.S. 84<br />

Manhattan 2012<br />

03 M087 M087 P.S. 87<br />

Manhattan 2012<br />

03 M087 M087 P.S. 87<br />

Manhattan 2011<br />

03 M087 M087 P.S. 87<br />

Manhattan 2012<br />

03 M088 I.S. 88<br />

Manhattan 2012<br />

03 M088 M415 WADLEIGH ARTS HS<br />

Manhattan 2012<br />

03 M113 M241 P.S. 241<br />

Manhattan 2012<br />

03 M118 M256 I.S. 256<br />

Manhattan 2012<br />

03 M118 M258 I.S. 258<br />

Manhattan 2012<br />

03 M118 M333 P.S. 333<br />

Manhattan 2012<br />

03 M118 M256 I.S. 256<br />

Manhattan 2012<br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4)<br />

Manhattan 2012<br />

03 M<strong>14</strong>5 M<strong>14</strong>5 P.S. <strong>14</strong>5<br />

Manhattan 2012<br />

03 M163 M163 P.S. 163<br />

Manhattan 2012<br />

03 M165 P.S. 165<br />

Manhattan 2012<br />

03 M165 M165 P.S. 165<br />

Manhattan 2012<br />

03 M166 M166 P.S. 166<br />

Manhattan 2012<br />

03 M166 M166 P.S. 166<br />

Manhattan 2012<br />

03 M166 M166 P.S. 166<br />

Manhattan 2011<br />

03 M180 M180 P.S. 180<br />

Manhattan 2012<br />

03 M185 M185 P.S. 185 (TANDEM M208)<br />

Manhattan 2012<br />

03 M199 M199 P.S. 199<br />

Manhattan 2011<br />

03 M199 M199 P.S. 199<br />

Manhattan 2012<br />

03 M199 P.S. 199<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

03 M199 P.S. 199<br />

Manhattan 2012<br />

03 M199 M199 P.S. 199<br />

Manhattan 2012<br />

03 M199 P.S. 199<br />

Manhattan 2012<br />

03 M207 P.S. 207 (TANDEM M<strong>14</strong>9)<br />

Manhattan 2012<br />

03 M207 M<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Manhattan 2012<br />

04 M007 P.S. 7<br />

Manhattan 2012<br />

04 M007 M406 GLOBAL TECHNOLOGY PREPARATORY<br />

Manhattan 2012<br />

04 M013 M497 P.S. 497<br />

Manhattan 2012<br />

04 M013 M013 I.S. 13<br />

Manhattan 2012<br />

04 M013 M013 I.S. 13<br />

Manhattan 2012<br />

04 M013 M555 CENTRAL PARK EAST HS<br />

Manhattan 2012<br />

04 M045 M045 I.S. 45<br />

Manhattan 2012<br />

04 M045 I.S. 45<br />

Manhattan 2012<br />

04 M057 M057 P.S. 57<br />

Manhattan 2012<br />

04 M072 M072 P.S. 72<br />

Manhattan 2012<br />

04 M083 M182 P.S. 182<br />

Manhattan 2012<br />

04 M083 M083 P.S. 83<br />

Manhattan 2012<br />

04 M083 M083 P.S. 83<br />

Manhattan 2012<br />

04 M099 I.S. 99<br />

Manhattan 2012<br />

04 M099 M224 I.S. 224<br />

Manhattan 2012<br />

04 M099 M224 I.S. 224<br />

Manhattan 2012<br />

04 M099 I.S. 99<br />

Manhattan 2012<br />

04 M099 M635 ENVIRONMENTAL SCI SEC. SCL<br />

Manhattan 2012<br />

04 M099 M377 I.S. 377<br />

Manhattan 2012<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Manhattan 2012<br />

04 M<strong>10</strong>1 M375 PS/IS 375<br />

Manhattan 2012<br />

04 M<strong>10</strong>2 M<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Manhattan 2012<br />

04 M<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Manhattan 2012<br />

04 M<strong>10</strong>8 M<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Manhattan 2012<br />

04 M<strong>10</strong>8 M<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Manhattan 2012<br />

04 M112 M112 P.S. 112 (TANDEM M206)<br />

Manhattan 2012<br />

04 M117 J.H.S. 117<br />

Manhattan 2012<br />

04 M117 J.H.S. 117<br />

Manhattan 2012<br />

04 M121 M038 P.S. 38<br />

Manhattan 2012<br />

04 M<strong>14</strong>6 M<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Manhattan 2012<br />

04 M155 M155 P.S. 155<br />

Manhattan 2012<br />

04 M155 P.S. 155<br />

Manhattan 2012<br />

04 M171 M171 P.S. 171<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

04 M171 P.S. 171<br />

Manhattan 2012<br />

04 M171 P.S. 171<br />

Manhattan 2012<br />

04 M206 M037 P.S. 37<br />

Manhattan 2012<br />

05 M0<strong>10</strong> M499 FREDERICK DOUGLAS ACADEMY<br />

Manhattan 2012<br />

05 M0<strong>10</strong> M499 FREDERICK DOUGLAS ACADEMY<br />

Manhattan 2011<br />

05 M030 M030 P.S. 30<br />

Manhattan 2012<br />

05 M036 M036 P.S. 36<br />

Manhattan 2012<br />

05 M043 M286 I.S. 286<br />

Manhattan 2012<br />

05 M043 M4<strong>10</strong> THE URBAN ASSEMBLY INSTITUTE FOR NEW<br />

TECHNOLOGIES<br />

Manhattan 2012<br />

05 M043 I.S. 172 (OLD 43)<br />

Manhattan 2012<br />

05 M043 M367 I.S. 367<br />

Manhattan 2012<br />

05 M043 M369 I.S. 369<br />

Manhattan 2012<br />

05 M043 M286 I.S. 286<br />

Manhattan 2012<br />

05 M046 M046 P.S. 46<br />

Manhattan 2012<br />

05 M046 M046 P.S. 46<br />

Manhattan 2012<br />

05 M092 M092 P.S. 92<br />

Manhattan 2011<br />

05 M092 M344 I.S. 344<br />

Manhattan 2011<br />

05 M092 P.S. 92<br />

Manhattan 2012<br />

05 M092 P.S. 92<br />

Manhattan 2012<br />

05 M123 M123 P.S. 123<br />

Manhattan 2012<br />

05 M125 M125 P.S. 125<br />

Manhattan 2011<br />

05 M125 P.S. 125<br />

Manhattan 2012<br />

05 M129 P.S. 129<br />

Manhattan 2012<br />

05 M129 M129 P.S. 129<br />

Manhattan 2012<br />

05 M129 M129 P.S. 129<br />

Manhattan 2011<br />

05 M133 M133 P.S. 133<br />

Manhattan 2011<br />

05 M161 M161 P.S. 161<br />

Manhattan 2012<br />

05 M175 M175 P.S. 175<br />

Manhattan 2012<br />

05 M194 M194 P.S. 194<br />

Manhattan 2012<br />

05 M195 I.S. 195 (ECF)<br />

Manhattan 2012<br />

05 M195 M195 I.S. 195 (ECF)<br />

Manhattan 2012<br />

05 M197 M197 P.S. 197<br />

Manhattan 2012<br />

05 M200 M200 P.S. 200 (TANDEM M0<strong>10</strong>)<br />

Manhattan 2012<br />

05 M200 M200 P.S. 200 (TANDEM M0<strong>10</strong>)<br />

Manhattan 2011<br />

05 M371 M318 P.S. 318<br />

Manhattan 2012<br />

06 M004 M004 P.S. 4<br />

Manhattan 2012<br />

06 M005 M005 P.S. 5<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

06 M008 M008 P.S. 8<br />

Manhattan 2012<br />

06 M028 M028 P.S. 28<br />

Manhattan 2012<br />

06 M048 M048 P.S. 48<br />

Manhattan 2012<br />

06 M052 M052 I.S. 52<br />

Manhattan 2012<br />

06 M090 M319 I.S. 319<br />

Manhattan 2012<br />

06 M090 M324 I.S. 324<br />

Manhattan 2012<br />

06 M090 M319 I.S. 319<br />

Manhattan 2012<br />

06 M093 M2<strong>10</strong> P.S. 2<strong>10</strong><br />

Manhattan 2012<br />

06 M098 M098 P.S. 98<br />

Manhattan 2012<br />

06 M115 M115 P.S. 115<br />

Manhattan 2012<br />

06 M128 M128 P.S. 128<br />

Manhattan 2012<br />

06 M132 M132 P.S. 132<br />

Manhattan 2012<br />

06 M<strong>14</strong>3 M<strong>14</strong>3 I.S. <strong>14</strong>3<br />

Manhattan 2012<br />

06 M<strong>14</strong>3 M348 I.S. 348<br />

Manhattan 2012<br />

06 M<strong>14</strong>3 M<strong>14</strong>3 I.S. <strong>14</strong>3<br />

Manhattan 2012<br />

06 M152 M152 P.S. 152<br />

Manhattan 2012<br />

06 M153 M153 P.S. 153<br />

Manhattan 2012<br />

06 M164 M326 I.S. 326<br />

Manhattan 2012<br />

06 M173 M349 I.S. 349<br />

Manhattan 2012<br />

06 M173 M173 P.S. 173<br />

Manhattan 2012<br />

06 M173 M173 P.S. 173<br />

Manhattan 2012<br />

06 M176 M311 P.S. 311<br />

Manhattan 2012<br />

06 M176 M311 P.S. 311<br />

Manhattan 2012<br />

06 M178 M178 P.S. 178<br />

Manhattan 2011<br />

06 M178 M178 P.S. 178<br />

Manhattan 2012<br />

06 M187 M187 P.S./I.S. 187<br />

Manhattan 20<strong>10</strong><br />

06 M189 M189 P.S. 189<br />

Manhattan 2012<br />

06 M192 P.S. 192<br />

Manhattan 2012<br />

06 M192 M192 P.S. 192<br />

Manhattan 2012<br />

06 M218 M218 I.S. 218<br />

Manhattan 2012<br />

06 M218 M218 I.S. 218<br />

Manhattan 2012<br />

06 M218 M322 I.S. 322<br />

Manhattan 2012<br />

06 M218 M293 I.S. 293<br />

Manhattan 2012<br />

06 M223 M223 I.S. 223 (MOTT HALL)<br />

Manhattan 2011<br />

06 M263 M366 P.S. 366<br />

Manhattan 2012<br />

06 M528 M528 I.S. 528<br />

Manhattan 2012<br />

06 M856 P.S. 2<strong>10</strong><br />

Manhattan 2012<br />

06 M859 M346 I.S. 346<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

06 M898 P.S. 18<br />

Manhattan 2012<br />

06 M898 M018 P.S. 18<br />

Manhattan 2012<br />

06 M918 M278 P.S./I.S. 278<br />

Manhattan 2012<br />

07 X001 X001 P.S. 1<br />

Bronx<br />

2012<br />

07 X018 X018 P.S. 18<br />

Bronx<br />

2012<br />

07 X025 X025 P.S. 25<br />

Bronx<br />

2012<br />

07 X027 X277 P.S. 277<br />

Bronx<br />

2012<br />

07 X029 X029 P.S. 29<br />

Bronx<br />

2012<br />

07 X030 X030 P.S. 30<br />

Bronx<br />

2012<br />

07 X040 X179 P.S. 179<br />

Bronx<br />

2012<br />

07 X040 P.S. 220<br />

Bronx<br />

2012<br />

07 X043 X043 P.S. 43<br />

Bronx<br />

2012<br />

07 X043 P.S. 43<br />

Bronx<br />

2012<br />

07 X049 P.S. 49<br />

Bronx<br />

2012<br />

07 X049 X049 P.S. 49<br />

Bronx<br />

2012<br />

07 X065 X065 P.S. 65<br />

Bronx<br />

2012<br />

07 X139 X224 I.S. 224<br />

Bronx<br />

2012<br />

07 X139 X224 I.S. 224<br />

Bronx<br />

2012<br />

07 X139 X343 I.S. 343<br />

Bronx<br />

2012<br />

07 X139 X334 INTERNATIONAL COMMUNITY HS<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 X223 I.S. 223<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 X221 I.S. 221<br />

Bronx<br />

20<strong>10</strong><br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 X221 I.S. 221<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9<br />

Bronx<br />

2012<br />

07 X151 X151 I.S. 151<br />

Bronx<br />

2012<br />

07 X151 X031 P.S. 31<br />

Bronx<br />

2012<br />

07 X151 I.S. 151<br />

Bronx<br />

2012<br />

07 X154 X154 P.S. 154<br />

Bronx<br />

2012<br />

07 X156 X385 PERFORMANCE SCHOOL<br />

Bronx<br />

2012<br />

07 X156 P.S. 156<br />

Bronx<br />

2012<br />

07 X156 X385 PERFORMANCE SCHOOL<br />

Bronx<br />

2012<br />

07 X157 X157 P.S. 157<br />

Bronx<br />

2012<br />

07 X161 X161 P.S. 161<br />

Bronx<br />

2012<br />

07 X162 X162 I.S. 162<br />

Bronx<br />

2012<br />

07 X162 I.S. 162<br />

Bronx<br />

2012<br />

07 X162 I.S. 162<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

07 X183 J.H.S. 203<br />

Bronx<br />

2012<br />

07 X183 X168 X168 SPED<br />

Bronx<br />

2012<br />

07 X184 I.S. 184<br />

Bronx<br />

2012<br />

07 X184 X298 I.S. 298<br />

Bronx<br />

2012<br />

07 X184 X379 JILL CHAIFETZ TRANSFER HIGH SCHOOL<br />

Bronx<br />

2012<br />

07 X184 X017 X017 SPED<br />

Bronx<br />

2012<br />

07 X184 X017 X017 SPED<br />

Bronx<br />

2012<br />

07 X184 X296 I.S. 296<br />

Bronx<br />

2012<br />

08 X0<strong>14</strong> X0<strong>14</strong> P.S. <strong>14</strong><br />

Bronx<br />

20<strong>10</strong><br />

08 X036 X036 P.S. 36<br />

Bronx<br />

2011<br />

08 X048 X048 P.S. 48<br />

Bronx<br />

2012<br />

08 X052 X302 I.S. 302<br />

Bronx<br />

2012<br />

08 X052 X302 I.S. 302<br />

Bronx<br />

2012<br />

08 X060 P.S. 333<br />

Bronx<br />

2012<br />

08 X060 X333 P.S. 333<br />

Bronx<br />

2012<br />

08 X062 X062 P.S. 62<br />

Bronx<br />

2012<br />

08 X062 X062 P.S. 62<br />

Bronx<br />

2012<br />

08 X071 X071 P.S. 71<br />

Bronx<br />

20<strong>10</strong><br />

08 X072 X072 P.S. 72<br />

Bronx<br />

2012<br />

08 X074 X352 X352 SPED<br />

Bronx<br />

2012<br />

08 X075 P.S. 75<br />

Bronx<br />

2012<br />

08 X075 X075 P.S. 75<br />

Bronx<br />

2012<br />

08 X093 X093 P.S. 93<br />

Bronx<br />

2012<br />

08 X<strong>10</strong>1 X0<strong>10</strong> X0<strong>10</strong> SPED<br />

Bronx<br />

2012<br />

08 X<strong>10</strong>7 X<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Bronx<br />

2012<br />

08 X119 X119 P.S. 119<br />

Bronx<br />

2011<br />

08 X120 X301 I.S. 301<br />

Bronx<br />

2012<br />

08 X120 I.S. 301<br />

Bronx<br />

2012<br />

08 X120 I.S. 301<br />

Bronx<br />

2012<br />

08 X123 I.S. 123<br />

Bronx<br />

2012<br />

08 X123 X337 I.S. 337<br />

Bronx<br />

2012<br />

08 X123 X123 I.S. 123<br />

Bronx<br />

2012<br />

08 X123 X123 I.S. 123<br />

Bronx<br />

2012<br />

08 X125 X125 I.S. 125<br />

Bronx<br />

2012<br />

08 X130 X130 P.S. 130<br />

Bronx<br />

2012<br />

08 X131 I.S. 131<br />

Bronx<br />

2012<br />

08 X131 X131 I.S. 131<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

08 X131 X448 SOUNDVIEW ACADEMY FOR CULTURE AND<br />

SCHOLARSHIP<br />

Bronx<br />

2012<br />

08 X131 X131 I.S. 131<br />

Bronx<br />

2012<br />

08 X138 X138 P.S. 138<br />

Bronx<br />

2012<br />

08 X138 X138 P.S. 138<br />

Bronx<br />

2012<br />

08 X<strong>14</strong>0 X<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Bronx<br />

2012<br />

08 X<strong>14</strong>6 X<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Bronx<br />

2012<br />

08 X152 X152 P.S. 152<br />

Bronx<br />

2012<br />

08 X174 X367 ARCHIMEDES ACADEMY FOR MATH<br />

Bronx<br />

2012<br />

08 X174 X375 BRONX MATH PREP<br />

Bronx<br />

2012<br />

08 X174 X282 WOMENS ACADEMY OF EXCELLENCE<br />

Bronx<br />

2012<br />

08 X174 I.S. 174<br />

Bronx<br />

2012<br />

08 X174 X282 WOMENS ACADEMY OF EXCELLENCE<br />

Bronx<br />

2012<br />

08 X182 X182 P.S. 182<br />

Bronx<br />

2012<br />

08 X192 I.S. 192<br />

Bronx<br />

2012<br />

08 X192 X366 I.S. 366<br />

Bronx<br />

2012<br />

09 X002 X250 M.S./H.S. 250<br />

Bronx<br />

2012<br />

09 X004 X004 P.S. 4<br />

Bronx<br />

2012<br />

09 X004 P.S. 4<br />

Bronx<br />

2012<br />

09 X011 X011 P.S. 11<br />

Bronx<br />

2012<br />

09 X022 X022 I.S. 22<br />

Bronx<br />

2012<br />

09 X022 X022 I.S. 22<br />

Bronx<br />

2012<br />

09 X022 X323 I.S. 323<br />

Bronx<br />

2012<br />

09 X022 I.S. 22<br />

Bronx<br />

2012<br />

09 X028 X028 P.S. 28<br />

Bronx<br />

2012<br />

09 X035 X035 P.S. 35<br />

Bronx<br />

2012<br />

09 X042 X042 P.S. 42<br />

Bronx<br />

2012<br />

09 X055 X055 P.S. 55<br />

Bronx<br />

2012<br />

09 X055 P.S. 55<br />

Bronx<br />

2012<br />

09 X055 P.S. 55<br />

Bronx<br />

2012<br />

09 X058 X058 P.S. 58<br />

Bronx<br />

2012<br />

09 X063 X002 P.S. 2<br />

Bronx<br />

2012<br />

09 X064 X064 P.S. 64<br />

Bronx<br />

2012<br />

09 X070 X070 P.S. 70<br />

Bronx<br />

2012<br />

09 X073 X073 P.S. 73<br />

Bronx<br />

2012<br />

09 X082 I.S. 232<br />

Bronx<br />

2012<br />

09 X082 X365 ACADEMY FOR LANGUAGE & TECH<br />

Bronx<br />

2012<br />

09 X088 X088 P.S. 88<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

09 X088 X088 P.S. 88<br />

Bronx<br />

2012<br />

09 X090 X457 SHERIDAN ACADEMY FOR YOUNG LEADERS<br />

Bronx<br />

2012<br />

09 X090 X443 THE FAMILY SCHOOL<br />

Bronx<br />

2012<br />

09 X090 X443 THE FAMILY SCHOOL<br />

Bronx<br />

2012<br />

09 X<strong>10</strong>4 X199 P.S. 199<br />

Bronx<br />

2012<br />

09 X<strong>10</strong>9 X<strong>10</strong>9 P.S. <strong>10</strong>9<br />

Bronx<br />

2012<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong><br />

Bronx<br />

2012<br />

09 X1<strong>10</strong> X1<strong>10</strong> P.S. 1<strong>10</strong><br />

Bronx<br />

2012<br />

09 X1<strong>14</strong> X1<strong>14</strong> P.S. 1<strong>14</strong><br />

Bronx<br />

2012<br />

09 X117 X117 I.S. 117<br />

Bronx<br />

2012<br />

09 X126 X126 P.S. 126 (ECF)<br />

Bronx<br />

2012<br />

09 X132 X132 P.S. 132<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>5 I.S. <strong>14</strong>5<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>5 X<strong>14</strong>5 I.S. <strong>14</strong>5<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>7 X313 I.S. 313<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>8 X215 I.S. 215<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>8 X219 I.S. 219<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>8 X517 I.S. 517<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>8 X215 I.S. 215<br />

Bronx<br />

2012<br />

09 X163 X163 P.S. 163<br />

Bronx<br />

2012<br />

09 X166 X324 BRONX EARLY COLLEGE ACADEMY<br />

Bronx<br />

2011<br />

09 X166 I.S. 166<br />

Bronx<br />

2012<br />

09 X170 X170 P.S. 170 (ECC)<br />

Bronx<br />

2012<br />

09 X173 X236 P.S. 236<br />

Bronx<br />

2012<br />

09 X229 X229 P.S. 230/I.S. 229 (UDC)<br />

Bronx<br />

2012<br />

09 X235 P.S./I.S. 218<br />

Bronx<br />

2012<br />

09 X235 X218 P.S./I.S. 218<br />

Bronx<br />

2012<br />

09 X338 X204 P.S. 204<br />

Bronx<br />

2012<br />

<strong>10</strong> X003 X003 P.S. 3<br />

Bronx<br />

2012<br />

<strong>10</strong> X003 X003 P.S. 3<br />

Bronx<br />

2011<br />

<strong>10</strong> X007 X007 P.S. 7<br />

Bronx<br />

2012<br />

<strong>10</strong> X008 X008 P.S. 8<br />

Bronx<br />

2012<br />

<strong>10</strong> X009 X009 P.S. 9 (OLD 115)<br />

Bronx<br />

2012<br />

<strong>10</strong> X015 P.S. 15<br />

Bronx<br />

2012<br />

<strong>10</strong> X015 X015 P.S. 15<br />

Bronx<br />

2012<br />

<strong>10</strong> X015 X291 P.S. 291<br />

Bronx<br />

2012<br />

<strong>10</strong> X015 X015 P.S. 15<br />

Bronx<br />

2012<br />

<strong>10</strong> X020 X020 P.S. 20<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

<strong>10</strong> X023 X023 P.S. 23<br />

Bronx<br />

2012<br />

<strong>10</strong> X023 X023 P.S. 23<br />

Bronx<br />

2012<br />

<strong>10</strong> X024 X024 P.S. 24<br />

Bronx<br />

2012<br />

<strong>10</strong> X024 X024 P.S. 24<br />

Bronx<br />

2011<br />

<strong>10</strong> X024 X024 P.S. 24<br />

Bronx<br />

2012<br />

<strong>10</strong> X026 X390 I.S. 390<br />

Bronx<br />

2012<br />

<strong>10</strong> X026 P.S. 396<br />

Bronx<br />

2012<br />

<strong>10</strong> X032 X032 P.S. 32<br />

Bronx<br />

2012<br />

<strong>10</strong> X033 X033 P.S. 33<br />

Bronx<br />

2012<br />

<strong>10</strong> X037 X037 P.S. 37<br />

Bronx<br />

2012<br />

<strong>10</strong> X045 X045 I.S. 45<br />

Bronx<br />

2012<br />

<strong>10</strong> X045 X045 I.S. 45<br />

Bronx<br />

2012<br />

<strong>10</strong> X046 X046 P.S. 46<br />

Bronx<br />

2012<br />

<strong>10</strong> X054 X054 P.S. 54<br />

Bronx<br />

2012<br />

<strong>10</strong> X056 X056 P.S. 56 ADDITION<br />

Bronx<br />

2012<br />

<strong>10</strong> X056 X056 P.S. 56 ADDITION<br />

Bronx<br />

2012<br />

<strong>10</strong> X059 X059 P.S. 59<br />

Bronx<br />

2012<br />

<strong>10</strong> X079 P.S. 79<br />

Bronx<br />

2012<br />

<strong>10</strong> X079 X382 P.S. 382<br />

Bronx<br />

2012<br />

<strong>10</strong> X080 X080 I.S. 80/P.S. 280<br />

Bronx<br />

2012<br />

<strong>10</strong> X081 X081 P.S. 81<br />

Bronx<br />

2011<br />

<strong>10</strong> X081 X081 P.S. 81<br />

Bronx<br />

2012<br />

<strong>10</strong> X085 X085 P.S. 85<br />

Bronx<br />

2012<br />

<strong>10</strong> X086 X086 P.S. 86<br />

Bronx<br />

2012<br />

<strong>10</strong> X086 X086 P.S. 86<br />

Bronx<br />

2011<br />

<strong>10</strong> X091 X091 P.S. 91<br />

Bronx<br />

2012<br />

<strong>10</strong> X094 X094 P.S. 94<br />

Bronx<br />

2012<br />

<strong>10</strong> X094 X094 P.S. 94<br />

Bronx<br />

2012<br />

<strong>10</strong> X095 X095 P.S. 95<br />

Bronx<br />

2011<br />

<strong>10</strong> X095 X095 P.S. 95<br />

Bronx<br />

2012<br />

<strong>10</strong> X115 X363 M.S. 363<br />

Bronx<br />

2012<br />

<strong>10</strong> X118 X118 I.S. 118<br />

Bronx<br />

2012<br />

<strong>10</strong> X122 X3<strong>10</strong> P.S. 3<strong>10</strong><br />

Bronx<br />

2012<br />

<strong>10</strong> X122 X3<strong>10</strong> P.S. 3<strong>10</strong><br />

Bronx<br />

2012<br />

<strong>10</strong> X<strong>14</strong>1 X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1<br />

Bronx<br />

2012<br />

<strong>10</strong> X<strong>14</strong>1 X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1<br />

Bronx<br />

2011<br />

<strong>10</strong> X<strong>14</strong>3 X237 MARIE CURIE HS FOR NURSING<br />

Bronx<br />

2012<br />

<strong>10</strong> X<strong>14</strong>3 X237 MARIE CURIE HS FOR NURSING<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

<strong>10</strong> X<strong>14</strong>3 X244 I.S. 244<br />

Bronx<br />

2012<br />

<strong>10</strong> X159 X159 P.S. 159<br />

Bronx<br />

2012<br />

<strong>10</strong> X205 X205 P.S. 205A (ECF)<br />

Bronx<br />

2012<br />

<strong>10</strong> X206 X206 I.S. 206B<br />

Bronx<br />

2012<br />

<strong>10</strong> X209 X209 P.S. 209<br />

Bronx<br />

2012<br />

<strong>10</strong> X254 X254 I.S. 254<br />

Bronx<br />

2012<br />

<strong>10</strong> X279 X279 P.S. 279<br />

Bronx<br />

2012<br />

<strong>10</strong> X283 X228 I.S. 228<br />

Bronx<br />

2012<br />

<strong>10</strong> X306 X306 P.S. 306<br />

Bronx<br />

2012<br />

<strong>10</strong> X306 P.S. 306<br />

Bronx<br />

2012<br />

<strong>10</strong> X306 X306 P.S. 306<br />

Bronx<br />

2012<br />

<strong>10</strong> X306 X331 I.S. 331<br />

Bronx<br />

2012<br />

<strong>10</strong> X340 X340 P.S. 340<br />

Bronx<br />

2012<br />

<strong>10</strong> X360 X360 P.S. 360<br />

Bronx<br />

2012<br />

<strong>10</strong> X368 X368 M.S./H.S. 368<br />

Bronx<br />

2012<br />

<strong>10</strong> X368 M.S./H.S. 368<br />

Bronx<br />

2012<br />

<strong>10</strong> X781 X051 P.S. 51<br />

Bronx<br />

2012<br />

<strong>10</strong> X826 X226 P.S. 226<br />

Bronx<br />

2012<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR)<br />

Bronx<br />

2012<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR)<br />

Bronx<br />

2012<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR)<br />

Bronx<br />

2012<br />

<strong>10</strong> X842 X344 P.S. 344<br />

Bronx<br />

2012<br />

<strong>10</strong> X843 X246 P.S. 246<br />

Bronx<br />

2012<br />

<strong>10</strong> X852 X308 BRONX DANCE ACADEMY<br />

Bronx<br />

2012<br />

<strong>10</strong> X958 I.S. 228<br />

Bronx<br />

2012<br />

11 X016 X016 P.S. 16<br />

Bronx<br />

2012<br />

11 X019 X019 P.S. 19<br />

Bronx<br />

2012<br />

11 X019 X019 P.S. 19<br />

Bronx<br />

2011<br />

11 X021 X021 P.S. 21<br />

Bronx<br />

2012<br />

11 X041 X041 P.S. 41<br />

Bronx<br />

2012<br />

11 X068 X068 P.S. 68<br />

Bronx<br />

2012<br />

11 X076 X076 P.S. 76<br />

Bronx<br />

2012<br />

11 X078 X078 P.S. 78<br />

Bronx<br />

2012<br />

11 X083 X083 P.S. 83<br />

Bronx<br />

2012<br />

11 X087 X087 P.S. 87<br />

Bronx<br />

20<strong>10</strong><br />

11 X089 X089 P.S. 89<br />

Bronx<br />

2012<br />

11 X089 X089 P.S. 89<br />

Bronx<br />

2012<br />

11 X096 X096 P.S. 96 ADDITION<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

11 X097 X097 P.S. 97<br />

Bronx<br />

20<strong>10</strong><br />

11 X<strong>10</strong>3 X<strong>10</strong>3 P.S. <strong>10</strong>3<br />

Bronx<br />

2012<br />

11 X<strong>10</strong>5 X<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Bronx<br />

2012<br />

11 X<strong>10</strong>6 X<strong>10</strong>6 P.S. <strong>10</strong>6 ADDITION<br />

Bronx<br />

2012<br />

11 X<strong>10</strong>8 X<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Bronx<br />

2012<br />

11 X<strong>10</strong>8 X<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Bronx<br />

2012<br />

11 X111 X111 P.S. 111<br />

Bronx<br />

2012<br />

11 X112 X112 P.S. 112<br />

Bronx<br />

2012<br />

11 X113 X272 M.S./H.S. 272<br />

Bronx<br />

2012<br />

11 X113 I.S. 113<br />

Bronx<br />

2012<br />

11 X121 X121 P.S. 121<br />

Bronx<br />

2012<br />

11 X127 X127 I.S. 127<br />

Bronx<br />

2012<br />

11 X135 I.S. 135<br />

Bronx<br />

2012<br />

11 X135 X322 I.S. 322<br />

Bronx<br />

2012<br />

11 X135 X322 I.S. 322<br />

Bronx<br />

2012<br />

11 X135 X468 PELHAM ACADEMY OF ACADEMICS AND COMMUNITY<br />

ENGAGEMENT<br />

Bronx<br />

2012<br />

11 X135 X326 I.S. 326<br />

Bronx<br />

2012<br />

11 X<strong>14</strong>2 X<strong>14</strong>2 I.S. <strong>14</strong>2<br />

Bronx<br />

2012<br />

11 X<strong>14</strong>2 X<strong>14</strong>2 I.S. <strong>14</strong>2<br />

Bronx<br />

2011<br />

11 X<strong>14</strong>4 X<strong>14</strong>4 I.S. <strong>14</strong>4<br />

Bronx<br />

2012<br />

11 X153 X153 P.S. 153<br />

Bronx<br />

2012<br />

11 X153 P.S. 153<br />

Bronx<br />

2012<br />

11 X153 X153 P.S. 153<br />

Bronx<br />

2012<br />

11 X160 X160 P.S. 160<br />

Bronx<br />

2012<br />

11 X160 X160 P.S. 160<br />

Bronx<br />

2012<br />

11 X169 X169 THE WILLIE ELLA PASCHAL BOWMAN CAMPUS<br />

Bronx<br />

2012<br />

11 X175 X175 P.S. 175<br />

Bronx<br />

2012<br />

11 X178 X176 X176 SPED<br />

Bronx<br />

2012<br />

11 X180 X180 I.S. 180<br />

Bronx<br />

2012<br />

11 X181 X181 I.S. 181<br />

Bronx<br />

2012<br />

11 X189 X189 P.S./I.S. 189 (@STEENWICK AVE)<br />

Bronx<br />

2012<br />

11 X189 X462 CORNERSTONE ACADEMY FOR SOCIAL ACTION<br />

MIDDLE SCHOOL (CASA)<br />

Bronx<br />

2012<br />

11 X189 X189 P.S./I.S. 189 (@STEENWICK AVE)<br />

Bronx<br />

2012<br />

11 X194 X194 P.S./I.S. 194<br />

Bronx<br />

2012<br />

11 X498 X498 THE LT. CURTIS MEYRAN AND JOHN BELLEW<br />

EDUCATION COMPLEX<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

12 X006 X006 P.S. 6<br />

Bronx<br />

2012<br />

12 X006 X006 P.S. 6<br />

Bronx<br />

2012<br />

12 X044 X044 P.S. 44<br />

Bronx<br />

2012<br />

12 X044 P.S. 44<br />

Bronx<br />

2012<br />

12 X047 X047 P.S. 47<br />

Bronx<br />

2012<br />

12 X050 X050 P.S. 50<br />

Bronx<br />

2012<br />

12 X057 P.S. 57<br />

Bronx<br />

2012<br />

12 X061 P.S. 61<br />

Bronx<br />

2012<br />

12 X061 P.S. 61<br />

Bronx<br />

2012<br />

12 X061 X061 P.S. 61<br />

Bronx<br />

2012<br />

12 X066 X066 P.S. 66<br />

Bronx<br />

2012<br />

12 X066 P.S. 66<br />

Bronx<br />

2012<br />

12 X067 X067 P.S. 67<br />

Bronx<br />

2012<br />

12 X077 P.S. 195<br />

Bronx<br />

2012<br />

12 X077 X195 P.S. 195<br />

Bronx<br />

2012<br />

12 X092 P.S. 92<br />

Bronx<br />

2012<br />

12 X092 X092 P.S. 92<br />

Bronx<br />

2012<br />

12 X098 I.S. 98<br />

Bronx<br />

2012<br />

12 X098 X098 I.S. 98<br />

Bronx<br />

2012<br />

12 X<strong>10</strong>2 X<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Bronx<br />

2012<br />

12 X116 X217 I.S. 217<br />

Bronx<br />

2012<br />

12 X116 I.S. 216<br />

Bronx<br />

2012<br />

12 X129 X129 I.S. 129 (PAIRED W P234)<br />

Bronx<br />

2012<br />

12 X129 I.S. 129 (PAIRED W P234)<br />

Bronx<br />

2012<br />

12 X129 X129 I.S. 129 (PAIRED W P234)<br />

Bronx<br />

2012<br />

12 X134 X134 P.S. 134<br />

Bronx<br />

2012<br />

12 X150 X150 P.S. 150<br />

Bronx<br />

2012<br />

12 X158 X479 BRONX CAREER AND COLLEGE PREPARATORY HIGH<br />

SCHOOL<br />

Bronx<br />

2012<br />

12 X158 I.S. 158<br />

Bronx<br />

2012<br />

12 X167 X2<strong>14</strong> P.S. 2<strong>14</strong><br />

Bronx<br />

2011<br />

12 X167 X2<strong>14</strong> P.S. 2<strong>14</strong><br />

Bronx<br />

2012<br />

12 X193 X211 P.S. 211<br />

Bronx<br />

2012<br />

12 X193 P.S. 211<br />

Bronx<br />

2012<br />

12 X193 X211 P.S. 211<br />

Bronx<br />

2012<br />

12 X193 X318 I.S. 318<br />

Bronx<br />

2012<br />

12 X198 X198 P.S. 198<br />

Bronx<br />

2012<br />

12 X198 P.S. 198<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

12 X234 X300 P.S. 300<br />

Bronx<br />

2012<br />

13 K003 K003 P.S. 3<br />

Brooklyn<br />

2011<br />

13 K008 K008 P.S. 8<br />

Brooklyn<br />

2011<br />

13 K008 K008 P.S. 8<br />

Brooklyn<br />

2012<br />

13 K009 P.S. 9<br />

Brooklyn<br />

2012<br />

13 K009 P.S. 9<br />

Brooklyn<br />

2012<br />

13 K009 K009 P.S. 9<br />

Brooklyn<br />

2012<br />

13 K011 K011 P.S. 11<br />

Brooklyn<br />

20<strong>10</strong><br />

13 K020 P.S. 20<br />

Brooklyn<br />

2012<br />

13 K020 K492 I.S. 492<br />

Brooklyn<br />

2012<br />

13 K020 K020 P.S. 20<br />

Brooklyn<br />

2012<br />

13 K044 K044 P.S. 44<br />

Brooklyn<br />

2012<br />

13 K046 K046 P.S. 46<br />

Brooklyn<br />

2012<br />

13 K046 K046 P.S. 46<br />

Brooklyn<br />

2012<br />

13 K054 K054 P.S. 54<br />

Brooklyn<br />

2012<br />

13 K056 P.S. 56<br />

Brooklyn<br />

2012<br />

13 K056 K056 P.S. 56<br />

Brooklyn<br />

2012<br />

13 K056 P.S. 56<br />

Brooklyn<br />

2012<br />

13 K067 K067 P.S. 67<br />

Brooklyn<br />

2012<br />

13 K067 P.S. 67<br />

Brooklyn<br />

2012<br />

13 K093 K093 P.S. 93<br />

Brooklyn<br />

2012<br />

13 K113 K113 I.S. 113<br />

Brooklyn<br />

2012<br />

13 K113 K113 I.S. 113<br />

Brooklyn<br />

2012<br />

13 K117 I.S. 117<br />

Brooklyn<br />

2012<br />

13 K117 I.S. 117<br />

Brooklyn<br />

2012<br />

13 K256 K256 P.S. 256<br />

Brooklyn<br />

2012<br />

13 K258 I.S. 258<br />

Brooklyn<br />

2012<br />

13 K258 K336 I.S. 336<br />

Brooklyn<br />

2012<br />

13 K258 I.S. 258<br />

Brooklyn<br />

2012<br />

13 K265 K265 I.S. 265<br />

Brooklyn<br />

2012<br />

13 K270 K270 P.S. 270<br />

Brooklyn<br />

2012<br />

13 K282 K282 P.S. 282<br />

Brooklyn<br />

2012<br />

13 K282 K282 P.S. 282<br />

Brooklyn<br />

2011<br />

13 K287 P.S. 287<br />

Brooklyn<br />

2012<br />

13 K287 P.S. 287<br />

Brooklyn<br />

2012<br />

13 K287 K287 P.S. 287<br />

Brooklyn<br />

2012<br />

13 K305 P.S. 305<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K016 K016 P.S. 16<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

<strong>14</strong> K017 P.S. 17<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K017 K017 P.S. 17<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K017 P.S. 17<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K018 K018 P.S. 18<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K019 K019 P.S. 19<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K023 K023 P.S. 23<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K031 K031 P.S. 31 (OLD 126)<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 I.S. 33<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 K330 I.S. 330<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 K322 FOUNDATIONS ACADEMY<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 I.S. 33<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 K322 FOUNDATIONS ACADEMY<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K033 K368 K368 SPED<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K034 K034 P.S. 34<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 I.S. 49<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 K586 LYONS COMMUNITY SCHOOL<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 K6<strong>14</strong> YOUNG WOMEN'S LEADERSHIP SCHOOL<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 I.S. 49<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 K454 GREEN SCHOOL HS<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 K454 GREEN SCHOOL HS<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K050 J.H.S. 50<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K050 K050 J.H.S. 50<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K050 J.H.S. 50<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K059 K059 P.S. 59<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K071 K071 I.S. 71<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K084 K084 P.S. 84<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K1<strong>10</strong> K1<strong>10</strong> P.S. 1<strong>10</strong><br />

Brooklyn<br />

2011<br />

<strong>14</strong> K1<strong>10</strong> K1<strong>10</strong> P.S. 1<strong>10</strong><br />

Brooklyn<br />

2012<br />

<strong>14</strong> K120 K120 P.S. 120<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K126 K126 J.H.S. 126<br />

Brooklyn<br />

2011<br />

<strong>14</strong> K126 K126 J.H.S. 126<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K132 K132 P.S. 132<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K<strong>14</strong>7 K<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K157 K157 P.S. 157<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K157 P.S. 157<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K196 P.S. 196<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

<strong>14</strong> K196 P.S. 196<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K196 K196 P.S. 196<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K250 K250 P.S. 250<br />

Brooklyn<br />

2011<br />

<strong>14</strong> K257 K257 P.S. 257<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K297 K297 P.S. 297<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K318 K318 I.S. 318<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K319 K319 P.S. 319<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K380 K380 P.S. 380<br />

Brooklyn<br />

2012<br />

15 K001 K001 P.S. 1<br />

Brooklyn<br />

2012<br />

15 K0<strong>10</strong> K0<strong>10</strong> P.S. <strong>10</strong><br />

Brooklyn<br />

2011<br />

15 K015 K015 P.S. 15<br />

Brooklyn<br />

2012<br />

15 K015 P.S. 15<br />

Brooklyn<br />

2012<br />

15 K024 K024 P.S. 24<br />

Brooklyn<br />

2012<br />

15 K024 K024 P.S. 24<br />

Brooklyn<br />

2012<br />

15 K027 K676 RED HOOK NEIGHBORHOOD SCHOOL<br />

Brooklyn<br />

2012<br />

15 K029 K029 P.S. 29<br />

Brooklyn<br />

2012<br />

15 K029 K029 P.S. 29<br />

Brooklyn<br />

2012<br />

15 K029 K029 P.S. 29<br />

Brooklyn<br />

2011<br />

15 K032 K032 P.S. 32<br />

Brooklyn<br />

2012<br />

15 K038 K038 P.S. 38<br />

Brooklyn<br />

2012<br />

15 K039 K039 P.S. 39<br />

Brooklyn<br />

2011<br />

15 K039 K039 P.S. 39<br />

Brooklyn<br />

2012<br />

15 K039 K039 P.S. 39<br />

Brooklyn<br />

2012<br />

15 K051 K051 I.S. 51<br />

Brooklyn<br />

2012<br />

15 K051 K051 I.S. 51<br />

Brooklyn<br />

2012<br />

15 K058 K058 P.S. 58<br />

Brooklyn<br />

2011<br />

15 K058 K058 P.S. 58<br />

Brooklyn<br />

2012<br />

15 K088 K088 I.S. 88<br />

Brooklyn<br />

2012<br />

15 K094 K094 P.S. 94<br />

Brooklyn<br />

2012<br />

15 K<strong>10</strong>7 K<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Brooklyn<br />

20<strong>10</strong><br />

15 K124 K124 P.S. 124<br />

Brooklyn<br />

2012<br />

15 K130 K130 P.S. 130<br />

Brooklyn<br />

2012<br />

15 K130 K130 P.S. 130<br />

Brooklyn<br />

2012<br />

15 K131 K131 P.S. 131<br />

Brooklyn<br />

2012<br />

15 K136 K136 I.S. 136<br />

Brooklyn<br />

2012<br />

15 K136 K136 I.S. 136<br />

Brooklyn<br />

2012<br />

15 K136 K821 I.S. 821<br />

Brooklyn<br />

2012<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

15 K<strong>14</strong>2 K<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Brooklyn<br />

2012<br />

15 K154 K154 P.S. 154<br />

Brooklyn<br />

2012<br />

15 K154 K154 P.S. 154<br />

Brooklyn<br />

2012<br />

15 K154 K154 P.S. 154<br />

Brooklyn<br />

2011<br />

15 K169 K169 P.S. 169<br />

Brooklyn<br />

2012<br />

15 K172 K172 P.S. 172<br />

Brooklyn<br />

2012<br />

15 K230 K230 P.S. 230<br />

Brooklyn<br />

2011<br />

15 K230 K230 P.S. 230<br />

Brooklyn<br />

2012<br />

15 K261 K261 P.S. 261<br />

Brooklyn<br />

20<strong>10</strong><br />

15 K293 K429 BKLYN SCL FOR GLBL STUD<br />

Brooklyn<br />

2012<br />

15 K293 J.H.S. 293<br />

Brooklyn<br />

2012<br />

15 K293 J.H.S. 293<br />

Brooklyn<br />

2012<br />

15 K321 K321 P.S. 321<br />

Brooklyn<br />

2012<br />

15 K321 K321 P.S. 321<br />

Brooklyn<br />

2012<br />

15 K321 K321 P.S. 321<br />

Brooklyn<br />

2011<br />

15 K763 K133 P.S. 133<br />

Brooklyn<br />

2011<br />

15 K845 K295 P.S. 295<br />

Brooklyn<br />

20<strong>10</strong><br />

16 K005 K005 P.S. 5<br />

Brooklyn<br />

2012<br />

16 K021 K021 P.S. 21<br />

Brooklyn<br />

2011<br />

16 K021 K021 P.S. 21<br />

Brooklyn<br />

2012<br />

16 K025 P.S. 25<br />

Brooklyn<br />

2012<br />

16 K025 P.S. 25<br />

Brooklyn<br />

2012<br />

16 K026 K026 P.S. 26<br />

Brooklyn<br />

2012<br />

16 K026 K026 P.S. 26<br />

Brooklyn<br />

2012<br />

16 K026 K393 I.S. 393<br />

Brooklyn<br />

2012<br />

16 K035 K035 I.S. 35<br />

Brooklyn<br />

2012<br />

16 K035 I.S. 35<br />

Brooklyn<br />

2012<br />

16 K040 P.S. 40<br />

Brooklyn<br />

2012<br />

16 K040 K040 P.S. 40<br />

Brooklyn<br />

2012<br />

16 K040 P.S. 40<br />

Brooklyn<br />

2012<br />

16 K057 K057 J.H.S. 57<br />

Brooklyn<br />

2012<br />

16 K081 K081 P.S. 81<br />

Brooklyn<br />

2012<br />

16 K081 P.S. 81<br />

Brooklyn<br />

2012<br />

16 K304 K627 BRIGHTER CHOICE COMMUN SCHL<br />

Brooklyn<br />

2012<br />

16 K304 P.S. 304<br />

Brooklyn<br />

2012<br />

16 K308 K308 P.S. 308<br />

Brooklyn<br />

2012<br />

16 K308 K308 P.S. 308<br />

Brooklyn<br />

2012<br />

16 K309 K309 P.S. 309<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

16 K324 I.S. 324<br />

Brooklyn<br />

2012<br />

16 K324 K267 I.S. 267<br />

Brooklyn<br />

2012<br />

16 K335 P.S. 335<br />

Brooklyn<br />

2012<br />

16 K335 K335 P.S. 335<br />

Brooklyn<br />

2012<br />

17 K002 K002 I.S. 2<br />

Brooklyn<br />

2012<br />

17 K002 K<strong>14</strong>1 K<strong>14</strong>1 SPED<br />

Brooklyn<br />

2012<br />

17 K002 K002 I.S. 2<br />

Brooklyn<br />

2012<br />

17 K006 K006 P.S. 6<br />

Brooklyn<br />

2012<br />

17 K006 K006 P.S. 6<br />

Brooklyn<br />

2012<br />

17 K012 P.S. 12<br />

Brooklyn<br />

2012<br />

17 K012 P.S. 12<br />

Brooklyn<br />

2012<br />

17 K012 K012 P.S. 12<br />

Brooklyn<br />

2012<br />

17 K022 K022 P.S. 22<br />

Brooklyn<br />

2012<br />

17 K061 K061 I.S. 61<br />

Brooklyn<br />

2012<br />

17 K091 K091 P.S. 91<br />

Brooklyn<br />

2012<br />

17 K092 K092 P.S. 92<br />

Brooklyn<br />

2012<br />

17 K138 P.S. 138<br />

Brooklyn<br />

2012<br />

17 K138 K138 P.S. 138<br />

Brooklyn<br />

2012<br />

17 K161 K161 P.S. 161<br />

Brooklyn<br />

2012<br />

17 K167 K167 P.S. 167<br />

Brooklyn<br />

2012<br />

17 K181 K181 P.S. 181<br />

Brooklyn<br />

2012<br />

17 K189 K189 P.S. 189<br />

Brooklyn<br />

2012<br />

17 K191 K191 P.S. 191<br />

Brooklyn<br />

2012<br />

17 K2<strong>10</strong> K394 I.S. 394<br />

Brooklyn<br />

2012<br />

17 K221 K221 P.S. 221<br />

Brooklyn<br />

2012<br />

17 K241 K241 P.S. 241<br />

Brooklyn<br />

2012<br />

17 K246 I.S. 246<br />

Brooklyn<br />

2012<br />

17 K246 K246 I.S. 246<br />

Brooklyn<br />

2012<br />

17 K249 K249 P.S. 249<br />

Brooklyn<br />

2012<br />

17 K289 K289 P.S. 289<br />

Brooklyn<br />

2012<br />

17 K316 K316 P.S. 316<br />

Brooklyn<br />

2011<br />

17 K320 K352 M.S. 352<br />

Brooklyn<br />

2012<br />

17 K390 K334 M.S. 334<br />

Brooklyn<br />

2012<br />

17 K391 I.S. 391<br />

Brooklyn<br />

2012<br />

17 K391 I.S. 391<br />

Brooklyn<br />

2012<br />

17 K391 K587 I.S. 587<br />

Brooklyn<br />

2012<br />

17 K397 K397 P.S. 397<br />

Brooklyn<br />

2012<br />

17 K399 K399 P.S. 399<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

17 K867 P.S. 138 AX (CROWN HGTS ECC 1)<br />

Brooklyn<br />

2012<br />

17 K874 K340 I.S. 340<br />

Brooklyn<br />

2012<br />

18 K066 P.S. 66<br />

Brooklyn<br />

2012<br />

18 K066 K066 P.S. 66<br />

Brooklyn<br />

2012<br />

18 K068 K068 I.S. 68<br />

Brooklyn<br />

2012<br />

18 K1<strong>14</strong> K1<strong>14</strong> P.S. 1<strong>14</strong><br />

Brooklyn<br />

2012<br />

18 K115 K115 P.S. 115<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K135 K135 P.S. 135<br />

Brooklyn<br />

2012<br />

18 K135 K135 P.S. 135<br />

Brooklyn<br />

2012<br />

18 K208 K208 P.S. 208<br />

Brooklyn<br />

2012<br />

18 K211 K211 I.S. 211<br />

Brooklyn<br />

2012<br />

18 K219 K219 P.S. 219<br />

Brooklyn<br />

2012<br />

18 K232 I.S. 232<br />

Brooklyn<br />

2012<br />

18 K232 K589 ARTS & MEDIA PREP ACADEMY<br />

Brooklyn<br />

2012<br />

18 K232 K581 EAST FLATBUSH COMMUNITY RESCH<br />

Brooklyn<br />

2012<br />

18 K232 K581 EAST FLATBUSH COMMUNITY RESCH<br />

Brooklyn<br />

2012<br />

18 K232 I.S. 232<br />

Brooklyn<br />

2012<br />

18 K232 K598 MIDDLE SCHOOL OF MKTG<br />

Brooklyn<br />

2012<br />

18 K233 K233 P.S. 233<br />

Brooklyn<br />

2012<br />

18 K235 K235 P.S. 235<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K242 K635 OLYMPUS ACADEMY<br />

Brooklyn<br />

2012<br />

18 K244 K244 P.S. 244<br />

Brooklyn<br />

2012<br />

18 K252 K588 MIDDLE SCHOOL FOR ART & PHILOS<br />

Brooklyn<br />

2012<br />

18 K268 K268 P.S. 268<br />

Brooklyn<br />

2012<br />

18 K272 K272 P.S. 272<br />

Brooklyn<br />

2012<br />

18 K279 K279 P.S. 279<br />

Brooklyn<br />

2011<br />

18 K279 K279 P.S. 279<br />

Brooklyn<br />

2012<br />

18 K285 K285 I.S. 285<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K366 K673 EAST BKLN COMMUNITY HS<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K366 K673 EAST BKLN COMMUNITY HS<br />

Brooklyn<br />

2012<br />

19 K007 P.S. 7<br />

Brooklyn<br />

2012<br />

19 K007 K007 P.S. 7<br />

Brooklyn<br />

2012<br />

19 K013 P.S. 13<br />

Brooklyn<br />

2012<br />

19 K013 K013 P.S. 13<br />

Brooklyn<br />

2012<br />

19 K072 K677 EAST NEW YORK ELEMENTARY SCHOOL OF<br />

EXCELLENCE<br />

Brooklyn<br />

2012<br />

19 K072 P.S. 72<br />

Brooklyn<br />

2012<br />

19 K<strong>10</strong>8 K<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

19 K<strong>10</strong>8 K<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Brooklyn<br />

2012<br />

19 K<strong>14</strong>9 K<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Brooklyn<br />

2012<br />

19 K<strong>14</strong>9 K<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Brooklyn<br />

2012<br />

19 K158 K158 P.S. 158<br />

Brooklyn<br />

2012<br />

19 K159 K159 P.S. 159<br />

Brooklyn<br />

2012<br />

19 K166 I.S. 166<br />

Brooklyn<br />

2012<br />

19 K166 I.S. 166<br />

Brooklyn<br />

2012<br />

19 K166 I.S. 166<br />

Brooklyn<br />

2012<br />

19 K166 K166 I.S. 166<br />

Brooklyn<br />

2012<br />

19 K171 K171 I.S. 171<br />

Brooklyn<br />

2012<br />

19 K171 K171 I.S. 171<br />

Brooklyn<br />

2012<br />

19 K174 K174 P.S. 174<br />

Brooklyn<br />

2012<br />

19 K190 K190 P.S. 190<br />

Brooklyn<br />

2012<br />

19 K202 K202 P.S. 202<br />

Brooklyn<br />

2012<br />

19 K213 K213 P.S. 213<br />

Brooklyn<br />

2012<br />

19 K2<strong>14</strong> K2<strong>14</strong> P.S. 2<strong>14</strong><br />

Brooklyn<br />

2012<br />

19 K218 K218 I.S. 218<br />

Brooklyn<br />

2012<br />

19 K224 K224 P.S. 224<br />

Brooklyn<br />

2012<br />

19 K260 K260 P.S. 260<br />

Brooklyn<br />

2011<br />

19 K260 K260 P.S. 260<br />

Brooklyn<br />

2012<br />

19 K273 K273 P.S. 273<br />

Brooklyn<br />

2012<br />

19 K290 K290 P.S. 290<br />

Brooklyn<br />

2012<br />

19 K292 I.S. 292<br />

Brooklyn<br />

2012<br />

19 K292 K292 I.S. 292<br />

Brooklyn<br />

2012<br />

19 K302 I.S. 302<br />

Brooklyn<br />

2012<br />

19 K302 K302 I.S. 302<br />

Brooklyn<br />

2012<br />

19 K306 K306 P.S. 306<br />

Brooklyn<br />

2012<br />

19 K306 K306 P.S. 306<br />

Brooklyn<br />

2012<br />

19 K328 K328 P.S. 328<br />

Brooklyn<br />

2012<br />

19 K345 K345 P.S. 345<br />

Brooklyn<br />

2012<br />

19 K346 P.S. 346<br />

Brooklyn<br />

2012<br />

19 K346 P.S. 346<br />

Brooklyn<br />

2012<br />

19 K346 K346 P.S. 346<br />

Brooklyn<br />

2012<br />

19 K798 K065 P.S. 65<br />

Brooklyn<br />

2012<br />

19 K8<strong>14</strong> K089 P.S. 89<br />

Brooklyn<br />

2012<br />

19 K949 P.S. 2<strong>14</strong> TRANSPORTABLE<br />

Brooklyn<br />

2012<br />

19 K974 I.S. 302 TRANSPORTABLE<br />

Brooklyn<br />

2012<br />

20 K048 K048 P.S. 48<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

20 K062 K062 I.S. 62<br />

Brooklyn<br />

2012<br />

20 K069 K069 P.S. 69<br />

Brooklyn<br />

2012<br />

20 K<strong>10</strong>2 K<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K<strong>10</strong>4 K<strong>10</strong>4 P.S. <strong>10</strong>4<br />

Brooklyn<br />

2011<br />

20 K<strong>10</strong>4 K<strong>10</strong>4 P.S. <strong>10</strong>4<br />

Brooklyn<br />

2012<br />

20 K<strong>10</strong>5 K<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Brooklyn<br />

2012<br />

20 K112 K112 P.S. 112<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K127 K127 P.S. 127<br />

Brooklyn<br />

2012<br />

20 K160 K160 P.S. 160<br />

Brooklyn<br />

2012<br />

20 K163 K748 P.S. 748<br />

Brooklyn<br />

2011<br />

20 K164 K164 P.S. 164<br />

Brooklyn<br />

2012<br />

20 K164 P.S. 164<br />

Brooklyn<br />

2012<br />

20 K170 K170 P.S. 170 ADDITION<br />

Brooklyn<br />

2012<br />

20 K176 K176 P.S. 176<br />

Brooklyn<br />

2012<br />

20 K179 K179 P.S. 179<br />

Brooklyn<br />

2012<br />

20 K180 K180 P.S. 180<br />

Brooklyn<br />

2012<br />

20 K185 K185 P.S. 185<br />

Brooklyn<br />

2011<br />

20 K185 K185 P.S. 185<br />

Brooklyn<br />

2012<br />

20 K186 K186 P.S. 186<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K192 K192 P.S. 192<br />

Brooklyn<br />

2011<br />

20 K200 K200 P.S. 200<br />

Brooklyn<br />

2011<br />

20 K200 K200 P.S. 200<br />

Brooklyn<br />

2012<br />

20 K201 K201 I.S. 201<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K204 K204 P.S. 204<br />

Brooklyn<br />

2012<br />

20 K204 K204 P.S. 204<br />

Brooklyn<br />

2011<br />

20 K205 K205 P.S. 205<br />

Brooklyn<br />

2012<br />

20 K220 K220 I.S. 220<br />

Brooklyn<br />

2012<br />

20 K223 K609 URBN ASSY SCHL CRIM JUSTICE<br />

Brooklyn<br />

2012<br />

20 K223 K223 I.S. 223<br />

Brooklyn<br />

2012<br />

20 K227 K227 I.S. 227<br />

Brooklyn<br />

2012<br />

20 K229 K229 P.S. 229<br />

Brooklyn<br />

2012<br />

20 K229 K229 P.S. 229<br />

Brooklyn<br />

2011<br />

20 K237 K682 THE ACADAMY OF TALENTED SCHOLARS<br />

Brooklyn<br />

2012<br />

20 K247 K247 P.S. 247<br />

Brooklyn<br />

2011<br />

20 K247 K247 P.S. 247<br />

Brooklyn<br />

2012<br />

20 K259 K259 I.S. 259<br />

Brooklyn<br />

2012<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong><br />

Brooklyn<br />

2012<br />

20 K3<strong>14</strong> K503 P.S. 503<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

20 K486 K187 I.S. 187<br />

Brooklyn<br />

2011<br />

20 K486 K187 I.S. 187<br />

Brooklyn<br />

2012<br />

20 K807 K163 P.S. 163<br />

Brooklyn<br />

2012<br />

20 K940 K030 I.S. 30<br />

Brooklyn<br />

2011<br />

20 K971 K3<strong>10</strong> P.S. 3<strong>10</strong><br />

Brooklyn<br />

2012<br />

21 K043 I.S. 98<br />

Brooklyn<br />

2012<br />

21 K043 K098 I.S. 98<br />

Brooklyn<br />

2011<br />

21 K043 I.S. 98<br />

Brooklyn<br />

2012<br />

21 K043 K098 I.S. 98<br />

Brooklyn<br />

2012<br />

21 K090 K090 P.S. 90<br />

Brooklyn<br />

2011<br />

21 K095 K095 P.S. 95<br />

Brooklyn<br />

2012<br />

21 K096 K096 I.S. 96<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K097 K097 P.S. 97<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K099 K099 P.S. 99<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K<strong>10</strong>0 K<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Brooklyn<br />

2012<br />

21 K<strong>10</strong>1 K<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Brooklyn<br />

2011<br />

21 K<strong>10</strong>1 K<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Brooklyn<br />

2012<br />

21 K121 K121 P.S. 121<br />

Brooklyn<br />

2012<br />

21 K128 K128 P.S. 128 (TANDEM BROOKLYN STUDIO)<br />

Brooklyn<br />

2011<br />

21 K128 K128 P.S. 128 (TANDEM BROOKLYN STUDIO)<br />

Brooklyn<br />

2012<br />

21 K153 K153 P.S. 153<br />

Brooklyn<br />

2012<br />

21 K153 K153 P.S. 153<br />

Brooklyn<br />

2011<br />

21 K177 K177 P.S. 177<br />

Brooklyn<br />

2011<br />

21 K177 K177 P.S. 177<br />

Brooklyn<br />

2012<br />

21 K188 K188 P.S. 188<br />

Brooklyn<br />

2012<br />

21 K199 K199 P.S. 199<br />

Brooklyn<br />

2012<br />

21 K199 K199 P.S. 199<br />

Brooklyn<br />

2011<br />

21 K209 K209 P.S. 209<br />

Brooklyn<br />

2012<br />

21 K209 K209 P.S. 209<br />

Brooklyn<br />

2011<br />

21 K212 K212 P.S. 212<br />

Brooklyn<br />

2011<br />

21 K215 K215 P.S. 215<br />

Brooklyn<br />

2012<br />

21 K216 K216 P.S. 216<br />

Brooklyn<br />

2012<br />

21 K216 K216 P.S. 216<br />

Brooklyn<br />

2011<br />

21 K225 K225 P.S. 225<br />

Brooklyn<br />

2012<br />

21 K226 K226 P.S. 226<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K228 K228 I.S. 228<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K238 K238 P.S. 238<br />

Brooklyn<br />

2012<br />

21 K239 K239 I.S. 239<br />

Brooklyn<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

21 K239 K239 I.S. 239<br />

Brooklyn<br />

2012<br />

21 K253 K253 P.S. 253<br />

Brooklyn<br />

2012<br />

21 K281 K281 I.S. 281<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K288 K288 P.S. 288<br />

Brooklyn<br />

2012<br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

21 K303 K303 I.S. 303<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K303 K344 R. CARSON SCL OF COASTAL ST<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

21 K329 K329 P.S. 329<br />

Brooklyn<br />

2012<br />

22 K0<strong>14</strong> K0<strong>14</strong> I.S. <strong>14</strong><br />

Brooklyn<br />

2012<br />

22 K052 K052 P.S. 52<br />

Brooklyn<br />

2012<br />

22 K052 K052 P.S. 52<br />

Brooklyn<br />

2011<br />

22 K078 K078 I.S. 78<br />

Brooklyn<br />

2012<br />

22 K119 K119 P.S. 119<br />

Brooklyn<br />

2012<br />

22 K139 K139 P.S. 139<br />

Brooklyn<br />

2012<br />

22 K152 K152 P.S. 152<br />

Brooklyn<br />

2012<br />

22 K193 K193 P.S. 193<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K194 K194 P.S. 194<br />

Brooklyn<br />

2012<br />

22 K195 K195 P.S. 195<br />

Brooklyn<br />

2011<br />

22 K195 K195 P.S. 195<br />

Brooklyn<br />

2012<br />

22 K197 K381 I.S. 381<br />

Brooklyn<br />

2012<br />

22 K197 K197 P.S. 197<br />

Brooklyn<br />

2012<br />

22 K198 K198 P.S. 198<br />

Brooklyn<br />

2012<br />

22 K203 K203 P.S. 203<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K206 K206 P.S. 206<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K207 K207 P.S. 207<br />

Brooklyn<br />

2012<br />

22 K207 K207 P.S. 207<br />

Brooklyn<br />

2011<br />

22 K217 K217 P.S. 217<br />

Brooklyn<br />

2012<br />

22 K217 K217 P.S. 217<br />

Brooklyn<br />

2011<br />

22 K222 K222 P.S. 222<br />

Brooklyn<br />

2011<br />

22 K222 K222 P.S. 222<br />

Brooklyn<br />

2012<br />

22 K234 K234 I.S. 234<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K236 K236 P.S. 236<br />

Brooklyn<br />

2012<br />

22 K240 K240 I.S. 240<br />

Brooklyn<br />

2012<br />

22 K240 K240 I.S. 240<br />

Brooklyn<br />

2011<br />

22 K251 K251 P.S. 251<br />

Brooklyn<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

22 K251 K251 P.S. 251<br />

Brooklyn<br />

2012<br />

22 K254 K254 P.S. 254<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K255 K255 P.S. 255<br />

Brooklyn<br />

2011<br />

22 K255 K255 P.S. 255<br />

Brooklyn<br />

2012<br />

22 K269 K269 P.S. 269<br />

Brooklyn<br />

2012<br />

22 K277 K277 P.S. 277<br />

Brooklyn<br />

2012<br />

22 K277 K277 P.S. 277<br />

Brooklyn<br />

2011<br />

22 K278 K278 I.S. 278<br />

Brooklyn<br />

2012<br />

22 K278 K278 I.S. 278<br />

Brooklyn<br />

2012<br />

22 K312 K312 P.S. 312<br />

Brooklyn<br />

2011<br />

22 K312 K312 P.S. 312<br />

Brooklyn<br />

2012<br />

22 K395 P.S./I.S. 395<br />

Brooklyn<br />

2012<br />

22 K395 P.S./I.S. 395<br />

Brooklyn<br />

2012<br />

22 K395 K<strong>10</strong>9 P.S. <strong>10</strong>9<br />

Brooklyn<br />

2012<br />

22 K735 K245 P.S. 245<br />

Brooklyn<br />

2011<br />

22 K826 P.S. 245<br />

Brooklyn<br />

2012<br />

22 K849 K134 P.S. 134<br />

Brooklyn<br />

2012<br />

22 K852 K326 P.S. 326<br />

Brooklyn<br />

2011<br />

22 K852 K326 P.S. 326<br />

Brooklyn<br />

2012<br />

22 K864 K361 P.S. 361<br />

Brooklyn<br />

2012<br />

23 K041 K041 P.S. 41<br />

Brooklyn<br />

2012<br />

23 K055 K493 I.S. 493<br />

Brooklyn<br />

2012<br />

23 K055 K493 I.S. 493<br />

Brooklyn<br />

2012<br />

23 K073 K073 P.S. 73<br />

Brooklyn<br />

2012<br />

23 K137 K137 P.S. 137<br />

Brooklyn<br />

2012<br />

23 K150 K150 P.S. 150<br />

Brooklyn<br />

2012<br />

23 K150 K150 P.S. 150<br />

Brooklyn<br />

2012<br />

23 K155 K155 P.S. 155<br />

Brooklyn<br />

2012<br />

23 K165 K165 P.S. 165<br />

Brooklyn<br />

2012<br />

23 K178 K178 P.S. 178<br />

Brooklyn<br />

2012<br />

23 K183 K446 P.S. 446<br />

Brooklyn<br />

2012<br />

23 K184 K184 P.S. 184<br />

Brooklyn<br />

2012<br />

23 K263 P.S./I.S. 323<br />

Brooklyn<br />

2012<br />

23 K263 K323 P.S./I.S. 323<br />

Brooklyn<br />

2012<br />

23 K263 K323 P.S./I.S. 323<br />

Brooklyn<br />

2011<br />

23 K271 I.S. 271<br />

Brooklyn<br />

2012<br />

23 K271 K522 I.S. 522<br />

Brooklyn<br />

2012<br />

23 K271 I.S. 271<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

23 K271 I.S. 271<br />

Brooklyn<br />

2012<br />

23 K275 K<strong>14</strong>0 K<strong>14</strong>0 SPED<br />

Brooklyn<br />

2012<br />

23 K275 K<strong>14</strong>0 K<strong>14</strong>0 SPED<br />

Brooklyn<br />

2012<br />

23 K275 K518 I.S. 518<br />

Brooklyn<br />

2012<br />

23 K275 K643 BROOKLYN DEMOCRACY ACADEMY<br />

Brooklyn<br />

2012<br />

23 K275 I.S. 275<br />

Brooklyn<br />

2012<br />

23 K275 K647 METRO DIPLOMA PLUS<br />

Brooklyn<br />

2012<br />

23 K284 K284 P.S. 284<br />

Brooklyn<br />

2012<br />

23 K298 K298 P.S. 298<br />

Brooklyn<br />

2012<br />

23 K332 K332 P.S. 332<br />

Brooklyn<br />

2012<br />

23 K356 K156 P.S. 156<br />

Brooklyn<br />

2012<br />

24 Q005 Q005 I.S. 5<br />

Queens<br />

2012<br />

24 Q007 P.S. 7<br />

Queens<br />

2012<br />

24 Q007 Q007 P.S. 7<br />

Queens<br />

2012<br />

24 Q012 Q012 P.S. 12<br />

Queens<br />

20<strong>10</strong><br />

24 Q013 Q013 P.S. 13<br />

Queens<br />

20<strong>10</strong><br />

24 Q0<strong>14</strong> Q0<strong>14</strong> P.S. <strong>14</strong><br />

Queens<br />

2012<br />

24 Q0<strong>14</strong> Q0<strong>14</strong> P.S. <strong>14</strong><br />

Queens<br />

2012<br />

24 Q019 Q019 P.S. 19<br />

Queens<br />

2012<br />

24 Q028 Q028 P.S. 28 (ECC)<br />

Queens<br />

2012<br />

24 Q049 Q049 P.S./I.S. 49<br />

Queens<br />

2012<br />

24 Q058 Q058 P.S. 58<br />

Queens<br />

2012<br />

24 Q061 Q061 I.S. 61<br />

Queens<br />

2012<br />

24 Q068 Q068 P.S. 68<br />

Queens<br />

2012<br />

24 Q071 Q071 P.S. 71<br />

Queens<br />

2012<br />

24 Q073 Q073 I.S. 73<br />

Queens<br />

20<strong>10</strong><br />

24 Q081 Q081 P.S. 81<br />

Queens<br />

2012<br />

24 Q081 Q081 P.S. 81<br />

Queens<br />

2012<br />

24 Q087 Q087 P.S. 87 ADDITION<br />

Queens<br />

2012<br />

24 Q087 Q087 P.S. 87 ADDITION<br />

Queens<br />

2011<br />

24 Q088 Q088 P.S. 88<br />

Queens<br />

20<strong>10</strong><br />

24 Q089 Q089 P.S. 89<br />

Queens<br />

2012<br />

24 Q091 Q091 P.S. 91<br />

Queens<br />

2012<br />

24 Q093 Q093 I.S. 93<br />

Queens<br />

2012<br />

24 Q<strong>10</strong>2 Q<strong>10</strong>2 P.S./I.S. <strong>10</strong>2<br />

Queens<br />

2012<br />

24 Q<strong>10</strong>2 Q<strong>10</strong>2 P.S./I.S. <strong>10</strong>2<br />

Queens<br />

2012<br />

24 Q113 Q113 P.S./I.S. 113<br />

Queens<br />

20<strong>10</strong><br />

24 Q119 Q119 I.S. 119<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

24 Q119 Q119 I.S. 119<br />

Queens<br />

2012<br />

24 Q119 Q119 I.S. 119<br />

Queens<br />

2011<br />

24 Q125 Q125 I.S. 125<br />

Queens<br />

2012<br />

24 Q<strong>14</strong>3 Q<strong>14</strong>3 P.S. <strong>14</strong>3<br />

Queens<br />

2011<br />

24 Q<strong>14</strong>3 Q<strong>14</strong>3 P.S. <strong>14</strong>3<br />

Queens<br />

2012<br />

24 Q153 Q153 P.S. 153<br />

Queens<br />

2012<br />

24 Q153 Q153 P.S. 153<br />

Queens<br />

2011<br />

24 Q199 Q199 P.S. 199<br />

Queens<br />

2011<br />

24 Q199 Q199 P.S. 199<br />

Queens<br />

2012<br />

24 Q229 Q229 P.S. 229<br />

Queens<br />

2012<br />

24 Q229 Q229 P.S. 229<br />

Queens<br />

2012<br />

24 Q239 Q239 P.S. 239<br />

Queens<br />

2012<br />

24 Q239 Q239 P.S. 239<br />

Queens<br />

2012<br />

24 Q245 Q305 P.S. 305<br />

Queens<br />

2012<br />

24 Q247 Q128 P.S. 128<br />

Queens<br />

2012<br />

24 Q247 Q128 P.S. 128<br />

Queens<br />

2012<br />

24 Q260 Q307 P.S. 307<br />

Queens<br />

2012<br />

24 Q269 Q330 P.S. 330<br />

Queens<br />

2012<br />

24 Q721 P.S. 16 (OLD Q721 SPED)<br />

Queens<br />

2012<br />

24 Q721 Q016 P.S. 16<br />

Queens<br />

2012<br />

24 Q721 P.S. 16 (OLD Q721 SPED)<br />

Queens<br />

2012<br />

24 Q721 P.S. 16 (OLD Q721 SPED)<br />

Queens<br />

2012<br />

24 Q849 Q077 I.S. 77<br />

Queens<br />

2011<br />

24 Q849 Q077 I.S. 77<br />

Queens<br />

2012<br />

24 Q873 Q290 P.S. 290<br />

Queens<br />

2012<br />

24 Q877 Q877 51ST AVENUE ACADEMY<br />

Queens<br />

2012<br />

25 Q020 Q020 P.S. 20<br />

Queens<br />

2012<br />

25 Q021 Q021 P.S. 21<br />

Queens<br />

20<strong>10</strong><br />

25 Q022 Q022 P.S. 22<br />

Queens<br />

20<strong>10</strong><br />

25 Q024 Q024 P.S. 24<br />

Queens<br />

2011<br />

25 Q024 Q024 P.S. 24<br />

Queens<br />

2012<br />

25 Q025 J.H.S. 25<br />

Queens<br />

2012<br />

25 Q025 Q025 J.H.S. 25<br />

Queens<br />

2012<br />

25 Q025 J.H.S. 25<br />

Queens<br />

2012<br />

25 Q029 Q029 P.S. 29<br />

Queens<br />

2012<br />

25 Q029 Q029 P.S. 29<br />

Queens<br />

2011<br />

25 Q032 Q032 P.S. 32<br />

Queens<br />

2012<br />

25 Q032 Q032 P.S. 32<br />

Queens<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

25 Q079 Q079 P.S. 79<br />

Queens<br />

2012<br />

25 Q079 Q079 P.S. 79<br />

Queens<br />

2011<br />

25 Q<strong>10</strong>7 Q<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Queens<br />

2012<br />

25 Q<strong>10</strong>7 Q<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Queens<br />

2012<br />

25 Q120 Q120 P.S. 120<br />

Queens<br />

20<strong>10</strong><br />

25 Q129 Q129 P.S. 129<br />

Queens<br />

2012<br />

25 Q130 Q130 P.S. 130<br />

Queens<br />

2012<br />

25 Q130 Q130 P.S. 130<br />

Queens<br />

2011<br />

25 Q154 P.S. 154<br />

Queens<br />

2012<br />

25 Q154 Q154 P.S. 154<br />

Queens<br />

20<strong>10</strong><br />

25 Q154 P.S. 154<br />

Queens<br />

2012<br />

25 Q163 Q163 P.S. 163 ADDITION<br />

Queens<br />

20<strong>10</strong><br />

25 Q164 Q164 P.S. 164<br />

Queens<br />

2012<br />

25 Q165 Q165 P.S. 165<br />

Queens<br />

2012<br />

25 Q168 J.H.S. 168<br />

Queens<br />

2012<br />

25 Q168 J.H.S. 168<br />

Queens<br />

2012<br />

25 Q168 Q250 I.S. 250<br />

Queens<br />

2012<br />

25 Q169 P.S. 169<br />

Queens<br />

2012<br />

25 Q169 Q169 P.S. 169<br />

Queens<br />

2012<br />

25 Q184 Q184 P.S. 184<br />

Queens<br />

2011<br />

25 Q184 Q184 P.S. 184<br />

Queens<br />

2012<br />

25 Q185 Q185 J.H.S. 185<br />

Queens<br />

20<strong>10</strong><br />

25 Q189 Q189 J.H.S. 189<br />

Queens<br />

2012<br />

25 Q189 Q263 THE FLUSHING INTERNATIONAL HS<br />

Queens<br />

2012<br />

25 Q189 J.H.S. 189<br />

Queens<br />

2012<br />

25 Q193 Q193 P.S. 193<br />

Queens<br />

2012<br />

25 Q193 Q193 P.S. 193<br />

Queens<br />

2011<br />

25 Q193 Q193 P.S. 193<br />

Queens<br />

2012<br />

25 Q194 Q194 J.H.S. 194<br />

Queens<br />

2011<br />

25 Q194 Q194 J.H.S. 194<br />

Queens<br />

2012<br />

25 Q194 Q194 J.H.S. 194<br />

Queens<br />

2012<br />

25 Q200 Q200 P.S. 200<br />

Queens<br />

20<strong>10</strong><br />

25 Q201 Q201 P.S. 201<br />

Queens<br />

2011<br />

25 Q201 Q201 P.S. 201<br />

Queens<br />

2012<br />

25 Q209 Q209 P.S. 209<br />

Queens<br />

2012<br />

25 Q209 Q209 P.S. 209<br />

Queens<br />

2012<br />

25 Q2<strong>14</strong> Q2<strong>14</strong> P.S. 2<strong>14</strong><br />

Queens<br />

2012<br />

25 Q219 Q219 P.S. 219<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

25 Q237 J.H.S. 237<br />

Queens<br />

2012<br />

25 Q237 J.H.S. 237<br />

Queens<br />

2012<br />

25 Q237 Q237 J.H.S. 237<br />

Queens<br />

20<strong>10</strong><br />

25 Q237 J.H.S. 237<br />

Queens<br />

2012<br />

25 Q242 Q242 P.S. 242 - (ECC)<br />

Queens<br />

2012<br />

25 Q242 Q242 P.S. 242 - (ECC)<br />

Queens<br />

2011<br />

25 Q244 Q244 P.S. 244 ECC (@ FRANKLIN AVE)<br />

Queens<br />

2012<br />

25 Q499 Q499 P.S./I.S. 499<br />

Queens<br />

2011<br />

25 Q499 Q499 P.S./I.S. 499<br />

Queens<br />

2012<br />

26 Q018 Q018 P.S. 18<br />

Queens<br />

2012<br />

26 Q018 Q018 P.S. 18<br />

Queens<br />

2011<br />

26 Q026 Q026 P.S. 26<br />

Queens<br />

2011<br />

26 Q031 Q031 P.S. 31<br />

Queens<br />

2011<br />

26 Q031 Q031 P.S. 31<br />

Queens<br />

2012<br />

26 Q041 Q041 P.S. 41<br />

Queens<br />

2011<br />

26 Q041 P.S. 41<br />

Queens<br />

2012<br />

26 Q041 Q041 P.S. 41<br />

Queens<br />

2012<br />

26 Q041 Q041 P.S. 41<br />

Queens<br />

2012<br />

26 Q046 Q046 P.S. 46<br />

Queens<br />

2012<br />

26 Q046 Q046 P.S. 46<br />

Queens<br />

2012<br />

26 Q067 Q067 J.H.S. 67<br />

Queens<br />

2012<br />

26 Q067 Q067 J.H.S. 67<br />

Queens<br />

2012<br />

26 Q074 Q074 I.S. 74<br />

Queens<br />

2012<br />

26 Q074 Q074 I.S. 74<br />

Queens<br />

2011<br />

26 Q094 Q094 P.S. 94<br />

Queens<br />

2012<br />

26 Q094 Q094 P.S. 94<br />

Queens<br />

2011<br />

26 Q094 Q094 P.S. 94<br />

Queens<br />

2012<br />

26 Q098 Q098 P.S. 98<br />

Queens<br />

2011<br />

26 Q098 Q098 P.S. 98<br />

Queens<br />

2012<br />

26 Q098 Q098 P.S. 98<br />

Queens<br />

2012<br />

26 Q115 Q115 P.S. 115<br />

Queens<br />

2012<br />

26 Q115 Q115 P.S. 115<br />

Queens<br />

2011<br />

26 Q133 Q133 P.S. 133<br />

Queens<br />

2011<br />

26 Q133 Q133 P.S. 133<br />

Queens<br />

2012<br />

26 Q158 Q158 J.H.S. 158<br />

Queens<br />

2012<br />

26 Q159 Q159 P.S. 159<br />

Queens<br />

2011<br />

26 Q159 Q159 P.S. 159<br />

Queens<br />

2012<br />

26 Q162 Q162 P.S. 162<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

26 Q172 Q172 J.H.S. 172<br />

Queens<br />

2012<br />

26 Q173 Q173 P.S. 173<br />

Queens<br />

2011<br />

26 Q173 Q173 P.S. 173<br />

Queens<br />

2012<br />

26 Q178 Q178 P.S. 178<br />

Queens<br />

2012<br />

26 Q178 Q178 P.S. 178<br />

Queens<br />

2011<br />

26 Q179 Q004 Q004 SPED<br />

Queens<br />

2012<br />

26 Q186 Q224 Q224 SPED<br />

Queens<br />

20<strong>10</strong><br />

26 Q188 Q188 P.S. 188<br />

Queens<br />

2011<br />

26 Q188 Q188 P.S. 188<br />

Queens<br />

2012<br />

26 Q188 Q188 P.S. 188<br />

Queens<br />

2012<br />

26 Q191 Q191 P.S. 191<br />

Queens<br />

2012<br />

26 Q203 Q203 P.S. 203<br />

Queens<br />

2012<br />

26 Q203 Q203 P.S. 203<br />

Queens<br />

2012<br />

26 Q205 Q205 P.S. 205<br />

Queens<br />

2011<br />

26 Q205 Q205 P.S. 205<br />

Queens<br />

2012<br />

26 Q205 P.S. 205<br />

Queens<br />

2012<br />

26 Q205 Q205 P.S. 205<br />

Queens<br />

2012<br />

26 Q213 P.S. 213<br />

Queens<br />

2012<br />

26 Q213 Q213 P.S. 213<br />

Queens<br />

2012<br />

26 Q213 Q213 P.S. 213<br />

Queens<br />

2012<br />

26 Q216 Q216 J.H.S. 216<br />

Queens<br />

2011<br />

26 Q216 Q216 J.H.S. 216<br />

Queens<br />

2012<br />

26 Q221 Q221 P.S. 221<br />

Queens<br />

2012<br />

26 Q221 Q221 P.S. 221<br />

Queens<br />

2011<br />

26 Q221 Q221 P.S. 221<br />

Queens<br />

2012<br />

26 Q266 Q266 P.S./I.S. 266<br />

Queens<br />

2011<br />

26 Q266 P.S./I.S. 266<br />

Queens<br />

2012<br />

26 Q266 Q266 P.S./I.S. 266<br />

Queens<br />

2012<br />

26 Q266 Q266 P.S./I.S. 266<br />

Queens<br />

2012<br />

26 QALP Q023 PS 23 @ HILLSIDE PSYCH<br />

Queens<br />

20<strong>10</strong><br />

27 Q042 Q042 P.S. 42<br />

Queens<br />

2012<br />

27 Q043 Q043 P.S. 43<br />

Queens<br />

2012<br />

27 Q045 Q045 P.S. 45<br />

Queens<br />

2012<br />

27 Q047 Q047 P.S. 47<br />

Queens<br />

2011<br />

27 Q047 Q047 P.S. 47<br />

Queens<br />

2012<br />

27 Q047 Q047 P.S. 47<br />

Queens<br />

2012<br />

27 Q051 Q051 P.S. 51 (ECC)<br />

Queens<br />

20<strong>10</strong><br />

27 Q053 I.S. 53<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

27 Q053 Q053 I.S. 53<br />

Queens<br />

2012<br />

27 Q056 Q056 P.S. 56 (OLD R HILL AX)<br />

Queens<br />

2012<br />

27 Q060 Q060 P.S. 60<br />

Queens<br />

2011<br />

27 Q062 Q062 P.S. 62<br />

Queens<br />

2012<br />

27 Q063 Q063 P.S. 63<br />

Queens<br />

20<strong>10</strong><br />

27 Q064 Q064 P.S. 64<br />

Queens<br />

2011<br />

27 Q066 Q066 P.S. 66<br />

Queens<br />

2012<br />

27 Q090 Q090 P.S. 90<br />

Queens<br />

2011<br />

27 Q090 Q090 P.S. 90<br />

Queens<br />

2012<br />

27 Q096 Q096 P.S. 96<br />

Queens<br />

2012<br />

27 Q096 Q096 P.S. 96<br />

Queens<br />

2011<br />

27 Q097 Q097 P.S. 97<br />

Queens<br />

20<strong>10</strong><br />

27 Q<strong>10</strong>0 Q<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Queens<br />

20<strong>10</strong><br />

27 Q<strong>10</strong>4 Q<strong>10</strong>4 P.S. <strong>10</strong>4<br />

Queens<br />

2012<br />

27 Q<strong>10</strong>5 Q<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Queens<br />

2012<br />

27 Q<strong>10</strong>6 Q<strong>10</strong>6 P.S. <strong>10</strong>6<br />

Queens<br />

2012<br />

27 Q<strong>10</strong>8 Q<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Queens<br />

2012<br />

27 Q1<strong>14</strong> Q1<strong>14</strong> P.S. 1<strong>14</strong><br />

Queens<br />

2012<br />

27 Q123 Q123 P.S. 123<br />

Queens<br />

2012<br />

27 Q124 Q124 P.S. 124<br />

Queens<br />

2012<br />

27 Q137 Q137 M.S. 137<br />

Queens<br />

2012<br />

27 Q<strong>14</strong>6 Q<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Queens<br />

2012<br />

27 Q155 Q155 P.S. 155<br />

Queens<br />

2012<br />

27 Q155 Q155 P.S. 155<br />

Queens<br />

2012<br />

27 Q180 Q323 THE SCHOLARS ACADEMY<br />

Queens<br />

2011<br />

27 Q180 Q323 THE SCHOLARS ACADEMY<br />

Queens<br />

2012<br />

27 Q183 Q183 P.S. 183<br />

Queens<br />

2012<br />

27 Q197 Q197 P.S. 197<br />

Queens<br />

2012<br />

27 Q198 Q333 P.S. 333<br />

Queens<br />

2012<br />

27 Q202 Q308 HS OF COMMN. ARTS & TECH<br />

Queens<br />

20<strong>10</strong><br />

27 Q202 Q202 I.S. 202<br />

Queens<br />

20<strong>10</strong><br />

27 Q202 I.S. 202<br />

Queens<br />

2012<br />

27 Q202 Q202 I.S. 202<br />

Queens<br />

2012<br />

27 Q202 I.S. 202<br />

Queens<br />

2012<br />

27 Q202 Q308 HS OF COMMN. ARTS & TECH<br />

Queens<br />

2012<br />

27 Q207 Q207 P.S. 207<br />

Queens<br />

2011<br />

27 Q207 Q207 P.S. 207<br />

Queens<br />

2012<br />

27 Q2<strong>10</strong> Q2<strong>10</strong> I.S. 2<strong>10</strong><br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

27 Q215 Q215 P.S. 215<br />

Queens<br />

2012<br />

27 Q223 Q223 P.S. 223<br />

Queens<br />

2012<br />

27 Q225 Q225 P.S. 225<br />

Queens<br />

2011<br />

27 Q226 Q226 I.S. 226<br />

Queens<br />

2011<br />

27 Q226 Q226 I.S. 226<br />

Queens<br />

2012<br />

27 Q232 Q232 P.S. 232<br />

Queens<br />

2012<br />

27 Q232 Q232 P.S. 232<br />

Queens<br />

2012<br />

27 Q253 Q253 P.S. 253<br />

Queens<br />

2012<br />

27 Q253 Q253 P.S. 253<br />

Queens<br />

2012<br />

27 Q254 Q254 P.S. 254<br />

Queens<br />

2012<br />

27 Q254 Q254 P.S. 254<br />

Queens<br />

2012<br />

27 Q262 Q306 P.S. 306<br />

Queens<br />

2012<br />

27 Q273 Q273 P.S. 273<br />

Queens<br />

2012<br />

27 Q884 Q065 P.S. 65<br />

Queens<br />

2011<br />

28 Q003 Q303 P.S. 303<br />

Queens<br />

2012<br />

28 Q008 Q008 J.H.S. 8<br />

Queens<br />

2012<br />

28 Q030 Q030 P.S. 30<br />

Queens<br />

2011<br />

28 Q040 P.S. 40<br />

Queens<br />

2012<br />

28 Q040 Q040 P.S. 40<br />

Queens<br />

2012<br />

28 Q040 P.S. 40<br />

Queens<br />

2012<br />

28 Q050 Q050 P.S. 50 ADDITION<br />

Queens<br />

2012<br />

28 Q054 Q054 P.S. 54<br />

Queens<br />

2012<br />

28 Q055 Q055 P.S. 55<br />

Queens<br />

2011<br />

28 Q055 Q055 P.S. 55<br />

Queens<br />

2012<br />

28 Q072 J.H.S. 72<br />

Queens<br />

2012<br />

28 Q072 Q072 J.H.S. 72<br />

Queens<br />

2012<br />

28 Q072 Q072 J.H.S. 72<br />

Queens<br />

2012<br />

28 Q080 Q080 P.S. 80<br />

Queens<br />

2012<br />

28 Q082 Q082 P.S. 82<br />

Queens<br />

2012<br />

28 Q086 Q086 P.S. 86<br />

Queens<br />

2011<br />

28 Q086 Q086 P.S. 86<br />

Queens<br />

2012<br />

28 Q099 Q099 P.S. 99<br />

Queens<br />

2012<br />

28 Q<strong>10</strong>1 Q<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Queens<br />

2012<br />

28 Q<strong>10</strong>1 Q<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Queens<br />

2011<br />

28 Q<strong>10</strong>1 Q<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Queens<br />

2012<br />

28 Q117 Q117 P.S. 117<br />

Queens<br />

2011<br />

28 Q121 Q121 P.S. 121<br />

Queens<br />

2012<br />

28 Q139 Q139 P.S. 139<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

28 Q139 Q139 P.S. 139<br />

Queens<br />

2011<br />

28 Q<strong>14</strong>0 Q<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Queens<br />

2011<br />

28 Q<strong>14</strong>4 Q<strong>14</strong>4 P.S. <strong>14</strong>4<br />

Queens<br />

2011<br />

28 Q<strong>14</strong>4 Q<strong>14</strong>4 P.S. <strong>14</strong>4<br />

Queens<br />

2012<br />

28 Q157 Q157 J.H.S. 157<br />

Queens<br />

2012<br />

28 Q157 Q157 J.H.S. 157<br />

Queens<br />

2012<br />

28 Q160 Q160 P.S. 160<br />

Queens<br />

2012<br />

28 Q161 Q161 P.S. 161<br />

Queens<br />

2012<br />

28 Q167 I.S./ H.S. 167<br />

Queens<br />

2012<br />

28 Q167 I.S./ H.S. 167<br />

Queens<br />

2012<br />

28 Q174 Q174 P.S. 174<br />

Queens<br />

2011<br />

28 Q174 Q174 P.S. 174<br />

Queens<br />

2012<br />

28 Q175 Q175 P.S. 175<br />

Queens<br />

2012<br />

28 Q175 Q175 P.S. 175<br />

Queens<br />

2012<br />

28 Q190 Q190 J.H.S. 190<br />

Queens<br />

2012<br />

28 Q190 Q190 J.H.S. 190<br />

Queens<br />

2011<br />

28 Q196 Q196 P.S. 196<br />

Queens<br />

2011<br />

28 Q196 Q196 P.S. 196<br />

Queens<br />

2012<br />

28 Q206 Q206 P.S. 206<br />

Queens<br />

20<strong>10</strong><br />

28 Q217 Q217 I.S. 217<br />

Queens<br />

2012<br />

28 Q217 Q217 I.S. 217<br />

Queens<br />

2012<br />

28 Q220 Q220 P.S. 220<br />

Queens<br />

20<strong>10</strong><br />

28 Q276 Q048 P.S. 48<br />

Queens<br />

2012<br />

28 Q882 Q182 P.S. 182<br />

Queens<br />

2012<br />

28 Q882 Q182 P.S. 182<br />

Queens<br />

2012<br />

29 Q015 Q015 P.S. 15<br />

Queens<br />

2012<br />

29 Q033 Q033 P.S. 33<br />

Queens<br />

20<strong>10</strong><br />

29 Q034 Q034 P.S. 34<br />

Queens<br />

2012<br />

29 Q035 Q035 P.S. 35 ADDITION<br />

Queens<br />

2012<br />

29 Q036 Q036 P.S. 36<br />

Queens<br />

2012<br />

29 Q037 Q037 P.S. 37<br />

Queens<br />

2011<br />

29 Q037 Q037 P.S. 37<br />

Queens<br />

2012<br />

29 Q038 Q038 P.S. 38<br />

Queens<br />

2012<br />

29 Q038 Q038 P.S. 38<br />

Queens<br />

2012<br />

29 Q052 Q052 P.S. 52<br />

Queens<br />

2012<br />

29 Q059 Q059 I.S. 59<br />

Queens<br />

2011<br />

29 Q059 Q059 I.S. 59<br />

Queens<br />

2012<br />

29 Q095 Q095 P.S. 95<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

29 Q<strong>10</strong>9 Q<strong>10</strong>9 I.S. <strong>10</strong>9<br />

Queens<br />

20<strong>10</strong><br />

29 Q116 Q116 P.S. 116<br />

Queens<br />

2011<br />

29 Q118 Q118 P.S. 118<br />

Queens<br />

2012<br />

29 Q131 Q131 P.S. 131<br />

Queens<br />

2012<br />

29 Q131 Q131 P.S. 131<br />

Queens<br />

2012<br />

29 Q132 Q132 P.S. 132<br />

Queens<br />

2012<br />

29 Q134 Q134 P.S. 134<br />

Queens<br />

2012<br />

29 Q135 Q135 P.S. 135<br />

Queens<br />

2012<br />

29 Q136 Q136 P.S. 136<br />

Queens<br />

2012<br />

29 Q138 Q138 P.S. 138<br />

Queens<br />

20<strong>10</strong><br />

29 Q<strong>14</strong>7 Q<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Queens<br />

2012<br />

29 Q156 Q156 P.S. 156<br />

Queens<br />

20<strong>10</strong><br />

29 Q176 Q176 P.S. 176 ADDITION<br />

Queens<br />

2012<br />

29 Q176 Q176 P.S. 176 ADDITION<br />

Queens<br />

2012<br />

29 Q181 Q181 P.S. 181<br />

Queens<br />

20<strong>10</strong><br />

29 Q192 Q192 I.S. 192<br />

Queens<br />

2012<br />

29 Q192 Q259 PATHWAYS COLL. PREP SCHOOL<br />

Queens<br />

2012<br />

29 Q192 I.S. 192<br />

Queens<br />

2012<br />

29 Q195 Q195 P.S. 195<br />

Queens<br />

20<strong>10</strong><br />

29 Q208 Q208 P.S./I.S. 208<br />

Queens<br />

2012<br />

29 Q208 Q208 P.S./I.S. 208<br />

Queens<br />

2011<br />

29 Q231 Q231 I.S. 231 (TANDEM Q251)<br />

Queens<br />

2012<br />

29 Q231 Q231 I.S. 231 (TANDEM Q251)<br />

Queens<br />

2011<br />

29 Q238 Q238 I.S. 238<br />

Queens<br />

2012<br />

29 Q238 Q238 I.S. 238<br />

Queens<br />

2011<br />

29 Q251 Q251 P.S. 251 (TANDEM Q231)<br />

Queens<br />

2012<br />

29 Q251 Q251 P.S. 251 (TANDEM Q231)<br />

Queens<br />

2012<br />

29 Q263 Q295 P.S. /I.S 295<br />

Queens<br />

2011<br />

29 Q263 Q295 P.S. /I.S 295<br />

Queens<br />

2012<br />

29 Q268 Q268 P.S. 268<br />

Queens<br />

20<strong>10</strong><br />

29 Q270 Q270 P.S. 270<br />

Queens<br />

2011<br />

29 Q270 Q270 P.S. 270<br />

Queens<br />

2012<br />

30 Q002 Q002 P.S. 2<br />

Queens<br />

2012<br />

30 Q0<strong>10</strong> Q0<strong>10</strong> I.S. <strong>10</strong><br />

Queens<br />

2012<br />

30 Q011 Q011 P.S. 11 ADDITION<br />

Queens<br />

2012<br />

30 Q017 Q017 P.S. 17<br />

Queens<br />

2011<br />

30 Q069 Q069 P.S. 69<br />

Queens<br />

20<strong>10</strong><br />

30 Q070 Q070 P.S. 70 ADDITION<br />

Queens<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

30 Q076 Q076 P.S. 76<br />

Queens<br />

2012<br />

30 Q076 Q076 P.S. 76<br />

Queens<br />

2011<br />

30 Q084 Q084 P.S. 84<br />

Queens<br />

20<strong>10</strong><br />

30 Q085 Q085 P.S. 85<br />

Queens<br />

2012<br />

30 Q092 P.S. 92<br />

Queens<br />

2012<br />

30 Q092 P.S. 92<br />

Queens<br />

2012<br />

30 Q111 Q111 P.S. 111<br />

Queens<br />

2012<br />

30 Q112 Q112 P.S. 112<br />

Queens<br />

2012<br />

30 Q122 Q122 P.S. 122<br />

Queens<br />

2012<br />

30 Q126 Q126 I.S. 126<br />

Queens<br />

2012<br />

30 Q127 Q127 P.S. 127<br />

Queens<br />

2011<br />

30 Q<strong>14</strong>1 Q<strong>14</strong>1 I.S. <strong>14</strong>1<br />

Queens<br />

2012<br />

30 Q<strong>14</strong>5 Q<strong>14</strong>5 I.S. <strong>14</strong>5<br />

Queens<br />

2012<br />

30 Q<strong>14</strong>8 Q<strong>14</strong>8 P.S. <strong>14</strong>8<br />

Queens<br />

2012<br />

30 Q<strong>14</strong>9 Q<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Queens<br />

2012<br />

30 Q150 Q150 P.S. 150<br />

Queens<br />

2012<br />

30 Q151 Q151 P.S. 151<br />

Queens<br />

2012<br />

30 Q152 Q152 P.S. 152<br />

Queens<br />

2012<br />

30 Q166 Q166 P.S. 166<br />

Queens<br />

2012<br />

30 Q171 Q171 P.S. 171<br />

Queens<br />

2012<br />

30 Q204 I.S. 204<br />

Queens<br />

2012<br />

30 Q204 Q301 ACAD FOR CAREERS IN TV AND FILM<br />

Queens<br />

2012<br />

30 Q204 Q204 I.S. 204<br />

Queens<br />

2012<br />

30 Q204 I.S. 204<br />

Queens<br />

2012<br />

30 Q212 Q212 P.S. 212<br />

Queens<br />

2012<br />

30 Q222 Q222 P.S. 222 (ECC)<br />

Queens<br />

20<strong>10</strong><br />

30 Q227 Q227 I.S. 227<br />

Queens<br />

2012<br />

30 Q227 Q227 I.S. 227<br />

Queens<br />

2011<br />

30 Q228 Q228 P.S. 228 (ECC)<br />

Queens<br />

2012<br />

30 Q228 Q228 P.S. 228 (ECC)<br />

Queens<br />

2011<br />

30 Q230 Q230 I.S. 230<br />

Queens<br />

2012<br />

30 Q230 Q230 I.S. 230<br />

Queens<br />

2012<br />

30 Q234 Q234 P.S. 234<br />

Queens<br />

2012<br />

30 Q280 Q280 P.S. 280<br />

Queens<br />

2012<br />

30 Q292 Q092 P.S. 92<br />

Queens<br />

2012<br />

30 Q868 Q078 P.S. 78<br />

Queens<br />

20<strong>10</strong><br />

30 Q868 Q078 P.S. 78<br />

Queens<br />

20<strong>10</strong><br />

30 Q868 Q078 P.S. 78<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

31 R001 R001 P.S. 1<br />

Staten Island 2012<br />

31 R001 R001 P.S. 1<br />

Staten Island 2011<br />

31 R002 R002 I.S. 2<br />

Staten Island 2012<br />

31 R002 R002 I.S. 2<br />

Staten Island 2011<br />

31 R003 R003 P.S. 3<br />

Staten Island 2012<br />

31 R003 R003 P.S. 3<br />

Staten Island 2012<br />

31 R003 R003 P.S. 3<br />

Staten Island 2011<br />

31 R004 P.S. 4<br />

Staten Island 2012<br />

31 R004 R004 P.S. 4<br />

Staten Island 2012<br />

31 R004 R004 P.S. 4<br />

Staten Island 2012<br />

31 R005 R005 P.S. 5<br />

Staten Island 2012<br />

31 R005 R005 P.S. 5<br />

Staten Island 2011<br />

31 R005 R005 P.S. 5<br />

Staten Island 2012<br />

31 R006 R006 P.S. 6<br />

Staten Island 2012<br />

31 R006 R006 P.S. 6<br />

Staten Island 2011<br />

31 R006 R006 P.S. 6<br />

Staten Island 2012<br />

31 R007 R007 I.S. 7<br />

Staten Island 2012<br />

31 R007 R007 I.S. 7<br />

Staten Island 2012<br />

31 R007 R007 I.S. 7<br />

Staten Island 2011<br />

31 R008 R008 P.S. 8<br />

Staten Island 2012<br />

31 R008 R008 P.S. 8<br />

Staten Island 2012<br />

31 R011 R011 P.S. 11<br />

Staten Island 20<strong>10</strong><br />

31 R013 R013 P.S. 13<br />

Staten Island 2011<br />

31 R013 R013 P.S. 13<br />

Staten Island 2012<br />

31 R0<strong>14</strong> R0<strong>14</strong> P.S. <strong>14</strong><br />

Staten Island 2012<br />

31 R016 R016 P.S. 16<br />

Staten Island 2011<br />

31 R018 R018 P.S. 18<br />

Staten Island 2012<br />

31 R019 R019 P.S. 19<br />

Staten Island 2012<br />

31 R020 R020 P.S. 20<br />

Staten Island 2012<br />

31 R021 R021 P.S. 21<br />

Staten Island 2012<br />

31 R022 R022 P.S. 22<br />

Staten Island 2012<br />

31 R022 R022 P.S. 22<br />

Staten Island 2012<br />

31 R023 R023 P.S. 23<br />

Staten Island 2012<br />

31 R023 R023 P.S. 23<br />

Staten Island 2011<br />

31 R023 R023 P.S. 23<br />

Staten Island 2012<br />

31 R024 R024 I.S. 24<br />

Staten Island 2012<br />

31 R024 R024 I.S. 24<br />

Staten Island 2012<br />

31 R026 R026 P.S. 26<br />

Staten Island 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

31 R027 R027 I.S. 27<br />

Staten Island 2012<br />

31 R027 R027 I.S. 27<br />

Staten Island 2011<br />

31 R029 R029 P.S. 29<br />

Staten Island 2012<br />

31 R029 R029 P.S. 29<br />

Staten Island 2011<br />

31 R030 R030 P.S. 30<br />

Staten Island 2012<br />

31 R031 R031 P.S. 31<br />

Staten Island 2012<br />

31 R032 R032 P.S. 32<br />

Staten Island 2012<br />

31 R032 R032 P.S. 32<br />

Staten Island 2011<br />

31 R032 R032 P.S. 32<br />

Staten Island 2012<br />

31 R034 R034 I.S. 34 (OLD TOTTENVILLE)<br />

Staten Island 2012<br />

31 R034 R034 I.S. 34 (OLD TOTTENVILLE)<br />

Staten Island 2011<br />

31 R034 R034 I.S. 34 (OLD TOTTENVILLE)<br />

Staten Island 2012<br />

31 R035 R035 P.S. 35<br />

Staten Island 2012<br />

31 R035 R035 P.S. 35<br />

Staten Island 2012<br />

31 R036 R036 P.S. 36<br />

Staten Island 2012<br />

31 R036 R036 P.S. 36<br />

Staten Island 2011<br />

31 R036 R036 P.S. 36<br />

Staten Island 2012<br />

31 R038 R038 P.S. 38<br />

Staten Island 20<strong>10</strong><br />

31 R039 R039 P.S. 39<br />

Staten Island 2012<br />

31 R041 R041 P.S. 41<br />

Staten Island 2012<br />

31 R041 R041 P.S. 41<br />

Staten Island 2011<br />

31 R042 R042 P.S. 42<br />

Staten Island 2012<br />

31 R042 R042 P.S. 42<br />

Staten Island 2011<br />

31 R043 R047 CSI HS FOR INTERNATIONAL STUDIES<br />

Staten Island 2012<br />

31 R044 R044 P.S. 44<br />

Staten Island 2012<br />

31 R045 R045 P.S. 45<br />

Staten Island 2012<br />

31 R045 R045 P.S. 45<br />

Staten Island 2011<br />

31 R046 R046 P.S. 46<br />

Staten Island 20<strong>10</strong><br />

31 R048 R048 P.S. 48<br />

Staten Island 2011<br />

31 R048 R048 P.S. 48<br />

Staten Island 2012<br />

31 R049 R049 I.S. 49<br />

Staten Island 2012<br />

31 R049 R049 I.S. 49<br />

Staten Island 2012<br />

31 R050 R050 P.S. 50<br />

Staten Island 2012<br />

31 R050 R050 P.S. 50<br />

Staten Island 2012<br />

31 R050 R050 P.S. 50<br />

Staten Island 2011<br />

31 R051 R051 I.S. 51<br />

Staten Island 20<strong>10</strong><br />

31 R052 R052 P.S. 52<br />

Staten Island 2012<br />

31 R052 R052 P.S. 52<br />

Staten Island 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

31 R053 R053 P.S. 53<br />

Staten Island 2012<br />

31 R053 R053 P.S. 53<br />

Staten Island 2011<br />

31 R054 R054 P.S. 54<br />

Staten Island 2011<br />

31 R054 R054 P.S. 54<br />

Staten Island 2012<br />

31 R055 R055 P.S. 55<br />

Staten Island 2011<br />

31 R055 R055 P.S. 55<br />

Staten Island 2012<br />

31 R056 R056 P.S. 56<br />

Staten Island 2012<br />

31 R056 R056 P.S. 56<br />

Staten Island 2012<br />

31 R057 R057 P.S. 57<br />

Staten Island 2012<br />

31 R058 R058 P.S. 58<br />

Staten Island 2011<br />

31 R058 R058 P.S. 58<br />

Staten Island 2012<br />

31 R060 R060 P.S. 60<br />

Staten Island 2011<br />

31 R060 R060 P.S. 60<br />

Staten Island 2012<br />

31 R061 R061 I.S. 61<br />

Staten Island 20<strong>10</strong><br />

31 R069 R069 P.S. 69<br />

Staten Island 2012<br />

31 R072 R072 I.S. 72<br />

Staten Island 2012<br />

31 R072 R072 I.S. 72<br />

Staten Island 2011<br />

31 R075 R075 I.S. 75<br />

Staten Island 2012<br />

31 R075 R075 I.S. 75<br />

Staten Island 2012<br />

31 R829 R065 P.S. 65<br />

Staten Island 2012<br />

31 R831 R074 P.S. 74<br />

Staten Island 2012<br />

31 R861 R861 ELIZABETH A. CONNELLY CAMPUS<br />

Staten Island 2012<br />

31 R880 R080 P.S. 80<br />

Staten Island 2012<br />

31 R880 R080 P.S. 80<br />

Staten Island 2012<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B)<br />

Staten Island 2012<br />

32 K045 K045 P.S. 45<br />

Brooklyn<br />

2012<br />

32 K075 K075 P.S. 75<br />

Brooklyn<br />

2012<br />

32 K086 K086 P.S. 86<br />

Brooklyn<br />

2012<br />

32 K<strong>10</strong>6 K<strong>10</strong>6 P.S. <strong>10</strong>6<br />

Brooklyn<br />

2012<br />

32 K116 K116 P.S. 116<br />

Brooklyn<br />

2012<br />

32 K123 K123 P.S. 123<br />

Brooklyn<br />

2012<br />

32 K<strong>14</strong>5 K<strong>14</strong>5 P.S. <strong>14</strong>5<br />

Brooklyn<br />

2012<br />

32 K151 K151 P.S. 151<br />

Brooklyn<br />

2012<br />

32 K162 K162 I.S. 162<br />

Brooklyn<br />

2012<br />

32 K274 K274 P.S. 274<br />

Brooklyn<br />

2012<br />

32 K291 I.S. 291<br />

Brooklyn<br />

2012<br />

32 K291 K291 I.S. 291<br />

Brooklyn<br />

2012<br />

32 K296 I.S. 296<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

32 K296 K296 I.S. 296<br />

Brooklyn<br />

2012<br />

32 K299 K299 P.S. 299<br />

Brooklyn<br />

2012<br />

32 K376 K376 P.S. 376A<br />

Brooklyn<br />

2012<br />

32 K377 K377 P.S. 377<br />

Brooklyn<br />

2012<br />

32 K383 K383 I.S. 383<br />

Brooklyn<br />

20<strong>10</strong><br />

32 K384 K384 P.S. 384<br />

Brooklyn<br />

2012<br />

32 K865 K556 BUSHWICK LEADERS<br />

Brooklyn<br />

2012<br />

33M M825 UFT USE<br />

Manhattan 2012<br />

75K K085 K753 K753 SPED<br />

Brooklyn<br />

2012<br />

75K K<strong>14</strong>8 K373 K373 SPED<br />

Brooklyn<br />

2011<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8)<br />

Brooklyn<br />

2012<br />

75K K286 K811 K811 SPED<br />

Brooklyn<br />

2012<br />

75K K286 K811 K811 SPED<br />

Brooklyn<br />

2012<br />

75K K369 K369 P.S. 369 (COY COX SCHOOL)<br />

Brooklyn<br />

2012<br />

75K K370 K370 P.S. 370<br />

Brooklyn<br />

2011<br />

75K K370 K370 P.S. 370<br />

Brooklyn<br />

2012<br />

75K K371 K371 P.S. 371 (OLD 615)<br />

Brooklyn<br />

2011<br />

75K K396 K396 P.S. 396 (TANDEM K327-D23)<br />

Brooklyn<br />

2012<br />

75K K722 K721 K721 SPED<br />

Brooklyn<br />

2012<br />

75K K834 K372 K372 SPED<br />

Brooklyn<br />

2012<br />

75K K834 K372 K372 SPED<br />

Brooklyn<br />

2012<br />

75K K838 K053 K053 SPED<br />

Brooklyn<br />

2012<br />

75K K857 K036 K036 SPED<br />

Brooklyn<br />

2011<br />

75K K902 K077 K077 SPED<br />

Brooklyn<br />

2012<br />

75M M058 P.S. 35 (OLD 58/MNHT HS)<br />

Manhattan 2012<br />

75M M058 M035 M035 SPED<br />

Manhattan 2012<br />

75M M079 M079 P.S. 79 (MULT. HANDICAP)<br />

Manhattan 2012<br />

75M M169 M169 P.S. 169 (ECF)<br />

Manhattan 2012<br />

75M M751 M751 P.S. 751 (CAR.DEV/OLD 25)<br />

Manhattan 2012<br />

75M M841 M811 M811 SPED<br />

Manhattan 2012<br />

75Q L001 Q256 Q256 SPED<br />

Queens<br />

2011<br />

75Q L001 Q256 Q256 SPED<br />

Queens<br />

2012<br />

75Q L001 Q256 Q256 SPED<br />

Queens<br />

2011<br />

75Q Q009 Q009 P.S. 9 (W REED SCHOOL)<br />

Queens<br />

2011<br />

75Q Q009 Q009 P.S. 9 (W REED SCHOOL)<br />

Queens<br />

2012<br />

75Q Q075 Q075 P.S. 75 (R PEARY SCHOOL)<br />

Queens<br />

2012<br />

75Q Q<strong>14</strong>2 Q752 Q752 SPED<br />

Queens<br />

2012<br />

75Q Q177 Q177 P.S. 177<br />

Queens<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

75Q Q177 Q177 P.S. 177<br />

Queens<br />

2012<br />

75Q Q722 Q721 Q721 SPED<br />

Queens<br />

2012<br />

75Q Q722 Q721 Q721 SPED<br />

Queens<br />

2011<br />

75Q Q811 Q811 P.S. 811 (OLD 187)<br />

Queens<br />

2011<br />

75Q Q811 Q811 P.S. 811 (OLD 187)<br />

Queens<br />

2012<br />

75Q QAPM Q023 PS 23 @ HILLSIDE PSYCH<br />

Queens<br />

2012<br />

75R R040 R373 R373 SPED<br />

Staten Island 2012<br />

75R R722 R721 R721 SPED<br />

Staten Island 2012<br />

75R R840 R037 R037 SPED<br />

Staten Island 2012<br />

75R R840 R037 R037 SPED<br />

Staten Island 2012<br />

75X X012 X012 P.S. 12<br />

Bronx<br />

2012<br />

75X X034 P.S. 34<br />

Bronx<br />

2012<br />

75X X034 X188 X188 SPED<br />

Bronx<br />

2012<br />

75X X034 X188 X188 SPED<br />

Bronx<br />

2011<br />

75X X034 P.S. 34<br />

Bronx<br />

2012<br />

75X X084 X811 X811 SPED<br />

Bronx<br />

2012<br />

75X X136 X186 X186 SPED<br />

Bronx<br />

2012<br />

75X X155 X520 FLAGS ACADEMY<br />

Bronx<br />

2012<br />

75X X155 X754 X754 SPED<br />

Bronx<br />

2012<br />

75X X155 X520 FLAGS ACADEMY<br />

Bronx<br />

2012<br />

75X X701 X723 X723 SPED<br />

Bronx<br />

2012<br />

75X X722 X721 X721 SPED<br />

Bronx<br />

2012<br />

78K K313 K483 URBAN ASSEMBLY HS<br />

Brooklyn<br />

2012<br />

78K K400 K337 INTERNATIONAL HIGH SCHOOL<br />

Brooklyn<br />

2012<br />

78K K400 LAFAYETTE HS<br />

Brooklyn<br />

2012<br />

78K K400 K337 INTERNATIONAL HIGH SCHOOL<br />

Brooklyn<br />

2012<br />

78K K400 K468 KINGSBOROUGH EARLY COLLEGE SCHOOL<br />

Brooklyn<br />

2012<br />

78K K400 LAFAYETTE HS<br />

Brooklyn<br />

2012<br />

78K K400 K559 LIFE ACADEMY H.S. FILM & MUSIC<br />

Brooklyn<br />

2012<br />

78K K400 K572 EXPED LEARN SCHOOL FOR COMM<br />

Brooklyn<br />

2012<br />

78K K400 K348 HIGH SCHOOL OF SPORTS MGMT<br />

Brooklyn<br />

2012<br />

78K K405 K405 MIDWOOD HS<br />

Brooklyn<br />

2011<br />

78K K405 K405 MIDWOOD HS<br />

Brooklyn<br />

2012<br />

78K K4<strong>10</strong> K4<strong>10</strong> ABRAHAM LINCOLN HS<br />

Brooklyn<br />

2011<br />

78K K4<strong>10</strong> K4<strong>10</strong> ABRAHAM LINCOLN HS<br />

Brooklyn<br />

2012<br />

78K K415 K563 IT TAKES A VILLAGE ACADEMY<br />

Brooklyn<br />

2012<br />

78K K425 K425 JAMES MADISON HS<br />

Brooklyn<br />

2012<br />

78K K430 K430 BROOKLYN TECH HS<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78K K430 K430 BROOKLYN TECH HS<br />

Brooklyn<br />

2011<br />

78K K435 THOMAS JEFFERSON HS<br />

Brooklyn<br />

2012<br />

78K K435 K502 FDNY HS FOR FIRE AND LIFE SAFETY<br />

Brooklyn<br />

2012<br />

78K K440 PROSPECT HEIGHTS HS<br />

Brooklyn<br />

2012<br />

78K K440 K528 HS FOR GLOBAL CITIZENSHIP<br />

Brooklyn<br />

2012<br />

78K K440 K524 THE INTERNATIONAL HS<br />

Brooklyn<br />

2012<br />

78K K440 K548 BROOKLYN HS FOR MUSIC &THEATER<br />

Brooklyn<br />

2012<br />

78K K440 K547 BROOKLYN HS FOR SCI & THE ENVI<br />

Brooklyn<br />

2012<br />

78K K440 K524 THE INTERNATIONAL HS<br />

Brooklyn<br />

2012<br />

78K K445 K445 NEW UTRECHT HS<br />

Brooklyn<br />

2012<br />

78K K445 NEW UTRECHT HS<br />

Brooklyn<br />

2012<br />

78K K445 K445 NEW UTRECHT HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K450 K478 HS OF ENTERPRISE, BUS. & TECH.<br />

Brooklyn<br />

2012<br />

78K K450 K474 PROGRESS HS<br />

Brooklyn<br />

2012<br />

78K K450 K477 HS OF LEGAL STUDIES<br />

Brooklyn<br />

2012<br />

78K K455 K455 BOYS & GIRLS HS<br />

Brooklyn<br />

2012<br />

78K K458 K575 BED<br />

Brooklyn<br />

2012<br />

78K K458 BOYS HS (OLD)<br />

Brooklyn<br />

2012<br />

78K K458 K553 BROOKLYN ACADEMY HS<br />

Brooklyn<br />

2012<br />

78K K458 K553 BROOKLYN ACADEMY HS<br />

Brooklyn<br />

2012<br />

78K K460 K462 SECONDARY SCHOOL FOR LAW<br />

Brooklyn<br />

2012<br />

78K K460 K462 SECONDARY SCHOOL FOR LAW<br />

Brooklyn<br />

2012<br />

78K K460 JOHN JAY HS<br />

Brooklyn<br />

2012<br />

78K K460 JOHN JAY HS<br />

Brooklyn<br />

2012<br />

78K K460 K464 SECONDARY SCHOOL FOR RESEARCH<br />

Brooklyn<br />

2012<br />

78K K460 JOHN JAY HS<br />

Brooklyn<br />

2012<br />

78K K460 K463 SECONDARY SCHOOL FOR JOURNALISM<br />

Brooklyn<br />

2012<br />

78K K465 K382 I.S. 382<br />

Brooklyn<br />

2012<br />

78K K465 ERASMUS HALL CAMPUS<br />

Brooklyn<br />

2012<br />

78K K470 K531 I.S. 531<br />

Brooklyn<br />

2012<br />

78K K480 K552 HIGH SCHOOL OF URBAN PLANNING<br />

Brooklyn<br />

2012<br />

78K K480 BUSHWICK HS<br />

Brooklyn<br />

2012<br />

78K K480 K403 ACAD. FOR ENVIRON. LDRSHP<br />

Brooklyn<br />

2012<br />

78K K480 K549 BUSHWICK HS OF SOCIAL JUSTICE<br />

Brooklyn<br />

2012<br />

78K K480 KG02 LYFE PROGRAM<br />

Brooklyn<br />

2012<br />

78K K480 K168 BROOKLYN SCHOOL FOR MATH AND RESEARCH<br />

Brooklyn<br />

2012<br />

78K K485 K485 TELECOM. ARTS & TECH.<br />

Brooklyn<br />

2012<br />

78K K485 K485 TELECOM. ARTS & TECH.<br />

Brooklyn<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78K K490 FORT HAMILTON HS<br />

Brooklyn<br />

2012<br />

78K K490 FORT HAMILTON HS<br />

Brooklyn<br />

2012<br />

78K K490 K490 FORT HAMILTON HS<br />

Brooklyn<br />

2011<br />

78K K490 K490 FORT HAMILTON HS<br />

Brooklyn<br />

2012<br />

78K K495 K495 SHEEPSHEAD BAY HS<br />

Brooklyn<br />

2012<br />

78K K500 K617 HS FOR INNOVATION IN AD<br />

Brooklyn<br />

2012<br />

78K K500 K642 URBAN ACTION ACADEMY<br />

Brooklyn<br />

2012<br />

78K K500 K633 HS FOR MEDICAL PROFESSIONS<br />

Brooklyn<br />

2012<br />

78K K500 K617 HS FOR INNOVATION IN AD<br />

Brooklyn<br />

2012<br />

78K K505 K505 FRANKLIN D. ROOSEVELT HS<br />

Brooklyn<br />

2012<br />

78K K505 K505 FRANKLIN D. ROOSEVELT HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K567 BROOKLYN THEATRE ARTS H.S.<br />

Brooklyn<br />

2011<br />

78K K515 K515 SOUTH SHORE HS<br />

Brooklyn<br />

2011<br />

78K K515 K578 BROOKLYN BRIDGE ACADEMY<br />

Brooklyn<br />

2011<br />

78K K515 K576 VICTORY COLLEGIATE HS<br />

Brooklyn<br />

2012<br />

78K K515 K578 BROOKLYN BRIDGE ACADEMY<br />

Brooklyn<br />

2012<br />

78K K515 K576 VICTORY COLLEGIATE HS<br />

Brooklyn<br />

2011<br />

78K K515 K567 BROOKLYN THEATRE ARTS H.S.<br />

Brooklyn<br />

2012<br />

78K K515 K637 ACAD FOR CONSERV & THE ENVIR<br />

Brooklyn<br />

2012<br />

78K K515 K566 BROOKLYN GENERATION SCHOOL<br />

Brooklyn<br />

2011<br />

78K K515 K566 BROOKLYN GENERATION SCHOOL<br />

Brooklyn<br />

2012<br />

78K K515 K637 ACAD FOR CONSERV & THE ENVIR<br />

Brooklyn<br />

2011<br />

78K K520 K423 BROOKLYN FRONTIERS HIGH SCHOOL<br />

Brooklyn<br />

2012<br />

78K K520 K520 PACIFIC ALT HS<br />

Brooklyn<br />

2012<br />

78K K525 K525 EDWARD R. MURROW HS<br />

Brooklyn<br />

2012<br />

78K K525 K525 EDWARD R. MURROW HS<br />

Brooklyn<br />

2011<br />

78K K535 K535 LEON GOLDSTEIN HS<br />

Brooklyn<br />

2012<br />

78K K535 LEON GOLDSTEIN HS<br />

Brooklyn<br />

2012<br />

78K K535 K535 LEON GOLDSTEIN HS<br />

Brooklyn<br />

2011<br />

78K K540 K540 JOHN DEWEY HS<br />

Brooklyn<br />

2012<br />

78K K555 K555 BKLYN COLL ACAD (AT BKLYN COLL)<br />

Brooklyn<br />

2012<br />

78K K564 K667 SUNSET PARK HS<br />

Brooklyn<br />

2012<br />

78K K580 K674 CITY POLYTECHNIC HIGH SCHOOL OF ENGINEERING,<br />

ARCHITECTURE, AND TECHNOLOGY<br />

Brooklyn<br />

2011<br />

78K K580 K674 CITY POLYTECHNIC HIGH SCHOOL OF ENGINEERING,<br />

ARCHITECTURE, AND TECHNOLOGY<br />

Brooklyn<br />

2012<br />

78K K580 GEORGE WESTINGHOUSE VOC HS<br />

Brooklyn<br />

2012<br />

78K K590 K590 MIDDLE COLLEGE HS<br />

Brooklyn<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78K K590 K590 MIDDLE COLLEGE HS<br />

Brooklyn<br />

2012<br />

78K K600 K600 CLARA BARTON HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K6<strong>10</strong> K632 FRANCES PERKINS ACAD<br />

Brooklyn<br />

2012<br />

78K K6<strong>10</strong> K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS<br />

Brooklyn<br />

2012<br />

78K K6<strong>10</strong> K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS<br />

Brooklyn<br />

2012<br />

78K K615 K615 E NY VOC HS OF TRANSIT TECH.<br />

Brooklyn<br />

2012<br />

78K K615 K615 E NY VOC HS OF TRANSIT TECH.<br />

Brooklyn<br />

2012<br />

78K K620 K620 WILLIAM E. GRADY VOC HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K620 WILLIAM E. GRADY VOC HS<br />

Brooklyn<br />

2012<br />

78K K625 K625 ROBESON HS COMP&BUS TC (A HML)<br />

Brooklyn<br />

2012<br />

78K K625 K625 ROBESON HS COMP&BUS TC (A HML)<br />

Brooklyn<br />

2012<br />

78K K625 K122 PATHWAYS IN TECHNOLOGY EARLY COLLEGE HS Brooklyn<br />

2012<br />

78K K650 K558 WILLIAMSBURG HS FOR ARCH & DES<br />

Brooklyn<br />

2012<br />

78K K650 K561 WIILIAMSBURG PREP<br />

Brooklyn<br />

2012<br />

78K K650 K488 BROOKLYN PREPARATORY HS<br />

Brooklyn<br />

2012<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL)<br />

Brooklyn<br />

2012<br />

78K K655 K447 I.S. 447<br />

Brooklyn<br />

2012<br />

78K K655 K447 I.S. 447<br />

Brooklyn<br />

2012<br />

78K K655 K656 BROOKLYN HS OF THE ARTS<br />

Brooklyn<br />

2012<br />

78K K660 K660 WILLIAM MAXWELL CTE HS<br />

Brooklyn<br />

2012<br />

78K K660 K660 WILLIAM MAXWELL CTE HS<br />

Brooklyn<br />

2012<br />

78K K721 K690 BKLYN STUDIO SEC. SCL<br />

Brooklyn<br />

2012<br />

78K K721 K690 BKLYN STUDIO SEC. SCL<br />

Brooklyn<br />

2012<br />

78K K728 K728 LIBERATION DIPLOMA PLUS H.S.<br />

Brooklyn<br />

2012<br />

78K K728 K728 LIBERATION DIPLOMA PLUS H.S.<br />

Brooklyn<br />

2012<br />

78K K728 LIBERATION DIPLOMA PLUS H.S.<br />

Brooklyn<br />

2012<br />

78K K778 K685 EL PUENTE ACADEMY<br />

Brooklyn<br />

2012<br />

78K K778 K685 EL PUENTE ACADEMY<br />

Brooklyn<br />

2012<br />

78K K779 K554 I.S. 554<br />

Brooklyn<br />

2012<br />

78K K781 WEST BROOKLYN COMMUNITY HS<br />

Brooklyn<br />

2012<br />

78K K781 K529 WEST BROOKLYN COMMUNITY HS<br />

Brooklyn<br />

2012<br />

78K K804 COBBLE HILL SCL OF AMR STD (OL6)<br />

Brooklyn<br />

2012<br />

78K K804 K519 COBBLE HILL SCHL OF AMER. STUD<br />

Brooklyn<br />

2012<br />

78K K805 K439 BROOKLYN INTERNATIONAL HS<br />

Brooklyn<br />

2012<br />

78K K805 K419 SCIENCE SKILLS CENTER HS<br />

Brooklyn<br />

2012<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX<br />

Brooklyn<br />

2012<br />

78K K805 K350 URBAN ASSEMB HS OF MUSIC AND ART<br />

Brooklyn<br />

2012<br />

78K K805 K350 URBAN ASSEMB HS OF MUSIC AND ART<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78K K806 METROPOLITAN CORPORATE ACAD.<br />

Brooklyn<br />

2012<br />

78K K806 METROPOLITAN CORPORATE ACAD.<br />

Brooklyn<br />

2012<br />

78K K806 K530 METROPOLITAN CORP. ACADEMY<br />

Brooklyn<br />

2012<br />

78K K819 K409 EAST NY FAMILY ACAD.<br />

Brooklyn<br />

2012<br />

78K K824 K489 W.E.B. DUBOIS HS<br />

Brooklyn<br />

2012<br />

78K K824 W.E.B. DUBOIS HS<br />

Brooklyn<br />

2012<br />

78K K824 K489 W.E.B. DUBOIS HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K825 K698 SOUTH BROOKLYN COMM. HS<br />

Brooklyn<br />

2011<br />

78K K894 HS FOR PUBLIC SERVICE-ENY<br />

Brooklyn<br />

2012<br />

78K K894 HS FOR PUBLIC SERVICE-ENY<br />

Brooklyn<br />

2012<br />

78K K894 K645 HS FOR PUBLIC SERVICE<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K894 HS FOR PUBLIC SERVICE-ENY<br />

Brooklyn<br />

2012<br />

78K K906 K509 FREEDOM ACADEMY<br />

Brooklyn<br />

2012<br />

78K K906 K509 FREEDOM ACADEMY<br />

Brooklyn<br />

2012<br />

78K K907 K568 BROWNSVILLE DIPLOMA PLUS HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K907 K568 BROWNSVILLE DIPLOMA PLUS HS<br />

Brooklyn<br />

2012<br />

78K K909 K499 ACORN COMMUNITY HS<br />

Brooklyn<br />

2012<br />

78K K909 K499 ACORN COMMUNITY HS<br />

Brooklyn<br />

2012<br />

78K K9<strong>14</strong> K670 BENJAMIN BANNEKER ACAD. (HS LVL)<br />

Brooklyn<br />

2012<br />

78K K9<strong>14</strong> K670 BENJAMIN BANNEKER ACAD. (HS LVL)<br />

Brooklyn<br />

2011<br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE<br />

Brooklyn<br />

2012<br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE<br />

Brooklyn<br />

2012<br />

78K K987 K498 ACORN SCHOOL FOR SOCIAL JUSTICE<br />

Brooklyn<br />

2012<br />

78K K987 K498 ACORN SCHOOL FOR SOCIAL JUSTICE<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K994 K595 BEDFORD ACADEMY HS<br />

Brooklyn<br />

2012<br />

78K K994 BEDFORD ACADEMY<br />

Brooklyn<br />

2012<br />

78M M066 M151 P.S. 151<br />

Manhattan 2012<br />

78M M097 M696 BARD COLLEGE HS<br />

Manhattan 2012<br />

78M M097 M696 BARD COLLEGE HS<br />

Manhattan 2011<br />

78M M097 M696 BARD COLLEGE HS<br />

Manhattan 2012<br />

78M M<strong>10</strong>7 M680 THE HERITAGE SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M136 M304 MOTT HALL HS<br />

Manhattan 2012<br />

78M M282 M316 URBAN ASSEMBLY SCHOOL<br />

Manhattan 2012<br />

78M M435 M825 I.S. 825<br />

Manhattan 20<strong>10</strong><br />

78M M440 M419 LANDMARK HS<br />

Manhattan 2012<br />

78M M440 M313 JAMES BALDWIN SCHOOL<br />

Manhattan 2012<br />

78M M440 M440 BAYARD RUSTIN EDUCATIONAL COMP<br />

Manhattan 2012<br />

78M M440 M605 HUMANITIES PREPARATORY ACAD<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M440 M313 JAMES BALDWIN SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M440 M605 HUMANITIES PREPARATORY ACAD<br />

Manhattan 20<strong>10</strong><br />

78M M440 M392 MANHATTAN BUSINESS ACADEMY<br />

Manhattan 2012<br />

78M M440 M440 BAYARD RUSTIN EDUCATIONAL COMP<br />

Manhattan 20<strong>10</strong><br />

78M M440 M437 HUDSON HS OF LEARNING TECH<br />

Manhattan 2012<br />

78M M445 M543 NEW DESIGN HS<br />

Manhattan 2012<br />

78M M445 M543 NEW DESIGN HS<br />

Manhattan 2012<br />

78M M445 SEWARD PARK HS<br />

Manhattan 2012<br />

78M M445 SEWARD PARK HS<br />

Manhattan 2012<br />

78M M445 M308 LOWER MANHATTAN ARTS<br />

Manhattan 2012<br />

78M M445 M294 ESSEX STREET ACADEMY<br />

Manhattan 2012<br />

78M M445 M305 URBAN ASSEMBLY ACADEMY<br />

Manhattan 2012<br />

78M M446 M448 UNIVERSITY NEIGHBORHOOD HS<br />

Manhattan 20<strong>10</strong><br />

78M M451 M550 LIBERTY HS ACADEMY FOR NEWCOMERS<br />

Manhattan 2012<br />

78M M460 WASHINGTON IRVING HS<br />

Manhattan 2012<br />

78M M460 M374 GRAMMERCY ARTS HS<br />

Manhattan 2011<br />

78M M460 M374 GRAMMERCY ARTS HS<br />

Manhattan 2012<br />

78M M460 M399 THE HIGH SCHOOL FOR LANGUAGE AND DIPLOMACY Manhattan 2012<br />

78M M460 M460 WASHINGTON IRVING HS<br />

Manhattan 2011<br />

78M M460 M460 WASHINGTON IRVING HS<br />

Manhattan 2012<br />

78M M465 G. WASHINGTON HS EDUC. CAMPUS<br />

Manhattan 2012<br />

78M M465 M462 HS FOR INTL BUSINESS & FINANCE<br />

Manhattan 2012<br />

78M M470 M470 LOUIS D. BRANDEIS HS<br />

Manhattan 2011<br />

78M M470 M403 THE GLOBAL LEARNING COLLABORATIVE<br />

Manhattan 2012<br />

78M M470 M404 INNOVATION DIPLOMA PLUS<br />

Manhattan 2012<br />

78M M470 M402 THE URBAN ASSEMBLY SCHOOL FOR GREEN<br />

CAREERS<br />

Manhattan 2012<br />

78M M470 M470 LOUIS D. BRANDEIS HS<br />

Manhattan 2012<br />

78M M475 M226 M226 SPED<br />

Manhattan 2012<br />

78M M475 M407 INSTITUTE FOR COLLABORATIVE ED<br />

Manhattan 2012<br />

78M M475 M420 HS FOR HEALTH PROF & HUMAN SERV<br />

Manhattan 2012<br />

78M M475 M226 M226 SPED<br />

Manhattan 2012<br />

78M M477 M475 STUYVESANT HS<br />

Manhattan 2012<br />

78M M477 STUYVESANT HS (NEW)<br />

Manhattan 2012<br />

78M M477 M475 STUYVESANT HS<br />

Manhattan 2012<br />

78M M480 JULIA RICHMAN ED. COMPLEX<br />

Manhattan 2012<br />

78M M480 JULIA RICHMAN ED. COMPLEX<br />

Manhattan 2012<br />

78M M480 M225 P.S. 225<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M485 M485 FIORELLO LAGUARDIA HS<br />

Manhattan 2012<br />

78M M485 M485 FIORELLO LAGUARDIA HS<br />

Manhattan 2011<br />

78M M485 M485 FIORELLO LAGUARDIA HS<br />

Manhattan 2012<br />

78M M486 M529 J. K. ONASIS HS FOR INT CAREERS<br />

Manhattan 20<strong>10</strong><br />

78M M490 M299 SCHOOL FOR ARTS, IMAGINATION<br />

Manhattan 2012<br />

78M M490 M541 HUNTER SCIENCE HS<br />

Manhattan 2012<br />

78M M490 MARTIN LUTHER KING, JR. HS<br />

Manhattan 2012<br />

78M M490 M283 MANHATTAN THEATER LAB<br />

Manhattan 2012<br />

78M M490 M307 URBAN ASSEMBLY MEDIA<br />

Manhattan 2012<br />

78M M490 M492 HS FOR LAW ADVOCACY & JUSTICE<br />

Manhattan 2012<br />

78M M490 M494 HS FOR ARTS & TECHNOLOGY<br />

Manhattan 2012<br />

78M M490 MARTIN LUTHER KING, JR. HS<br />

Manhattan 2012<br />

78M M495 M495 PARK EAST HS<br />

Manhattan 2012<br />

78M M495 M495 PARK EAST HS<br />

Manhattan 2012<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201)<br />

Manhattan 2012<br />

78M M501 M469 CHOIR ACAD OF HARLEM<br />

Manhattan 20<strong>10</strong><br />

78M M501 ARTHUR SCHOMBURG HS (IS 201)<br />

Manhattan 2012<br />

78M M506 M505 EDWARD A. REYNOLDS WEST SIDE HS<br />

Manhattan 2012<br />

78M M5<strong>10</strong> M650 CASCADES CTR FOR TCHING & LNG<br />

Manhattan 2012<br />

78M M5<strong>10</strong> M458 SATELLITE AT FORSYTHE<br />

Manhattan 2012<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91)<br />

Manhattan 2012<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91)<br />

Manhattan 2012<br />

78M M520 M520 MURRY BERGTRAUM HS (ECF)<br />

Manhattan 20<strong>10</strong><br />

78M M535 PARK WEST HS (ECF)<br />

Manhattan 2012<br />

78M M535 M296 HOSPITALITY MANAGEMENT HS<br />

Manhattan 2012<br />

78M M535 M300 URBAN ASSEMBLY HS<br />

Manhattan 2012<br />

78M M535 M303 FACING HISTORY SCHOOL<br />

Manhattan 2012<br />

78M M535 M542 MANHATTAN BRIDGES<br />

Manhattan 2012<br />

78M M535 M288 FOOD AND FINANCE HS<br />

Manhattan 2012<br />

78M M535 M288 FOOD AND FINANCE HS<br />

Manhattan 2012<br />

78M M540 M540 A. PHILLIP RANDOLPH HS<br />

Manhattan 20<strong>10</strong><br />

78M M600 M600 FASHION INDUSTRIES VOC HS<br />

Manhattan 2012<br />

78M M600 M600 FASHION INDUSTRIES VOC HS<br />

Manhattan 2012<br />

78M M615 M376 NYC ISCHOOL<br />

Manhattan 2011<br />

78M M615 M615 CHELSEA VOC HS<br />

Manhattan 2011<br />

78M M615 CHELSEA VOC HS<br />

Manhattan 2012<br />

78M M615 M615 CHELSEA VOC HS<br />

Manhattan 2012<br />

78M M615 M376 NYC ISCHOOL<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M615 CHELSEA VOC HS<br />

Manhattan 2012<br />

78M M620 M620 NORMAN THOMAS HS (ECF)<br />

Manhattan 2012<br />

78M M620 M432 MURRAY HILL ACADEMY HS<br />

Manhattan 2012<br />

78M M625 M393 THE BUSINESS OF SPORTS SCHOOL<br />

Manhattan 2012<br />

78M M625 M625 HS OF GRAPHIC COMMUNICATION ARTS<br />

Manhattan 2012<br />

78M M625 M393 THE BUSINESS OF SPORTS SCHOOL<br />

Manhattan 2012<br />

78M M630 M630 ART & DESIGN VOC HS<br />

Manhattan 2011<br />

78M M641 M721 M721 SPED<br />

Manhattan 2012<br />

78M M641 CITY AS SCHOOL (OLD 95)<br />

Manhattan 2012<br />

78M M641 M560 CITY<br />

Manhattan 2012<br />

78M M645 M655 LIFE SCIENCE SECONDARY SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M646 M645 SCHOOL FOR COOP TECH. ED.<br />

Manhattan 2012<br />

78M M661 M575 MNHT COMPR. NIGHT & DAY HS<br />

Manhattan 2012<br />

78M M807 M586 HARVEY MILK SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M812 HS FOR MATH, SCI & ENGINEERING<br />

Manhattan 2012<br />

78M M812 M692 HS FOR MATH, SCI AND ENGINEERING<br />

Manhattan 2011<br />

78M M812 M692 HS FOR MATH, SCI AND ENGINEERING<br />

Manhattan 2012<br />

78M M812 M692 HS FOR MATH, SCI AND ENGINEERING<br />

Manhattan 2012<br />

78M M826 SUSPENDED PEDAGOGUE CENTER<br />

Manhattan 2012<br />

78M M833 M489 HS FOR ECONOMICS & FINANCE<br />

Manhattan 2012<br />

78M M833 M489 HS FOR ECONOMICS & FINANCE<br />

Manhattan 2012<br />

78M M834 M400 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 2011<br />

78M M834 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 2012<br />

78M M834 M544 INDEPENDENCE HS<br />

Manhattan 2011<br />

78M M834 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 2012<br />

78M M835 M612 THE COMMUNITY PREPARATORY HS<br />

Manhattan 20<strong>10</strong><br />

78M M837 M479 BEACON HS<br />

Manhattan 2012<br />

78M M837 M479 BEACON HS<br />

Manhattan 2011<br />

78M M873 M439 MANHATTAN VILLAGE ACADEMY<br />

Manhattan 20<strong>10</strong><br />

78M M874 M411 BARUCH COLLEGE CAMPUS HS<br />

Manhattan 2012<br />

78M M876 M552 GREGORIO LUPERON PREP. SCHOOL<br />

Manhattan 2012<br />

78M M876 M552 GREGORIO LUPERON PREP. SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M883 LEGACY HS FOR INTEGR. STUDIES<br />

Manhattan 2012<br />

78M M883 M429 LEGACY HS FOR INTEGR. STUDIES<br />

Manhattan 2012<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES<br />

Manhattan 2012<br />

78M M894 M425 HS FOR LEADERSHIP & PUBLIC SERV<br />

Manhattan 20<strong>10</strong><br />

78M M895 M6<strong>10</strong> YOUNG WOMEN'S LEADERSHIP HS<br />

Manhattan 2011<br />

78M M911 M285 HARLEM RENAISSANCE HS<br />

Manhattan 20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M920 M570 SATELLITE ACADEMY<br />

Manhattan 2011<br />

78M M920 M570 SATELLITE ACADEMY<br />

Manhattan 2012<br />

78M M970 M670 THURGOOD MARSHALL ACADEMY<br />

Manhattan 2012<br />

78M M970 M670 THURGOOD MARSHALL ACADEMY<br />

Manhattan 2011<br />

78Q K420 K659 CYPRESS HILLS COLLEGIATE<br />

Queens<br />

2012<br />

78Q K420 K420 FRANKLIN K. LANE HS<br />

Queens<br />

2012<br />

78Q K420 K420 FRANKLIN K. LANE HS<br />

Queens<br />

2012<br />

78Q K420 K618 ACADEMY OF INNOV TECH<br />

Queens<br />

2012<br />

78Q K420 K583 MULTICULTURAL HS<br />

Queens<br />

2012<br />

78Q K420 K639 BROOKLYN LAB SCHOOL<br />

Queens<br />

2012<br />

78Q Q023 Q540 QUEENS ACADEMY HIGH SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q023 Q540 QUEENS ACADEMY HIGH SCHOOL<br />

Queens<br />

2012<br />

78Q Q400 Q400 AUGUST MARTIN HS<br />

Queens<br />

2012<br />

78Q Q405 Q495 BAYSIDE HIGH SCHOOL<br />

Queens<br />

2012<br />

78Q Q405 Q495 BAYSIDE HIGH SCHOOL<br />

Queens<br />

2011<br />

78Q Q4<strong>10</strong> BEACH CHANNEL HS<br />

Queens<br />

2012<br />

78Q Q4<strong>10</strong> Q262 CHANNEL VIEW SCL FOR RESEARCH<br />

Queens<br />

20<strong>10</strong><br />

78Q Q415 Q415 BENJAMIN N. CARDOZO HS<br />

Queens<br />

2012<br />

78Q Q415 Q415 BENJAMIN N. CARDOZO HS<br />

Queens<br />

2012<br />

78Q Q420 Q248 QUEENS PREPARATORY ACADEMY<br />

Queens<br />

2011<br />

78Q Q420 Q272 G. WASHINGTON CARVER HS FOR SCI.<br />

Queens<br />

2011<br />

78Q Q420 Q265 EXCELSIOR PREP HIGH SCHOOL<br />

Queens<br />

2011<br />

78Q Q420 Q283 PREPARATORY ACADEMY FOR WRITERS<br />

Queens<br />

2011<br />

78Q Q425 Q425 JOHN BOWNE HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q430 Q430 FRANCIS LEWIS HS<br />

Queens<br />

2012<br />

78Q Q430 Q430 FRANCIS LEWIS HS<br />

Queens<br />

2012<br />

78Q Q435 Q435 MARTIN VAN BUREN HS<br />

Queens<br />

2012<br />

78Q Q435 Q435 MARTIN VAN BUREN HS<br />

Queens<br />

2012<br />

78Q Q440 Q440 FOREST HILLS HS<br />

Queens<br />

2012<br />

78Q Q445 Q445 WILLIAM C. BRYANT HS<br />

Queens<br />

2012<br />

78Q Q445 Q445 WILLIAM C. BRYANT HS<br />

Queens<br />

2012<br />

78Q Q445 Q445 WILLIAM C. BRYANT HS<br />

Queens<br />

2011<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC)<br />

Queens<br />

2012<br />

78Q Q450 Q555 NEWCOMERS HIGH SCHOOL<br />

Queens<br />

2012<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC)<br />

Queens<br />

2012<br />

78Q Q451 Q575 ACADEMY OF AMERICAN STUDIES<br />

Queens<br />

2011<br />

78Q Q452 LONG ISLAND CITY HS (NEW)<br />

Queens<br />

2012<br />

78Q Q452 Q450 LONG ISLAND CITY HS<br />

Queens<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78Q Q455 Q455 NEWTOWN HS<br />

Queens<br />

2012<br />

78Q Q456 Q550 HS FOR ARTS AND BUSINESS<br />

Queens<br />

2012<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X)<br />

Queens<br />

2012<br />

78Q Q460 Q460 FLUSHING HS<br />

Queens<br />

2012<br />

78Q Q460 Q460 FLUSHING HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q465 FAR ROCKAWAY HS<br />

Queens<br />

2012<br />

78Q Q465 Q282 M.S. 282<br />

Queens<br />

2012<br />

78Q Q465 FAR ROCKAWAY HS<br />

Queens<br />

2012<br />

78Q Q465 Q260 FREDERICK DOUGLASS ACADEMY VI HS<br />

Queens<br />

2012<br />

78Q Q465 Q260 FREDERICK DOUGLASS ACADEMY VI HS<br />

Queens<br />

2012<br />

78Q Q465 Q309 ACAD. OF MEDICAL TECHNOLOGY<br />

Queens<br />

2012<br />

78Q Q465 Q302 QNS HS FOR INF. RESEARCH & TECH.<br />

Queens<br />

2012<br />

78Q Q470 Q470 JAMAICA HS<br />

Queens<br />

2012<br />

78Q Q470 Q325 HILLSIDE ACADEMY FOR ARTS AND LETTERS<br />

Queens<br />

2012<br />

78Q Q470 Q3<strong>10</strong> QUEENS COLLEGIATE SCHOOL<br />

Queens<br />

2012<br />

78Q Q475 Q475 RICHMOND HILL HS<br />

Queens<br />

2012<br />

78Q Q480 Q480 JOHN ADAMS HS<br />

Queens<br />

2012<br />

78Q Q485 Q485 GROVER CLEVELAND HS<br />

Queens<br />

2011<br />

78Q Q485 Q485 GROVER CLEVELAND HS<br />

Queens<br />

2012<br />

78Q Q490 Q492 MATH, SCI., RESEARCH & TECH. HS<br />

Queens<br />

2012<br />

78Q Q505 Q505 HILLCREST HS<br />

Queens<br />

2011<br />

78Q Q505 Q505 HILLCREST HS<br />

Queens<br />

2012<br />

78Q Q515 TOWNSEND HARRIS HS<br />

Queens<br />

2012<br />

78Q Q515 Q525 TOWNSEND HARRIS HS<br />

Queens<br />

2012<br />

78Q Q515 Q525 TOWNSEND HARRIS HS<br />

Queens<br />

2012<br />

78Q Q520 Q520 MIDDLE COLLEGE CAMPUS<br />

Queens<br />

2012<br />

78Q Q530 Q530 INTERNATIONAL HS (BLDG M @LAGUA)<br />

Queens<br />

2012<br />

78Q Q566 QNS HS OF TEACH., LIB. ARTS&SCI<br />

Queens<br />

2012<br />

78Q Q566 Q566 QNS HS OF TEACH., LIB. ARTS&SCI<br />

Queens<br />

2012<br />

78Q Q566 Q566 QNS HS OF TEACH., LIB. ARTS&SCI<br />

Queens<br />

2012<br />

78Q Q566 Q566 QNS HS OF TEACH., LIB. ARTS&SCI<br />

Queens<br />

2012<br />

78Q Q570 Q501 FRANK SINATRA SCL OF THE ARTS HS<br />

Queens<br />

2012<br />

78Q Q595 Q338 QUEENS SATELLITE HS FOR OPPORTUNITY<br />

Queens<br />

2012<br />

78Q Q600 Q600 QUEENS VOC HS<br />

Queens<br />

2011<br />

78Q Q600 Q600 QUEENS VOC HS<br />

Queens<br />

2012<br />

78Q Q6<strong>10</strong> Q6<strong>10</strong> AVIATION HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q620 Q620 THOMAS A. EDISON VOC HS<br />

Queens<br />

2012<br />

78Q Q650 Q650 HS FOR CONST.TRADES,ENGG.,& ARCH<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78Q Q650 Q650 HS FOR CONST.TRADES,ENGG.,& ARCH<br />

Queens<br />

2012<br />

78Q Q680 Q896 YOUNG WOMENS' LEADERSHIP SCHOOL<br />

Queens<br />

2011<br />

78Q Q680 Q896 YOUNG WOMENS' LEADERSHIP SCHOOL<br />

Queens<br />

2012<br />

78Q Q686 Q167 I.S. /H.S. 167<br />

Queens<br />

2012<br />

78Q Q690 Q690 HS FOR LAW ENFORCEMENT<br />

Queens<br />

2011<br />

78Q Q690 Q690 HS FOR LAW ENFORCEMENT<br />

Queens<br />

2012<br />

78Q Q695 Q680 QUEENS GATEWAY TO HEALTH SCIENCES<br />

SECONDARY SCHOOL<br />

Queens<br />

2012<br />

78Q Q707 Q670 R. F. KENNEDY COMM. MIDDLE/HS<br />

Queens<br />

2012<br />

78Q Q707 Q670 R. F. KENNEDY COMM. MIDDLE/HS<br />

Queens<br />

2012<br />

78Q Q725 Q502 HS FOR INFORMATION TECH<br />

Queens<br />

2012<br />

78Q Q735 QUEENS HIGH SCHOOL COMPLEX<br />

Queens<br />

2012<br />

78Q Q735 QUEENS HIGH SCHOOL COMPLEX<br />

Queens<br />

2012<br />

78Q Q735 Q264 ACADEMY OF FIN. AND ENTERPRISE<br />

Queens<br />

2012<br />

78Q Q739 Q286 YOUNG W. LEADERSHIP SCL ASTORIA<br />

Queens<br />

2012<br />

78Q Q739 Q286 YOUNG W. LEADERSHIP SCL ASTORIA<br />

Queens<br />

2011<br />

78Q Q744 Q296 PAN AMERICAN INTERNATIONAL HS<br />

Queens<br />

2012<br />

78Q Q744 Q293 CIVIC LEADERSHIP ACADEMY<br />

Queens<br />

2012<br />

78Q Q744 Q744 ELMHURST EDUCATIONAL CAMPUS<br />

Queens<br />

2012<br />

78Q Q744 Q293 CIVIC LEADERSHIP ACADEMY<br />

Queens<br />

2012<br />

78Q Q774 Q687 QUEENS HS FOR THE SCIENCES<br />

Queens<br />

2012<br />

78Q Q774 Q687 QUEENS HS FOR THE SCIENCES<br />

Queens<br />

2011<br />

78Q Q792 Q792 NORTH QUEENS COMMUNITY HS<br />

Queens<br />

2012<br />

78Q Q798 Q580 BACCALAUREATE SCL FOR GLOBAL ED<br />

Queens<br />

2012<br />

78Q Q799 Q326 CAMBRIA HEIGHTS ACADEMY<br />

Queens<br />

2012<br />

78Q Q891 Q560 R. F. WAGNER SEC SCL ARTS & TECH<br />

Queens<br />

20<strong>10</strong><br />

78R R435 R440 NEW DORP HS<br />

Staten Island 2011<br />

78R R435 R440 NEW DORP HS<br />

Staten Island 2012<br />

78R R440 R605 STATEN ISLAND TECHNICAL HS<br />

Staten Island 2012<br />

78R R440 R605 STATEN ISLAND TECHNICAL HS<br />

Staten Island 2011<br />

78R R440 R605 STATEN ISLAND TECHNICAL HS<br />

Staten Island 2012<br />

78R R445 R445 PORT RICHMOND HS<br />

Staten Island 2011<br />

78R R445 R445 PORT RICHMOND HS<br />

Staten Island 2012<br />

78R R450 R450 CURTIS HS<br />

Staten Island 2011<br />

78R R450 R450 CURTIS HS<br />

Staten Island 2012<br />

78R R455 R455 TOTTENVILLE HS<br />

Staten Island 2012<br />

78R R455 R455 TOTTENVILLE HS<br />

Staten Island 2011<br />

78R R455 TOTTENVILLE HS<br />

Staten Island 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78R R455 R455 TOTTENVILLE HS<br />

Staten Island 2012<br />

78R R460 R460 SUSAN E. WAGNER HS<br />

Staten Island 2012<br />

78R R460 R460 SUSAN E. WAGNER HS<br />

Staten Island 2012<br />

78R R470 R470 CONCORD HS (OLD 12)<br />

Staten Island 2011<br />

78R R470 R470 CONCORD HS (OLD 12)<br />

Staten Island 2012<br />

78R R600 R600 RALPH MCKEE VOC HS<br />

Staten Island 2012<br />

78R R600 R600 RALPH MCKEE VOC HS<br />

Staten Island 2011<br />

78X X039 X530 BANANA KELLY COMM. LEARNING CTR<br />

Bronx<br />

2012<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE<br />

Bronx<br />

2012<br />

78X X039 X332 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY<br />

RESEARCH<br />

Bronx<br />

2012<br />

78X X039 X332 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY<br />

RESEARCH<br />

Bronx<br />

2012<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE<br />

Bronx<br />

2012<br />

78X X099 X248 METROPOLITAN HS<br />

Bronx<br />

2012<br />

78X X362 X513 NEW WORLD HS<br />

Bronx<br />

2012<br />

78X X392 X269 M.S./H.S. 269<br />

Bronx<br />

2012<br />

78X X392 X269 M.S./H.S. 269<br />

Bronx<br />

2012<br />

78X X400 X527 BRONX LEADERSHIP ACADEMY II<br />

Bronx<br />

2011<br />

78X X400 X543 HS FOR VIOLIN AND DANCE<br />

Bronx<br />

2012<br />

78X X400 MORRIS HS<br />

Bronx<br />

2012<br />

78X X400 X403 BRONX INTERNATIONAL<br />

Bronx<br />

2012<br />

78X X400 X404 HIGH SCHOOL FOR EXCELLENCE<br />

Bronx<br />

2012<br />

78X X400 X297 MORRIS COLLAB HS TECH & HUMAN<br />

Bronx<br />

2012<br />

78X X400 MORRIS HS<br />

Bronx<br />

2012<br />

78X X401 BRONX REGIONAL HS (OLD 133)<br />

Bronx<br />

2012<br />

78X X401 BRONX REGIONAL HS (OLD 133)<br />

Bronx<br />

2012<br />

78X X401 X446 ARTURO A. SCHOMBERG SATELLITE ACADEMY<br />

Bronx<br />

2012<br />

78X X405 X405 HERBERT H. LEHMAN HS<br />

Bronx<br />

2012<br />

78X X405 X293 RENAISSANCE HS FOR MUS THEATRE<br />

Bronx<br />

2012<br />

78X X4<strong>10</strong> X227 BRONX EXPEDITIONARY LEARNG HS<br />

Bronx<br />

2012<br />

78X X415 CHRISTOPHER COLUMBUS HS<br />

Bronx<br />

2012<br />

78X X415 X299 ASTOR COLLEGIATE HS<br />

Bronx<br />

2012<br />

78X X415 X542 PELHAM PREP HS<br />

Bronx<br />

2012<br />

78X X415 X541 GLOBAL ENTERPRISE HS<br />

Bronx<br />

2012<br />

78X X415 X288 COLLEGIATE INST FOR MATH & SCI<br />

Bronx<br />

2012<br />

78X X415 X415 CHRISTOPHER COLUMBUS HS<br />

Bronx<br />

2012<br />

78X X420 JAMES MONROE CAMPUS<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78X X420 X388 PAN AMERICAN INTER HS<br />

Bronx<br />

2012<br />

78X X423 X478 THE CINEMA SCHOOL<br />

Bronx<br />

2012<br />

78X X423 X242 I.S. 242<br />

Bronx<br />

2012<br />

78X X423 X242 I.S. 242<br />

Bronx<br />

2012<br />

78X X425 EVANDER CHILDS HS<br />

Bronx<br />

2012<br />

78X X425 EVANDER CHILDS HS<br />

Bronx<br />

2012<br />

78X X425 X253 HS FOR WRITING & COMM ARTS<br />

Bronx<br />

2012<br />

78X X430 WALTON HS<br />

Bronx<br />

2012<br />

78X X430 X268 KINGSBRIDGE INTERNATIONAL HS<br />

Bronx<br />

2012<br />

78X X435 X243 I.S. 243<br />

Bronx<br />

2012<br />

78X X435 THEODORE ROOSEVELT HS<br />

Bronx<br />

2012<br />

78X X435 X374 KAPPA<br />

Bronx<br />

2012<br />

78X X435 X243 I.S. 243<br />

Bronx<br />

2012<br />

78X X435 X438 LEADERSHIP ACAD FOR BUS & TECH<br />

Bronx<br />

2012<br />

78X X435 X439 HS OF LAW & COMMUNITY SERV<br />

Bronx<br />

2012<br />

78X X435 X437 FORDHAM HS FOR THE ARTS<br />

Bronx<br />

2012<br />

78X X435 X434 BELMONT PREPARATORY HS<br />

Bronx<br />

2012<br />

78X X440 DEWITT CLINTON HS<br />

Bronx<br />

2012<br />

78X X440 X440 DEWITT CLINTON HS<br />

Bronx<br />

2012<br />

78X X440 DEWITT CLINTON HS<br />

Bronx<br />

2012<br />

78X X445 X445 BRONX HS OF SCIENCE<br />

Bronx<br />

2011<br />

78X X445 X445 BRONX HS OF SCIENCE<br />

Bronx<br />

2012<br />

78X X445 X445 BRONX HS OF SCIENCE<br />

Bronx<br />

2012<br />

78X X450 X312 MILLENIUM ART ACADEMY<br />

Bronx<br />

2012<br />

78X X450 X452 BRONX GUILD HS<br />

Bronx<br />

2012<br />

78X X450 X295 GATEWAY SCH FOR RES & TECH<br />

Bronx<br />

2012<br />

78X X450 X377 BRONX COMMUNITY HIGH SCHOOL<br />

Bronx<br />

2012<br />

78X X450 ADLAI E. STEVENSON HS<br />

Bronx<br />

2012<br />

78X X450 X295 GATEWAY SCH FOR RES & TECH<br />

Bronx<br />

2012<br />

78X X450 X376 ANTONIA PANTOJA PREP ACADEMY<br />

Bronx<br />

2012<br />

78X X450 ADLAI E. STEVENSON HS<br />

Bronx<br />

2012<br />

78X X450 X540 HS FOR COMM RESEARCH & LRNG<br />

Bronx<br />

2012<br />

78X X450 X305 P N ACAD FOR ARCH & WORLD STUD<br />

Bronx<br />

2012<br />

78X X455 X249 BRONX HEALTH SCIENCES HS<br />

Bronx<br />

2012<br />

78X X460 X505 HS OF LAW, GOV'T & JUSTICE<br />

Bronx<br />

2012<br />

78X X465 X231 EAGLE ACADEMY FOR YOUNG MEN<br />

Bronx<br />

2012<br />

78X X470 SOUTH BRONX HS (OLD 38)<br />

Bronx<br />

2012<br />

78X X470 X473 MOTT HAVEN VILLAGE PREP<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78X X470 SOUTH BRONX HS (OLD 38)<br />

Bronx<br />

2012<br />

78X X470 X495 UNIVERSITY HEIGHTS HS<br />

Bronx<br />

2012<br />

78X X475 X475 JOHN F. KENNEDY HS<br />

Bronx<br />

2012<br />

78X X475 JOHN F. KENNEDY HS<br />

Bronx<br />

2012<br />

78X X475 X477 MARBLE HILL INTERNATIONAL HS<br />

Bronx<br />

2012<br />

78X X475 X546 BRONX THEATRE HS<br />

Bronx<br />

2012<br />

78X X475 X284 BRONX SCHOOL OF LAW & FINANCE<br />

Bronx<br />

2012<br />

78X X475 X397 ELLIS PREPAR ATORY ACADEMY<br />

Bronx<br />

2012<br />

78X X475 X213 BX ENGINEERING & TECH ACADEMY<br />

Bronx<br />

2012<br />

78X X500 X500 HOSTOS LINCOLN ACADEMY OF SCI HS<br />

Bronx<br />

20<strong>10</strong><br />

78X X600 X381 BRONX HAVEN HIGH SCHOOL<br />

Bronx<br />

2012<br />

78X X650 X559 H.S. 559<br />

Bronx<br />

2012<br />

78X X655 X655 SAMUEL GOMPERS VOC HS<br />

Bronx<br />

2012<br />

78X X660 X660 GRACE H. DODGE VOC HS<br />

Bronx<br />

2012<br />

78X X660 X660 GRACE H. DODGE VOC HS<br />

Bronx<br />

2011<br />

78X X790 X527 BRONX LEADERSHIP ACADEMY II HS<br />

Bronx<br />

2012<br />

78X X790 X527 BRONX LEADERSHIP ACADEMY II HS<br />

Bronx<br />

2012<br />

78X X839 X418 BRONX HS FOR THE VISUAL ARTS<br />

Bronx<br />

2012<br />

78X X876 X525 BRONX LEADERSHIP ACADEMY<br />

Bronx<br />

20<strong>10</strong><br />

78X X878 X682 FANNIE LOU HAMER FREEDOM HS<br />

Bronx<br />

2012<br />

78X X878 X682 FANNIE LOU HAMER FREEDOM HS<br />

Bronx<br />

2012<br />

78X X879 X684 WINGS ACADEMY<br />

Bronx<br />

2012<br />

78X X879 X684 WINGS ACADEMY<br />

Bronx<br />

2012<br />

78X X884 X427 COMM HS FOR SOCIAL JUSTICE<br />

Bronx<br />

2012<br />

78X X884 HEALTH OPPORTUNITIES HS<br />

Bronx<br />

2012<br />

78X X905 X696 HS OF AMERICAN STUDIES<br />

Bronx<br />

2012<br />

78X X905 X696 HS OF AMERICAN STUDIES<br />

Bronx<br />

2012<br />

78X X905 X696 HS OF AMERICAN STUDIES<br />

Bronx<br />

2011<br />

78X X908 METROPOLITAN HS<br />

Bronx<br />

2012<br />

78X X953 AUXILIARY SERVICES HS<br />

Bronx<br />

2012<br />

78X X963 X321 CROTONA ACADEMY<br />

Bronx<br />

20<strong>10</strong><br />

78X X970 X241 I.S. 241<br />

Bronx<br />

2012<br />

78X X972 X519 F R DE GAUTIER LAW & PUB STUD<br />

Bronx<br />

2012<br />

78X X972 X560 BRONX ACADEMY HS<br />

Bronx<br />

2012<br />

78X X972 X519 F R DE GAUTIER LAW & PUB STUD<br />

Bronx<br />

2012<br />

78X X972 X560 BRONX ACADEMY HS<br />

Bronx<br />

2012<br />

78X X972 X537 BRONX ARENA HIGH SCHOOL<br />

Bronx<br />

2012<br />

78X X972 X519 F R DE GAUTIER LAW & PUB STUD<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Classroom Connectivity<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78X X973 X271 EAST BRONX ACADEMY FOR THE FUTURE<br />

Bronx<br />

2012<br />

78X X973 X271 EAST BRONX ACADEMY FOR THE FUTURE<br />

Bronx<br />

20<strong>10</strong><br />

78X X991 PASSAGES ACADEMY(HORIZON)<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

01 M015 P.S. 15<br />

Manhattan 2012<br />

01 M019 M019 P.S. 19<br />

Manhattan 20<strong>10</strong><br />

01 M019 M301 I.S. 301<br />

Manhattan 20<strong>10</strong><br />

01 M034 M034 P.S. 34<br />

Manhattan 2012<br />

01 M060 J.H.S. 60<br />

Manhattan 2012<br />

01 M063 M063 P.S. 63<br />

Manhattan 2012<br />

01 M064 P.S. 64 (OLD 71)<br />

Manhattan 2012<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong><br />

Manhattan 2012<br />

01 M<strong>14</strong>0 M<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Manhattan 2012<br />

02 M001 M001 P.S. 1<br />

Manhattan 2012<br />

02 M033 M033 P.S. 33<br />

Manhattan 2012<br />

02 M040 P.S. 40<br />

Manhattan 2012<br />

02 M041 P.S. 41<br />

Manhattan 2012<br />

02 M051 M051 P.S. 51<br />

Manhattan 20<strong>10</strong><br />

02 M070 M312 NYC LAB MIDDLE SCHOOL<br />

Manhattan 2012<br />

02 M<strong>10</strong>4 M<strong>10</strong>4 I.S. <strong>10</strong>4<br />

Manhattan 20<strong>10</strong><br />

02 M<strong>10</strong>4 I.S. <strong>10</strong>4<br />

Manhattan 2012<br />

02 M111 M111 P.S. 111<br />

Manhattan 2012<br />

02 M158 M158 P.S. 158<br />

Manhattan 2012<br />

02 M167 I.S. 167<br />

Manhattan 2012<br />

02 M198 M198 P.S. 198<br />

Manhattan 2012<br />

02 M234 M234 P.S. 234<br />

Manhattan 20<strong>10</strong><br />

02 M271 M217 P.S./I.S. 217<br />

Manhattan 20<strong>10</strong><br />

02 M660 M413 SCHOOL OF THE FUTURE<br />

Manhattan 20<strong>10</strong><br />

02 M855 M416 ELEANOR ROOSEVELT HS<br />

Manhattan 2012<br />

03 M009 P.S. 9<br />

Manhattan 2012<br />

03 M044 M044 I.S. 44<br />

Manhattan 2011<br />

03 M054 M054 I.S. 54<br />

Manhattan 2012<br />

03 M076 M076 P.S. 76<br />

Manhattan 2012<br />

03 M087 P.S. 87<br />

Manhattan 2012<br />

03 M088 I.S. 88<br />

Manhattan 2012<br />

03 M163 P.S. 163<br />

Manhattan 2012<br />

03 M166 P.S. 166<br />

Manhattan 2012<br />

03 M185 M185 P.S. 185 (TANDEM M208)<br />

Manhattan 2012<br />

03 M199 P.S. 199<br />

Manhattan 2012<br />

03 M207 M<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Manhattan 2011<br />

03 M208 M208 P.S. 208 (TANDEM M185)<br />

Manhattan 2012<br />

04 M007 M007 P.S. 7<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

04 M007 M406 GLOBAL TECHNOLOGY PREPARATORY<br />

Manhattan 2012<br />

04 M013 I.S. 13<br />

Manhattan 2012<br />

04 M050 M050 P.S. 50 (UDC & ECF)<br />

Manhattan 2011<br />

04 M096 M096 P.S. 96<br />

Manhattan 2012<br />

04 M121 M038 P.S. 38<br />

Manhattan 2012<br />

04 M155 M155 P.S. 155<br />

Manhattan 2012<br />

04 M171 P.S. 171<br />

Manhattan 2012<br />

05 M0<strong>10</strong> M499 FREDERICK DOUGLAS ACADEMY<br />

Manhattan 20<strong>10</strong><br />

05 M046 M046 P.S. 46<br />

Manhattan 2012<br />

05 M092 M344 I.S. 344<br />

Manhattan 20<strong>10</strong><br />

05 M092 M092 P.S. 92<br />

Manhattan 20<strong>10</strong><br />

05 M123 M123 P.S. 123<br />

Manhattan 2012<br />

05 M129 M129 P.S. 129<br />

Manhattan 20<strong>10</strong><br />

05 M133 M133 P.S. 133<br />

Manhattan 20<strong>10</strong><br />

05 M154 M154 P.S. 154<br />

Manhattan 2012<br />

05 M161 M161 P.S. 161<br />

Manhattan 2012<br />

05 M195 I.S. 195 (ECF)<br />

Manhattan 2012<br />

05 M197 M197 P.S. 197<br />

Manhattan 2011<br />

06 M028 P.S. 28<br />

Manhattan 2012<br />

06 M048 M048 P.S. 48<br />

Manhattan 2011<br />

06 M048 M048 P.S. 48<br />

Manhattan 2012<br />

06 M052 M423 HIGH SCHOOL FOR EXCELLENCE AND INNOVATION Manhattan 2011<br />

06 M052 M052 I.S. 52<br />

Manhattan 2011<br />

06 M098 P.S. 98<br />

Manhattan 2012<br />

06 M164 I.S. 164<br />

Manhattan 2012<br />

06 M178 M178 P.S. 178<br />

Manhattan 20<strong>10</strong><br />

06 M187 M187 P.S./I.S. 187<br />

Manhattan 20<strong>10</strong><br />

06 M189 P.S. 189<br />

Manhattan 2012<br />

06 M192 P.S. 192<br />

Manhattan 2012<br />

06 M218 I.S. 218<br />

Manhattan 2012<br />

06 M856 P.S. 2<strong>10</strong><br />

Manhattan 2012<br />

07 X040 P.S. 220<br />

Bronx<br />

2012<br />

07 X043 P.S. 43<br />

Bronx<br />

2012<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9<br />

Bronx<br />

2012<br />

07 X151 I.S. 151<br />

Bronx<br />

2012<br />

07 X162 I.S. 162<br />

Bronx<br />

2012<br />

07 X183 X203 J.H.S. 203<br />

Bronx<br />

2012<br />

07 X184 I.S. 184<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

08 X036 X036 P.S. 36<br />

Bronx<br />

20<strong>10</strong><br />

08 X071 X071 P.S. 71<br />

Bronx<br />

20<strong>10</strong><br />

08 X093 X093 P.S. 93<br />

Bronx<br />

2012<br />

08 X<strong>10</strong>0 X<strong>10</strong>0 P.S. <strong>10</strong>0<br />

Bronx<br />

2012<br />

08 X<strong>10</strong>1 I.S. <strong>10</strong>1<br />

Bronx<br />

2012<br />

08 X<strong>10</strong>7 X<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Bronx<br />

2012<br />

08 X119 X119 P.S. 119<br />

Bronx<br />

20<strong>10</strong><br />

08 X125 I.S. 125<br />

Bronx<br />

2012<br />

08 X<strong>14</strong>0 X<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Bronx<br />

2012<br />

08 X192 X366 I.S. 366<br />

Bronx<br />

2012<br />

09 X002 X250 M.S./H.S. 250<br />

Bronx<br />

20<strong>10</strong><br />

09 X011 X011 P.S. 11<br />

Bronx<br />

2012<br />

09 X028 P.S. 28<br />

Bronx<br />

2012<br />

09 X035 X035 P.S. 35<br />

Bronx<br />

2012<br />

09 X053 X053 P.S. 53<br />

Bronx<br />

20<strong>10</strong><br />

09 X053 P.S. 53<br />

Bronx<br />

2012<br />

09 X055 X055 P.S. 55<br />

Bronx<br />

2012<br />

09 X058 X058 P.S. 58<br />

Bronx<br />

2012<br />

09 X063 X063 P.S. 63<br />

Bronx<br />

2012<br />

09 X073 X073 P.S. 73<br />

Bronx<br />

2012<br />

09 X088 P.S. 88<br />

Bronx<br />

2012<br />

09 X<strong>10</strong>9 X<strong>10</strong>9 P.S. <strong>10</strong>9<br />

Bronx<br />

2012<br />

09 X1<strong>10</strong> X1<strong>10</strong> P.S. 1<strong>10</strong><br />

Bronx<br />

2012<br />

09 X1<strong>14</strong> X1<strong>14</strong> P.S. 1<strong>14</strong><br />

Bronx<br />

2012<br />

09 X126 P.S. 126 (ECF)<br />

Bronx<br />

2012<br />

09 X132 X132 P.S. 132<br />

Bronx<br />

2012<br />

09 X<strong>14</strong>7 X313 I.S. 313<br />

Bronx<br />

20<strong>10</strong><br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8)<br />

Bronx<br />

2012<br />

09 X235 P.S./I.S. 218<br />

Bronx<br />

2012<br />

09 X236 X236 P.S. 236 ANNEX (P173 ECC)<br />

Bronx<br />

2012<br />

<strong>10</strong> X003 X003 P.S. 3<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X033 X033 P.S. 33<br />

Bronx<br />

2012<br />

<strong>10</strong> X059 X059 P.S. 59<br />

Bronx<br />

2012<br />

<strong>10</strong> X079 P.S. 79<br />

Bronx<br />

2012<br />

<strong>10</strong> X081 X081 P.S. 81<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X081 P.S. 81<br />

Bronx<br />

2012<br />

<strong>10</strong> X085 X085 P.S. 85<br />

Bronx<br />

2012<br />

<strong>10</strong> X086 P.S. 86<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

<strong>10</strong> X086 X086 P.S. 86<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X091 X091 P.S. 91<br />

Bronx<br />

2012<br />

<strong>10</strong> X095 X095 P.S. 95<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X<strong>14</strong>1 X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1<br />

Bronx<br />

2012<br />

<strong>10</strong> X340 P.S. 340<br />

Bronx<br />

2012<br />

<strong>10</strong> X360 P.S. 360<br />

Bronx<br />

2012<br />

<strong>10</strong> X841 I.S. 241<br />

Bronx<br />

2012<br />

<strong>10</strong> X842 X344 P.S. 344<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X843 X246 P.S. 246<br />

Bronx<br />

2012<br />

<strong>10</strong> X852 X308 BRONX DANCE ACADEMY<br />

Bronx<br />

2012<br />

11 X016 X016 P.S. 16<br />

Bronx<br />

2012<br />

11 X019 X019 P.S. 19<br />

Bronx<br />

2012<br />

11 X068 P.S. 68<br />

Bronx<br />

2012<br />

11 X076 X076 P.S. 76<br />

Bronx<br />

2012<br />

11 X078 X078 P.S. 78<br />

Bronx<br />

2012<br />

11 X<strong>10</strong>5 X<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Bronx<br />

2012<br />

11 X111 X111 P.S. 111<br />

Bronx<br />

2012<br />

11 X113 I.S. 113<br />

Bronx<br />

2012<br />

11 X<strong>14</strong>2 X<strong>14</strong>2 I.S. <strong>14</strong>2<br />

Bronx<br />

20<strong>10</strong><br />

11 X<strong>14</strong>4 X<strong>14</strong>4 I.S. <strong>14</strong>4<br />

Bronx<br />

2012<br />

12 X050 X050 P.S. 50<br />

Bronx<br />

2012<br />

12 X061 X061 P.S. 61<br />

Bronx<br />

2012<br />

12 X066 X066 P.S. 66<br />

Bronx<br />

2012<br />

12 X067 X067 P.S. 67<br />

Bronx<br />

2012<br />

12 X077 P.S. 195<br />

Bronx<br />

2012<br />

12 X092 X092 P.S. 92<br />

Bronx<br />

2012<br />

12 X098 X098 I.S. 98<br />

Bronx<br />

20<strong>10</strong><br />

12 X116 I.S. 216<br />

Bronx<br />

2012<br />

12 X167 X2<strong>14</strong> P.S. 2<strong>14</strong><br />

Bronx<br />

20<strong>10</strong><br />

12 X198 P.S. 198<br />

Bronx<br />

2012<br />

12 X234 X300 P.S. 300<br />

Bronx<br />

20<strong>10</strong><br />

13 K003 K003 P.S. 3<br />

Brooklyn<br />

20<strong>10</strong><br />

13 K011 K011 P.S. 11<br />

Brooklyn<br />

20<strong>10</strong><br />

13 K046 K691 FORT GREENE PREPARATORY ACADEMY<br />

Brooklyn<br />

2012<br />

13 K056 P.S. 56<br />

Brooklyn<br />

2012<br />

13 K067 P.S. 67<br />

Brooklyn<br />

2012<br />

13 K093 K093 P.S. 93<br />

Brooklyn<br />

2012<br />

13 K256 K256 P.S. 256<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

13 K265 K265 I.S. 265<br />

Brooklyn<br />

2011<br />

13 K270 K270 P.S. 270<br />

Brooklyn<br />

2012<br />

13 K282 K282 P.S. 282<br />

Brooklyn<br />

20<strong>10</strong><br />

13 K287 K287 P.S. 287<br />

Brooklyn<br />

2012<br />

13 K305 K305 P.S. 305<br />

Brooklyn<br />

2012<br />

13 K813 K751 ACADEMY OF HEALTH CAREERS<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K019 K019 P.S. 19<br />

Brooklyn<br />

2011<br />

<strong>14</strong> K023 K023 P.S. 23<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K031 K031 P.S. 31 (OLD 126)<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 K454 GREEN SCHOOL HS<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K049 I.S. 49<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K1<strong>10</strong> K1<strong>10</strong> P.S. 1<strong>10</strong><br />

Brooklyn<br />

20<strong>10</strong><br />

<strong>14</strong> K126 K126 J.H.S. 126<br />

Brooklyn<br />

20<strong>10</strong><br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K157 K157 P.S. 157<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K250 K250 P.S. 250<br />

Brooklyn<br />

20<strong>10</strong><br />

<strong>14</strong> K297 K297 P.S. 297<br />

Brooklyn<br />

2012<br />

<strong>14</strong> K319 K319 P.S. 319<br />

Brooklyn<br />

2012<br />

15 K0<strong>10</strong> K0<strong>10</strong> P.S. <strong>10</strong><br />

Brooklyn<br />

20<strong>10</strong><br />

15 K015 K015 P.S. 15<br />

Brooklyn<br />

2012<br />

15 K032 K032 P.S. 32<br />

Brooklyn<br />

2012<br />

15 K038 K038 P.S. 38<br />

Brooklyn<br />

2012<br />

15 K039 K039 P.S. 39<br />

Brooklyn<br />

20<strong>10</strong><br />

15 K051 K051 I.S. 51<br />

Brooklyn<br />

2011<br />

15 K088 I.S. 88<br />

Brooklyn<br />

2012<br />

15 K<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Brooklyn<br />

2012<br />

15 K131 K131 P.S. 131<br />

Brooklyn<br />

2012<br />

15 K136 K136 I.S. 136<br />

Brooklyn<br />

2012<br />

15 K<strong>14</strong>2 K<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Brooklyn<br />

2011<br />

15 K230 K230 P.S. 230<br />

Brooklyn<br />

20<strong>10</strong><br />

15 K261 K261 P.S. 261<br />

Brooklyn<br />

2011<br />

16 K021 K021 P.S. 21<br />

Brooklyn<br />

20<strong>10</strong><br />

16 K026 P.S. 26<br />

Brooklyn<br />

2012<br />

16 K243 K243 P.S. 243<br />

Brooklyn<br />

2012<br />

16 K262 K262 P.S. 262<br />

Brooklyn<br />

2012<br />

16 K304 P.S. 304<br />

Brooklyn<br />

2012<br />

16 K309 K309 P.S. 309<br />

Brooklyn<br />

2012<br />

17 K138 P.S. 138<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

17 K161 K161 P.S. 161<br />

Brooklyn<br />

2012<br />

17 K167 K167 P.S. 167<br />

Brooklyn<br />

2012<br />

17 K189 K189 P.S. 189<br />

Brooklyn<br />

2012<br />

17 K191 K191 P.S. 191<br />

Brooklyn<br />

2012<br />

17 K221 P.S. 221<br />

Brooklyn<br />

2012<br />

17 K316 K316 P.S. 316<br />

Brooklyn<br />

2012<br />

17 K390 K334 M.S. 334<br />

Brooklyn<br />

20<strong>10</strong><br />

17 K391 K587 I.S. 587<br />

Brooklyn<br />

2011<br />

17 K399 K399 P.S. 399<br />

Brooklyn<br />

2012<br />

17 K874 I.S. 340 (OLD 249 AX)<br />

Brooklyn<br />

2012<br />

18 K066 K066 P.S. 66<br />

Brooklyn<br />

2012<br />

18 K068 K068 I.S. 68<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong><br />

Brooklyn<br />

2012<br />

18 K115 K115 P.S. 115<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K211 I.S. 211<br />

Brooklyn<br />

2012<br />

18 K232 I.S. 232<br />

Brooklyn<br />

2012<br />

18 K235 K235 P.S. 235<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K244 K244 P.S. 244<br />

Brooklyn<br />

2012<br />

18 K279 K279 P.S. 279<br />

Brooklyn<br />

20<strong>10</strong><br />

18 K279 P.S. 279<br />

Brooklyn<br />

2012<br />

19 K013 P.S. 13<br />

Brooklyn<br />

2012<br />

19 K072 K677 EAST NEW YORK ELEMENTARY SCHOOL OF<br />

EXCELLENCE<br />

Brooklyn<br />

2012<br />

19 K<strong>10</strong>8 K<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Brooklyn<br />

2012<br />

19 K159 K159 P.S. 159<br />

Brooklyn<br />

2012<br />

19 K166 I.S. 166<br />

Brooklyn<br />

2012<br />

19 K202 K202 P.S. 202<br />

Brooklyn<br />

2012<br />

19 K260 K260 P.S. 260<br />

Brooklyn<br />

20<strong>10</strong><br />

19 K273 K273 P.S. 273<br />

Brooklyn<br />

2012<br />

19 K290 K290 P.S. 290<br />

Brooklyn<br />

2012<br />

19 K292 K292 I.S. 292<br />

Brooklyn<br />

20<strong>10</strong><br />

19 K345 K345 P.S. 345<br />

Brooklyn<br />

2012<br />

19 K346 K346 P.S. 346<br />

Brooklyn<br />

2012<br />

20 K069 K069 P.S. 69<br />

Brooklyn<br />

2012<br />

20 K<strong>10</strong>2 K<strong>10</strong>2 P.S. <strong>10</strong>2<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K112 K112 P.S. 112<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K160 K160 P.S. 160<br />

Brooklyn<br />

2012<br />

20 K180 K231 K231 SPED<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

20 K192 K192 P.S. 192<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K200 K200 P.S. 200<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K201 K201 I.S. 201<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K204 K204 P.S. 204<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K247 K247 P.S. 247<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K486 K187 I.S. 187<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K090 K090 P.S. 90<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K095 P.S. 95<br />

Brooklyn<br />

2012<br />

21 K097 K097 P.S. 97<br />

Brooklyn<br />

2012<br />

21 K<strong>10</strong>1 K<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K177 K177 P.S. 177<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K199 K199 P.S. 199<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K209 K209 P.S. 209<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K212 K212 P.S. 212<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K216 K216 P.S. 216<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K225 K225 P.S. 225<br />

Brooklyn<br />

2012<br />

21 K226 K226 P.S. 226<br />

Brooklyn<br />

2012<br />

21 K228 K228 I.S. 228<br />

Brooklyn<br />

2011<br />

21 K238 K238 P.S. 238<br />

Brooklyn<br />

2012<br />

21 K288 K288 P.S. 288<br />

Brooklyn<br />

2012<br />

21 K303 K344 R. CARSON SCL OF COASTAL ST<br />

Brooklyn<br />

20<strong>10</strong><br />

21 K303 K303 I.S. 303<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K052 K052 P.S. 52<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K152 P.S. 152<br />

Brooklyn<br />

2012<br />

22 K193 K193 P.S. 193<br />

Brooklyn<br />

2011<br />

22 K194 K194 P.S. 194<br />

Brooklyn<br />

2012<br />

22 K195 K195 P.S. 195<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K197 K197 P.S. 197<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K197 K197 P.S. 197<br />

Brooklyn<br />

2012<br />

22 K197 K381 I.S. 381<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K206 K206 P.S. 206<br />

Brooklyn<br />

2011<br />

22 K234 K234 I.S. 234<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K240 K240 I.S. 240<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K251 K251 P.S. 251<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K254 K254 P.S. 254<br />

Brooklyn<br />

2011<br />

22 K255 K255 P.S. 255<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K269 K269 P.S. 269<br />

Brooklyn<br />

2012<br />

22 K395 K<strong>10</strong>9 P.S. <strong>10</strong>9<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

22 K735 K245 P.S. 245<br />

Brooklyn<br />

20<strong>10</strong><br />

22 K852 K326 P.S. 326<br />

Brooklyn<br />

20<strong>10</strong><br />

23 K155 K155 P.S. 155<br />

Brooklyn<br />

2012<br />

23 K271 K522 I.S. 522<br />

Brooklyn<br />

2012<br />

23 K284 K284 P.S. 284<br />

Brooklyn<br />

2012<br />

23 K356 K156 P.S. 156<br />

Brooklyn<br />

2012<br />

24 Q005 Q005 I.S. 5<br />

Queens<br />

2012<br />

24 Q007 P.S. 7<br />

Queens<br />

2012<br />

24 Q007 Q007 P.S. 7<br />

Queens<br />

2012<br />

24 Q013 Q013 P.S. 13<br />

Queens<br />

2011<br />

24 Q028 Q028 P.S. 28 (ECC)<br />

Queens<br />

20<strong>10</strong><br />

24 Q058 Q058 P.S. 58<br />

Queens<br />

2012<br />

24 Q061 Q061 I.S. 61<br />

Queens<br />

20<strong>10</strong><br />

24 Q087 Q087 P.S. 87 ADDITION<br />

Queens<br />

20<strong>10</strong><br />

24 Q088 Q088 P.S. 88<br />

Queens<br />

20<strong>10</strong><br />

24 Q089 Q089 P.S. 89<br />

Queens<br />

20<strong>10</strong><br />

24 Q091 Q091 P.S. 91<br />

Queens<br />

2012<br />

24 Q153 Q153 P.S. 153<br />

Queens<br />

20<strong>10</strong><br />

24 Q199 Q199 P.S. 199<br />

Queens<br />

20<strong>10</strong><br />

24 Q239 Q239 P.S. 239<br />

Queens<br />

2012<br />

24 Q721 P.S. 16 (OLD Q721 SPED)<br />

Queens<br />

2012<br />

24 Q849 Q077 I.S. 77<br />

Queens<br />

20<strong>10</strong><br />

25 Q021 Q021 P.S. 21<br />

Queens<br />

2012<br />

25 Q022 Q022 P.S. 22<br />

Queens<br />

2011<br />

25 Q024 Q024 P.S. 24<br />

Queens<br />

20<strong>10</strong><br />

25 Q029 Q029 P.S. 29<br />

Queens<br />

20<strong>10</strong><br />

25 Q<strong>10</strong>7 Q<strong>10</strong>7 P.S. <strong>10</strong>7<br />

Queens<br />

2012<br />

25 Q120 Q120 P.S. 120<br />

Queens<br />

20<strong>10</strong><br />

25 Q129 Q129 P.S. 129<br />

Queens<br />

2011<br />

25 Q154 Q154 P.S. 154<br />

Queens<br />

2011<br />

25 Q163 Q163 P.S. 163 ADDITION<br />

Queens<br />

2011<br />

25 Q168 J.H.S. 168<br />

Queens<br />

2012<br />

25 Q169 P.S. 169<br />

Queens<br />

2012<br />

25 Q189 J.H.S. 189<br />

Queens<br />

2012<br />

25 Q201 Q201 P.S. 201<br />

Queens<br />

20<strong>10</strong><br />

25 Q237 J.H.S. 237<br />

Queens<br />

2012<br />

25 Q242 Q242 P.S. 242 - (ECC)<br />

Queens<br />

20<strong>10</strong><br />

25 Q499 Q499 P.S./I.S. 499<br />

Queens<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

26 Q026 Q026 P.S. 26<br />

Queens<br />

20<strong>10</strong><br />

26 Q031 Q031 P.S. 31<br />

Queens<br />

20<strong>10</strong><br />

26 Q041 P.S. 41<br />

Queens<br />

2012<br />

26 Q074 Q074 I.S. 74<br />

Queens<br />

20<strong>10</strong><br />

26 Q115 Q115 P.S. 115<br />

Queens<br />

20<strong>10</strong><br />

26 Q133 Q133 P.S. 133<br />

Queens<br />

20<strong>10</strong><br />

26 Q158 Q158 J.H.S. 158<br />

Queens<br />

20<strong>10</strong><br />

26 Q173 Q173 P.S. 173<br />

Queens<br />

20<strong>10</strong><br />

26 Q179 P.S. 179<br />

Queens<br />

2012<br />

26 Q186 P.S. 186<br />

Queens<br />

2012<br />

26 Q205 P.S. 205<br />

Queens<br />

2012<br />

26 Q266 Q266 P.S./I.S. 266<br />

Queens<br />

2012<br />

27 Q042 Q042 P.S. 42<br />

Queens<br />

2012<br />

27 Q045 Q045 P.S. 45<br />

Queens<br />

2012<br />

27 Q047 P.S. 47<br />

Queens<br />

2012<br />

27 Q056 P.S. 56 (OLD R HILL AX)<br />

Queens<br />

2012<br />

27 Q060 Q060 P.S. 60<br />

Queens<br />

20<strong>10</strong><br />

27 Q062 Q062 P.S. 62<br />

Queens<br />

2012<br />

27 Q064 Q064 P.S. 64<br />

Queens<br />

20<strong>10</strong><br />

27 Q090 Q090 P.S. 90<br />

Queens<br />

20<strong>10</strong><br />

27 Q096 Q096 P.S. 96<br />

Queens<br />

20<strong>10</strong><br />

27 Q<strong>10</strong>4 Q<strong>10</strong>4 P.S. <strong>10</strong>4<br />

Queens<br />

2012<br />

27 Q<strong>10</strong>5 Q<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Queens<br />

2012<br />

27 Q<strong>10</strong>8 Q<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Queens<br />

2012<br />

27 Q123 Q123 P.S. 123<br />

Queens<br />

20<strong>10</strong><br />

27 Q137 Q137 M.S. 137<br />

Queens<br />

2012<br />

27 Q<strong>14</strong>6 P.S. <strong>14</strong>6<br />

Queens<br />

2012<br />

27 Q180 Q323 THE SCHOLARS ACADEMY<br />

Queens<br />

2012<br />

27 Q183 P.S. 183<br />

Queens<br />

2012<br />

27 Q197 P.S. 197<br />

Queens<br />

2012<br />

27 Q215 Q215 P.S. 215<br />

Queens<br />

20<strong>10</strong><br />

27 Q225 Q225 P.S. 225<br />

Queens<br />

20<strong>10</strong><br />

27 Q226 Q226 I.S. 226<br />

Queens<br />

20<strong>10</strong><br />

27 Q884 Q065 P.S. 65<br />

Queens<br />

20<strong>10</strong><br />

28 Q030 Q030 P.S. 30<br />

Queens<br />

20<strong>10</strong><br />

28 Q080 Q080 P.S. 80<br />

Queens<br />

2012<br />

28 Q086 Q086 P.S. 86<br />

Queens<br />

20<strong>10</strong><br />

28 Q<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

28 Q121 P.S. 121<br />

Queens<br />

2012<br />

28 Q139 Q139 P.S. 139<br />

Queens<br />

20<strong>10</strong><br />

28 Q<strong>14</strong>0 Q<strong>14</strong>0 P.S. <strong>14</strong>0<br />

Queens<br />

20<strong>10</strong><br />

28 Q157 J.H.S. 157<br />

Queens<br />

2012<br />

28 Q161 Q161 P.S. 161<br />

Queens<br />

2011<br />

28 Q190 Q190 J.H.S. 190<br />

Queens<br />

2011<br />

29 Q037 P.S. 37<br />

Queens<br />

2012<br />

29 Q037 Q037 P.S. 37<br />

Queens<br />

20<strong>10</strong><br />

29 Q052 Q052 P.S. 52<br />

Queens<br />

20<strong>10</strong><br />

29 Q059 Q059 I.S. 59<br />

Queens<br />

20<strong>10</strong><br />

29 Q<strong>10</strong>9 Q<strong>10</strong>9 I.S. <strong>10</strong>9<br />

Queens<br />

20<strong>10</strong><br />

29 Q116 Q116 P.S. 116<br />

Queens<br />

20<strong>10</strong><br />

29 Q132 Q132 P.S. 132<br />

Queens<br />

2012<br />

29 Q134 Q134 P.S. 134<br />

Queens<br />

2012<br />

29 Q135 P.S. 135<br />

Queens<br />

2012<br />

29 Q<strong>14</strong>7 Q<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Queens<br />

20<strong>10</strong><br />

29 Q176 P.S. 176 ADDITION<br />

Queens<br />

2012<br />

29 Q181 Q181 P.S. 181<br />

Queens<br />

2012<br />

29 Q195 Q195 P.S. 195<br />

Queens<br />

20<strong>10</strong><br />

29 Q208 Q208 P.S./I.S. 208<br />

Queens<br />

20<strong>10</strong><br />

29 Q231 Q231 I.S. 231 (TANDEM Q251)<br />

Queens<br />

20<strong>10</strong><br />

29 Q238 Q238 I.S. 238<br />

Queens<br />

20<strong>10</strong><br />

29 Q251 Q251 P.S. 251 (TANDEM Q231)<br />

Queens<br />

20<strong>10</strong><br />

29 Q268 Q268 P.S. 268<br />

Queens<br />

2012<br />

29 Q270 Q270 P.S. 270<br />

Queens<br />

20<strong>10</strong><br />

30 Q002 Q002 P.S. 2<br />

Queens<br />

2012<br />

30 Q011 P.S. 11 ADDITION<br />

Queens<br />

2012<br />

30 Q070 Q070 P.S. 70 ADDITION<br />

Queens<br />

20<strong>10</strong><br />

30 Q076 Q076 P.S. 76<br />

Queens<br />

20<strong>10</strong><br />

30 Q092 P.S. 92<br />

Queens<br />

2012<br />

30 Q122 Q122 P.S. 122<br />

Queens<br />

2012<br />

30 Q127 Q127 P.S. 127<br />

Queens<br />

20<strong>10</strong><br />

30 Q<strong>14</strong>8 Q<strong>14</strong>8 P.S. <strong>14</strong>8<br />

Queens<br />

20<strong>10</strong><br />

30 Q<strong>14</strong>9 Q<strong>14</strong>9 P.S. <strong>14</strong>9<br />

Queens<br />

20<strong>10</strong><br />

30 Q151 Q151 P.S. 151<br />

Queens<br />

2012<br />

30 Q204 I.S. 204<br />

Queens<br />

2012<br />

30 Q212 Q212 P.S. 212<br />

Queens<br />

2011<br />

30 Q222 Q222 P.S. 222 (ECC)<br />

Queens<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

30 Q227 Q227 I.S. 227<br />

Queens<br />

20<strong>10</strong><br />

30 Q228 Q228 P.S. 228 (ECC)<br />

Queens<br />

20<strong>10</strong><br />

30 Q234 Q234 P.S. 234<br />

Queens<br />

2012<br />

30 Q868 Q078 P.S. 78<br />

Queens<br />

20<strong>10</strong><br />

31 R002 R002 I.S. 2<br />

Staten Island 20<strong>10</strong><br />

31 R003 R003 P.S. 3<br />

Staten Island 2012<br />

31 R004 R004 P.S. 4<br />

Staten Island 2012<br />

31 R006 R006 P.S. 6<br />

Staten Island 2012<br />

31 R007 R007 I.S. 7<br />

Staten Island 2012<br />

31 R013 R013 P.S. 13<br />

Staten Island 20<strong>10</strong><br />

31 R0<strong>14</strong> R0<strong>14</strong> P.S. <strong>14</strong><br />

Staten Island 2012<br />

31 R016 R016 P.S. 16<br />

Staten Island 20<strong>10</strong><br />

31 R019 R019 P.S. 19<br />

Staten Island 2012<br />

31 R020 P.S. 20<br />

Staten Island 2012<br />

31 R024 R024 I.S. 24<br />

Staten Island 2012<br />

31 R027 R027 I.S. 27<br />

Staten Island 20<strong>10</strong><br />

31 R029 R029 P.S. 29<br />

Staten Island 2012<br />

31 R034 R034 I.S. 34 (OLD TOTTENVILLE)<br />

Staten Island 2012<br />

31 R039 R039 P.S. 39<br />

Staten Island 2011<br />

31 R041 R041 P.S. 41<br />

Staten Island 20<strong>10</strong><br />

31 R044 P.S. 44<br />

Staten Island 2012<br />

31 R044 P.S. 44<br />

Staten Island 2012<br />

31 R045 R045 P.S. 45<br />

Staten Island 20<strong>10</strong><br />

31 R048 R048 P.S. 48<br />

Staten Island 20<strong>10</strong><br />

31 R051 R051 I.S. 51<br />

Staten Island 20<strong>10</strong><br />

31 R052 R052 P.S. 52<br />

Staten Island 2012<br />

31 R053 R053 P.S. 53<br />

Staten Island 2012<br />

31 R054 R054 P.S. 54<br />

Staten Island 20<strong>10</strong><br />

31 R056 R056 P.S. 56<br />

Staten Island 20<strong>10</strong><br />

31 R057 R057 P.S. 57<br />

Staten Island 2012<br />

31 R058 R058 P.S. 58<br />

Staten Island 20<strong>10</strong><br />

31 R060 R060 P.S. 60<br />

Staten Island 20<strong>10</strong><br />

31 R061 R061 I.S. 61<br />

Staten Island 20<strong>10</strong><br />

31 R072 R072 I.S. 72<br />

Staten Island 20<strong>10</strong><br />

31 R072 I.S. 72<br />

Staten Island 2012<br />

31 R880 R080 P.S. 80<br />

Staten Island 20<strong>10</strong><br />

32 K045 K045 P.S. 45<br />

Brooklyn<br />

2012<br />

32 K086 K086 P.S. 86<br />

Brooklyn<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

32 K111 K347 I.S. 347<br />

Brooklyn<br />

20<strong>10</strong><br />

32 K123 K123 P.S. 123<br />

Brooklyn<br />

2012<br />

32 K151 K151 P.S. 151<br />

Brooklyn<br />

2012<br />

32 K274 K274 P.S. 274<br />

Brooklyn<br />

2012<br />

32 K299 K299 P.S. 299<br />

Brooklyn<br />

2012<br />

32 K377 P.S. 377<br />

Brooklyn<br />

2012<br />

32 K383 K383 I.S. 383<br />

Brooklyn<br />

2011<br />

75K K<strong>14</strong>8 K373 K373 SPED<br />

Brooklyn<br />

20<strong>10</strong><br />

75K K369 K369 P.S. 369 (COY COX SCHOOL)<br />

Brooklyn<br />

2012<br />

75M M058 P.S. 35 (OLD 58/MNHT HS)<br />

Manhattan 2012<br />

75M M169 P.S. 169 (ECF)<br />

Manhattan 2012<br />

75Q Q009 Q009 P.S. 9 (W REED SCHOOL)<br />

Queens<br />

20<strong>10</strong><br />

75Q Q009 Q009 P.S. 9 (W REED SCHOOL)<br />

Queens<br />

2012<br />

75Q Q075 Q075 P.S. 75 (R PEARY SCHOOL)<br />

Queens<br />

2012<br />

75Q Q177 Q177 P.S. 177<br />

Queens<br />

2011<br />

75Q Q722 Q721 Q721 SPED<br />

Queens<br />

20<strong>10</strong><br />

75Q Q811 Q811 P.S. 811 (OLD 187)<br />

Queens<br />

20<strong>10</strong><br />

75Q Q835 Q233 Q233 SPED<br />

Queens<br />

2011<br />

78K K175 TEACHERS PREP HS(OL REDIRECTION)<br />

Brooklyn<br />

2012<br />

78K K400 K348 HIGH SCHOOL OF SPORTS MGMT<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K4<strong>10</strong> K4<strong>10</strong> ABRAHAM LINCOLN HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K425 K425 JAMES MADISON HS<br />

Brooklyn<br />

2011<br />

78K K430 K430 BROOKLYN TECH HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K440 PROSPECT HEIGHTS HS<br />

Brooklyn<br />

2012<br />

78K K445 K445 NEW UTRECHT HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K450 K478 HS OF ENTERPRISE, BUS. & TECH.<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K450 K474 PROGRESS HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K450 K477 HS OF LEGAL STUDIES<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K458 BOYS HS (OLD)<br />

Brooklyn<br />

2012<br />

78K K465 ERASMUS HALL CAMPUS<br />

Brooklyn<br />

2012<br />

78K K470 GEORGE W. WINGATE HS<br />

Brooklyn<br />

2012<br />

78K K490 K490 FORT HAMILTON HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K505 K505 FRANKLIN D. ROOSEVELT HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K637 ACAD FOR CONSERV & THE ENVIR<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K578 BROOKLYN BRIDGE ACADEMY<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K566 BROOKLYN GENERATION SCHOOL<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K567 BROOKLYN THEATRE ARTS H.S.<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K515 K576 VICTORY COLLEGIATE HS<br />

Brooklyn<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78K K515 K515 SOUTH SHORE HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K525 K525 EDWARD R. MURROW HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K535 K535 LEON GOLDSTEIN HS<br />

Brooklyn<br />

2012<br />

78K K540 K540 JOHN DEWEY HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K580 GEORGE WESTINGHOUSE VOC HS<br />

Brooklyn<br />

2012<br />

78K K590 K590 MIDDLE COLLEGE HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K620 K620 WILLIAM E. GRADY VOC HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K650 K561 WIILIAMSBURG PREP<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K650 K488 BROOKLYN PREPARATORY HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K650 K558 WILLIAMSBURG HS FOR ARCH & DES<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K806 METROPOLITAN CORPORATE ACAD.<br />

Brooklyn<br />

2012<br />

78K K825 K698 SOUTH BROOKLYN COMM. HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K871 COMM SCHL COMP ED (PRG GIRLS)<br />

Brooklyn<br />

2012<br />

78K K907 BROWNSVILLE DIPLOMA PLUS HS<br />

Brooklyn<br />

2012<br />

78K K909 K499 ACORN COMMUNITY HS<br />

Brooklyn<br />

2011<br />

78K K913 K545 EBC HS FOR PUB. SERV.<br />

Brooklyn<br />

2011<br />

78K K9<strong>14</strong> K670 BENJAMIN BANNEKER ACAD. (HS LVL)<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE<br />

Brooklyn<br />

2012<br />

78K K987 K498 ACORN SCHOOL FOR SOCIAL JUSTICE<br />

Brooklyn<br />

20<strong>10</strong><br />

78M M066 M580 RICHARD R GREEN HS OF TEACHING<br />

Manhattan 2012<br />

78M M097 M696 BARD COLLEGE HS<br />

Manhattan 2012<br />

78M M136 M302 I.S. 302<br />

Manhattan 2012<br />

78M M435 M435 MANHTN CT FOR MATH & SCI. HS<br />

Manhattan 20<strong>10</strong><br />

78M M435 M825 I.S. 825<br />

Manhattan 20<strong>10</strong><br />

78M M440 M605 HUMANITIES PREPARATORY ACAD<br />

Manhattan 20<strong>10</strong><br />

78M M440 M313 JAMES BALDWIN SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M440 M440 BAYARD RUSTIN EDUCATIONAL COMP<br />

Manhattan 20<strong>10</strong><br />

78M M460 M460 WASHINGTON IRVING HS<br />

Manhattan 20<strong>10</strong><br />

78M M460 M374 GRAMMERCY ARTS HS<br />

Manhattan 20<strong>10</strong><br />

78M M465 M467 HS FOR LAW AND PUBLIC SERVICE<br />

Manhattan 2012<br />

78M M470 M470 LOUIS D. BRANDEIS HS<br />

Manhattan 20<strong>10</strong><br />

78M M475 HEALTH PROFESSIONS HS (OL STY)<br />

Manhattan 2012<br />

78M M477 M475 STUYVESANT HS<br />

Manhattan 2011<br />

78M M480 JULIA RICHMAN ED. COMPLEX<br />

Manhattan 2012<br />

78M M485 M485 FIORELLO LAGUARDIA HS<br />

Manhattan 2012<br />

78M M485 M485 FIORELLO LAGUARDIA HS<br />

Manhattan 2012<br />

78M M486 M529 J. K. ONASIS HS FOR INT CAREERS<br />

Manhattan 20<strong>10</strong><br />

78M M486 M529 J. K. ONASIS HS FOR INT CAREERS<br />

Manhattan 2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78M M501 M469 CHOIR ACAD OF HARLEM<br />

Manhattan 20<strong>10</strong><br />

78M M505 WEST SIDE ALT HS (OLD 179)<br />

Manhattan 2012<br />

78M M520 M520 MURRY BERGTRAUM HS (ECF)<br />

Manhattan 20<strong>10</strong><br />

78M M535 M296 HOSPITALITY MANAGEMENT HS<br />

Manhattan 2012<br />

78M M600 M600 FASHION INDUSTRIES VOC HS<br />

Manhattan 20<strong>10</strong><br />

78M M615 M376 NYC ISCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M615 M615 CHELSEA VOC HS<br />

Manhattan 20<strong>10</strong><br />

78M M641 CITY AS SCHOOL (OLD 95)<br />

Manhattan 2012<br />

78M M645 M655 LIFE SCIENCE SECONDARY SCHOOL<br />

Manhattan 20<strong>10</strong><br />

78M M646 M645 SCHOOL FOR COOP TECH. ED.<br />

Manhattan 20<strong>10</strong><br />

78M M646 M645 SCHOOL FOR COOP TECH. ED.<br />

Manhattan 2012<br />

78M M834 M544 INDEPENDENCE HS<br />

Manhattan 20<strong>10</strong><br />

78M M834 M400 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 20<strong>10</strong><br />

78M M834 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 2012<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES<br />

Manhattan 2012<br />

78M M894 M425 HS FOR LEADERSHIP & PUBLIC SERV<br />

Manhattan 20<strong>10</strong><br />

78M M897 M500 UNITY HS<br />

Manhattan 20<strong>10</strong><br />

78M M920 M570 SATELLITE ACADEMY<br />

Manhattan 20<strong>10</strong><br />

78M M970 M670 THURGOOD MARSHALL ACADEMY<br />

Manhattan 20<strong>10</strong><br />

78Q Q023 Q540 QUEENS ACADEMY HIGH SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q405 Q495 BAYSIDE HIGH SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q415 Q415 BENJAMIN N. CARDOZO HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q420 Q265 EXCELSIOR PREP HIGH SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q420 Q272 G. WASHINGTON CARVER HS FOR SCI.<br />

Queens<br />

20<strong>10</strong><br />

78Q Q420 Q248 QUEENS PREPARATORY ACADEMY<br />

Queens<br />

20<strong>10</strong><br />

78Q Q420 Q283 PREPARATORY ACADEMY FOR WRITERS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q435 Q435 MARTIN VAN BUREN HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q445 Q445 WILLIAM C. BRYANT HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q451 Q575 ACADEMY OF AMERICAN STUDIES<br />

Queens<br />

20<strong>10</strong><br />

78Q Q452 Q450 LONG ISLAND CITY HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q455 Q455 NEWTOWN HS<br />

Queens<br />

2012<br />

78Q Q460 Q460 FLUSHING HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q465 FAR ROCKAWAY HS<br />

Queens<br />

2012<br />

78Q Q470 Q325 HILLSIDE ACADEMY FOR ARTS AND LETTERS<br />

Queens<br />

2011<br />

78Q Q470 Q328 HIGH SCHOOL FOR COMMUNITY LEADERSHIP<br />

Queens<br />

2011<br />

78Q Q470 Q470 JAMAICA HS<br />

Queens<br />

2011<br />

78Q Q470 Q3<strong>10</strong> QUEENS COLLEGIATE SCHOOL<br />

Queens<br />

2011<br />

78Q Q475 Q475 RICHMOND HILL HS<br />

Queens<br />

2011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

New/Retrofit Telephone/Intercom Systems<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78Q Q485 Q485 GROVER CLEVELAND HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q505 Q505 HILLCREST HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q515 TOWNSEND HARRIS HS<br />

Queens<br />

2012<br />

78Q Q600 Q600 QUEENS VOC HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q620 Q620 THOMAS A. EDISON VOC HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q680 Q680 YOUNG WOMENS' LEADERSHIP SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q690 Q690 HS FOR LAW ENFORCEMENT<br />

Queens<br />

20<strong>10</strong><br />

78Q Q707 R. F. KENNEDY COMM. MIDDLE/HS<br />

Queens<br />

2012<br />

78Q Q774 Q687 QUEENS HS FOR THE SCIENCES<br />

Queens<br />

2012<br />

78Q Q798 Q580 BACCALAUREATE SCL FOR GLOBAL ED<br />

Queens<br />

2012<br />

78Q Q891 Q560 R. F. WAGNER SEC SCL ARTS & TECH<br />

Queens<br />

20<strong>10</strong><br />

78Q Q898 IDA B. WELLS FAMILY CENTER<br />

Queens<br />

2012<br />

78R R435 R440 NEW DORP HS<br />

Staten Island 20<strong>10</strong><br />

78R R440 R605 STATEN ISLAND TECHNICAL HS<br />

Staten Island 2012<br />

78R R445 R445 PORT RICHMOND HS<br />

Staten Island 20<strong>10</strong><br />

78R R450 R450 CURTIS HS<br />

Staten Island 20<strong>10</strong><br />

78R R455 R455 TOTTENVILLE HS<br />

Staten Island 2011<br />

78R R470 R470 CONCORD HS (OLD 12)<br />

Staten Island 20<strong>10</strong><br />

78R R600 R600 RALPH MCKEE VOC HS<br />

Staten Island 20<strong>10</strong><br />

78X X400 X403 BRONX INTERNATIONAL<br />

Bronx<br />

2012<br />

78X X401 X480 BRONX REGIONAL HS<br />

Bronx<br />

2012<br />

78X X420 JAMES MONROE CAMPUS<br />

Bronx<br />

2012<br />

78X X445 BRONX HS OF SCIENCE<br />

Bronx<br />

2012<br />

78X X450 X305 P N ACAD FOR ARCH & WORLD STUD<br />

Bronx<br />

2012<br />

78X X460 X505 HS OF LAW, GOV'T & JUSTICE<br />

Bronx<br />

2012<br />

78X X470 X473 MOTT HAVEN VILLAGE PREP<br />

Bronx<br />

2011<br />

78X X470 X495 UNIVERSITY HEIGHTS HS<br />

Bronx<br />

2011<br />

78X X650 X650 JANE ADDAMS HS<br />

Bronx<br />

2012<br />

78X X660 X660 GRACE H. DODGE VOC HS<br />

Bronx<br />

20<strong>10</strong><br />

78X X879 WINGS ACADEMY<br />

Bronx<br />

2012<br />

78X X953 M560 CITY<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

IP Surveillance Camera Installation<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

01 M060 J.H.S. 60<br />

Manhattan 2013<br />

01 M063 P.S. 63<br />

Manhattan 2013<br />

01 M<strong>14</strong>2 P.S. <strong>14</strong>2<br />

Manhattan 2013<br />

02 M011 M011 P.S. 11<br />

Manhattan 2012<br />

02 M040 M040 P.S. 40<br />

Manhattan 2012<br />

02 M070 I.S. 70<br />

Manhattan 2013<br />

02 M<strong>10</strong>4 M<strong>10</strong>4 I.S. <strong>10</strong>4<br />

Manhattan 20<strong>10</strong><br />

02 M167 M167 I.S. 167<br />

Manhattan 20<strong>10</strong><br />

02 M855 M416 ELEANOR ROOSEVELT HS<br />

Manhattan 2012<br />

03 M113 P.S. 241<br />

Manhattan 2012<br />

03 M118 M256 I.S. 256<br />

Manhattan 2011<br />

03 M<strong>14</strong>9 P.S. <strong>14</strong>9 (TANDEM M207)<br />

Manhattan 2012<br />

03 M163 P.S. 163<br />

Manhattan 2013<br />

03 M180 P.S. 180<br />

Manhattan 2013<br />

04 M007 M007 P.S. 7<br />

Manhattan 20<strong>10</strong><br />

04 M013 M013 I.S. 13<br />

Manhattan 20<strong>10</strong><br />

04 M045 M045 I.S. 45<br />

Manhattan 20<strong>10</strong><br />

04 M050 M050 P.S. 50 (UDC & ECF)<br />

Manhattan 2012<br />

04 M099 M224 I.S. 224<br />

Manhattan 20<strong>10</strong><br />

05 M092 M092 P.S. 92<br />

Manhattan 2011<br />

05 M194 P.S. 194<br />

Manhattan 2013<br />

06 M189 P.S. 189<br />

Manhattan 2013<br />

07 X001 X001 P.S. 1<br />

Bronx<br />

2012<br />

07 X029 X029 P.S. 29<br />

Bronx<br />

20<strong>10</strong><br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9<br />

Bronx<br />

2013<br />

08 X123 X123 I.S. 123<br />

Bronx<br />

20<strong>10</strong><br />

08 X131 I.S. 131<br />

Bronx<br />

2012<br />

09 X004 X004 P.S. 4<br />

Bronx<br />

20<strong>10</strong><br />

09 X055 P.S. 55<br />

Bronx<br />

2012<br />

09 X064 X064 P.S. 64<br />

Bronx<br />

2012<br />

09 X<strong>10</strong>4 P.S. 199<br />

Bronx<br />

2013<br />

09 X117 X117 I.S. 117<br />

Bronx<br />

2012<br />

09 X132 X132 P.S. 132<br />

Bronx<br />

20<strong>10</strong><br />

09 X229 X229 P.S. 230/I.S. 229 (UDC)<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X045 X045 I.S. 45<br />

Bronx<br />

20<strong>10</strong><br />

<strong>10</strong> X091 P.S. 91<br />

Bronx<br />

2013<br />

<strong>10</strong> X360 X360 P.S. 360<br />

Bronx<br />

2011<br />

11 X<strong>10</strong>8 X<strong>10</strong>8 P.S. <strong>10</strong>8<br />

Bronx<br />

2012


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

IP Surveillance Camera Installation<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

11 X127 X127 I.S. 127<br />

Bronx<br />

2011<br />

11 X135 X322 I.S. 322<br />

Bronx<br />

20<strong>10</strong><br />

11 X160 P.S. 160<br />

Bronx<br />

2013<br />

11 X194 X194 P.S./I.S. 194<br />

Bronx<br />

2012<br />

12 X061 X061 P.S. 61<br />

Bronx<br />

2012<br />

12 X066 X066 P.S. 66<br />

Bronx<br />

2012<br />

12 X067 X067 P.S. 67<br />

Bronx<br />

2012<br />

12 X098 I.S. 98<br />

Bronx<br />

2012<br />

13 K113 I.S. 113<br />

Brooklyn<br />

2012<br />

13 K117 K412 BROOKLYN COMM. HS OF COMM.<br />

Brooklyn<br />

20<strong>10</strong><br />

<strong>14</strong> K050 K050 J.H.S. 50<br />

Brooklyn<br />

2011<br />

<strong>14</strong> K318 I.S. 318<br />

Brooklyn<br />

2012<br />

15 K027 K027 P.S. 27<br />

Brooklyn<br />

2012<br />

15 K029 P.S. 29<br />

Brooklyn<br />

2013<br />

15 K088 I.S. 88<br />

Brooklyn<br />

2012<br />

15 K261 K261 P.S. 261<br />

Brooklyn<br />

2012<br />

16 K026 K026 P.S. 26<br />

Brooklyn<br />

20<strong>10</strong><br />

16 K308 K308 P.S. 308<br />

Brooklyn<br />

20<strong>10</strong><br />

16 K335 K335 P.S. 335<br />

Brooklyn<br />

2011<br />

17 K012 K012 P.S. 12<br />

Brooklyn<br />

2011<br />

17 K022 K022 P.S. 22<br />

Brooklyn<br />

20<strong>10</strong><br />

17 K061 K061 I.S. 61<br />

Brooklyn<br />

2012<br />

17 K167 K167 P.S. 167<br />

Brooklyn<br />

2011<br />

17 K391 K587 I.S. 587<br />

Brooklyn<br />

2011<br />

18 K219 P.S. 219<br />

Brooklyn<br />

2012<br />

18 K233 P.S. 233<br />

Brooklyn<br />

2012<br />

18 K272 P.S. 272<br />

Brooklyn<br />

2012<br />

18 K285 K285 I.S. 285<br />

Brooklyn<br />

20<strong>10</strong><br />

19 K202 P.S. 202<br />

Brooklyn<br />

2012<br />

20 K062 K062 I.S. 62<br />

Brooklyn<br />

20<strong>10</strong><br />

20 K112 K112 P.S. 112<br />

Brooklyn<br />

2011<br />

20 K180 K180 P.S. 180<br />

Brooklyn<br />

2012<br />

20 K223 K223 I.S. 223<br />

Brooklyn<br />

2011<br />

20 K3<strong>14</strong> K503 P.S. 503<br />

Brooklyn<br />

2011<br />

21 K<strong>10</strong>1 P.S. <strong>10</strong>1<br />

Brooklyn<br />

2013<br />

21 K303 I.S. 303<br />

Brooklyn<br />

2012<br />

22 K0<strong>14</strong> K0<strong>14</strong> I.S. <strong>14</strong><br />

Brooklyn<br />

20<strong>10</strong><br />

22 K078 K078 I.S. 78<br />

Brooklyn<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

IP Surveillance Camera Installation<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

22 K198 P.S. 198<br />

Brooklyn<br />

2012<br />

22 K269 P.S. 269<br />

Brooklyn<br />

2012<br />

22 K395 K<strong>10</strong>9 P.S. <strong>10</strong>9<br />

Brooklyn<br />

2011<br />

23 K041 K041 P.S. 41<br />

Brooklyn<br />

2011<br />

23 K055 K493 I.S. 493<br />

Brooklyn<br />

2012<br />

23 K178 K178 P.S. 178<br />

Brooklyn<br />

2012<br />

23 K284 K284 P.S. 284<br />

Brooklyn<br />

2011<br />

24 Q089 P.S. 89<br />

Queens<br />

2013<br />

24 Q093 I.S. 93<br />

Queens<br />

2013<br />

24 Q119 Q119 I.S. 119<br />

Queens<br />

2011<br />

24 Q<strong>14</strong>3 Q<strong>14</strong>3 P.S. <strong>14</strong>3<br />

Queens<br />

2012<br />

25 Q025 Q025 J.H.S. 25<br />

Queens<br />

20<strong>10</strong><br />

25 Q129 P.S. 129<br />

Queens<br />

2013<br />

25 Q193 P.S. 193<br />

Queens<br />

2013<br />

26 Q067 J.H.S. 67<br />

Queens<br />

2012<br />

27 Q062 Q062 P.S. 62<br />

Queens<br />

2012<br />

27 Q063 P.S. 63<br />

Queens<br />

2013<br />

27 Q<strong>10</strong>5 Q<strong>10</strong>5 P.S. <strong>10</strong>5<br />

Queens<br />

20<strong>10</strong><br />

27 Q155 P.S. 155<br />

Queens<br />

2013<br />

27 Q180 Q323 THE SCHOLARS ACADEMY<br />

Queens<br />

2012<br />

27 Q223 Q223 P.S. 223<br />

Queens<br />

2012<br />

28 Q040 Q040 P.S. 40<br />

Queens<br />

2011<br />

28 Q217 I.S. 217<br />

Queens<br />

2012<br />

29 Q138 P.S. 138<br />

Queens<br />

2013<br />

29 Q<strong>14</strong>7 Q<strong>14</strong>7 P.S. <strong>14</strong>7<br />

Queens<br />

2011<br />

29 Q156 P.S. 156<br />

Queens<br />

2013<br />

29 Q181 P.S. 181<br />

Queens<br />

2013<br />

29 Q238 I.S. 238<br />

Queens<br />

2012<br />

29 Q270 P.S. 270<br />

Queens<br />

2013<br />

30 Q111 Q111 P.S. 111<br />

Queens<br />

2011<br />

30 Q112 Q112 P.S. 112<br />

Queens<br />

2011<br />

31 R007 R007 I.S. 7<br />

Staten Island 20<strong>10</strong><br />

31 R018 R018 P.S. 18<br />

Staten Island 2011<br />

31 R019 R019 P.S. 19<br />

Staten Island 2012<br />

31 R022 R022 P.S. 22<br />

Staten Island 20<strong>10</strong><br />

31 R023 P.S. 23<br />

Staten Island 2013<br />

31 R042 R042 P.S. 42<br />

Staten Island 2011<br />

31 R045 P.S. 45<br />

Staten Island 2013


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

IP Surveillance Camera Installation<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

31 R051 R051 I.S. 51<br />

Staten Island 20<strong>10</strong><br />

31 R053 P.S. 53<br />

Staten Island 2013<br />

31 R880 R080 P.S. 80<br />

Staten Island 20<strong>10</strong><br />

32 K274 K274 P.S. 274<br />

Brooklyn<br />

2011<br />

75R R040 P.S. 373 (OLD P40)<br />

Staten Island 2013<br />

78K K175 K697 TEACHERS PREP (HS LVL)<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K4<strong>10</strong> K4<strong>10</strong> ABRAHAM LINCOLN HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K425 K425 JAMES MADISON HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K445 K445 NEW UTRECHT HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K485 K485 TELECOM. ARTS & TECH.<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K505 FRANKLIN D. ROOSEVELT HS<br />

Brooklyn<br />

2012<br />

78K K590 K590 MIDDLE COLLEGE HS<br />

Brooklyn<br />

2011<br />

78K K620 K620 WILLIAM E. GRADY VOC HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K819 EAST NY FAMILY ACADEMY<br />

Brooklyn<br />

2013<br />

78K K907 K568 BROWNSVILLE DIPLOMA PLUS HS<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K9<strong>14</strong> K670 BENJAMIN BANNEKER ACAD. (HS LVL)<br />

Brooklyn<br />

20<strong>10</strong><br />

78K K917 BKLYN COLL ACAD (BRIDGES TO K)<br />

Brooklyn<br />

2013<br />

78K K932 HIGH SCHOOL SUSPENSION CENTER<br />

Brooklyn<br />

2012<br />

78M M446 M448 UNIVERSITY NEIGHBORHOOD HS<br />

Manhattan 2012<br />

78M M451 M550 LIBERTY HS ACADEMY FOR NEWCOMERS<br />

Manhattan 2012<br />

78M M486 M529 J. K. ONASIS HS FOR INT CAREERS<br />

Manhattan 2012<br />

78M M5<strong>10</strong> M650 CASCADES CTR FOR TCHING & LNG<br />

Manhattan 2012<br />

78M M540 A. PHILLIP RANDOLPH HS<br />

Manhattan 2013<br />

78M M833 M489 HS FOR ECONOMICS & FINANCE<br />

Manhattan 2011<br />

78M M834 M400 HS FOR ENVIRONMENTAL STUDIES<br />

Manhattan 2011<br />

78M M883 M429 LEGACY HS FOR INTEGR. STUDIES<br />

Manhattan 20<strong>10</strong><br />

78M M894 M425 HS FOR LEADERSHIP & PUBLIC SERV<br />

Manhattan 2011<br />

78Q Q400 Q400 AUGUST MARTIN HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q420 Q265 EXCELSIOR PREP HIGH SCHOOL<br />

Queens<br />

20<strong>10</strong><br />

78Q Q452 Q450 LONG ISLAND CITY HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q475 Q475 RICHMOND HILL HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q505 Q505 HILLCREST HS<br />

Queens<br />

20<strong>10</strong><br />

78Q Q650 HS FOR CONST.TRADES,ENGG.,& ARCH<br />

Queens<br />

2012<br />

78Q Q680 Q896 YOUNG WOMENS' LEADERSHIP SCHOOL<br />

Queens<br />

2012<br />

78Q Q725 Q502 HS FOR INFORMATION TECH<br />

Queens<br />

20<strong>10</strong><br />

78X X362 X270 ACADEMY FOR SCHOLARSHIP AND ENTR<br />

Bronx<br />

2012<br />

78X X401 BRONX REGIONAL HS (OLD 133)<br />

Bronx<br />

2012<br />

78X X405 X405 HERBERT H. LEHMAN HS<br />

Bronx<br />

20<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

IP Surveillance Camera Installation<br />

District<br />

Building<br />

ID Org ID School Name Borough<br />

Constr.<br />

Start FY<br />

78X X878 FANNIE LOU HAMER FREEDOM HS<br />

Bronx<br />

2012


District Project #<br />

School<br />

Boro<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

L 02 DSF0000709405 PROJECT #5 M 98 May-13 Jun-<strong>14</strong> Jul-15 9.68 0.00<br />

8.31 1.37<br />

* 02 DSF0000687090 P.S. 59 (MEETH) M 374 May-09 Nov-<strong>10</strong> Sep-12 0.00 0.00<br />

0.00 0.00<br />

* 02 DSF0000687092 PS/IS 281 M 640 Apr-09 Jul-<strong>10</strong> Jul-13 <strong>10</strong>7.90 33.36 74.54 0.00<br />

02 DSF00004243<strong>14</strong> PROJECT #4 M 806 May-<strong>14</strong> Aug-15 Mar-18 <strong>10</strong>9.24 0.08<br />

2.02 <strong>10</strong>7.<strong>14</strong><br />

* 02 DSF0000688179 P.S. 51 M 321 Mar-09 Jul-<strong>10</strong> Jul-13 38.16 0.27 37.90 0.00<br />

* 02 DSF0000687091 P.S. 340 M 518 Jun-<strong>10</strong> Jul-12 May-<strong>14</strong> 112.97 63.28 49.69 0.00<br />

* 02 DSF0000417357 P.S. 343 M 712 Nov-11 Mar-13 Aug-15 77.<strong>10</strong> 0.00 71.42 5.68<br />

* L 02 DSF0000709406 P.S. 816 M 126 Jun-11 Jun-12 Sep-12 3.62 0.00<br />

3.62 0.00<br />

* 02 DSF00007<strong>10</strong>937 I.S/H.S. 868 M 307 Aug-11 Jun-12 Apr-15 52.50 0.01 49.56 2.93<br />

* 03 DSF0000730952 P.S./I.S. 342 (RIVERSIDE CENTER) M 692 Apr-11 Jul-<strong>14</strong> Sep-16 62.77 0.00<br />

4.65 58.13<br />

L 08 DSF0000752870 PROJECT #2 X 350 Apr-13 Jun-<strong>14</strong> Jun-16 9.<strong>10</strong> 0.00<br />

7.88 1.22<br />

08 DSF0000752871 PROJECT #1 X 350 Apr-13 Jun-<strong>14</strong> Jun-16 25.89 0.00 23.19 2.69<br />

* 09 DSF0000417427 IS 285 X 391 May-09 Jun-<strong>10</strong> May-13 54.47 0.18 54.29 0.00<br />

* <strong>10</strong> DSF0000752872 P.S. 56 ADDITION X 350 Oct-12 Oct-13 Jan-16 35.33 0.00 31.50 3.84<br />

L <strong>10</strong> DSF0000709407 PROJECT #2 X 416 May-13 Jun-<strong>14</strong> Jul-16 37.71 0.00 32.47 5.25<br />

* <strong>10</strong> DSF0000418128 PS/IS 177 X 640 Apr-09 Jun-<strong>10</strong> Mar-<strong>14</strong> 77.35 8.02 69.33 0.00<br />

* 11 DSF0000752490 P.S. 96 ADDITION X 408 May-12 Jul-13 Aug-15 43.36 0.06 38.86 4.43<br />

* 11 DSF0000665736 P.S. <strong>10</strong>6 ADDITION X 356 Jun-12 Jul-13 Sep-15 44.90 0.04 40.21 4.65<br />

11 DSF0000731123 PROJECT #1 X 333 Apr-13 Jun-<strong>14</strong> Aug-16 41.35 0.00 37.18 4.17<br />

* 11 DSF0000688281 PS 292 X 379 Jun-09 Mar-<strong>10</strong> Apr-13 49.87 3.64 46.23 0.00<br />

* L 11 DSF0000752873 P.S. 311 X 350 Dec-12 Dec-13 Sep-15 11.70 0.00 <strong>10</strong>.04 1.65<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

Needed to<br />

Complete


District Project #<br />

School<br />

Boro<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* L 11 DSF0000752874 P.S. 3<strong>14</strong> X 350 Nov-12 Sep-13 Sep-15 8.43 0.00<br />

7.26 1.17<br />

* 13 DSF0000687093 I.S. 611 K 333 May-12 Jul-13 Sep-15 27.17 0.04 24.31 2.83<br />

L <strong>14</strong> DSF0000687094 PROJECT #1 K 612 Jan-<strong>14</strong> Jul-15 Dec-17 61.27 0.04<br />

0.90 60.33<br />

15 DSF0000730949 PROJECT #1 K 482 Apr-13 Jun-<strong>14</strong> Aug-16 60.66 0.00 54.17 6.49<br />

* L 15 DSF0000687095 P.S. 333 K 332 Apr-<strong>10</strong> Jun-12 May-<strong>14</strong> 16.55 0.00 16.55 0.00<br />

* 15 DSF0000730968 P.S./I.S. 437 K 757 Feb-11 Jul-12 Apr-15 <strong>10</strong>6.18 0.<strong>14</strong> 98.05 7.98<br />

15 DSF0000488526 PROJECT #2 K 406 Apr-13 Jun-<strong>14</strong> Jul-16 51.12 0.07 45.92 5.13<br />

* L 15 DSF0000775561 P.S. 763 K 256 Nov-12 Jun-13 Sep-13 5.23 0.00<br />

5.23 0.00<br />

* 20 DSF0000417375 P.S. 170 ADDITION K 240 Jul-12 Jul-13 Aug-15 41.09 0.24 36.62 4.24<br />

20 DSF0000690222 PROJECT #1 K 640 Mar-13 Jun-<strong>14</strong> Jun-16 89.13 0.00 79.62 9.51<br />

* 20 DSF0000687<strong>10</strong>6 PS 3<strong>10</strong> THE SCHOOL FOR FUTURE<br />

LEADERS<br />

K<br />

367 Jan-09 Jun-<strong>10</strong> Aug-12<br />

* 20 DSF0000417409 P.S. 331 K 708 Mar-09 Jul-<strong>10</strong> May-13 84.31 13.15 71.15 0.00<br />

* L 20 DSF0000775562 P.S. 768 K 256 Nov-12 Oct-13 Jun-15 11.66 0.00 <strong>10</strong>.01 1.65<br />

20 DSF0000754571 PROJECT #5 K 161 May-13 Jun-<strong>14</strong> Sep-15 22.71 0.00 20.41 2.30<br />

* 22 DSF0000425868 PS/IS 338 K 757 May-<strong>10</strong> Jun-13 Jun-16 91.53 0.20 83.86 7.47<br />

* 22 DSF0000690224 P.S. 438 K 456 Dec-12 Mar-<strong>14</strong> Mar-17 53.57 0.00 47.83 5.73<br />

* 24 DSF0000417389 P.S. 87 ADDITION Q <strong>14</strong>0 Sep-<strong>10</strong> Apr-12 Sep-13 30.88 0.13 30.75 0.00<br />

L 24 DSF0000752881 PROJECT #1 Q 284 Apr-13 Jun-<strong>14</strong> Jun-16 25.75 0.00 22.11 3.64<br />

* 24 DSF0000687097 P.S. 287 Q 420 Apr-<strong>10</strong> Oct-11 Jun-13 57.22 0.00 57.22 0.00<br />

* 24 DSF00007<strong>10</strong>030 P.S. 290 Q 616 Mar-<strong>10</strong> Dec-11 Apr-<strong>14</strong> 76.02 0.00 76.02 0.00<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

44.83<br />

4.91<br />

39.92<br />

Needed to<br />

Complete<br />

0.00


District Project #<br />

School<br />

Boro<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* 24 DSF0000687098 P.S./ I.S. 298 Q 796 Mar-<strong>10</strong> Jul-13 Jul-16 86.45 0.00 77.17 9.29<br />

* 24 DSF0000687096 I.S. 311 Q 785 Feb-<strong>10</strong> Jun-13 Jun-16 79.87 0.03 73.48 6.36<br />

* 24 DSF00007<strong>10</strong>983 P.S. 313 Q 432 Sep-<strong>10</strong> Jun-12 Jul-<strong>14</strong> 67.57 0.00 67.57 0.00<br />

* 24 DSF0000690216 P.S. 315 Q 1,1<strong>10</strong> Sep-<strong>10</strong> Jun-12 Mar-15 <strong>10</strong>5.50 0.00 97.60 7.90<br />

* 24 DSF0000752883 P.S. 320 Q 472 Apr-12 Jun-13 Jun-15 67.49 0.00 62.37 5.12<br />

* L 24 DSF0000690227<br />

§ Phase 2<br />

P.S. 841 Q 0 Dec-12 Jun-13 Sep-13 9.12 0.00<br />

9.12 0.00<br />

* L 24 DSF0000775581<br />

§ Phase 1<br />

P.S. 841 Q 284 Apr-12 Jul-12 Sep-12 0.00 0.00<br />

0.00 0.00<br />

* 25 DSF0000488527 P.S. 29 Q 232 Feb-09 Apr-<strong>10</strong> Sep-12 30.05 0.61 29.44 0.00<br />

* 25 DSF0000752885 P.S. 163 ADDITION Q 350 Sep-12 Nov-13 Aug-16 44.83 0.00 40.03 4.80<br />

25 DSF0000752884 PROJECT #1 Q 400 Apr-13 Jun-<strong>14</strong> Jun-16 50.72 0.00 45.24 5.48<br />

26 DSF0000417403 PROJECT #1 Q 416 Apr-13 Jun-<strong>14</strong> Jul-16 58.06 0.07 51.80 6.19<br />

* 27 DSF0000423888 P.S. 316 Q 444 Feb-11 Jun-12 Jun-<strong>14</strong> 58.58 0.00 58.58 0.00<br />

27 DSF0000417420 PROJECT #4 Q 416 Apr-13 Jul-<strong>14</strong> Jul-16 57.27 4.35<br />

4.09 48.82<br />

* 28 DSF0000752886 P.S. 50 ADDITION Q 350 Nov-12 Jan-<strong>14</strong> Jun-16 38.83 0.00 34.59 4.24<br />

* 28 DSF0000417395 P.S./ I.S. 3<strong>14</strong> Q 833 Sep-<strong>10</strong> Jun-12 Mar-15 97.48 0.18 90.38 6.93<br />

* 29 DSF0000752431 P.S. 35 ADDITION Q 352 May-12 Jun-13 Jan-16 36.47 0.00 33.25 3.23<br />

* 29 DSF0000752887 P.S. 176 ADDITION Q 372 Sep-12 Dec-13 Sep-16 45.55 0.00 40.59 4.97<br />

* 29 DSF0000690225 P.S. 892 Q 379 Nov-11 Apr-13 Apr-15 28.82 0.00 27.23 1.59<br />

* 30 DSF0000775571 P.S. 11 ADDITION Q 350 Dec-12 Feb-<strong>14</strong> Jul-16 38.83 0.01 34.55 4.26<br />

* 30 DSF0000687<strong>10</strong>1 P.S. 70 ADDITION Q 508 Feb-11 Jun-12 Aug-<strong>14</strong> 59.<strong>14</strong> 0.00 56.79 2.35<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

Needed to<br />

Complete


District Project #<br />

School<br />

Boro<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* L 30 DSF0000688299<br />

§ Phase 1<br />

P.S. 280 Q 199 Aug-09 Apr-<strong>10</strong> Sep-<strong>10</strong> 11.39 0.04 11.34 0.00<br />

* L 30 DSF0000709439<br />

§ Phase 2<br />

P.S. 280 Q 341 Aug-09 Jun-<strong>10</strong> May-11 9.60 0.00<br />

9.60 0.00<br />

* 30 DSF0000622501 I.S. 297 Q 423 Apr-08 Feb-12 Apr-<strong>14</strong> 39.92 4.08 35.84 0.00<br />

L 30 DSF0000775572 PROJECT #6 Q 256 Mar-13 Apr-<strong>14</strong> Apr-15 25.09 0.00 21.54 3.55<br />

30 DSF0000752430 PROJECT #2 Q 248 Mar-13 Jun-<strong>14</strong> Dec-16 31.92 0.00 28.51 3.41<br />

* 30 DSF0000622568 PS/IS 312 Q 578 May-08 Feb-11 Jun-13 66.84 2.72 64.12 0.00<br />

* L 30 DSF0000687<strong>10</strong>2 P.S. 329 Q 342 Aug-11 Sep-12 Jul-13 13.89 0.00 13.89 0.00<br />

* 30 DSF0000687330 P.S. 339 Q 472 Apr-12 Jul-13 Jul-15 63.35 0.00 57.52 5.83<br />

* L 31 DSF0000687<strong>10</strong>4 P.S. 59 R 372 May-11 Jun-12 Jun-13 15.67 0.00 15.67 0.00<br />

* 31 DSF0000687<strong>10</strong>5 P.S. 62 R 444 Jan-11 Jul-12 May-15 <strong>10</strong>0.08 0.00 91.68 8.39<br />

* 31 DSF0000417400 P.S. 71 (PS 48) R 844 Oct-09 Jun-11 Jun-13 86.63 0.25 86.38 0.00<br />

L 31 DSF0000732426 PROJECT #1 R 44 Mar-13 Apr-<strong>14</strong> Jul-15 4.33 0.00<br />

3.72 0.61<br />

* 78K DSF0000622354 SPRING CREEK EDUCATIONAL CAMPUS K 1,202 Apr-08 Jul-09 Sep-12 <strong>10</strong>4.30 4.53 99.77 0.00<br />

* 78Q DSF0000622618 I.S./H.S. 404 Q 1,071 Apr-09 Jul-<strong>10</strong> Jun-13 85.87 0.12 85.75 0.00<br />

* L 78Q DSF00007<strong>10</strong>091 RICHMOND HILL HS ANNEX Q 402 May-<strong>10</strong> Nov-11 May-13 19.53 0.04 19.49 0.00<br />

78Q DSF0000752888 PROJECT #1 Q 8<strong>10</strong> Apr-13 Jun-<strong>14</strong> Jun-17 57.37 0.00 51.28 6.09<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

Needed to<br />

Complete


New York City Department of Education<br />

Proposed Five Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Replacement Projects<br />

(in millions)<br />

Actual /<br />

Funding<br />

Forecast Design Constr Est. Total Est. Previous Req'd Needed to<br />

District Project # School Boro Capacity Start Start Compl Cost Appropriations FY<strong>10</strong>-<strong>14</strong> Complete<br />

* 02 DSF00007<strong>10</strong>937 MANHATTAN HIGH SCHOOL<br />

M Replacement Aug-11 Jun-12 Apr-15 72.85 0.01 68.76 4.07<br />

* 02 DSF0000688179 P.S. 51<br />

M Replacement Mar-09 Jul-<strong>10</strong> Jul-13 39.22 0.28 38.94 0.00<br />

* L 02 DSF00007<strong>10</strong>330 I.S. 260 M Replacement Apr-<strong>10</strong> Jul-<strong>10</strong> Sep-<strong>10</strong> 6.58 0.00 6.58 0.00<br />

* L <strong>10</strong> DSF0000732170 P.S. 51 X Replacement Aug-11 Jun-12 Sep-<strong>14</strong> 8.00 0.00 7.73 0.27<br />

* L 29 DSF0000752868 EAGLE ACADEMY Q Replacement Mar-12 Jun-12 Sep-12 17.60 0.00 17.60 0.00<br />

* L 29 DSF0000754449 EAGLE ACADEMY Q Replacement Jul-12 Jan-13 Sep-13 8.93 0.00 8.93 0.00<br />

* L 33Q DSF0000754388 ADULT BASIC EDUCATION Q Replacement Sep-12 Apr-13 Aug-13 8.25 0.00 8.25 0.00<br />

* L 78K DSF0000544842 ALL CITY LEADERSHIP SCHOOL K Replacement Oct-07 Jun-<strong>10</strong> Jan-13 43.15 2.20 40.95 0.00<br />

* L 78M DSF0000622556 BROADWAY EDUCATION CAMPUS M Replacement Jun-09 Jun-<strong>10</strong> Jun-11 30.01 0.15 29.87 0.00<br />

* 78M DSF00007<strong>10</strong>361 BEACON HIGH SCHOOL<br />

M Replacement Feb-11 Jun-12 May-15 167.38 0.00 157.15 <strong>10</strong>.23<br />

* 78Q DSF0000622665 MIDDLE COLLEGE CAMPUS<br />

Q Replacement Nov-09 Jun-<strong>10</strong> Sep-12 82.65 13.06 69.58 0.00<br />

* L 78X DSF00007<strong>10</strong><strong>10</strong>7 SUSPENSION CENTER X Replacement Sep-<strong>10</strong> Aug-11 Jun-13 <strong>10</strong>.96 0.00 <strong>10</strong>.96 0.00<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

FY 20<strong>10</strong> - FY 20<strong>14</strong> Capacity Program<br />

Site Location<br />

DISTRICT SCHOOL BOROUGH LOCATION<br />

NEW CAPACITY<br />

2 P.S. 59 (MEETH) M 213 EAST 63RD STREET<br />

2 P.S./I.S. 281 M 425 EAST 35TH STREET<br />

2 P.S. 51 M 525 WEST 44TH STREET<br />

2 P.S. 340 M 590 6TH AVENUE<br />

2 P.S. 343 M 1 PECK SLIP<br />

2 P.S. 816 M 323 EAST 91ST STREET<br />

2 I.S./H.S. 868 M <strong>10</strong> EAST 15TH STREET<br />

3 P.S./I.S. 342 (RIVERSIDE CENTER)* M 315 WEST 61ST STREET<br />

9 I.S. 285 X 200 WEST 167TH STREET<br />

<strong>10</strong> P.S. 56 ADDITION X 341 EAST 207TH STREET<br />

<strong>10</strong> P.S./I.S. 177 X 3177 WEBSTER AVENUE<br />

11 P.S. 96 ADDITION X 650 WARING AVENUE<br />

11 P.S. <strong>10</strong>6 ADDITION X 2120 ST. RAYMOND AVENUE<br />

11 P.S. 292 X 800 LYDIG AVENUE<br />

11 P.S. 311 X 1684 WHITE PLAINS ROAD<br />

11 P.S. 3<strong>14</strong> X 4520 MATILDA AVENUE<br />

13 I.S. 611 K 60 WATER STREET<br />

15 P.S. 333 K 4222 4TH AVENUE<br />

15 P.S./I.S 437 K 701 CATON AVENUE<br />

15 P.S. 763 K 211 8TH STREET<br />

20 P.S. 170 ADDITION K 7<strong>10</strong>9 6TH AVENUE<br />

20 P.S. 3<strong>10</strong> THE SCHOOL FOR FUTURE LEADERS K 942 62ND STREET<br />

20 P.S. 331 K 7002 4TH AVENUE<br />

20 P.S. 768 K 7301 15TH AVENUE<br />

22 P.S./I.S 338 K 5<strong>10</strong> CONEY ISLAND AVENUE<br />

22 P.S. 438 K 1704-12 OCEAN AVENUE


New York City Department of Education<br />

FY 20<strong>10</strong> - FY 20<strong>14</strong> Capacity Program<br />

Site Location<br />

DISTRICT SCHOOL BOROUGH LOCATION<br />

24 P.S. 87 ADDITION Q 67-54 80TH STREET<br />

24 P.S. 287 Q 1<strong>10</strong>-08 NORTHERN BOULEVARD<br />

24 P.S. 290 Q 55-20 METROPOLITAN AVENUE<br />

24 P.S./I.S. 298 Q 50-51 98TH STREET<br />

24 I.S. 311 Q 97-11 44TH AVENUE<br />

24 P.S. 313 Q 45-46 42ND STREET<br />

24 P.S. 315 Q 96-18 43RD AVENUE<br />

24 P.S. 320 Q 360 SENECA AVENUE<br />

24 P.S. 841 Q 48-25 37TH STREET<br />

25 P.S. 29 ADDITION Q 125-<strong>10</strong> 23RD AVENUE<br />

25 P.S. 163 ADDITION Q 159-01 59TH AVENUE<br />

27 P.S. 316 Q 90-07 <strong>10</strong>1ST AVENUE<br />

28 P.S. 50 ADDITION Q <strong>14</strong>3-26 <strong>10</strong>1ST AVENUE<br />

28 P.S./I.S. 3<strong>14</strong> Q 88-08 164TH STREET<br />

29 P.S. 35 ADDITION Q 191-02 90TH AVENUE<br />

29 P.S. 176 ADDITION Q 120-45 235TH STREET<br />

29 P.S. 892 Q 199-<strong>10</strong> 112TH AVENUE<br />

30 P.S. 11 ADDITION Q 54-25 SKILLMAN AVENUE<br />

30 P.S. 70 ADDITION Q 30-45 42ND STREET<br />

30 P.S. 280 Q 34-20 94TH STREET<br />

30 I.S. 297 Q 74-03 34TH AVENUE<br />

30 P.S./I.S. 312 Q 46-08 5TH STREET<br />

30 P.S. 329 Q 26-25 97TH STREET<br />

30 P.S. 339 Q 57-02 TO 57-08 39TH AVENUE<br />

31 P.S. 59 R 300 RICHMOND TERRACE<br />

31 P.S. 62 R 644 BLOOMINGDALE ROAD<br />

31 P.S. 71 (P.S. 48) R <strong>10</strong>50 TARGEE STREET<br />

78K SPRING CREEK EDUCATIONAL CAMPUS K <strong>10</strong>65 ELTON STREET<br />

78Q I.S./H.S. 404 Q 1-50 51ST AVENUE<br />

78Q RICHMOND HILL H.S. ANNEX Q 94-25 117TH STREET


New York City Department of Education<br />

FY 20<strong>10</strong> - FY 20<strong>14</strong> Capacity Program<br />

Site Location<br />

DISTRICT SCHOOL BOROUGH LOCATION<br />

REPLACEMENTS<br />

2 MANHATTAN HIGH SCHOOL M 320 WEST 21ST STREET<br />

2 P.S 51 M 525 WEST 44TH STREET<br />

2 I.S. 260 M 425 WEST 33RD STREET<br />

<strong>10</strong> P.S. 51 X 695 EAST 182ND STREET<br />

29 EAGLE ACADEMY Q 171-<strong>10</strong> LINDEN BOULEVARD<br />

78Q ADULT BASIC EDUCATION Q 27-35 JACKSON AVENUE<br />

78K ALL CITY LEADERSHIP SCHOOL K 321 PALMETTO STREET<br />

78M BROADWAY EDUCATION CAMPUS M 26 BROADWAY<br />

78M BEACON HIGH SCHOOL M 521 WEST 43RD STREET<br />

78Q MIDDLE COLLEGE CAMPUS Q 45-35 VAN DAM STREET<br />

78X SUSPENSION CENTER X 1231 LAFAYETTE AVENUE<br />

* Projects funded for design only in this plan and construction in the next plan.


New York City Department of Education<br />

FY 2005 - FY 2009 Five Year Capital Plan<br />

Capacity in Process<br />

DISTRICT BUILDING NAME BOROUGH ADDRESS NUMBER OF SEATS OPENING YEAR<br />

15 P.S. 133 K 375 BUTLER STREET 609 * 2013<br />

TOTAL SEATS OPENING SEPTEMBER 2013 609<br />

*New seats created. Project also includes replacement seats


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

01 M056 J.H.S. 56 M Windows<br />

01 M061 P.S. 61 M Floors<br />

01 M064 P.S. 64 (OLD 71) M Flood Elimination<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong> M Gymnasium Upgrade<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong> M Reinforcing Support Elements<br />

02 M042 P.S. 42 M Electrical Systems<br />

02 M042 P.S. 42 M Floors<br />

02 M042 P.S. 42 M Interior Spaces<br />

02 M111 P.S. 111 M Heating Plant Upgrade<br />

02 M111 P.S. 111 M Climate Control<br />

02 M190 P.S. 290 M Roofs<br />

02 M190 P.S. 290 M Parapets<br />

02 M198 P.S. 198 M Low-Voltage Electrical Systems<br />

03 M044 I.S. 44 M Paved Area-Blacktop<br />

03 M044 I.S. 44 M Fencing<br />

03 M076 P.S. 76 M Gymnasium Upgrade<br />

03 M118 I.S. 118 M Windows<br />

03 M118 I.S. 118 M Flood Elimination<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Windows<br />

03 M165 P.S. 165 M IP Digital Video Surveillance<br />

04 M050 P.S. 50 (UDC & ECF) M Flood Elimination<br />

04 M117 J.H.S. 117 M IP Digital Video Surveillance<br />

05 M030 P.S. 30 M Windows<br />

05 M133 P.S. 133 M Auditorium Upgrade<br />

05 M175 P.S. 175 M Toilets-Students<br />

05 M194 P.S. 194 M Playground Redevelopment<br />

06 M005 P.S. 5 M Exterior Masonry<br />

06 M005 P.S. 5 M Interior Spaces<br />

06 M008 P.S. 8 M Paved Area-Concrete<br />

06 M128 P.S. 128 M Roofs<br />

06 M128 P.S. 128 M Exterior Masonry<br />

06 M128 P.S. 128 M Paved Area-Concrete


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

06 M128 P.S. 128 M Safety Systems<br />

06 M189 P.S. 189 M Toilets-Students<br />

06 M845 P.S. 98 MINISCHOOL M Windows<br />

07 X025 P.S. 25 X Paved Area-Blacktop<br />

07 X040 P.S. 220 X Gymnasium Upgrade<br />

07 X139 J.H.S. 222 X Paved Area-Blacktop<br />

07 X139 J.H.S. 222 X Low-Voltage Electrical Systems<br />

07 X161 P.S. 161 X Playground Redevelopment<br />

07 X807 DISTRICT OFFICE #7 (OLD 18) X Windows<br />

08 X0<strong>14</strong> P.S. <strong>14</strong> X Flood Elimination<br />

08 X072 P.S. 72 X Roofs<br />

08 X123 I.S. 123 X Exterior Masonry<br />

08 X123 I.S. 123 X Auditorium Upgrade<br />

08 X182 P.S. 182 X Playground Redevelopment<br />

09 X011 P.S. 11 X Fencing<br />

09 X028 P.S. 28 X Paved Area-Blacktop<br />

09 X028 P.S. 28 X Fencing<br />

09 X042 P.S. 42 X Flood Elimination<br />

09 X053 P.S. 53 X Technology<br />

09 X064 P.S. 64 X Auditorium Upgrade<br />

09 X090 P.S. 90 X Electrical Systems<br />

09 X<strong>14</strong>5 I.S. <strong>14</strong>5 X Windows<br />

09 X163 P.S. 163 X Windows<br />

09 X166 I.S. 166 X Roofs<br />

<strong>10</strong> X007 P.S. 7 X Toilets-Students<br />

<strong>10</strong> X023 P.S. 23 X Low-Voltage Electrical Systems<br />

<strong>10</strong> X024 P.S. 24 X Windows<br />

<strong>10</strong> X024 P.S. 24 X Auditorium Upgrade<br />

<strong>10</strong> X085 P.S. 85 X Windows<br />

<strong>10</strong> X118 I.S. 118 X Technology<br />

<strong>10</strong> X118 I.S. 118 X Technology<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Toilets-Students


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Gymnasium Upgrade<br />

<strong>10</strong> X205 P.S. 205A (ECF) X Auditorium Upgrade<br />

<strong>10</strong> X279 P.S. 279 X Gymnasium Upgrade<br />

11 X021 P.S. 21 X Playground Redevelopment<br />

11 X041 P.S. 41 X Auditorium Upgrade<br />

11 X089 P.S. 89 X IP Digital Video Surveillance<br />

11 X097 P.S. 97 X Auditorium Upgrade<br />

11 X<strong>10</strong>6 P.S. <strong>10</strong>6 X Auditorium Upgrade<br />

11 X<strong>10</strong>6 P.S. <strong>10</strong>6 X Playground Redevelopment<br />

11 X112 P.S. 112 X Electrical Systems<br />

11 X113 I.S. 113 X Electrical Systems<br />

11 X121 P.S. 121 X Playground Redevelopment<br />

11 X121 P.S. 121 X Parapets<br />

11 X121 P.S. 121 X Windows<br />

11 X<strong>14</strong>2 I.S. <strong>14</strong>2 X Flood Elimination<br />

11 X<strong>14</strong>2 I.S. <strong>14</strong>2 X Exterior Masonry<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X TCU Removal and Playground Redevelopment<br />

12 X044 P.S. 44 X Toilets-Students<br />

12 X057 P.S. 57 X Low-Voltage Electrical Systems<br />

12 X061 P.S. 61 X Paved Area-Blacktop<br />

12 X067 P.S. 67 X Flood Elimination<br />

12 X092 P.S. 92 X Auditorium Upgrade<br />

12 X<strong>10</strong>2 P.S. <strong>10</strong>2 X Parapets<br />

12 X<strong>10</strong>2 P.S. <strong>10</strong>2 X Exterior Masonry<br />

12 X116 I.S. 216 X Paved Area-Blacktop<br />

12 X198 P.S. 198 X Paved Area-Blacktop<br />

13 K113 I.S. 113 K Walk In Freezer Replacement<br />

13 K265 I.S. 265 K Walk In Freezer Replacement<br />

13 K853 P.S. 93 AX (ECF-BD STUY ECC2) K Electrical Systems<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Windows<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Auditorium Upgrade<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

<strong>14</strong> K033 I.S. 33 K Walk In Freezer Replacement<br />

<strong>14</strong> K033 I.S. 33 K IP Digital Video Surveillance<br />

<strong>14</strong> K049 I.S. 49 K Low-Voltage Electrical Systems<br />

<strong>14</strong> K071 I.S. 71 K Science Lab Upgrades<br />

<strong>14</strong> K132 P.S. 132 K Exit Stairs<br />

<strong>14</strong> K157 P.S. 157 K Floors<br />

<strong>14</strong> K157 P.S. 157 K Auditorium Upgrade<br />

<strong>14</strong> K318 I.S. 318 K Paved Area-Blacktop<br />

<strong>14</strong> K318 I.S. 318 K Walk In Freezer Replacement<br />

15 K088 I.S. 88 K Walk In Freezer Replacement<br />

15 K<strong>10</strong>7 P.S. <strong>10</strong>7 K Flood Elimination<br />

15 K<strong>10</strong>7 P.S. <strong>10</strong>7 K Windows<br />

15 K169 P.S. 169 K Roofs<br />

15 K169 P.S. 169 K Parapets<br />

15 K169 P.S. 169 K Exterior Masonry<br />

15 K293 J.H.S. 293 K Walk In Freezer Replacement<br />

15 K321 P.S. 321 K Low-Voltage Electrical Systems<br />

16 K005 P.S. 5 K Gymnasium Upgrade<br />

16 K081 P.S. 81 K Gymnasium Upgrade<br />

16 K335 P.S. 335 K Toilets-Students<br />

17 K061 I.S. 61 K Low-Voltage Electrical Systems<br />

17 K091 P.S. 91 K Toilets-Students<br />

17 K138 P.S. 138 K Paved Area-Concrete<br />

17 K138 P.S. 138 K Gymnasium Upgrade<br />

17 K189 P.S. 189 K Exterior Masonry<br />

17 K189 P.S. 189 K Floors<br />

17 K189 P.S. 189 K Auditorium Upgrade<br />

17 K2<strong>10</strong> I.S. 394 K Playground Redevelopment<br />

17 K221 P.S. 221 K Roofs<br />

17 K221 P.S. 221 K Parapets<br />

17 K221 P.S. 221 K Exterior Masonry<br />

17 K221 P.S. 221 K Floors


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

17 K391 I.S. 391 K Windows<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K Electrical Systems<br />

18 K219 P.S. 219 K Auditorium Upgrade<br />

18 K219 P.S. 219 K Toilets-Students<br />

18 K232 I.S. 232 K Electrical Systems<br />

18 K233 P.S. 233 K Auditorium Upgrade<br />

18 K242 P.S. 235 ANNEX K Parapets<br />

18 K242 P.S. 235 ANNEX K Exterior Masonry<br />

18 K242 P.S. 235 ANNEX K Flood Elimination<br />

18 K242 P.S. 235 ANNEX K Technology<br />

18 K242 P.S. 235 ANNEX K Technology<br />

18 K272 P.S. 272 K Auditorium Upgrade<br />

18 K279 P.S. 279 K Windows<br />

18 K279 P.S. 279 K Flood Elimination<br />

19 K065 P.S. 65 K Paved Area-Blacktop<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Flood Elimination<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Roofs<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Exterior Masonry<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Electrical Systems<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Floors<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Fencing<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Cafeteria / Multipurpose Room Upgrade<br />

19 K174 P.S. 174 K Paved Area-Blacktop<br />

19 K213 P.S. 213 K Roofs<br />

19 K213 P.S. 213 K Parapets<br />

19 K213 P.S. 213 K Exterior Masonry<br />

19 K213 P.S. 213 K Floors<br />

19 K213 P.S. 213 K Paved Area-Blacktop<br />

19 K213 P.S. 213 K Paved Area-Concrete<br />

19 K213 P.S. 213 K Fencing<br />

19 K213 P.S. 213 K Low-Voltage Electrical Systems<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Auditorium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

19 K218 I.S. 218 K Paved Area-Concrete<br />

19 K224 P.S. 224 K Roofs<br />

19 K224 P.S. 224 K Parapets<br />

19 K224 P.S. 224 K Exterior Masonry<br />

19 K224 P.S. 224 K Flood Elimination<br />

19 K273 P.S. 273 K Playground Redevelopment<br />

19 K273 P.S. 273 K Floors<br />

19 K345 P.S. 345 K Paved Area-Blacktop<br />

20 K062 I.S. 62 K Playground Redevelopment<br />

20 K186 P.S. 186 K Flood Elimination<br />

20 K186 P.S. 186 K Exterior Masonry<br />

20 K205 P.S. 205 K Auditorium Upgrade<br />

20 K223 I.S. 223 K Technology<br />

20 K223 I.S. 223 K Technology<br />

20 K223 I.S. 223 K Technology<br />

20 K223 I.S. 223 K Technology<br />

20 K227 I.S. 227 K Technology<br />

20 K227 I.S. 227 K Technology<br />

21 K096 I.S. 96 K Exterior Masonry<br />

21 K177 P.S. 177 K Exterior Masonry<br />

21 K177 P.S. 177 K Floors<br />

21 K209 P.S. 209 K Toilets-Students<br />

21 K209 P.S. 209 K Auditorium Upgrade<br />

21 K228 I.S. 228 K Parapets<br />

21 K228 I.S. 228 K Exterior Masonry<br />

21 K288 P.S. 288 K Exterior Masonry<br />

21 K288 P.S. 288 K Electrical Systems<br />

21 K303 I.S. 303 K Windows<br />

21 K303 I.S. 303 K Exterior Masonry<br />

22 K119 P.S. 119 K Parapets<br />

22 K119 P.S. 119 K Exterior Masonry<br />

22 K119 P.S. 119 K Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

22 K119 P.S. 119 K Floors<br />

22 K193 P.S. 193 K Exterior Masonry<br />

22 K194 P.S. 194 K Paved Area-Blacktop<br />

22 K197 P.S. 197 K Auditorium Upgrade<br />

22 K197 P.S. 197 K Technology<br />

22 K197 P.S. 197 K Technology<br />

22 K234 I.S. 234 K Toilets-Students<br />

23 K165 P.S. 165 K Flood Elimination<br />

23 K165 P.S. 165 K Roofs<br />

23 K165 P.S. 165 K Parapets<br />

23 K165 P.S. 165 K Exterior Masonry<br />

23 K165 P.S. 165 K Safety Systems<br />

23 K178 P.S. 178 K Paved Area-Blacktop<br />

23 K178 P.S. 178 K Fencing<br />

23 K183 P.S. 183 K Floors<br />

23 K263 P.S./I.S. 323 K Technology<br />

23 K275 I.S. 275 K Accessibility<br />

23 K275 I.S. 275 K IP Digital Video Surveillance<br />

23 K284 P.S. 284 K Flood Elimination<br />

23 K298 P.S. 298 K Roofs<br />

23 K298 P.S. 298 K Windows<br />

23 K298 P.S. 298 K Exterior Masonry<br />

24 Q061 I.S. 61 Q Walk In Freezer Replacement<br />

24 Q073 I.S. 73 Q Windows<br />

24 Q087 P.S. 87 Q Flood Elimination<br />

24 Q089 P.S. 89 Q Technology<br />

25 Q022 P.S. 22 Q Gymnasium Upgrade<br />

25 Q163 P.S. 163 Q Gymnasium Upgrade<br />

25 Q168 J.H.S. 168 Q Parapets<br />

25 Q168 J.H.S. 168 Q Exterior Masonry<br />

25 Q168 J.H.S. 168 Q Electrical Systems<br />

25 Q184 P.S. 184 Q Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

25 Q189 J.H.S. 189 Q Walk In Freezer Replacement<br />

25 Q194 J.H.S. 194 Q Windows<br />

25 Q194 J.H.S. 194 Q Walk In Freezer Replacement<br />

26 Q018 P.S. 18 Q Technology<br />

26 Q026 P.S. 26 Q Windows<br />

26 Q026 P.S. 26 Q Flood Elimination<br />

26 Q098 P.S. 98 Q Gymnasium Upgrade<br />

26 Q158 J.H.S. 158 Q Exterior Masonry<br />

26 Q162 P.S. 162 Q Electrical Systems<br />

26 Q179 P.S. 179 Q Parapets<br />

26 Q179 P.S. 179 Q Exterior Masonry<br />

26 Q179 P.S. 179 Q Electrical Systems<br />

26 Q213 P.S. 213 Q Floors<br />

26 Q216 J.H.S. 216 Q Floors<br />

26 Q266 P.S./I.S. 266 Q IP Digital Video Surveillance<br />

27 Q043 P.S. 43 Q Playground Redevelopment<br />

27 Q043 P.S. 43 Q Technology<br />

27 Q043 P.S. 43 Q Technology<br />

27 Q053 I.S. 53 Q Low-Voltage Electrical Systems<br />

27 Q056 P.S. 56 (OLD R HILL AX) Q Auditorium Upgrade<br />

27 Q066 P.S. 66 Q Reinforcing Cinder Concrete Slabs<br />

27 Q097 P.S. 97 Q Playground Redevelopment<br />

27 Q<strong>10</strong>5 P.S. <strong>10</strong>5 Q Windows<br />

27 Q123 P.S. 123 Q Playground Redevelopment<br />

27 Q123 P.S. 123 Q Technology<br />

27 Q124 P.S. 124 Q Floors<br />

27 Q183 P.S. 183 Q Paved Area-Blacktop<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Playground Redevelopment<br />

27 Q226 I.S. 226 Q Auditorium Upgrade<br />

27 Q232 P.S. 232 Q Parapets<br />

27 Q232 P.S. 232 Q Windows<br />

27 Q232 P.S. 232 Q Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

27 Q860 P.S. 60 MINISCHOOL Q Exterior Masonry<br />

27 Q860 P.S. 60 MINISCHOOL Q Electrical Systems<br />

28 Q072 J.H.S. 72 Q Accessibility<br />

28 Q174 P.S. 174 Q Flood Elimination<br />

28 Q220 P.S. 220 Q Roofs<br />

28 Q220 P.S. 220 Q Windows<br />

28 Q220 P.S. 220 Q Exterior Masonry<br />

29 Q037 P.S. 37 Q Auditorium Upgrade<br />

29 Q118 P.S. 118 Q Parapets<br />

29 Q118 P.S. 118 Q Windows<br />

29 Q118 P.S. 118 Q Exterior Masonry<br />

29 Q118 P.S. 118 Q Electrical Systems<br />

29 Q118 P.S. 118 Q Floors<br />

29 Q118 P.S. 118 Q Auditorium Upgrade<br />

29 Q132 P.S. 132 Q Safety Systems<br />

29 Q181 P.S. 181 Q Auditorium Upgrade<br />

29 Q208 P.S./I.S. 208 Q IP Digital Video Surveillance<br />

30 Q011 P.S. 11 Q Parapets<br />

30 Q011 P.S. 11 Q Exterior Masonry<br />

30 Q070 P.S. 70 Q Exterior Masonry<br />

30 Q126 I.S. 126 Q Walk In Freezer Replacement<br />

30 Q127 P.S. 127 Q Electrical Systems<br />

30 Q127 P.S. 127 Q Heating Plant Upgrade<br />

30 Q127 P.S. 127 Q Floors<br />

30 Q<strong>14</strong>8 P.S. <strong>14</strong>8 Q Paved Area-Blacktop<br />

30 Q<strong>14</strong>9 P.S. <strong>14</strong>9 Q Technology<br />

30 Q227 I.S. 227 Q Heating Plant Upgrade<br />

30 Q227 I.S. 227 Q Climate Control<br />

31 R004 P.S. 4 R Auditorium Upgrade<br />

31 R005 P.S. 5 R Flood Elimination<br />

31 R005 P.S. 5 R Windows<br />

31 R005 P.S. 5 R Paved Area-Blacktop


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

31 R007 I.S. 7 R Windows<br />

31 R007 I.S. 7 R Paved Area-Blacktop<br />

31 R026 P.S. 26 R Windows<br />

31 R038 P.S. 38 R Windows<br />

31 R038 P.S. 38 R Paved Area-Concrete<br />

31 R039 P.S. 39 R Paved Area-Blacktop<br />

31 R039 P.S. 39 R Auditorium Upgrade<br />

31 R057 P.S. 57 R Playground Redevelopment<br />

31 R061 I.S. 61 R Auditorium Upgrade<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B) R Paved Area-Blacktop<br />

32 K111 I.S. 111 K Walk In Freezer Replacement<br />

32 K111 I.S. 111 K Technology<br />

32 K151 P.S. 151 K Low-Voltage Electrical Systems<br />

32 K383 I.S. 383 K Room Conversions/Partitioning<br />

32 K384 P.S. 384 K Low-Voltage Electrical Systems<br />

32 K876 P.S. 274 MINISCHOOL K Windows<br />

32 K876 P.S. 274 MINISCHOOL K Exterior Masonry<br />

32 K876 P.S. 274 MINISCHOOL K Electrical Systems<br />

32 K876 P.S. 274 MINISCHOOL K Safety Systems<br />

75K K085 P.S. 753 (OLD P85/STERLING HS) K Parapets<br />

75K K085 P.S. 753 (OLD P85/STERLING HS) K Windows<br />

75K K370 P.S. 370 K Playground Redevelopment<br />

75K K853 P.S. 93 AX (ECF-BD STUY ECC2) K Low-Voltage Electrical Systems<br />

75M M751 P.S. 751 (CAR.DEV/OLD 25) M Auditorium Upgrade<br />

75R R025 P.S. 25 ANNEX (OLD 4) R Auditorium / Multipurpose Room Upgrade<br />

75R R040 P.S. 373 (OLD P40) R Flood Elimination<br />

75R R722 P.S. 722 (OTC) R Paved Area-Blacktop<br />

75X X012 P.S. 12 X Paved Area-Blacktop<br />

75X X012 P.S. 12 X Fencing<br />

75X X084 P.S. 811 (OLD I84) X Electrical Systems<br />

75X X136 P.S. 186 (OLD J136) X Playground Redevelopment<br />

78K K400 LAFAYETTE HS K Toilets-Students


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Floors<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Toilets-Students<br />

78K K415 SAMUEL J. TILDEN HS K Auditorium Upgrade<br />

78K K420 FRANKLIN K. LANE HS K Auditorium Upgrade<br />

78K K425 JAMES MADISON HS K Roofs<br />

78K K425 JAMES MADISON HS K Parapets<br />

78K K425 JAMES MADISON HS K Windows<br />

78K K425 JAMES MADISON HS K Exterior Masonry<br />

78K K425 JAMES MADISON HS K Interior Spaces<br />

78K K425 JAMES MADISON HS K Toilets-Students<br />

78K K430 BROOKLYN TECH HS K Toilets-Students<br />

78K K430 BROOKLYN TECH HS K Low-Voltage Electrical Systems<br />

78K K440 PROSPECT HEIGHTS HS K Paved Area-Concrete<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Technology<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Technology<br />

78K K590 MIDDLE COLLEGE HS K Science Lab Upgrades<br />

78K K625 ROBESON HS COMP&BUS TC (A HML) K Flood Elimination<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Technology<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Technology<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Technology<br />

78K K721 BROOKLYN STUDIO (TANDEM K128) K Toilets-Students<br />

78K K781 WEST BROOKLYN COMMUNITY HS K Windows<br />

78K K781 WEST BROOKLYN COMMUNITY HS K Exterior Masonry<br />

78K K781 WEST BROOKLYN COMMUNITY HS K Flood Elimination<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Toilets-Students<br />

78M M136 I.S. 136 M Auditorium Upgrade<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M Technology<br />

78M M445 SEWARD PARK HS M Toilets-Students<br />

78M M460 WASHINGTON IRVING HS M Low-Voltage Electrical Systems<br />

78M M475 HEALTH PROFESSIONS HS (OL STY) M Reinforcing Support Elements<br />

78M M486 J. K. ONASSIS HS FOR INT CAREERS M Gymnasium Upgrade<br />

78M M535 PARK WEST HS (ECF) M Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

PROJECTS ADVANCED TO FY2009<br />

District Bld ID School Borough Program Category<br />

78M M535 PARK WEST HS (ECF) M Roofs<br />

78M M535 PARK WEST HS (ECF) M Exterior Masonry<br />

78M M535 PARK WEST HS (ECF) M Electrical Systems<br />

78M M535 PARK WEST HS (ECF) M Paved Area-Concrete<br />

78M M535 PARK WEST HS (ECF) M Cafeteria / Multipurpose Room Upgrade<br />

78M M535 PARK WEST HS (ECF) M Interior Spaces<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Roofs<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Windows<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Exterior Masonry<br />

78M M641 CITY-AS-SCHOOL (OLD 95) M Flood Elimination<br />

78M M911 HARLEM RENAISSANCE HS (OLD M24) M Technology<br />

78Q Q400 AUGUST MARTIN HS Q Auditorium Upgrade<br />

78Q Q425 JOHN BOWNE HS Q Low-Voltage Electrical Systems<br />

78Q Q430 FRANCIS LEWIS HS Q Walk In Freezer Replacement<br />

78Q Q440 FOREST HILLS HS Q Exterior Masonry<br />

78Q Q440 FOREST HILLS HS Q Walk In Freezer Replacement<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Reinforcing Cinder Concrete Slabs<br />

78Q Q455 NEWTOWN HS Q Auditorium Upgrade<br />

78Q Q460 FLUSHING HS Q Walk In Freezer Replacement<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Auditorium Upgrade<br />

78Q Q505 HILLCREST HS Q Gymnasium Upgrade<br />

78Q Q566 QNS HS OF TEACH., LIB. ARTS&SCI Q IP Digital Video Surveillance<br />

78Q Q595 AUX. SERV. - JAMAICA LEARN CT Q Reinforcing Cinder Concrete Slabs<br />

78R R445 PORT RICHMOND HS R Flood Elimination<br />

78R R445 PORT RICHMOND HS R Windows<br />

78R R455 TOTTENVILLE HS R Floors<br />

78R R455 TOTTENVILLE HS R Reinforcing Cinder Concrete Slabs<br />

78X X405 HERBERT H. LEHMAN HS X Electrical Systems<br />

78X X4<strong>10</strong> WILLIAM H. TAFT HS X Reinforcing Support Elements<br />

78X X420 JAMES MONROE CAMPUS X Flood Elimination<br />

78X X450 ADLAI E. STEVENSON HS X Flood Elimination<br />

78X X600 ALFRED E. SMITH HS X Paved Area-Concrete


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

01 M015 P.S. 15 M Classroom Connectivity<br />

01 M015 P.S. 15 M Classroom Connectivity<br />

01 M015 P.S. 15 M Low-Voltage Electrical Systems<br />

01 M015 P.S. 15 M New/Retrofit Telephone/Intercom System<br />

01 M019 P.S. 19 M Classroom Connectivity<br />

01 M019 P.S. 19 M New/Retrofit Telephone/Intercom System<br />

01 M020 P.S. 20 M Classroom Connectivity<br />

01 M022 N.E.S.T (OLD J22) M Classroom Connectivity<br />

01 M022 N.E.S.T (OLD J22) M Room Conversions/Partitioning<br />

01 M022 N.E.S.T (OLD J22) M Walk In Freezer Replacement<br />

01 M025 J.H.S. 25 M Classroom Connectivity<br />

01 M025 J.H.S. 25 M Classroom Connectivity<br />

01 M025 J.H.S. 25 M Classroom Connectivity<br />

01 M025 J.H.S. 25 M Science Lab Upgrades<br />

01 M034 P.S. 34 M Classroom Connectivity<br />

01 M034 P.S. 34 M Lighting Fixtures<br />

01 M034 P.S. 34 M New/Retrofit Telephone/Intercom System<br />

01 M034 P.S. 34 M Safety Systems<br />

01 M056 J.H.S. 56 M Classroom Connectivity<br />

01 M056 J.H.S. 56 M Classroom Connectivity<br />

01 M056 J.H.S. 56 M Classroom Connectivity<br />

01 M056 J.H.S. 56 M Emergency Stabilization<br />

01 M056 J.H.S. 56 M Room Conversions/Partitioning<br />

01 M056 J.H.S. 56 M Technology<br />

01 M056 J.H.S. 56 M Technology<br />

01 M060 J.H.S. 60 M Classroom Connectivity<br />

01 M060 J.H.S. 60 M IP Digital Video Surveillance<br />

01 M060 J.H.S. 60 M New/Retrofit Telephone/Intercom System<br />

01 M061 P.S. 61 M Classroom Connectivity<br />

01 M061 P.S. 61 M Domestic Piping<br />

01 M061 P.S. 61 M Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

01 M061 P.S. 61 M Low-Voltage Electrical Systems<br />

01 M061 P.S. 61 M Parapets<br />

01 M061 P.S. 61 M Windows<br />

01 M063 P.S. 63 M Classroom Connectivity<br />

01 M063 P.S. 63 M IP Digital Video Surveillance<br />

01 M063 P.S. 63 M New/Retrofit Telephone/Intercom System<br />

01 M063 P.S. 63 M Parapets<br />

01 M064 P.S. 64 (OLD 71) M Classroom Connectivity<br />

01 M064 P.S. 64 (OLD 71) M Classroom Connectivity<br />

01 M064 P.S. 64 (OLD 71) M New/Retrofit Telephone/Intercom System<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong> M Classroom Connectivity<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong> M Floors<br />

01 M1<strong>10</strong> P.S. 1<strong>10</strong> M New/Retrofit Telephone/Intercom System<br />

01 M134 P.S. 134 M Classroom Connectivity<br />

01 M137 P.S. 137 M Classroom Connectivity<br />

01 M137 P.S. 137 M Parapets<br />

01 M137 P.S. 137 M Roofs<br />

01 M<strong>14</strong>0 P.S. <strong>14</strong>0 M Classroom Connectivity<br />

01 M<strong>14</strong>0 P.S. <strong>14</strong>0 M New/Retrofit Telephone/Intercom System<br />

01 M<strong>14</strong>2 P.S. <strong>14</strong>2 M Classroom Connectivity<br />

01 M<strong>14</strong>2 P.S. <strong>14</strong>2 M Classroom Connectivity<br />

01 M<strong>14</strong>2 P.S. <strong>14</strong>2 M IP Digital Video Surveillance<br />

01 M188 P.S. 188 M Classroom Connectivity<br />

01 M188 P.S. 188 M Classroom Connectivity<br />

01 M188 P.S. 188 M Parapets<br />

01 M188 P.S. 188 M Roofs<br />

01 M188 P.S. 188 M Room Conversions/Partitioning<br />

01 M188 P.S. 188 M Windows<br />

02 M001 P.S. 1 M Classroom Connectivity<br />

02 M001 P.S. 1 M Domestic Piping<br />

02 M001 P.S. 1 M Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

02 M001 P.S. 1 M Library Upgrades<br />

02 M001 P.S. 1 M Low-Voltage Electrical Systems<br />

02 M001 P.S. 1 M New/Retrofit Telephone/Intercom System<br />

02 M002 P.S. 2 M Classroom Connectivity<br />

02 M002 P.S. 2 M Classroom Connectivity<br />

02 M003 P.S. 3 M Classroom Connectivity<br />

02 M003 P.S. 3 M Classroom Connectivity<br />

02 M003 P.S. 3 M Exterior Masonry<br />

02 M003 P.S. 3 M Roofs<br />

02 M003 P.S. 3 M Windows<br />

02 M006 P.S. 6 M Classroom Connectivity<br />

02 M006 P.S. 6 M Domestic Piping<br />

02 M011 P.S. 11 M Classroom Connectivity<br />

02 M011 P.S. 11 M Classroom Connectivity<br />

02 M011 P.S. 11 M IP Digital Video Surveillance<br />

02 M011 P.S. 11 M Low-Voltage Electrical Systems<br />

02 M017 I.S. 17 M Classroom Connectivity<br />

02 M017 I.S. 17 M Classroom Connectivity<br />

02 M017 I.S. 17 M Roofs<br />

02 M033 P.S. 33 M Classroom Connectivity<br />

02 M033 P.S. 33 M New/Retrofit Telephone/Intercom System<br />

02 M040 P.S. 40 M Classroom Connectivity<br />

02 M040 P.S. 40 M Classroom Connectivity<br />

02 M040 P.S. 40 M Classroom Connectivity<br />

02 M040 P.S. 40 M Classroom Connectivity<br />

02 M040 P.S. 40 M Flood Elimination<br />

02 M040 P.S. 40 M IP Digital Video Surveillance<br />

02 M040 P.S. 40 M New/Retrofit Telephone/Intercom System<br />

02 M040 P.S. 40 M Parapets<br />

02 M040 P.S. 40 M Roofs<br />

02 M041 P.S. 41 M Auditorium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

02 M041 P.S. 41 M Classroom Connectivity<br />

02 M041 P.S. 41 M Classroom Connectivity<br />

02 M041 P.S. 41 M Electrical Systems<br />

02 M041 P.S. 41 M Exterior Masonry<br />

02 M041 P.S. 41 M New/Retrofit Telephone/Intercom System<br />

02 M041 P.S. 41 M Parapets<br />

02 M041 P.S. 41 M Windows<br />

02 M042 P.S. 42 M Classroom Connectivity<br />

02 M042 P.S. 42 M Lighting Fixtures<br />

02 M042 P.S. 42 M Lighting Fixtures<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M Auditorium Upgrade<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M Classroom Connectivity<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M Room Conversions/Partitioning<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M School Improvement and Restructuring<br />

02 M051 P.S. 51 M Classroom Connectivity<br />

02 M051 P.S. 51 M IP Digital Video Surveillance<br />

02 M051 P.S. 51 M New/Retrofit Telephone/Intercom System<br />

02 M059 P.S. 59 (TANDEM A&D HS) M Classroom Connectivity<br />

02 M070 I.S. 70 M Exterior Masonry<br />

02 M070 I.S. 70 M IP Digital Video Surveillance<br />

02 M070 I.S. 70 M New/Retrofit Telephone/Intercom System<br />

02 M070 I.S. 70 M Parapets<br />

02 M070 I.S. 70 M Roofs<br />

02 M070 I.S. 70 M Technology<br />

02 M070 I.S. 70 M Walk In Freezer Replacement<br />

02 M070 I.S. 70 M Windows<br />

02 M089 P.S./I.S. 89 M Classroom Connectivity<br />

02 M089 P.S./I.S. 89 M Classroom Connectivity<br />

02 M<strong>10</strong>4 I.S. <strong>10</strong>4 M Auditorium Upgrade<br />

02 M<strong>10</strong>4 I.S. <strong>10</strong>4 M Classroom Connectivity<br />

02 M<strong>10</strong>4 I.S. <strong>10</strong>4 M IP Digital Video Surveillance


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

02 M<strong>10</strong>4 I.S. <strong>10</strong>4 M New/Retrofit Telephone/Intercom System<br />

02 M111 P.S. 111 M Classroom Connectivity<br />

02 M111 P.S. 111 M Electrical Systems<br />

02 M111 P.S. 111 M Low-Voltage Electrical Systems<br />

02 M111 P.S. 111 M New/Retrofit Telephone/Intercom System<br />

02 M1<strong>14</strong> EAST SIDE MIDDLE SCHOOL M Classroom Connectivity<br />

02 M116 P.S. 116 M Boiler Conversion<br />

02 M116 P.S. 116 M Classroom Connectivity<br />

02 M124 P.S. 124 (ECF) M Classroom Connectivity<br />

02 M124 P.S. 124 (ECF) M Exterior Masonry<br />

02 M124 P.S. 124 (ECF) M Parapets<br />

02 M126 P.S. 126 M Classroom Connectivity<br />

02 M126 P.S. 126 M Emergency Stabilization<br />

02 M126 P.S. 126 M Lighting Fixtures<br />

02 M130 P.S. 130 M Classroom Connectivity<br />

02 M130 P.S. 130 M Elevators and Escalators<br />

02 M130 P.S. 130 M New/Retrofit Telephone/Intercom System<br />

02 M130 P.S. 130 M Windows<br />

02 M131 I.S. 131 M Classroom Connectivity<br />

02 M131 I.S. 131 M Exterior Masonry<br />

02 M131 I.S. 131 M Parapets<br />

02 M131 I.S. 131 M Roofs<br />

02 M131 I.S. 131 M Room Conversions/Partitioning<br />

02 M131 I.S. 131 M Windows<br />

02 M158 P.S. 158 M Classroom Connectivity<br />

02 M158 P.S. 158 M New/Retrofit Telephone/Intercom System<br />

02 M167 I.S. 167 M Auditorium Upgrade<br />

02 M167 I.S. 167 M Classroom Connectivity<br />

02 M167 I.S. 167 M Domestic Piping<br />

02 M167 I.S. 167 M IP Digital Video Surveillance<br />

02 M167 I.S. 167 M New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

02 M183 P.S. 183 M Classroom Connectivity<br />

02 M190 P.S. 290 M Classroom Connectivity<br />

02 M190 P.S. 290 M Lighting Fixtures<br />

02 M198 P.S. 198 M Boiler Conversion<br />

02 M198 P.S. 198 M Cafeteria / Multipurpose Room Upgrade<br />

02 M198 P.S. 198 M Cimate Control<br />

02 M198 P.S. 198 M Classroom Connectivity<br />

02 M198 P.S. 198 M New/Retrofit Telephone/Intercom System<br />

02 M198 P.S. 198 M Waste System<br />

02 M234 P.S. 234 M Classroom Connectivity<br />

02 M234 P.S. 234 M New/Retrofit Telephone/Intercom System<br />

02 M267 P.S. 59 (MEETH) M Classroom Connectivity<br />

02 M271 P.S./I.S. 217 M Classroom Connectivity<br />

02 M271 P.S./I.S. 217 M New/Retrofit Telephone/Intercom System<br />

02 M271 P.S./I.S. 217 M Parapets<br />

02 M276 P.S./I.S. 276 M Classroom Connectivity<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Classroom Connectivity<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Classroom Connectivity<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Exterior Masonry<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Low-Voltage Electrical Systems<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M New/Retrofit Telephone/Intercom System<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Parapets<br />

02 M660 SCHL OF THE FUTURE (OLD BACON) M Roofs<br />

02 M816 P.S. 151 M Classroom Connectivity<br />

02 M824 MILLENNIUM HS M Classroom Connectivity<br />

02 M824 MILLENNIUM HS M Classroom Connectivity<br />

02 M840 P.S. 150 M Classroom Connectivity<br />

02 M840 P.S. 150 M Lighting Fixtures<br />

02 M855 ELEANOR ROOSEVELT HS M Classroom Connectivity<br />

02 M855 ELEANOR ROOSEVELT HS M IP Digital Video Surveillance<br />

02 M855 ELEANOR ROOSEVELT HS M New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

02 M877 NEW YORK HARBOR SCHOOL M Classroom Connectivity<br />

02 M887 BARUCH COLLEGE CAMPUS HS M Classroom Connectivity<br />

02 M971 HE SPRUCE STREET EDUCATIONAL CAMPU M Classroom Connectivity<br />

03 M009 P.S. 9 M Classroom Connectivity<br />

03 M009 P.S. 9 M Classroom Connectivity<br />

03 M009 P.S. 9 M Classroom Connectivity<br />

03 M009 P.S. 9 M New/Retrofit Telephone/Intercom System<br />

03 M009 P.S. 9 M Science Lab Upgrades<br />

03 M044 I.S. 44 M Classroom Connectivity<br />

03 M044 I.S. 44 M Low-Voltage Electrical Systems<br />

03 M044 I.S. 44 M New/Retrofit Telephone/Intercom System<br />

03 M054 I.S. 54 M Classroom Connectivity<br />

03 M054 I.S. 54 M New/Retrofit Telephone/Intercom System<br />

03 M075 P.S. 75 M Boiler Conversion<br />

03 M075 P.S. 75 M Cimate Control<br />

03 M075 P.S. 75 M Classroom Connectivity<br />

03 M075 P.S. 75 M Classroom Connectivity<br />

03 M075 P.S. 75 M Classroom Connectivity<br />

03 M075 P.S. 75 M Electrical Systems<br />

03 M075 P.S. 75 M Floors<br />

03 M075 P.S. 75 M Low-Voltage Electrical Systems<br />

03 M076 P.S. 76 M Emergency Stabilization<br />

03 M076 P.S. 76 M Lighting Fixtures<br />

03 M076 P.S. 76 M New/Retrofit Telephone/Intercom System<br />

03 M076 P.S. 76 M Science Lab Upgrades<br />

03 M084 P.S. 84 M Classroom Connectivity<br />

03 M084 P.S. 84 M Classroom Connectivity<br />

03 M087 P.S. 87 M Classroom Connectivity<br />

03 M087 P.S. 87 M Lighting Fixtures<br />

03 M087 P.S. 87 M New/Retrofit Telephone/Intercom System<br />

03 M088 I.S. 88 M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

03 M088 I.S. 88 M Library Upgrades<br />

03 M088 I.S. 88 M New/Retrofit Telephone/Intercom System<br />

03 M088 I.S. 88 M Room Conversions/Partitioning<br />

03 M088 I.S. 88 M Room Conversions/Partitioning<br />

03 M088 I.S. 88 M School Improvement and Restructuring<br />

03 M088 I.S. 88 M Science Lab Upgrades<br />

03 M113 P.S. 241 M Boiler Conversion<br />

03 M113 P.S. 241 M Cimate Control<br />

03 M113 P.S. 241 M Classroom Connectivity<br />

03 M113 P.S. 241 M Electrical Systems<br />

03 M113 P.S. 241 M IP Digital Video Surveillance<br />

03 M113 P.S. 241 M Low-Voltage Electrical Systems<br />

03 M118 I.S. 118 M Classroom Connectivity<br />

03 M118 I.S. 118 M Classroom Connectivity<br />

03 M118 I.S. 118 M Classroom Connectivity<br />

03 M118 I.S. 118 M Emergency Stabilization<br />

03 M118 I.S. 118 M IP Digital Video Surveillance<br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4) M Classroom Connectivity<br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4) M Lighting Fixtures<br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4) M Parapets<br />

03 M<strong>14</strong>4 P.S. 242 (OLD P<strong>14</strong>4) M Roofs<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Boiler Conversion<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Cimate Control<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Classroom Connectivity<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Science Lab Upgrades<br />

03 M<strong>14</strong>9 P.S. <strong>14</strong>9 (TANDEM M207) M Boiler Conversion<br />

03 M<strong>14</strong>9 P.S. <strong>14</strong>9 (TANDEM M207) M Climate Control<br />

03 M<strong>14</strong>9 P.S. <strong>14</strong>9 (TANDEM M207) M IP Digital Video Surveillance<br />

03 M<strong>14</strong>9 P.S. <strong>14</strong>9 (TANDEM M207) M Technology<br />

03 M163 P.S. 163 M Classroom Connectivity<br />

03 M163 P.S. 163 M IP Digital Video Surveillance


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

03 M163 P.S. 163 M Lighting Fixtures<br />

03 M163 P.S. 163 M New/Retrofit Telephone/Intercom System<br />

03 M165 P.S. 165 M Classroom Connectivity<br />

03 M166 P.S. 166 M Classroom Connectivity<br />

03 M166 P.S. 166 M Low-Voltage Electrical Systems<br />

03 M166 P.S. 166 M New/Retrofit Telephone/Intercom System<br />

03 M166 P.S. 166 M Paved Area-Concrete<br />

03 M180 P.S. 180 M Classroom Connectivity<br />

03 M180 P.S. 180 M Exterior Masonry<br />

03 M180 P.S. 180 M IP Digital Video Surveillance<br />

03 M180 P.S. 180 M Lighting Fixtures<br />

03 M180 P.S. 180 M Parapets<br />

03 M180 P.S. 180 M Science Lab Upgrades<br />

03 M180 P.S. 180 M Windows<br />

03 M185 P.S. 185 (TANDEM M208) M Classroom Connectivity<br />

03 M185 P.S. 185 (TANDEM M208) M New/Retrofit Telephone/Intercom System<br />

03 M191 P.S. 191 M Lighting Fixtures<br />

03 M191 P.S. 191 M Parapets<br />

03 M191 P.S. 191 M Roofs<br />

03 M199 P.S. 199 M Classroom Connectivity<br />

03 M199 P.S. 199 M Classroom Connectivity<br />

03 M199 P.S. 199 M Classroom Connectivity<br />

03 M199 P.S. 199 M Classroom Connectivity<br />

03 M199 P.S. 199 M New/Retrofit Telephone/Intercom System<br />

03 M199 P.S. 199 M Room Conversions/Partitioning<br />

03 M207 P.S. 207 (TANDEM M<strong>14</strong>9) M Classroom Connectivity<br />

03 M207 P.S. 207 (TANDEM M<strong>14</strong>9) M New/Retrofit Telephone/Intercom System<br />

03 M208 P.S. 208 (TANDEM M185) M New/Retrofit Telephone/Intercom System<br />

03 M208 P.S. 208 (TANDEM M185) M Technology<br />

04 M007 P.S. 7 M Boiler Conversion<br />

04 M007 P.S. 7 M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

04 M007 P.S. 7 M Classroom Connectivity<br />

04 M007 P.S. 7 M Climate Control<br />

04 M007 P.S. 7 M IP Digital Video Surveillance<br />

04 M007 P.S. 7 M Lighting Fixtures<br />

04 M007 P.S. 7 M New/Retrofit Telephone/Intercom System<br />

04 M007 P.S. 7 M Playground Redevelopment<br />

04 M013 I.S. 13 M Classroom Connectivity<br />

04 M013 I.S. 13 M Classroom Connectivity<br />

04 M013 I.S. 13 M Classroom Connectivity<br />

04 M013 I.S. 13 M IP Digital Video Surveillance<br />

04 M013 I.S. 13 M New/Retrofit Telephone/Intercom System<br />

04 M013 I.S. 13 M Technology<br />

04 M013 I.S. 13 M Technology<br />

04 M045 K M Auditorium Upgrade<br />

04 M045 K M Classroom Connectivity<br />

04 M045 I.S. 45 M IP Digital Video Surveillance<br />

04 M045 I.S. 45 M Technology<br />

04 M045 I.S. 45 M Technology<br />

04 M045 I.S. 45 M Walk In Freezer Replacement<br />

04 M050 P.S. 50 (UDC & ECF) M Boiler Conversion<br />

04 M050 P.S. 50 (UDC & ECF) M Climate Control<br />

04 M050 P.S. 50 (UDC & ECF) M IP Digital Video Surveillance<br />

04 M050 P.S. 50 (UDC & ECF) M Library Upgrades<br />

04 M050 P.S. 50 (UDC & ECF) M New/Retrofit Telephone/Intercom System<br />

04 M057 P.S. 57 M Classroom Connectivity<br />

04 M072 P.S. 72 M Classroom Connectivity<br />

04 M083 P.S. 83 M Classroom Connectivity<br />

04 M083 P.S. 83 M Classroom Connectivity<br />

04 M083 P.S. 83 M Lighting Fixtures<br />

04 M083 P.S. 83 M Lighting Fixtures<br />

04 M083 P.S. 83 M Low-Voltage Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

04 M096 P.S. 96 M New/Retrofit Telephone/Intercom System<br />

04 M099 I.S. 99 M Classroom Connectivity<br />

04 M099 I.S. 99 M Classroom Connectivity<br />

04 M099 I.S. 99 M IP Digital Video Surveillance<br />

04 M099 I.S. 99 M Roofs<br />

04 M099 I.S. 99 M Room Conversions/Partitioning<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Boiler Conversion<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Classroom Connectivity<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Climate Control<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Lighting Fixtures<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Room Conversions/Partitioning<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Room Conversions/Partitioning<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M School Improvement and Restructuring<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Technology<br />

04 M<strong>10</strong>1 P.S. <strong>10</strong>1 M Technology<br />

04 M<strong>10</strong>2 P.S. <strong>10</strong>2 M Classroom Connectivity<br />

04 M<strong>10</strong>8 P.S. <strong>10</strong>8 M Classroom Connectivity<br />

04 M112 P.S. 112 (TANDEM M206) M Boiler Conversion<br />

04 M112 P.S. 112 (TANDEM M206) M Classroom Connectivity<br />

04 M112 P.S. 112 (TANDEM M206) M Climate Control<br />

04 M112 P.S. 112 (TANDEM M206) M Exterior Masonry<br />

04 M112 P.S. 112 (TANDEM M206) M Parapets<br />

04 M112 P.S. 112 (TANDEM M206) M Roofs<br />

04 M112 P.S. 112 (TANDEM M206) M Science Lab Upgrades<br />

04 M117 J.H.S. 117 M Classroom Connectivity<br />

04 M117 J.H.S. 117 M Classroom Connectivity<br />

04 M117 J.H.S. 117 M Playground Redevelopment<br />

04 M121 P.S. 38 (OLD M121) M Auditorium Upgrade<br />

04 M121 P.S. 38 (OLD M121) M Classroom Connectivity<br />

04 M121 P.S. 38 (OLD M121) M New/Retrofit Telephone/Intercom System<br />

04 M<strong>14</strong>6 P.S. <strong>14</strong>6 M Boiler Conversion


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

04 M<strong>14</strong>6 P.S. <strong>14</strong>6 M Classroom Connectivity<br />

04 M<strong>14</strong>6 P.S. <strong>14</strong>6 M Climate Control<br />

04 M155 P.S. 155 M Classroom Connectivity<br />

04 M155 P.S. 155 M New/Retrofit Telephone/Intercom System<br />

04 M155 P.S. 155 M Science Lab Upgrades<br />

04 M171 P.S. 171 M Classroom Connectivity<br />

04 M171 P.S. 171 M Classroom Connectivity<br />

04 M171 P.S. 171 M New/Retrofit Telephone/Intercom System<br />

04 M171 P.S. 171 M Paved Area-Blacktop<br />

04 M206 P.S. 206 (TANDEM M112) M Classroom Connectivity<br />

04 M206 P.S. 206 (TANDEM M112) M Exterior Masonry<br />

04 M206 P.S. 206 (TANDEM M112) M Flood Elimination<br />

04 M206 P.S. 206 (TANDEM M112) M Parapets<br />

04 M206 P.S. 206 (TANDEM M112) M Paved Area-Concrete<br />

04 M206 P.S. 206 (TANDEM M112) M Roofs<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M Classroom Connectivity<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M Domestic Piping<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M Flood Elimination<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M Low-Voltage Electrical Systems<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M New/Retrofit Telephone/Intercom System<br />

05 M0<strong>10</strong> I.S. <strong>10</strong> (TANDEM M200) M Walk In Freezer Replacement<br />

05 M030 P.S. 30 M Classroom Connectivity<br />

05 M030 P.S. 30 M Domestic Piping<br />

05 M030 P.S. 30 M Emergency Stabilization<br />

05 M030 P.S. 30 M Low-Voltage Electrical Systems<br />

05 M030 P.S. 30 M Technology<br />

05 M030 P.S. 30 M Toilets-Students<br />

05 M030 P.S. 30 M Toilets-Students<br />

05 M030 P.S. 30 M Toilets-Students<br />

05 M030 P.S. 30 M Walk In Freezer Replacement<br />

05 M036 P.S. 36 M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

05 M036 P.S. 36 M Exterior Masonry<br />

05 M036 P.S. 36 M Low-Voltage Electrical Systems<br />

05 M036 P.S. 36 M Parapets<br />

05 M036 P.S. 36 M Roofs<br />

05 M043 I.S. 172 (OLD 43) M Classroom Connectivity<br />

05 M043 I.S. 172 (OLD 43) M Gymnasium Upgrade<br />

05 M043 I.S. 172 (OLD 43) M Library Upgrades<br />

05 M046 P.S. 46 M Classroom Connectivity<br />

05 M046 P.S. 46 M Classroom Connectivity<br />

05 M046 P.S. 46 M Domestic Piping<br />

05 M046 P.S. 46 M New/Retrofit Telephone/Intercom System<br />

05 M046 P.S. 46 M Science Lab Upgrades<br />

05 M092 P.S. 92 M Boiler Conversion<br />

05 M092 P.S. 92 M Classroom Connectivity<br />

05 M092 P.S. 92 M IP Digital Video Surveillance<br />

05 M092 P.S. 92 M Lighting Fixtures<br />

05 M092 P.S. 92 M New/Retrofit Telephone/Intercom System<br />

05 M092 P.S. 92 M Parapets<br />

05 M092 P.S. 92 M Technology<br />

05 M092 P.S. 92 M Windows<br />

05 M123 P.S. 123 M Boiler Conversion<br />

05 M123 P.S. 123 M Classroom Connectivity<br />

05 M123 P.S. 123 M Climate Control<br />

05 M123 P.S. 123 M Electrical Systems<br />

05 M123 P.S. 123 M Exterior Masonry<br />

05 M123 P.S. 123 M Lighting Fixtures<br />

05 M123 P.S. 123 M Lighting Fixtures<br />

05 M123 P.S. 123 M New/Retrofit Telephone/Intercom System<br />

05 M123 P.S. 123 M Parapets<br />

05 M123 P.S. 123 M Roofs<br />

05 M125 P.S. 125 M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

05 M125 P.S. 125 M Room Conversions/Partitioning<br />

05 M125 P.S. 125 M School Improvement and Restructuring<br />

05 M125 P.S. 125 M Science Lab Upgrades<br />

05 M129 P.S. 129 M Classroom Connectivity<br />

05 M129 P.S. 129 M New/Retrofit Telephone/Intercom System<br />

05 M133 P.S. 133 M Boiler Conversion<br />

05 M133 P.S. 133 M Classroom Connectivity<br />

05 M133 P.S. 133 M Climate Control<br />

05 M133 P.S. 133 M Low-Voltage Electrical Systems<br />

05 M133 P.S. 133 M New/Retrofit Telephone/Intercom System<br />

05 M154 P.S. 154 M Emergency Stabilization<br />

05 M154 P.S. 154 M New/Retrofit Telephone/Intercom System<br />

05 M154 P.S. 154 M Windows<br />

05 M161 P.S. 161 M Boiler Conversion<br />

05 M161 P.S. 161 M Classroom Connectivity<br />

05 M161 P.S. 161 M Climate Control<br />

05 M161 P.S. 161 M Electrical Systems<br />

05 M161 P.S. 161 M New/Retrofit Telephone/Intercom System<br />

05 M175 P.S. 175 M Classroom Connectivity<br />

05 M194 P.S. 194 M Classroom Connectivity<br />

05 M194 P.S. 194 M IP Digital Video Surveillance<br />

05 M195 I.S. 195 (ECF) M Boiler Conversion<br />

05 M195 I.S. 195 (ECF) M Classroom Connectivity<br />

05 M195 I.S. 195 (ECF) M Climate Control<br />

05 M195 I.S. 195 (ECF) M New/Retrofit Telephone/Intercom System<br />

05 M195 I.S. 195 (ECF) M Room Conversions/Partitioning<br />

05 M195 I.S. 195 (ECF) M Science Lab Upgrades<br />

05 M195 I.S. 195 (ECF) M Technology<br />

05 M195 I.S. 195 (ECF) M Technology<br />

05 M197 P.S. 197 M Classroom Connectivity<br />

05 M197 P.S. 197 M Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

05 M197 P.S. 197 M Low-Voltage Electrical Systems<br />

05 M197 P.S. 197 M New/Retrofit Telephone/Intercom System<br />

05 M197 P.S. 197 M Parapets<br />

05 M197 P.S. 197 M Roofs<br />

05 M200 P.S. 200 (TANDEM M0<strong>10</strong>) M Classroom Connectivity<br />

05 M371 P.S. 318 M Classroom Connectivity<br />

06 M004 P.S. 4 M Classroom Connectivity<br />

06 M005 P.S. 5 M Classroom Connectivity<br />

06 M005 P.S. 5 M Parapets<br />

06 M005 P.S. 5 M Ventilation<br />

06 M008 P.S. 8 M Classroom Connectivity<br />

06 M028 P.S. 28 M Classroom Connectivity<br />

06 M028 P.S. 28 M Exterior Masonry<br />

06 M028 P.S. 28 M Low-Voltage Electrical Systems<br />

06 M028 P.S. 28 M New/Retrofit Telephone/Intercom System<br />

06 M028 P.S. 28 M Parapets<br />

06 M028 P.S. 28 M Roofs<br />

06 M048 P.S. 48 M Classroom Connectivity<br />

06 M048 P.S. 48 M Exterior Masonry<br />

06 M048 P.S. 48 M Flood Elimination<br />

06 M048 P.S. 48 M New/Retrofit Telephone/Intercom System<br />

06 M048 P.S. 48 M Parapets<br />

06 M052 I.S. 52 M Cafeteria / Multipurpose Room Upgrade<br />

06 M052 I.S. 52 M Classroom Connectivity<br />

06 M052 I.S. 52 M Low-Voltage Electrical Systems<br />

06 M052 I.S. 52 M New/Retrofit Telephone/Intercom System<br />

06 M052 I.S. 52 M New/Retrofit Telephone/Intercom System<br />

06 M090 I.S. 90 M Classroom Connectivity<br />

06 M090 I.S. 90 M Classroom Connectivity<br />

06 M090 I.S. 90 M Room Conversions/Partitioning<br />

06 M093 P.S./I.S. 2<strong>10</strong> M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

06 M098 P.S. 98 M Auditorium Upgrade<br />

06 M098 P.S. 98 M Classroom Connectivity<br />

06 M098 P.S. 98 M Exterior Masonry<br />

06 M098 P.S. 98 M Library Upgrades<br />

06 M098 P.S. 98 M New/Retrofit Telephone/Intercom System<br />

06 M098 P.S. 98 M Parapets<br />

06 M098 P.S. 98 M Paved Area-Concrete<br />

06 M098 P.S. 98 M Roofs<br />

06 M115 P.S. 115 M Classroom Connectivity<br />

06 M115 P.S. 115 M Electrical Systems<br />

06 M115 P.S. 115 M Exterior Masonry<br />

06 M115 P.S. 115 M Parapets<br />

06 M115 P.S. 115 M Roofs<br />

06 M115 P.S. 115 M Room Conversions/Partitioning<br />

06 M128 P.S. 128 M Boiler Conversion<br />

06 M128 P.S. 128 M Cimate Control<br />

06 M128 P.S. 128 M Classroom Connectivity<br />

06 M128 P.S. 128 M Emergency Stabilization<br />

06 M128 P.S. 128 M Flood Elimination<br />

06 M128 P.S. 128 M Lighting Fixtures<br />

06 M128 P.S. 128 M Windows<br />

06 M132 P.S. 132 M Classroom Connectivity<br />

06 M132 P.S. 132 M Kitchen Areas<br />

06 M132 P.S. 132 M Low-Voltage Electrical Systems<br />

06 M<strong>14</strong>3 I.S. <strong>14</strong>3 M Classroom Connectivity<br />

06 M<strong>14</strong>3 I.S. <strong>14</strong>3 M Classroom Connectivity<br />

06 M<strong>14</strong>3 I.S. <strong>14</strong>3 M Kitchen Areas<br />

06 M<strong>14</strong>3 I.S. <strong>14</strong>3 M Walk In Freezer Replacement<br />

06 M152 P.S. 152 M Classroom Connectivity<br />

06 M152 P.S. 152 M Low-Voltage Electrical Systems<br />

06 M153 P.S. 153 M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

06 M164 I.S. 164 M Classroom Connectivity<br />

06 M164 I.S. 164 M Electrical Systems<br />

06 M164 I.S. 164 M New/Retrofit Telephone/Intercom System<br />

06 M173 P.S. 173 M Classroom Connectivity<br />

06 M173 P.S. 173 M Classroom Connectivity<br />

06 M176 P.S./I.S. 176 M Classroom Connectivity<br />

06 M178 P.S. 178 M Classroom Connectivity<br />

06 M178 P.S. 178 M New/Retrofit Telephone/Intercom System<br />

06 M178 P.S. 178 M Roofs<br />

06 M187 P.S./I.S. 187 M Classroom Connectivity<br />

06 M187 P.S./I.S. 187 M New/Retrofit Telephone/Intercom System<br />

06 M189 P.S. 189 M Classroom Connectivity<br />

06 M189 P.S. 189 M IP Digital Video Surveillance<br />

06 M189 P.S. 189 M Low-Voltage Electrical Systems<br />

06 M189 P.S. 189 M New/Retrofit Telephone/Intercom System<br />

06 M192 P.S. 192 M Classroom Connectivity<br />

06 M192 P.S. 192 M Flood Elimination<br />

06 M192 P.S. 192 M New/Retrofit Telephone/Intercom System<br />

06 M218 I.S. 218 M Classroom Connectivity<br />

06 M218 I.S. 218 M Classroom Connectivity<br />

06 M218 I.S. 218 M Classroom Connectivity<br />

06 M218 I.S. 218 M Classroom Connectivity<br />

06 M218 I.S. 218 M New/Retrofit Telephone/Intercom System<br />

06 M218 I.S. 218 M Roofs<br />

06 M223 I.S. 223 (MOTT HALL) M Classroom Connectivity<br />

06 M223 I.S. 223 (MOTT HALL) M New/Retrofit Telephone/Intercom System<br />

06 M263 P.S./I.S. 263 M Classroom Connectivity<br />

06 M528 I.S. 528 M Classroom Connectivity<br />

06 M528 I.S. 528 M Exterior Masonry<br />

06 M528 I.S. 528 M Flood Elimination<br />

06 M528 I.S. 528 M Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

06 M528 I.S. 528 M Roofs<br />

06 M856 P.S. 2<strong>10</strong> M Classroom Connectivity<br />

06 M856 P.S. 2<strong>10</strong> M New/Retrofit Telephone/Intercom System<br />

06 M859 I.S. <strong>14</strong>3 MINISCHOOL M Classroom Connectivity<br />

06 M898 P.S. 18 M Classroom Connectivity<br />

06 M918 P.S./IS 278 M Classroom Connectivity<br />

07 X001 P.S. 1 X Boiler Conversion<br />

07 X001 P.S. 1 X Classroom Connectivity<br />

07 X001 P.S. 1 X Climate Control<br />

07 X001 P.S. 1 X IP Digital Video Surveillance<br />

07 X001 P.S. 1 X Playground Redevelopment<br />

07 X005 P.S. 5 X Kitchen Areas<br />

07 X018 P.S. 18 X Boiler Conversion<br />

07 X018 P.S. 18 X Classroom Connectivity<br />

07 X018 P.S. 18 X Climate Control<br />

07 X018 P.S. 18 X Lighting Fixtures<br />

07 X018 P.S. 18 X Paved Area-Blacktop<br />

07 X025 P.S. 25 X Classroom Connectivity<br />

07 X025 P.S. 25 X Domestic Piping<br />

07 X027 P.S. 277 X Auditorium Upgrade<br />

07 X027 P.S. 277 X Classroom Connectivity<br />

07 X027 P.S. 277 X Parapets<br />

07 X027 P.S. 277 X Ventilation<br />

07 X027 P.S. 277 X Windows<br />

07 X029 P.S. 29 X Classroom Connectivity<br />

07 X029 P.S. 29 X IP Digital Video Surveillance<br />

07 X030 P.S. 30 X Classroom Connectivity<br />

07 X040 P.S. 220 X Boiler Conversion<br />

07 X040 P.S. 220 X Classroom Connectivity<br />

07 X040 P.S. 220 X Climate Control<br />

07 X040 P.S. 220 X Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

07 X040 P.S. 220 X Lighting Fixtures<br />

07 X040 P.S. 220 X New/Retrofit Telephone/Intercom System<br />

07 X043 P.S. 43 X Classroom Connectivity<br />

07 X043 P.S. 43 X Electrical Systems<br />

07 X043 P.S. 43 X New/Retrofit Telephone/Intercom System<br />

07 X043 P.S. 43 X Toilets-Students<br />

07 X049 P.S. 49 X Classroom Connectivity<br />

07 X049 P.S. 49 X Parapets<br />

07 X065 P.S. 65 X Cafeteria / Multipurpose Room Upgrade<br />

07 X065 P.S. 65 X Classroom Connectivity<br />

07 X065 P.S. 65 X Domestic Piping<br />

07 X065 P.S. 65 X Lighting Fixtures<br />

07 X065 P.S. 65 X Low-Voltage Electrical Systems<br />

07 X065 P.S. 65 X Technology<br />

07 X139 J.H.S. 222 X Boiler Conversion<br />

07 X139 J.H.S. 222 X Classroom Connectivity<br />

07 X139 J.H.S. 222 X Classroom Connectivity<br />

07 X139 J.H.S. 222 X Classroom Connectivity<br />

07 X139 J.H.S. 222 X Roofs<br />

07 X139 J.H.S. 222 X Science Lab Upgrades<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9 X IP Digital Video Surveillance<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9 X New/Retrofit Telephone/Intercom System<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9 X Room Conversions/Partitioning<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9 X Science Lab Upgrades<br />

07 X<strong>14</strong>9 J.H.S. <strong>14</strong>9 X Technology<br />

07 X151 I.S. 151 X Classroom Connectivity<br />

07 X151 I.S. 151 X Flood Elimination<br />

07 X151 I.S. 151 X New/Retrofit Telephone/Intercom System<br />

07 X154 P.S. 154 X Classroom Connectivity<br />

07 X154 P.S. 154 X Domestic Piping<br />

07 X154 P.S. 154 X Low-Voltage Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

07 X156 P.S. 156 X Auditorium Upgrade<br />

07 X156 P.S. 156 X Classroom Connectivity<br />

07 X156 P.S. 156 X Flood Elimination<br />

07 X156 P.S. 156 X Low-Voltage Electrical Systems<br />

07 X156 P.S. 156 X Playground Redevelopment<br />

07 X156 P.S. 156 X Reinforcing Support Elements<br />

07 X157 P.S. 157 X Boiler Conversion<br />

07 X157 P.S. 157 X Classroom Connectivity<br />

07 X157 P.S. 157 X Climate Control<br />

07 X157 P.S. 157 X Playground Redevelopment<br />

07 X161 P.S. 161 X Classroom Connectivity<br />

07 X161 P.S. 161 X Exterior Masonry<br />

07 X161 P.S. 161 X Windows<br />

07 X162 I.S. 162 X Classroom Connectivity<br />

07 X162 I.S. 162 X Classroom Connectivity<br />

07 X162 I.S. 162 X New/Retrofit Telephone/Intercom System<br />

07 X162 I.S. 162 X Room Conversions/Partitioning<br />

07 X162 I.S. 162 X Science Lab Upgrades<br />

07 X183 J.H.S. 203 X Boiler Conversion<br />

07 X183 J.H.S. 203 X Classroom Connectivity<br />

07 X183 J.H.S. 203 X Climate Control<br />

07 X183 J.H.S. 203 X Lighting Fixtures<br />

07 X183 J.H.S. 203 X Low-Voltage Electrical Systems<br />

07 X183 J.H.S. 203 X New/Retrofit Telephone/Intercom System<br />

07 X183 J.H.S. 203 X Room Conversions/Partitioning<br />

07 X183 J.H.S. 203 X Technology<br />

07 X183 J.H.S. 203 X Technology<br />

07 X184 I.S. 184 X Boiler Conversion<br />

07 X184 I.S. 184 X Classroom Connectivity<br />

07 X184 I.S. 184 X Climate Control<br />

07 X184 I.S. 184 X New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

07 X184 I.S. 184 X Paved Area-Blacktop<br />

07 X184 I.S. 184 X Science Lab Upgrades<br />

08 X0<strong>14</strong> P.S. <strong>14</strong> X Classroom Connectivity<br />

08 X0<strong>14</strong> P.S. <strong>14</strong> X Low-Voltage Electrical Systems<br />

08 X036 P.S. 36 X Classroom Connectivity<br />

08 X036 P.S. 36 X New/Retrofit Telephone/Intercom System<br />

08 X036 P.S. 36 X Playground Redevelopment<br />

08 X048 P.S. 48 X Classroom Connectivity<br />

08 X052 I.S. 302 X Classroom Connectivity<br />

08 X052 I.S. 302 X Classroom Connectivity<br />

08 X052 I.S. 302 X Climate Control<br />

08 X052 I.S. 302 X Fire Supression System<br />

08 X052 I.S. 302 X Low-Voltage Electrical Systems<br />

08 X052 I.S. 302 X Ventilation<br />

08 X060 P.S. 333 X Classroom Connectivity<br />

08 X060 P.S. 333 X Floors<br />

08 X060 P.S. 333 X Heating Plant Upgrade<br />

08 X060 P.S. 333 X Lighting Fixtures<br />

08 X060 P.S. 333 X Parapets<br />

08 X062 P.S. 62 X Classroom Connectivity<br />

08 X062 P.S. 62 X Classroom Connectivity<br />

08 X062 P.S. 62 X Lighting Fixtures<br />

08 X069 P.S. 69 X Flood Elimination<br />

08 X069 P.S. 69 X Lighting Fixtures<br />

08 X069 P.S. 69 X Parapets<br />

08 X071 P.S. 71 X Classroom Connectivity<br />

08 X071 P.S. 71 X Electrical Systems<br />

08 X071 P.S. 71 X New/Retrofit Telephone/Intercom System<br />

08 X072 P.S. 72 X Classroom Connectivity<br />

08 X072 P.S. 72 X Playground Redevelopment<br />

08 X072 P.S. 72 X Toilets-Students


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

08 X074 I.S. 201 X Cafeteria / Multipurpose Room Upgrade<br />

08 X074 I.S. 201 X Classroom Connectivity<br />

08 X074 I.S. 201 X Electrical Systems<br />

08 X074 I.S. 201 X Room Conversions/Partitioning<br />

08 X075 P.S. 75 X Classroom Connectivity<br />

08 X093 P.S. 93 X Classroom Connectivity<br />

08 X093 P.S. 93 X New/Retrofit Telephone/Intercom System<br />

08 X<strong>10</strong>0 P.S. <strong>10</strong>0 X Lighting Fixtures<br />

08 X<strong>10</strong>0 P.S. <strong>10</strong>0 X New/Retrofit Telephone/Intercom System<br />

08 X<strong>10</strong>1 I.S. <strong>10</strong>1 X Classroom Connectivity<br />

08 X<strong>10</strong>1 I.S. <strong>10</strong>1 X New/Retrofit Telephone/Intercom System<br />

08 X<strong>10</strong>1 I.S. <strong>10</strong>1 X Playground Redevelopment<br />

08 X<strong>10</strong>7 P.S. <strong>10</strong>7 X Classroom Connectivity<br />

08 X<strong>10</strong>7 P.S. <strong>10</strong>7 X Domestic Piping<br />

08 X<strong>10</strong>7 P.S. <strong>10</strong>7 X New/Retrofit Telephone/Intercom System<br />

08 X119 P.S. 119 X Classroom Connectivity<br />

08 X119 P.S. 119 X New/Retrofit Telephone/Intercom System<br />

08 X120 I.S. 301 X Classroom Connectivity<br />

08 X120 I.S. 301 X Classroom Connectivity<br />

08 X120 I.S. 301 X Gymnasium Upgrade<br />

08 X123 I.S. 123 X Classroom Connectivity<br />

08 X123 I.S. 123 X IP Digital Video Surveillance<br />

08 X123 I.S. 123 X Lighting Fixtures<br />

08 X125 I.S. 125 X Auditorium Upgrade<br />

08 X125 I.S. 125 X Classroom Connectivity<br />

08 X125 I.S. 125 X Exterior Masonry<br />

08 X125 I.S. 125 X Gymnasium Upgrade<br />

08 X125 I.S. 125 X New/Retrofit Telephone/Intercom System<br />

08 X125 I.S. 125 X Parapets<br />

08 X125 I.S. 125 X Roofs<br />

08 X125 I.S. 125 X Room Conversions/Partitioning


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

08 X125 I.S. 125 X Safety Systems<br />

08 X130 P.S. 130 X Classroom Connectivity<br />

08 X130 P.S. 130 X Paved Area-Blacktop<br />

08 X131 I.S. 131 X Classroom Connectivity<br />

08 X131 I.S. 131 X Classroom Connectivity<br />

08 X131 I.S. 131 X Classroom Connectivity<br />

08 X131 I.S. 131 X IP Digital Video Surveillance<br />

08 X131 I.S. 131 X Lighting Fixtures<br />

08 X138 P.S. 138 X Classroom Connectivity<br />

08 X138 P.S. 138 X Classroom Connectivity<br />

08 X138 P.S. 138 X Lighting Fixtures<br />

08 X<strong>14</strong>0 P.S. <strong>14</strong>0 X Classroom Connectivity<br />

08 X<strong>14</strong>0 P.S. <strong>14</strong>0 X New/Retrofit Telephone/Intercom System<br />

08 X<strong>14</strong>6 P.S. <strong>14</strong>6 X Classroom Connectivity<br />

08 X152 P.S. 152 X Classroom Connectivity<br />

08 X152 P.S. 152 X Lighting Fixtures<br />

08 X174 I.S. 174 X Classroom Connectivity<br />

08 X174 I.S. 174 X Classroom Connectivity<br />

08 X174 I.S. 174 X Classroom Connectivity<br />

08 X174 I.S. 174 X Classroom Connectivity<br />

08 X182 P.S. 182 X Classroom Connectivity<br />

08 X182 P.S. 182 X Exterior Masonry<br />

08 X182 P.S. 182 X Windows<br />

08 X192 I.S. 192 X Classroom Connectivity<br />

08 X192 I.S. 192 X Elevators And Escalators<br />

08 X192 I.S. 192 X Emergency Stabilization<br />

08 X192 I.S. 192 X Lighting Fixtures<br />

08 X192 I.S. 192 X New/Retrofit Telephone/Intercom System<br />

09 X002 MORRISANIA SEC ED COMPLEX X Classroom Connectivity<br />

09 X002 MORRISANIA SEC ED COMPLEX X Lighting Fixtures<br />

09 X002 MORRISANIA SEC ED COMPLEX X New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

09 X004 P.S. 4 X Classroom Connectivity<br />

09 X004 P.S. 4 X Flood Elimination<br />

09 X004 P.S. 4 X IP Digital Video Surveillance<br />

09 X004 P.S. 4 X Roofs<br />

09 X004 P.S. 4 X Technology<br />

09 X011 P.S. 11 X Auditorium Upgrade<br />

09 X011 P.S. 11 X Classroom Connectivity<br />

09 X011 P.S. 11 X Lighting Fixtures<br />

09 X011 P.S. 11 X New/Retrofit Telephone/Intercom System<br />

09 X022 I.S. 22 X Classroom Connectivity<br />

09 X022 I.S. 22 X Exterior Masonry<br />

09 X022 I.S. 22 X Flood Elimination<br />

09 X022 I.S. 22 X Low-Voltage Electrical Systems<br />

09 X022 I.S. 22 X Parapets<br />

09 X028 P.S. 28 X Classroom Connectivity<br />

09 X028 P.S. 28 X Exterior Masonry<br />

09 X028 P.S. 28 X Flood Elimination<br />

09 X028 P.S. 28 X Low-Voltage Electrical Systems<br />

09 X028 P.S. 28 X New/Retrofit Telephone/Intercom System<br />

09 X028 P.S. 28 X Parapets<br />

09 X035 P.S. 35 X Classroom Connectivity<br />

09 X035 P.S. 35 X New/Retrofit Telephone/Intercom System<br />

09 X042 P.S. 42 X Classroom Connectivity<br />

09 X042 P.S. 42 X Electrical Systems<br />

09 X042 P.S. 42 X Lighting Fixtures<br />

09 X053 P.S. 53 X Auditorium Upgrade<br />

09 X053 P.S. 53 X Classroom Connectivity<br />

09 X053 P.S. 53 X Electrical Systems<br />

09 X053 P.S. 53 X New/Retrofit Telephone/Intercom System<br />

09 X055 P.S. 55 X Classroom Connectivity<br />

09 X055 P.S. 55 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

09 X055 P.S. 55 X Electrical Systems<br />

09 X055 P.S. 55 X Heating Plant Upgrade<br />

09 X055 P.S. 55 X IP Digital Video Surveillance<br />

09 X055 P.S. 55 X Low-Voltage Electrical Systems<br />

09 X055 P.S. 55 X New/Retrofit Telephone/Intercom System<br />

09 X055 P.S. 55 X Parapets<br />

09 X055 P.S. 55 X Room Conversions/Partitioning<br />

09 X055 P.S. 55 X Technology<br />

09 X058 P.S. 58 X Classroom Connectivity<br />

09 X058 P.S. 58 X Low-Voltage Electrical Systems<br />

09 X058 P.S. 58 X New/Retrofit Telephone/Intercom System<br />

09 X063 P.S. 63 X Cafeteria / Multipurpose Room Upgrade<br />

09 X063 P.S. 63 X Classroom Connectivity<br />

09 X063 P.S. 63 X Low-Voltage Electrical Systems<br />

09 X063 P.S. 63 X New/Retrofit Telephone/Intercom System<br />

09 X064 P.S. 64 X Classroom Connectivity<br />

09 X064 P.S. 64 X IP Digital Video Surveillance<br />

09 X064 P.S. 64 X Walk In Freezer Replacement<br />

09 X070 P.S. 70 X Classroom Connectivity<br />

09 X070 P.S. 70 X Domestic Piping<br />

09 X070 P.S. 70 X Lighting Fixtures<br />

09 X073 P.S. 73 X Auditorium Upgrade<br />

09 X073 P.S. 73 X Classroom Connectivity<br />

09 X073 P.S. 73 X Flood Elimination<br />

09 X073 P.S. 73 X New/Retrofit Telephone/Intercom System<br />

09 X073 P.S. 73 X Parapets<br />

09 X082 I.S. 232 X Classroom Connectivity<br />

09 X082 I.S. 232 X Classroom Connectivity<br />

09 X082 I.S. 232 X Heating Plant Upgrade<br />

09 X082 I.S. 232 X Low-Voltage Electrical Systems<br />

09 X082 I.S. 232 X Science Lab Upgrades


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

09 X088 P.S. 88 X Classroom Connectivity<br />

09 X088 P.S. 88 X Classroom Connectivity<br />

09 X088 P.S. 88 X Electrical Systems<br />

09 X088 P.S. 88 X Flood Elimination<br />

09 X088 P.S. 88 X Low-Voltage Electrical Systems<br />

09 X088 P.S. 88 X New/Retrofit Telephone/Intercom System<br />

09 X090 P.S. 90 X Classroom Connectivity<br />

09 X090 P.S. 90 X Classroom Connectivity<br />

09 X090 P.S. 90 X Classroom Connectivity<br />

09 X090 P.S. 90 X Domestic Piping<br />

09 X090 P.S. 90 X Heating Plant Upgrade<br />

09 X090 P.S. 90 X Paved Area-Concrete<br />

09 X<strong>10</strong>4 P.S. 199 X Classroom Connectivity<br />

09 X<strong>10</strong>4 P.S. 199 X IP Digital Video Surveillance<br />

09 X<strong>10</strong>4 P.S. 199 X Low-Voltage Electrical Systems<br />

09 X<strong>10</strong>9 P.S. <strong>10</strong>9 X Classroom Connectivity<br />

09 X<strong>10</strong>9 P.S. <strong>10</strong>9 X New/Retrofit Telephone/Intercom System<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X Boiler Conversion<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X Cimate Control<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X Classroom Connectivity<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X Lighting Fixtures<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X New/Retrofit Telephone/Intercom System<br />

09 X1<strong>10</strong> P.S. 1<strong>10</strong> X Room Conversions/Partitioning<br />

09 X1<strong>14</strong> P.S. 1<strong>14</strong> X Auditorium Upgrade<br />

09 X1<strong>14</strong> P.S. 1<strong>14</strong> X Classroom Connectivity<br />

09 X1<strong>14</strong> P.S. 1<strong>14</strong> X Low-Voltage Electrical Systems<br />

09 X1<strong>14</strong> P.S. 1<strong>14</strong> X New/Retrofit Telephone/Intercom System<br />

09 X117 I.S. 117 X Classroom Connectivity<br />

09 X117 I.S. 117 X Exterior Masonry<br />

09 X117 I.S. 117 X IP Digital Video Surveillance<br />

09 X117 I.S. 117 X Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

09 X117 I.S. 117 X Roofs<br />

09 X117 I.S. 117 X Toilets-Students<br />

09 X126 P.S. 126 (ECF) X Classroom Connectivity<br />

09 X126 P.S. 126 (ECF) X New/Retrofit Telephone/Intercom System<br />

09 X132 P.S. 132 X Boiler Conversion<br />

09 X132 P.S. 132 X Classroom Connectivity<br />

09 X132 P.S. 132 X Climate Control<br />

09 X132 P.S. 132 X IP Digital Video Surveillance<br />

09 X132 P.S. 132 X Low-Voltage Electrical Systems<br />

09 X132 P.S. 132 X New/Retrofit Telephone/Intercom System<br />

09 X<strong>14</strong>5 I.S. <strong>14</strong>5 X Classroom Connectivity<br />

09 X<strong>14</strong>5 I.S. <strong>14</strong>5 X Emergency Stabilization<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Boiler Conversion<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Classroom Connectivity<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Climate Control<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Parapets<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Paved Area-Blacktop<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Paved Area-Concrete<br />

09 X<strong>14</strong>7 I.S. 339 (OLD <strong>14</strong>7) X Room Conversions/Partitioning<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Classroom Connectivity<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Classroom Connectivity<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Classroom Connectivity<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Classroom Connectivity<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Gymnasium Upgrade<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Hot Water Heater<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Lighting Fixtures<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X New/Retrofit Telephone/Intercom System<br />

09 X<strong>14</strong>8 I.S. 219 (OLD <strong>14</strong>8) X Paved Area-Blacktop<br />

09 X163 P.S. 163 X Classroom Connectivity<br />

09 X163 P.S. 163 X Roofs<br />

09 X166 I.S. 166 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

09 X166 I.S. 166 X Electrical Systems<br />

09 X166 I.S. 166 X Roofs<br />

09 X166 I.S. 166 X Walk In Freezer Replacement<br />

09 X170 P.S. 170 (ECC) X Classroom Connectivity<br />

09 X172 P.S. 11 ANNEX (P172 ECC) X Electrical Systems<br />

09 X173 P.S. 236 X Classroom Connectivity<br />

09 X173 P.S. 236 X Domestic Piping<br />

09 X229 P.S. 230/I.S. 229 (UDC) X Boiler Conversion<br />

09 X229 P.S. 230/I.S. 229 (UDC) X Classroom Connectivity<br />

09 X229 P.S. 230/I.S. 229 (UDC) X Climate Control<br />

09 X229 P.S. 230/I.S. 229 (UDC) X IP Digital Video Surveillance<br />

09 X235 P.S./I.S. 218 X Classroom Connectivity<br />

09 X235 P.S./I.S. 218 X New/Retrofit Telephone/Intercom System<br />

09 X235 P.S./I.S. 218 X Playground Redevelopment<br />

09 X236 P.S. 236 ANNEX (P173 ECC) X New/Retrofit Telephone/Intercom System<br />

09 X338 MORRIS HEIGHTS EDUCATIONAL COMPLEX X Classroom Connectivity<br />

09 X824 P.S. 204 X Room Conversions/Partitioning<br />

09 X862 P.S. 63 MINISCHOOL X Paved Area-Concrete<br />

<strong>10</strong> X003 P.S. 3 X Boiler Conversion<br />

<strong>10</strong> X003 P.S. 3 X Classroom Connectivity<br />

<strong>10</strong> X003 P.S. 3 X Climate Control<br />

<strong>10</strong> X003 P.S. 3 X Elevators And Escalators<br />

<strong>10</strong> X003 P.S. 3 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X007 P.S. 7 X Classroom Connectivity<br />

<strong>10</strong> X007 P.S. 7 X Low-Voltage Electrical Systems<br />

<strong>10</strong> X007 P.S. 7 X Playground Redevelopment<br />

<strong>10</strong> X008 P.S. 8 X Classroom Connectivity<br />

<strong>10</strong> X008 P.S. 8 X Low-Voltage Electrical Systems<br />

<strong>10</strong> X009 P.S. 9 (OLD 115) X Accessibility<br />

<strong>10</strong> X009 P.S. 9 (OLD 115) X Boiler Conversion<br />

<strong>10</strong> X009 P.S. 9 (OLD 115) X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>10</strong> X009 P.S. 9 (OLD 115) X Climate Control<br />

<strong>10</strong> X009 P.S. 9 (OLD 115) X Low-Voltage Electrical Systems<br />

<strong>10</strong> X015 P.S. 15 X Classroom Connectivity<br />

<strong>10</strong> X015 P.S. 15 X Heating Plant Upgrade<br />

<strong>10</strong> X020 P.S. 20 X Classroom Connectivity<br />

<strong>10</strong> X020 P.S. 20 X Exterior Masonry<br />

<strong>10</strong> X020 P.S. 20 X Parapets<br />

<strong>10</strong> X020 P.S. 20 X Playground Redevelopment<br />

<strong>10</strong> X020 P.S. 20 X Roofs<br />

<strong>10</strong> X023 P.S. 23 X Classroom Connectivity<br />

<strong>10</strong> X023 P.S. 23 X Classroom Connectivity<br />

<strong>10</strong> X023 P.S. 23 X Hot Water Heater<br />

<strong>10</strong> X023 P.S. 23 X Ventilation<br />

<strong>10</strong> X024 P.S. 24 X Classroom Connectivity<br />

<strong>10</strong> X024 P.S. 24 X Electrical Systems<br />

<strong>10</strong> X024 P.S. 24 X Parapets<br />

<strong>10</strong> X024 P.S. 24 X Roofs<br />

<strong>10</strong> X026 P.S. 396 X Auditorium Upgrade<br />

<strong>10</strong> X026 P.S. 396 X Classroom Connectivity<br />

<strong>10</strong> X026 P.S. 396 X Flood Elimination<br />

<strong>10</strong> X032 P.S. 32 X Cafeteria / Multipurpose Room Upgrade<br />

<strong>10</strong> X032 P.S. 32 X Classroom Connectivity<br />

<strong>10</strong> X032 P.S. 32 X Climate Control<br />

<strong>10</strong> X032 P.S. 32 X Heating Plant Upgrade<br />

<strong>10</strong> X032 P.S. 32 X Lighting Fixtures<br />

<strong>10</strong> X032 P.S. 32 X Reinforcing Support Elements<br />

<strong>10</strong> X033 P.S. 33 X Classroom Connectivity<br />

<strong>10</strong> X033 P.S. 33 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X033 P.S. 33 X Roofs<br />

<strong>10</strong> X037 P.S. 37 X Classroom Connectivity<br />

<strong>10</strong> X045 I.S. 45 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>10</strong> X045 I.S. 45 X Classroom Connectivity<br />

<strong>10</strong> X045 I.S. 45 X IP Digital Video Surveillance<br />

<strong>10</strong> X046 P.S. 46 X Classroom Connectivity<br />

<strong>10</strong> X054 P.S. 54 X Classroom Connectivity<br />

<strong>10</strong> X056 P.S. 56 X Classroom Connectivity<br />

<strong>10</strong> X056 P.S. 56 X Classroom Connectivity<br />

<strong>10</strong> X056 P.S. 56 X Domestic Piping<br />

<strong>10</strong> X059 P.S. 59 X Classroom Connectivity<br />

<strong>10</strong> X059 P.S. 59 X Library Upgrades<br />

<strong>10</strong> X059 P.S. 59 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X079 P.S. 79 X Classroom Connectivity<br />

<strong>10</strong> X079 P.S. 79 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X080 I.S. 80/P.S. 280 X Classroom Connectivity<br />

<strong>10</strong> X081 P.S. 81 X Cafeteria / Multipurpose Room Upgrade<br />

<strong>10</strong> X081 P.S. 81 X Classroom Connectivity<br />

<strong>10</strong> X081 P.S. 81 X Flood Elimination<br />

<strong>10</strong> X081 P.S. 81 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X085 P.S. 85 X Classroom Connectivity<br />

<strong>10</strong> X085 P.S. 85 X Kitchen Areas<br />

<strong>10</strong> X085 P.S. 85 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X086 P.S. 86 X Auditorium Upgrade<br />

<strong>10</strong> X086 P.S. 86 X Classroom Connectivity<br />

<strong>10</strong> X086 P.S. 86 X Flood Elimination<br />

<strong>10</strong> X086 P.S. 86 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X086 P.S. 86 X Parapets<br />

<strong>10</strong> X091 P.S. 91 X Classroom Connectivity<br />

<strong>10</strong> X091 P.S. 91 X IP Digital Video Surveillance<br />

<strong>10</strong> X091 P.S. 91 X Low-Voltage Electrical Systems<br />

<strong>10</strong> X091 P.S. 91 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X094 P.S. 94 X Classroom Connectivity<br />

<strong>10</strong> X094 P.S. 94 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>10</strong> X094 P.S. 94 X Exterior Masonry<br />

<strong>10</strong> X094 P.S. 94 X Flood Elimination<br />

<strong>10</strong> X094 P.S. 94 X Lighting Fixtures<br />

<strong>10</strong> X094 P.S. 94 X Parapets<br />

<strong>10</strong> X095 P.S. 95 X Classroom Connectivity<br />

<strong>10</strong> X095 P.S. 95 X Electrical Systems<br />

<strong>10</strong> X095 P.S. 95 X Emergency Stabilization<br />

<strong>10</strong> X095 P.S. 95 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X A/C Split System<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Classroom Connectivity<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Exterior Masonry<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Library Upgrades<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Low-Voltage Electrical Systems<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Parapets<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Reinforcing Support Elements<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Roofs<br />

<strong>10</strong> X118 I.S. 118 X Classroom Connectivity<br />

<strong>10</strong> X118 I.S. 118 X Classroom Connectivity<br />

<strong>10</strong> X118 I.S. 118 X Code Compliance<br />

<strong>10</strong> X118 I.S. 118 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X122 P.S. 3<strong>10</strong> X Classroom Connectivity<br />

<strong>10</strong> X122 P.S. 3<strong>10</strong> X Classroom Connectivity<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Boiler Conversion<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Climate Control<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Cooling Tower & Chillers<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Exterior Masonry<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Parapets<br />

<strong>10</strong> X137 I.S. 391 (UDC) X Roofs<br />

<strong>10</strong> X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1 X Classroom Connectivity<br />

<strong>10</strong> X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1 X Climate Control<br />

<strong>10</strong> X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1 X Gymnasium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>10</strong> X<strong>14</strong>1 M.S./H.S. <strong>14</strong>1 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X<strong>14</strong>3 I.S. <strong>14</strong>3 X Classroom Connectivity<br />

<strong>10</strong> X<strong>14</strong>3 I.S. <strong>14</strong>3 X Classroom Connectivity<br />

<strong>10</strong> X<strong>14</strong>3 I.S. <strong>14</strong>3 X Classroom Connectivity<br />

<strong>10</strong> X<strong>14</strong>3 I.S. <strong>14</strong>3 X Elevators And Escalators<br />

<strong>10</strong> X159 P.S. 159 X Classroom Connectivity<br />

<strong>10</strong> X205 P.S. 205A (ECF) X Classroom Connectivity<br />

<strong>10</strong> X205 P.S. 205A (ECF) X Heating Plant Upgrade<br />

<strong>10</strong> X205 P.S. 205A (ECF) X Ventilation<br />

<strong>10</strong> X206 I.S. 206B X A/C Split System<br />

<strong>10</strong> X206 I.S. 206B X Classroom Connectivity<br />

<strong>10</strong> X206 I.S. 206B X Domestic Piping<br />

<strong>10</strong> X209 P.S. 209 X Classroom Connectivity<br />

<strong>10</strong> X209 P.S. 209 X Heating Plant Upgrade<br />

<strong>10</strong> X254 I.S. 254 X Classroom Connectivity<br />

<strong>10</strong> X279 P.S. 279 X Classroom Connectivity<br />

<strong>10</strong> X279 P.S. 279 X Exterior Masonry<br />

<strong>10</strong> X279 P.S. 279 X Parapets<br />

<strong>10</strong> X279 P.S. 279 X Paved Area-Concrete<br />

<strong>10</strong> X279 P.S. 279 X Roofs<br />

<strong>10</strong> X283 JONAS BRONCK ACADEMY X Classroom Connectivity<br />

<strong>10</strong> X283 JONAS BRONCK ACADEMY X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X306 P.S. 306 X Classroom Connectivity<br />

<strong>10</strong> X340 P.S. 340 X Classroom Connectivity<br />

<strong>10</strong> X340 P.S. 340 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X360 P.S. 360 X Classroom Connectivity<br />

<strong>10</strong> X360 P.S. 360 X IP Digital Video Surveillance<br />

<strong>10</strong> X360 P.S. 360 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X368 M.S./H.S. 368 X Classroom Connectivity<br />

<strong>10</strong> X781 P.S. 51 X Classroom Connectivity<br />

<strong>10</strong> X808 P.S. 8 MINISCHOOL X Low-Voltage Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>10</strong> X826 P.S. 226 MINISCHOOL X Classroom Connectivity<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR) X Classroom Connectivity<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR) X Classroom Connectivity<br />

<strong>10</strong> X837 P.S. 23 AX (SAT. LEARN. CTR) X Classroom Connectivity<br />

<strong>10</strong> X841 I.S. 241 X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X842 P.S. 95 ANNEX X Classroom Connectivity<br />

<strong>10</strong> X842 P.S. 95 ANNEX X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X843 P.S. 246 (POE CENTER) X Classroom Connectivity<br />

<strong>10</strong> X843 P.S. 246 (POE CENTER) X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X852 BRONX DANCE ACADEMY X Classroom Connectivity<br />

<strong>10</strong> X852 BRONX DANCE ACADEMY X New/Retrofit Telephone/Intercom System<br />

<strong>10</strong> X958 I.S. 228 X Classroom Connectivity<br />

11 X016 P.S. 16 X Classroom Connectivity<br />

11 X016 P.S. 16 X New/Retrofit Telephone/Intercom System<br />

11 X016 P.S. 16 X Roofs<br />

11 X019 P.S. 19 X Classroom Connectivity<br />

11 X019 P.S. 19 X Domestic Piping<br />

11 X019 P.S. 19 X New/Retrofit Telephone/Intercom System<br />

11 X019 P.S. 19 X Playground Redevelopment<br />

11 X021 P.S. 21 X Auditorium Upgrade<br />

11 X021 P.S. 21 X Classroom Connectivity<br />

11 X021 P.S. 21 X Exterior Masonry<br />

11 X021 P.S. 21 X Flood Elimination<br />

11 X021 P.S. 21 X Lighting Fixtures<br />

11 X021 P.S. 21 X Low-Voltage Electrical Systems<br />

11 X021 P.S. 21 X Parapets<br />

11 X021 P.S. 21 X Roofs<br />

11 X041 P.S. 41 X Boiler Conversion<br />

11 X041 P.S. 41 X Classroom Connectivity<br />

11 X041 P.S. 41 X Climate Control<br />

11 X041 P.S. 41 X Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

11 X041 P.S. 41 X Lighting Fixtures<br />

11 X068 P.S. 68 X Auditorium Upgrade<br />

11 X068 P.S. 68 X Classroom Connectivity<br />

11 X068 P.S. 68 X Flood Elimination<br />

11 X068 P.S. 68 X New/Retrofit Telephone/Intercom System<br />

11 X076 P.S. 76 X Auditorium Upgrade<br />

11 X076 P.S. 76 X Classroom Connectivity<br />

11 X076 P.S. 76 X Exterior Masonry<br />

11 X076 P.S. 76 X Flood Elimination<br />

11 X076 P.S. 76 X New/Retrofit Telephone/Intercom System<br />

11 X076 P.S. 76 X Parapets<br />

11 X076 P.S. 76 X Roofs<br />

11 X078 P.S. 78 X Auditorium Upgrade<br />

11 X078 P.S. 78 X Classroom Connectivity<br />

11 X078 P.S. 78 X Flood Elimination<br />

11 X078 P.S. 78 X New/Retrofit Telephone/Intercom System<br />

11 X078 P.S. 78 X Playground Redevelopment<br />

11 X078 P.S. 78 X Toilets-Students<br />

11 X083 P.S. 83 X Classroom Connectivity<br />

11 X087 P.S. 87 X Classroom Connectivity<br />

11 X089 P.S. 89 X Classroom Connectivity<br />

11 X089 P.S. 89 X Low-Voltage Electrical Systems<br />

11 X089 P.S. 89 X Paved Area-Blacktop<br />

11 X096 P.S. 96 X Classroom Connectivity<br />

11 X097 P.S. 97 X Classroom Connectivity<br />

11 X097 P.S. 97 X Exterior Masonry<br />

11 X097 P.S. 97 X Flood Elimination<br />

11 X097 P.S. 97 X Parapets<br />

11 X097 P.S. 97 X Roofs<br />

11 X<strong>10</strong>3 P.S. <strong>10</strong>3 X Classroom Connectivity<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Accessibility


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Classroom Connectivity<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Fire Supression System<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Low-Voltage Electrical Systems<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X New/Retrofit Telephone/Intercom System<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Playground Redevelopment<br />

11 X<strong>10</strong>6 P.S. <strong>10</strong>6 X Classroom Connectivity<br />

11 X<strong>10</strong>6 P.S. <strong>10</strong>6 X Electrical Systems<br />

11 X<strong>10</strong>8 P.S. <strong>10</strong>8 X Classroom Connectivity<br />

11 X<strong>10</strong>8 P.S. <strong>10</strong>8 X Emergency Stabilization<br />

11 X<strong>10</strong>8 P.S. <strong>10</strong>8 X IP Digital Video Surveillance<br />

11 X111 P.S. 111 X Classroom Connectivity<br />

11 X111 P.S. 111 X New/Retrofit Telephone/Intercom System<br />

11 X111 P.S. 111 X Playground Redevelopment<br />

11 X112 P.S. 112 X Classroom Connectivity<br />

11 X112 P.S. 112 X Exterior Masonry<br />

11 X112 P.S. 112 X Lighting Fixtures<br />

11 X112 P.S. 112 X Parapets<br />

11 X112 P.S. 112 X Roofs<br />

11 X113 I.S. 113 X Auditorium Upgrade<br />

11 X113 I.S. 113 X Classroom Connectivity<br />

11 X113 I.S. 113 X Climate Control<br />

11 X113 I.S. 113 X Floors<br />

11 X113 I.S. 113 X Heating Plant Upgrade<br />

11 X113 I.S. 113 X New/Retrofit Telephone/Intercom System<br />

11 X121 P.S. 121 X Auditorium Upgrade<br />

11 X121 P.S. 121 X Classroom Connectivity<br />

11 X127 I.S. 127 X Accessibility<br />

11 X127 I.S. 127 X Classroom Connectivity<br />

11 X127 I.S. 127 X Floors<br />

11 X127 I.S. 127 X IP Digital Video Surveillance<br />

11 X135 I.S. 135 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

11 X135 I.S. 135 X IP Digital Video Surveillance<br />

11 X135 I.S. 135 X Roofs<br />

11 X135 I.S. 135 X Room Conversions/Partitioning<br />

11 X<strong>14</strong>2 I.S. <strong>14</strong>2 X Classroom Connectivity<br />

11 X<strong>14</strong>2 I.S. <strong>14</strong>2 X New/Retrofit Telephone/Intercom System<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Boiler Conversion<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Classroom Connectivity<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Climate Control<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Flood Elimination<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Lighting Fixtures<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X New/Retrofit Telephone/Intercom System<br />

11 X153 P.S. 153 X Classroom Connectivity<br />

11 X153 P.S. 153 X Classroom Connectivity<br />

11 X153 P.S. 153 X Lighting Fixtures<br />

11 X160 P.S. 160 X Classroom Connectivity<br />

11 X160 P.S. 160 X IP Digital Video Surveillance<br />

11 X160 P.S. 160 X Paved Area-Concrete<br />

11 X160 P.S. 160 X Windows<br />

11 X169 HE WILLIE ELLA PASCHAL BOWMAN CAMPU X Classroom Connectivity<br />

11 X175 P.S. 175 X Classroom Connectivity<br />

11 X175 P.S. 175 X Windows<br />

11 X178 P.S. 178 X Classroom Connectivity<br />

11 X180 I.S. 180 X Classroom Connectivity<br />

11 X181 I.S. 181 X Classroom Connectivity<br />

11 X189 P.S./I.S. 189 (@STEENWICK AVE) X Classroom Connectivity<br />

11 X189 P.S./I.S. 189 (@STEENWICK AVE) X Classroom Connectivity<br />

11 X189 P.S./I.S. 189 (@STEENWICK AVE) X Classroom Connectivity<br />

11 X194 P.S./I.S. 194 X Classroom Connectivity<br />

11 X194 P.S./I.S. 194 X IP Digital Video Surveillance<br />

11 X498 TIS MEYRAN AND JOHN BELLEW EDUCATIO X Classroom Connectivity<br />

12 X006 P.S. 6 X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

12 X006 P.S. 6 X Classroom Connectivity<br />

12 X006 P.S. 6 X Interior Spaces<br />

12 X006 P.S. 6 X Lighting Fixtures<br />

12 X006 P.S. 6 X Reinforcing Support Elements<br />

12 X044 P.S. 44 X Classroom Connectivity<br />

12 X044 P.S. 44 X Electrical Systems<br />

12 X044 P.S. 44 X Flood Elimination<br />

12 X044 P.S. 44 X Walk In Freezer Replacement<br />

12 X047 P.S. 47 X Classroom Connectivity<br />

12 X047 P.S. 47 X Floors<br />

12 X047 P.S. 47 X Gymnasium Upgrade<br />

12 X047 P.S. 47 X Playground Redevelopment<br />

12 X050 P.S. 50 X Auditorium Upgrade<br />

12 X050 P.S. 50 X Classroom Connectivity<br />

12 X050 P.S. 50 X New/Retrofit Telephone/Intercom System<br />

12 X050 P.S. 50 X Walk In Freezer Replacement<br />

12 X057 P.S. 57 X Classroom Connectivity<br />

12 X057 P.S. 57 X Low-Voltage Electrical Systems<br />

12 X057 P.S. 57 X Playground Redevelopment<br />

12 X061 P.S. 61 X Classroom Connectivity<br />

12 X061 P.S. 61 X Classroom Connectivity<br />

12 X061 P.S. 61 X Low-Voltage Electrical Systems<br />

12 X061 P.S. 61 X New/Retrofit Telephone/Intercom System<br />

12 X061 P.S. 61 X School Safety<br />

12 X061 P.S. 61 X Walk In Freezer Replacement<br />

12 X066 P.S. 66 X Classroom Connectivity<br />

12 X066 P.S. 66 X IP Digital Video Surveillance<br />

12 X066 P.S. 66 X New/Retrofit Telephone/Intercom System<br />

12 X067 P.S. 67 X Classroom Connectivity<br />

12 X067 P.S. 67 X Emergency Stabilization<br />

12 X067 P.S. 67 X Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

12 X067 P.S. 67 X Floors<br />

12 X067 P.S. 67 X IP Digital Video Surveillance<br />

12 X067 P.S. 67 X Lighting Fixtures<br />

12 X067 P.S. 67 X New/Retrofit Telephone/Intercom System<br />

12 X067 P.S. 67 X Reinforcing Cinder Concrete Slabs<br />

12 X067 P.S. 67 X Science Lab Upgrades<br />

12 X077 P.S. 195 X Classroom Connectivity<br />

12 X077 P.S. 195 X New/Retrofit Telephone/Intercom System<br />

12 X077 P.S. 195 X Reinforcing Support Elements<br />

12 X092 P.S. 92 X Classroom Connectivity<br />

12 X092 P.S. 92 X Lighting Fixtures<br />

12 X092 P.S. 92 X New/Retrofit Telephone/Intercom System<br />

12 X098 I.S. 98 X Cafeteria / Multipurpose Room Upgrade<br />

12 X098 I.S. 98 X Classroom Connectivity<br />

12 X098 I.S. 98 X Flood Elimination<br />

12 X098 I.S. 98 X IP Digital Video Surveillance<br />

12 X098 I.S. 98 X Parapets<br />

12 X098 I.S. 98 X Paved Area-Concrete<br />

12 X098 I.S. 98 X Technology<br />

12 X<strong>10</strong>2 P.S. <strong>10</strong>2 X Classroom Connectivity<br />

12 X116 I.S. 216 X Boiler Conversion<br />

12 X116 I.S. 216 X Classroom Connectivity<br />

12 X116 I.S. 216 X Climate Control<br />

12 X116 I.S. 216 X New/Retrofit Telephone/Intercom System<br />

12 X116 I.S. 216 X Walk In Freezer Replacement<br />

12 X129 I.S. 129 (PAIRED W P234) X Boiler Conversion<br />

12 X129 I.S. 129 (PAIRED W P234) X Classroom Connectivity<br />

12 X129 I.S. 129 (PAIRED W P234) X Climate Control<br />

12 X129 I.S. 129 (PAIRED W P234) X Exterior Masonry<br />

12 X129 I.S. 129 (PAIRED W P234) X Science Lab Upgrades<br />

12 X129 I.S. 129 (PAIRED W P234) X Walk In Freezer Replacement


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

12 X134 P.S. 134 X Classroom Connectivity<br />

12 X134 P.S. 134 X Exterior Masonry<br />

12 X134 P.S. 134 X Flood Elimination<br />

12 X134 P.S. 134 X Parapets<br />

12 X134 P.S. 134 X Roofs<br />

12 X150 P.S. 150 X Classroom Connectivity<br />

12 X150 P.S. 150 X Lighting Fixtures<br />

12 X150 P.S. 150 X Lighting Fixtures<br />

12 X158 I.S. 158 X Boiler Conversion<br />

12 X158 I.S. 158 X Classroom Connectivity<br />

12 X158 I.S. 158 X Classroom Connectivity<br />

12 X158 I.S. 158 X Climate Control<br />

12 X167 P.S. 2<strong>14</strong> X Air Conditioning Retrofit<br />

12 X167 P.S. 2<strong>14</strong> X Boiler Conversion<br />

12 X167 P.S. 2<strong>14</strong> X Classroom Connectivity<br />

12 X167 P.S. 2<strong>14</strong> X Climate Control<br />

12 X167 P.S. 2<strong>14</strong> X New/Retrofit Telephone/Intercom System<br />

12 X193 P.S. 211 X Boiler Conversion<br />

12 X193 P.S. 211 X Classroom Connectivity<br />

12 X193 P.S. 211 X Climate Control<br />

12 X193 P.S. 211 X Elevators and Escalators<br />

12 X193 P.S. 211 X Technology<br />

12 X193 P.S. 211 X Technology<br />

12 X198 P.S. 198 X Boiler Conversion<br />

12 X198 P.S. 198 X Classroom Connectivity<br />

12 X198 P.S. 198 X Climate Control<br />

12 X198 P.S. 198 X New/Retrofit Telephone/Intercom System<br />

12 X234 P.S. 234 (PAIRED W I129) X Classroom Connectivity<br />

12 X234 P.S. 234 (PAIRED W I129) X New/Retrofit Telephone/Intercom System<br />

13 K003 P.S. 3 K Classroom Connectivity<br />

13 K003 P.S. 3 K Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

13 K003 P.S. 3 K Low-Voltage Electrical Systems<br />

13 K003 P.S. 3 K New/Retrofit Telephone/Intercom System<br />

13 K003 P.S. 3 K Parapets<br />

13 K003 P.S. 3 K Playground Redevelopment<br />

13 K003 P.S. 3 K Roofs<br />

13 K008 P.S. 8 K Classroom Connectivity<br />

13 K008 P.S. 8 K Exterior Masonry<br />

13 K008 P.S. 8 K Parapets<br />

13 K008 P.S. 8 K Windows<br />

13 K009 P.S. 9 K Classroom Connectivity<br />

13 K009 P.S. 9 K Classroom Connectivity<br />

13 K009 P.S. 9 K Emergency Stabilization<br />

13 K009 P.S. 9 K Technology<br />

13 K011 P.S. 11 K Auditorium Upgrade<br />

13 K011 P.S. 11 K Classroom Connectivity<br />

13 K011 P.S. 11 K Flood Elimination<br />

13 K011 P.S. 11 K New/Retrofit Telephone/Intercom System<br />

13 K020 P.S. 20 K Classroom Connectivity<br />

13 K020 P.S. 20 K Exterior Masonry<br />

13 K020 P.S. 20 K Lighting Fixtures<br />

13 K020 P.S. 20 K Parapets<br />

13 K020 P.S. 20 K Room Conversions/Partitioning<br />

13 K020 P.S. 20 K School Improvement and Restructuring<br />

13 K044 P.S. 44 K Boiler Conversion<br />

13 K044 P.S. 44 K Classroom Connectivity<br />

13 K044 P.S. 44 K Climate Control<br />

13 K044 P.S. 44 K Domestic Piping<br />

13 K046 P.S. 46 K Classroom Connectivity<br />

13 K046 P.S. 46 K Classroom Connectivity<br />

13 K046 P.S. 46 K New/Retrofit Telephone/Intercom System<br />

13 K046 P.S. 46 K Room Conversions/Partitioning


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

13 K046 P.S. 46 K Science Lab Upgrades<br />

13 K054 P.S. 54 K Classroom Connectivity<br />

13 K054 P.S. 54 K Electrical Systems<br />

13 K054 P.S. 54 K Lighting Fixtures<br />

13 K054 P.S. 54 K Low-Voltage Electrical Systems<br />

13 K054 P.S. 54 K Paved Area-Blacktop<br />

13 K054 P.S. 54 K Safety Systems<br />

13 K054 P.S. 54 K Toilets-Students<br />

13 K056 P.S. 56 K Classroom Connectivity<br />

13 K056 P.S. 56 K Classroom Connectivity<br />

13 K056 P.S. 56 K New/Retrofit Telephone/Intercom System<br />

13 K067 P.S. 67 K Classroom Connectivity<br />

13 K067 P.S. 67 K Exterior Masonry<br />

13 K067 P.S. 67 K Flood Elimination<br />

13 K067 P.S. 67 K Lighting Fixtures<br />

13 K067 P.S. 67 K Low-Voltage Electrical Systems<br />

13 K067 P.S. 67 K New/Retrofit Telephone/Intercom System<br />

13 K067 P.S. 67 K Parapets<br />

13 K093 P.S. 93 K Auditorium Upgrade<br />

13 K093 P.S. 93 K Classroom Connectivity<br />

13 K093 P.S. 93 K Lighting Fixtures<br />

13 K093 P.S. 93 K New/Retrofit Telephone/Intercom System<br />

13 K113 I.S. 113 K Classroom Connectivity<br />

13 K113 I.S. 113 K Classroom Connectivity<br />

13 K113 I.S. 113 K IP Digital Video Surveillance<br />

13 K117 I.S. 117 K Classroom Connectivity<br />

13 K117 I.S. 117 K Classroom Connectivity<br />

13 K117 I.S. 117 K IP Digital Video Surveillance<br />

13 K117 I.S. 117 K Lighting Fixtures<br />

13 K256 P.S. 256 K Classroom Connectivity<br />

13 K256 P.S. 256 K Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

13 K256 P.S. 256 K New/Retrofit Telephone/Intercom System<br />

13 K256 P.S. 256 K Science Lab Upgrades<br />

13 K258 I.S. 258 K Classroom Connectivity<br />

13 K258 I.S. 258 K Classroom Connectivity<br />

13 K258 I.S. 258 K Lighting Fixtures<br />

13 K265 I.S. 265 K Classroom Connectivity<br />

13 K265 I.S. 265 K Lighting Fixtures<br />

13 K265 I.S. 265 K New/Retrofit Telephone/Intercom System<br />

13 K265 I.S. 265 K Science Lab Upgrades<br />

13 K270 P.S. 270 K Classroom Connectivity<br />

13 K270 P.S. 270 K New/Retrofit Telephone/Intercom System<br />

13 K282 P.S. 282 K Classroom Connectivity<br />

13 K282 P.S. 282 K Lighting Fixtures<br />

13 K282 P.S. 282 K New/Retrofit Telephone/Intercom System<br />

13 K287 P.S. 287 K Classroom Connectivity<br />

13 K287 P.S. 287 K Classroom Connectivity<br />

13 K287 P.S. 287 K New/Retrofit Telephone/Intercom System<br />

13 K287 P.S. 287 K Science Lab Upgrades<br />

13 K305 P.S. 305 K Classroom Connectivity<br />

13 K305 P.S. 305 K Emergency Stabilization<br />

13 K305 P.S. 305 K Lighting Fixtures<br />

13 K305 P.S. 305 K New/Retrofit Telephone/Intercom System<br />

13 K763 P.S. 133 ANNEX K Classroom Connectivity<br />

13 K813 DIST. OFFICE #13 (OLD 9 AX) K New/Retrofit Telephone/Intercom System<br />

13 K813 DIST. OFFICE #13 (OLD 9 AX) K Science Lab Upgrades<br />

<strong>14</strong> K016 P.S. 16 K Cafeteria / Multipurpose Room Upgrade<br />

<strong>14</strong> K016 P.S. 16 K Classroom Connectivity<br />

<strong>14</strong> K016 P.S. 16 K Lighting Fixtures<br />

<strong>14</strong> K016 P.S. 16 K Low-Voltage Electrical Systems<br />

<strong>14</strong> K017 P.S. 17 K Classroom Connectivity<br />

<strong>14</strong> K017 P.S. 17 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>14</strong> K018 P.S. 18 K Classroom Connectivity<br />

<strong>14</strong> K018 P.S. 18 K Flood Elimination<br />

<strong>14</strong> K018 P.S. 18 K Lighting Fixtures<br />

<strong>14</strong> K018 P.S. 18 K Windows<br />

<strong>14</strong> K019 P.S. 19 K Classroom Connectivity<br />

<strong>14</strong> K019 P.S. 19 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K023 P.S. 23 K Classroom Connectivity<br />

<strong>14</strong> K023 P.S. 23 K Lighting Fixtures<br />

<strong>14</strong> K023 P.S. 23 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Classroom Connectivity<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Low-Voltage Electrical Systems<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K033 I.S. 33 K Classroom Connectivity<br />

<strong>14</strong> K033 I.S. 33 K Classroom Connectivity<br />

<strong>14</strong> K033 I.S. 33 K Room Conversions/Partitioning<br />

<strong>14</strong> K033 I.S. 33 K Room Conversions/Partitioning<br />

<strong>14</strong> K033 I.S. 33 K Science Lab Upgrades<br />

<strong>14</strong> K033 I.S. 33 K Technology<br />

<strong>14</strong> K033 I.S. 33 K Technology<br />

<strong>14</strong> K034 P.S. 34 K Classroom Connectivity<br />

<strong>14</strong> K034 P.S. 34 K Lighting Fixtures<br />

<strong>14</strong> K049 I.S. 49 K Classroom Connectivity<br />

<strong>14</strong> K049 I.S. 49 K Classroom Connectivity<br />

<strong>14</strong> K049 I.S. 49 K Classroom Connectivity<br />

<strong>14</strong> K049 I.S. 49 K Classroom Connectivity<br />

<strong>14</strong> K049 I.S. 49 K Classroom Connectivity<br />

<strong>14</strong> K049 I.S. 49 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K049 I.S. 49 K Parapets<br />

<strong>14</strong> K049 I.S. 49 K School Improvement and Restructuring<br />

<strong>14</strong> K050 J.H.S. 50 K Auditorium Upgrade<br />

<strong>14</strong> K050 J.H.S. 50 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>14</strong> K050 J.H.S. 50 K Classroom Connectivity<br />

<strong>14</strong> K050 J.H.S. 50 K Electrical Systems<br />

<strong>14</strong> K050 J.H.S. 50 K Exterior Masonry<br />

<strong>14</strong> K050 J.H.S. 50 K IP Digital Video Surveillance<br />

<strong>14</strong> K050 J.H.S. 50 K Lighting Fixtures<br />

<strong>14</strong> K050 J.H.S. 50 K Parapets<br />

<strong>14</strong> K050 J.H.S. 50 K Technology<br />

<strong>14</strong> K059 P.S. 59 K Classroom Connectivity<br />

<strong>14</strong> K059 P.S. 59 K Lighting Fixtures<br />

<strong>14</strong> K059 P.S. 59 K Room Conversions/Partitioning<br />

<strong>14</strong> K059 P.S. 59 K Technology<br />

<strong>14</strong> K071 I.S. 71 K Boiler Conversion<br />

<strong>14</strong> K071 I.S. 71 K Classroom Connectivity<br />

<strong>14</strong> K071 I.S. 71 K Climate Control<br />

<strong>14</strong> K071 I.S. 71 K Low-Voltage Electrical Systems<br />

<strong>14</strong> K071 I.S. 71 K Windows<br />

<strong>14</strong> K084 P.S. 84 K Classroom Connectivity<br />

<strong>14</strong> K1<strong>10</strong> P.S. 1<strong>10</strong> K Classroom Connectivity<br />

<strong>14</strong> K1<strong>10</strong> P.S. 1<strong>10</strong> K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K1<strong>10</strong> P.S. 1<strong>10</strong> K Room Conversions/Partitioning<br />

<strong>14</strong> K120 P.S. 120 K Classroom Connectivity<br />

<strong>14</strong> K120 P.S. 120 K Playground Redevelopment<br />

<strong>14</strong> K126 J.H.S. 126 K Classroom Connectivity<br />

<strong>14</strong> K126 J.H.S. 126 K Exterior Masonry<br />

<strong>14</strong> K126 J.H.S. 126 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K126 J.H.S. 126 K Windows<br />

<strong>14</strong> K132 P.S. 132 K Classroom Connectivity<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7 K Classroom Connectivity<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7 K Classroom Connectivity<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7 K Lighting Fixtures<br />

<strong>14</strong> K<strong>14</strong>7 P.S. <strong>14</strong>7 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>14</strong> K157 P.S. 157 K Cafeteria / Multipurpose Room Upgrade<br />

<strong>14</strong> K157 P.S. 157 K Classroom Connectivity<br />

<strong>14</strong> K157 P.S. 157 K Exterior Masonry<br />

<strong>14</strong> K157 P.S. 157 K Lighting Fixtures<br />

<strong>14</strong> K157 P.S. 157 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K196 P.S. 196 K Classroom Connectivity<br />

<strong>14</strong> K196 P.S. 196 K Classroom Connectivity<br />

<strong>14</strong> K196 P.S. 196 K Exterior Masonry<br />

<strong>14</strong> K196 P.S. 196 K Flood Elimination<br />

<strong>14</strong> K196 P.S. 196 K Low-Voltage Electrical Systems<br />

<strong>14</strong> K196 P.S. 196 K Parapets<br />

<strong>14</strong> K196 P.S. 196 K Windows<br />

<strong>14</strong> K250 P.S. 250 K Classroom Connectivity<br />

<strong>14</strong> K250 P.S. 250 K Library Upgrades<br />

<strong>14</strong> K250 P.S. 250 K Lighting Fixtures<br />

<strong>14</strong> K250 P.S. 250 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K250 P.S. 250 K Safety Systems<br />

<strong>14</strong> K250 P.S. 250 K Windows<br />

<strong>14</strong> K257 P.S. 257 K Classroom Connectivity<br />

<strong>14</strong> K257 P.S. 257 K Lighting Fixtures<br />

<strong>14</strong> K257 P.S. 257 K Lighting Fixtures<br />

<strong>14</strong> K297 P.S. 297 K Classroom Connectivity<br />

<strong>14</strong> K297 P.S. 297 K Lighting Fixtures<br />

<strong>14</strong> K297 P.S. 297 K New/Retrofit Telephone/Intercom System<br />

<strong>14</strong> K318 I.S. 318 K Classroom Connectivity<br />

<strong>14</strong> K318 I.S. 318 K Exterior Masonry<br />

<strong>14</strong> K318 I.S. 318 K IP Digital Video Surveillance<br />

<strong>14</strong> K318 I.S. 318 K Parapets<br />

<strong>14</strong> K318 I.S. 318 K Windows<br />

<strong>14</strong> K319 P.S. 319 K Classroom Connectivity<br />

<strong>14</strong> K319 P.S. 319 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

<strong>14</strong> K380 P.S. 380 K Classroom Connectivity<br />

<strong>14</strong> K380 P.S. 380 K Flood Elimination<br />

<strong>14</strong> K380 P.S. 380 K Lighting Fixtures<br />

<strong>14</strong> K380 P.S. 380 K Low-Voltage Electrical Systems<br />

<strong>14</strong> K380 P.S. 380 K Paved Area-Blacktop<br />

<strong>14</strong> K380 P.S. 380 K Roofs<br />

<strong>14</strong> K380 P.S. 380 K Windows<br />

15 K001 P.S. 1 K Boiler Conversion<br />

15 K001 P.S. 1 K Cimate Control<br />

15 K001 P.S. 1 K Classroom Connectivity<br />

15 K001 P.S. 1 K Electrical Systems<br />

15 K001 P.S. 1 K Emergency Stabilization<br />

15 K001 P.S. 1 K Exterior Masonry<br />

15 K001 P.S. 1 K Lighting Fixtures<br />

15 K001 P.S. 1 K Parapets<br />

15 K001 P.S. 1 K Roofs<br />

15 K001 P.S. 1 K Windows<br />

15 K0<strong>10</strong> P.S. <strong>10</strong> K Classroom Connectivity<br />

15 K0<strong>10</strong> P.S. <strong>10</strong> K Lighting Fixtures<br />

15 K0<strong>10</strong> P.S. <strong>10</strong> K Low-Voltage Electrical Systems<br />

15 K0<strong>10</strong> P.S. <strong>10</strong> K New/Retrofit Telephone/Intercom System<br />

15 K015 P.S. 15 K Classroom Connectivity<br />

15 K015 P.S. 15 K New/Retrofit Telephone/Intercom System<br />

15 K015 P.S. 15 K Room Conversions/Partitioning<br />

15 K015 P.S. 15 K School Improvement and Restructuring<br />

15 K024 P.S. 24 K Classroom Connectivity<br />

15 K024 P.S. 24 K Classroom Connectivity<br />

15 K027 P.S. 27 K Classroom Connectivity<br />

15 K027 P.S. 27 K IP Digital Video Surveillance<br />

15 K029 P.S. 29 K Classroom Connectivity<br />

15 K029 P.S. 29 K Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

15 K029 P.S. 29 K Flood Elimination<br />

15 K029 P.S. 29 K IP Digital Video Surveillance<br />

15 K029 P.S. 29 K Parapets<br />

15 K029 P.S. 29 K Roofs<br />

15 K032 P.S. 32 K Classroom Connectivity<br />

15 K032 P.S. 32 K Domestic Piping<br />

15 K032 P.S. 32 K Lighting Fixtures<br />

15 K032 P.S. 32 K Lighting Fixtures<br />

15 K032 P.S. 32 K New/Retrofit Telephone/Intercom System<br />

15 K038 P.S. 38 K Classroom Connectivity<br />

15 K038 P.S. 38 K Domestic Piping<br />

15 K038 P.S. 38 K Emergency Stabilization<br />

15 K038 P.S. 38 K Lighting Fixtures<br />

15 K038 P.S. 38 K New/Retrofit Telephone/Intercom System<br />

15 K038 P.S. 38 K Roofs<br />

15 K039 P.S. 39 K Classroom Connectivity<br />

15 K039 P.S. 39 K Exterior Masonry<br />

15 K039 P.S. 39 K New/Retrofit Telephone/Intercom System<br />

15 K051 I.S. 51 K Classroom Connectivity<br />

15 K051 I.S. 51 K Gymnasium Upgrade<br />

15 K051 I.S. 51 K Lighting Fixtures<br />

15 K051 I.S. 51 K New/Retrofit Telephone/Intercom System<br />

15 K058 P.S. 58 K Classroom Connectivity<br />

15 K058 P.S. 58 K Lighting Fixtures<br />

15 K088 I.S. 88 K Boiler Conversion<br />

15 K088 I.S. 88 K Cimate Control<br />

15 K088 I.S. 88 K Classroom Connectivity<br />

15 K088 I.S. 88 K Exterior Masonry<br />

15 K088 I.S. 88 K IP Digital Video Surveillance<br />

15 K088 I.S. 88 K New/Retrofit Telephone/Intercom System<br />

15 K088 I.S. 88 K Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

15 K088 I.S. 88 K Room Conversions/Partitioning<br />

15 K088 I.S. 88 K Science Lab Upgrades<br />

15 K094 P.S. 94 K Classroom Connectivity<br />

15 K094 P.S. 94 K Playground Redevelopment<br />

15 K<strong>10</strong>7 P.S. <strong>10</strong>7 K Classroom Connectivity<br />

15 K<strong>10</strong>7 P.S. <strong>10</strong>7 K New/Retrofit Telephone/Intercom System<br />

15 K124 P.S. 124 K Classroom Connectivity<br />

15 K124 P.S. 124 K Lighting Fixtures<br />

15 K130 P.S. 130 K Classroom Connectivity<br />

15 K130 P.S. 130 K Classroom Connectivity<br />

15 K130 P.S. 130 K Lighting Fixtures<br />

15 K131 P.S. 131 K Classroom Connectivity<br />

15 K131 P.S. 131 K New/Retrofit Telephone/Intercom System<br />

15 K136 I.S. 136 K Classroom Connectivity<br />

15 K136 I.S. 136 K Classroom Connectivity<br />

15 K136 I.S. 136 K Classroom Connectivity<br />

15 K136 I.S. 136 K Domestic Piping<br />

15 K136 I.S. 136 K IP Digital Video Surveillance<br />

15 K136 I.S. 136 K Low-Voltage Electrical Systems<br />

15 K136 I.S. 136 K New/Retrofit Telephone/Intercom System<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Classroom Connectivity<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Exterior Masonry<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Flood Elimination<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Lighting Fixtures<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Low-Voltage Electrical Systems<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K New/Retrofit Telephone/Intercom System<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Parapets<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Paved Area-Concrete<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Roofs<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Room Conversions/Partitioning<br />

15 K<strong>14</strong>2 J.H.S. <strong>14</strong>2 K Windows


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

15 K154 P.S. 154 K Classroom Connectivity<br />

15 K169 P.S. 169 K Classroom Connectivity<br />

15 K169 P.S. 169 K Playground Redevelopment<br />

15 K172 P.S. 172 K Classroom Connectivity<br />

15 K172 P.S. 172 K Domestic Piping<br />

15 K230 P.S. 230 K Classroom Connectivity<br />

15 K230 P.S. 230 K Code Compliance<br />

15 K230 P.S. 230 K New/Retrofit Telephone/Intercom System<br />

15 K261 P.S. 261 K Classroom Connectivity<br />

15 K261 P.S. 261 K Domestic Piping<br />

15 K261 P.S. 261 K IP Digital Video Surveillance<br />

15 K261 P.S. 261 K New/Retrofit Telephone/Intercom System<br />

15 K293 J.H.S. 293 K Classroom Connectivity<br />

15 K293 J.H.S. 293 K Classroom Connectivity<br />

15 K293 J.H.S. 293 K Lighting Fixtures<br />

15 K293 J.H.S. 293 K Room Conversions/Partitioning<br />

15 K293 J.H.S. 293 K Room Conversions/Partitioning<br />

15 K321 P.S. 321 K Classroom Connectivity<br />

15 K845 P.S. 295 K Classroom Connectivity<br />

15 K845 P.S. 295 K Room Conversions/Partitioning<br />

16 K005 P.S. 5 K Classroom Connectivity<br />

16 K005 P.S. 5 K Exterior Masonry<br />

16 K005 P.S. 5 K Parapets<br />

16 K005 P.S. 5 K Roofs<br />

16 K005 P.S. 5 K Windows<br />

16 K021 P.S. 21 K Classroom Connectivity<br />

16 K021 P.S. 21 K Exterior Masonry<br />

16 K021 P.S. 21 K Flood Elimination<br />

16 K021 P.S. 21 K Lighting Fixtures<br />

16 K021 P.S. 21 K New/Retrofit Telephone/Intercom System<br />

16 K021 P.S. 21 K Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

16 K021 P.S. 21 K Paved Area-Blacktop<br />

16 K021 P.S. 21 K Roofs<br />

16 K025 P.S. 25 K Classroom Connectivity<br />

16 K025 P.S. 25 K Classroom Connectivity<br />

16 K025 P.S. 25 K Safety Systems<br />

16 K025 P.S. 25 K Toilets-Students<br />

16 K026 P.S. 26 K Boiler Conversion<br />

16 K026 P.S. 26 K Classroom Connectivity<br />

16 K026 P.S. 26 K Classroom Connectivity<br />

16 K026 P.S. 26 K Climate Control<br />

16 K026 P.S. 26 K Exterior Masonry<br />

16 K026 P.S. 26 K IP Digital Video Surveillance<br />

16 K026 P.S. 26 K Lighting Fixtures<br />

16 K026 P.S. 26 K New/Retrofit Telephone/Intercom System<br />

16 K026 P.S. 26 K Roofs<br />

16 K035 I.S. 35 K Cimate Control<br />

16 K035 I.S. 35 K Classroom Connectivity<br />

16 K035 I.S. 35 K Low-Voltage Electrical Systems<br />

16 K040 P.S. 40 K Classroom Connectivity<br />

16 K040 P.S. 40 K Classroom Connectivity<br />

16 K040 P.S. 40 K Lighting Fixtures<br />

16 K040 P.S. 40 K Playground Redevelopment<br />

16 K057 J.H.S. 57 K Classroom Connectivity<br />

16 K057 J.H.S. 57 K Domestic Piping<br />

16 K057 J.H.S. 57 K Electrical Systems<br />

16 K057 J.H.S. 57 K Exterior Masonry<br />

16 K057 J.H.S. 57 K Parapets<br />

16 K057 J.H.S. 57 K Roofs<br />

16 K057 J.H.S. 57 K Science Lab Upgrades<br />

16 K081 P.S. 81 K Classroom Connectivity<br />

16 K081 P.S. 81 K Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

16 K081 P.S. 81 K Emergency Stabilization<br />

16 K243 P.S. 243 K New/Retrofit Telephone/Intercom System<br />

16 K262 P.S. 262 K Lighting Fixtures<br />

16 K262 P.S. 262 K Lighting Fixtures<br />

16 K262 P.S. 262 K New/Retrofit Telephone/Intercom System<br />

16 K262 P.S. 262 K Science Lab Upgrades<br />

16 K304 P.S. 304 K Classroom Connectivity<br />

16 K304 P.S. 304 K Lighting Fixtures<br />

16 K304 P.S. 304 K New/Retrofit Telephone/Intercom System<br />

16 K308 P.S. 308 K Classroom Connectivity<br />

16 K308 P.S. 308 K IP Digital Video Surveillance<br />

16 K308 P.S. 308 K Lighting Fixtures<br />

16 K308 P.S. 308 K Room Conversions/Partitioning<br />

16 K309 P.S. 309 K Classroom Connectivity<br />

16 K309 P.S. 309 K Floors<br />

16 K309 P.S. 309 K New/Retrofit Telephone/Intercom System<br />

16 K324 I.S. 324 K Boiler Conversion<br />

16 K324 I.S. 324 K Classroom Connectivity<br />

16 K324 I.S. 324 K Climate Control<br />

16 K335 P.S. 335 K Classroom Connectivity<br />

16 K335 P.S. 335 K Exterior Masonry<br />

16 K335 P.S. 335 K IP Digital Video Surveillance<br />

16 K335 P.S. 335 K Lighting Fixtures<br />

16 K335 P.S. 335 K Roofs<br />

17 K002 I.S. 2 K Classroom Connectivity<br />

17 K002 I.S. 2 K Classroom Connectivity<br />

17 K002 I.S. 2 K Classroom Connectivity<br />

17 K002 I.S. 2 K Domestic Piping<br />

17 K002 I.S. 2 K Science Lab Upgrades<br />

17 K006 P.S. 6 K Classroom Connectivity<br />

17 K006 P.S. 6 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

17 K006 P.S. 6 K Roofs<br />

17 K012 P.S. 12 K Classroom Connectivity<br />

17 K012 P.S. 12 K Classroom Connectivity<br />

17 K012 P.S. 12 K IP Digital Video Surveillance<br />

17 K012 P.S. 12 K Playground Redevelopment<br />

17 K022 P.S. 22 K Classroom Connectivity<br />

17 K022 P.S. 22 K IP Digital Video Surveillance<br />

17 K061 I.S. 61 K Classroom Connectivity<br />

17 K061 I.S. 61 K IP Digital Video Surveillance<br />

17 K091 P.S. 91 K Classroom Connectivity<br />

17 K091 P.S. 91 K Library Upgrades<br />

17 K092 P.S. 92 K Classroom Connectivity<br />

17 K092 P.S. 92 K Exterior Masonry<br />

17 K092 P.S. 92 K Low-Voltage Electrical Systems<br />

17 K092 P.S. 92 K Roofs<br />

17 K138 P.S. 138 K Auditorium Upgrade<br />

17 K138 P.S. 138 K Classroom Connectivity<br />

17 K138 P.S. 138 K Exterior Masonry<br />

17 K138 P.S. 138 K New/Retrofit Telephone/Intercom System<br />

17 K138 P.S. 138 K Parapets<br />

17 K138 P.S. 138 K Science Lab Upgrades<br />

17 K161 P.S. 161 K Classroom Connectivity<br />

17 K161 P.S. 161 K Lighting Fixtures<br />

17 K161 P.S. 161 K New/Retrofit Telephone/Intercom System<br />

17 K167 P.S. 167 K Classroom Connectivity<br />

17 K167 P.S. 167 K Interior Spaces<br />

17 K167 P.S. 167 K IP Digital Video Surveillance<br />

17 K167 P.S. 167 K New/Retrofit Telephone/Intercom System<br />

17 K181 P.S. 181 K Classroom Connectivity<br />

17 K181 P.S. 181 K Playground Redevelopment<br />

17 K181 P.S. 181 K Roofs


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

17 K181 P.S. 181 K Windows<br />

17 K189 P.S. 189 K Classroom Connectivity<br />

17 K189 P.S. 189 K Lighting Fixtures<br />

17 K189 P.S. 189 K New/Retrofit Telephone/Intercom System<br />

17 K191 P.S. 191 K Classroom Connectivity<br />

17 K191 P.S. 191 K New/Retrofit Telephone/Intercom System<br />

17 K2<strong>10</strong> I.S. 394 K Classroom Connectivity<br />

17 K221 P.S. 221 K Classroom Connectivity<br />

17 K221 P.S. 221 K Lighting Fixtures<br />

17 K221 P.S. 221 K Low-Voltage Electrical Systems<br />

17 K221 P.S. 221 K New/Retrofit Telephone/Intercom System<br />

17 K221 P.S. 221 K Toilets-Students<br />

17 K241 P.S. 241 K Classroom Connectivity<br />

17 K246 I.S. 246 K Classroom Connectivity<br />

17 K246 I.S. 246 K Exterior Masonry<br />

17 K246 I.S. 246 K Flood Elimination<br />

17 K246 I.S. 246 K Parapets<br />

17 K246 I.S. 246 K Roofs<br />

17 K246 I.S. 246 K Windows<br />

17 K249 P.S. 249 K Classroom Connectivity<br />

17 K289 P.S. 289 K Classroom Connectivity<br />

17 K289 P.S. 289 K Heating Plant Upgrade<br />

17 K289 P.S. 289 K Low-Voltage Electrical Systems<br />

17 K316 P.S. 316 K Classroom Connectivity<br />

17 K316 P.S. 316 K Heating Plant Upgrade<br />

17 K316 P.S. 316 K Lighting Fixtures<br />

17 K316 P.S. 316 K New/Retrofit Telephone/Intercom System<br />

17 K316 P.S. 316 K Science Lab Upgrades<br />

17 K320 P.S. 375 K Classroom Connectivity<br />

17 K320 P.S. 375 K Lighting Fixtures<br />

17 K320 P.S. 375 K Walk In Freezer Replacement


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

17 K390 I.S. 390 K Classroom Connectivity<br />

17 K390 I.S. 390 K Elevators And Escalators<br />

17 K390 I.S. 390 K Flood Elimination<br />

17 K390 I.S. 390 K Interior Spaces<br />

17 K390 I.S. 390 K Science Lab Upgrades<br />

17 K390 I.S. 390 K Technology<br />

17 K390 I.S. 390 K Technology<br />

17 K390 I.S. 390 K Windows<br />

17 K391 I.S. 391 K Classroom Connectivity<br />

17 K391 I.S. 391 K Classroom Connectivity<br />

17 K391 I.S. 391 K IP Digital Video Surveillance<br />

17 K391 I.S. 391 K New/Retrofit Telephone/Intercom System<br />

17 K397 P.S. 397 K Classroom Connectivity<br />

17 K398 P.S. 398 (UDC) K Kitchen Areas<br />

17 K399 P.S. 399 K Classroom Connectivity<br />

17 K399 P.S. 399 K New/Retrofit Telephone/Intercom System<br />

17 K867 P.S. 138 AX (CROWN HGTS ECC 1) K Classroom Connectivity<br />

17 K867 P.S. 138 AX (CROWN HGTS ECC 1) K Heating Plant Upgrade<br />

17 K867 P.S. 138 AX (CROWN HGTS ECC 1) K Low-Voltage Electrical Systems<br />

17 K874 I.S. 340 (OLD 249 AX) K Classroom Connectivity<br />

17 K874 I.S. 340 (OLD 249 AX) K Flood Elimination<br />

17 K874 I.S. 340 (OLD 249 AX) K New/Retrofit Telephone/Intercom System<br />

17 K874 I.S. 340 (OLD 249 AX) K Safety Systems<br />

18 K066 P.S. 66 K Classroom Connectivity<br />

18 K066 P.S. 66 K New/Retrofit Telephone/Intercom System<br />

18 K068 I.S. 68 K Classroom Connectivity<br />

18 K068 I.S. 68 K Lighting Fixtures<br />

18 K068 I.S. 68 K Walk In Freezer Replacement<br />

18 K068 I.S. 68 K Walk In Freezer Replacement<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K Classroom Connectivity<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K Lighting Fixtures<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K Lighting Fixtures<br />

18 K1<strong>14</strong> P.S. 1<strong>14</strong> K New/Retrofit Telephone/Intercom System<br />

18 K115 P.S. 115 K Classroom Connectivity<br />

18 K115 P.S. 115 K Exterior Masonry<br />

18 K115 P.S. 115 K New/Retrofit Telephone/Intercom System<br />

18 K135 P.S. 135 K Classroom Connectivity<br />

18 K135 P.S. 135 K Classroom Connectivity<br />

18 K208 P.S. 208 K Classroom Connectivity<br />

18 K208 P.S. 208 K Gymnasium Upgrade<br />

18 K208 P.S. 208 K Kitchen Areas<br />

18 K208 P.S. 208 K Playground Redevelopment<br />

18 K211 I.S. 211 K Classroom Connectivity<br />

18 K211 I.S. 211 K Low-Voltage Electrical Systems<br />

18 K211 I.S. 211 K New/Retrofit Telephone/Intercom System<br />

18 K211 I.S. 211 K Parapets<br />

18 K211 I.S. 211 K Roofs<br />

18 K211 I.S. 211 K Walk In Freezer Replacement<br />

18 K219 P.S. 219 K Classroom Connectivity<br />

18 K219 P.S. 219 K Exterior Masonry<br />

18 K219 P.S. 219 K IP Digital Video Surveillance<br />

18 K219 P.S. 219 K Low-Voltage Electrical Systems<br />

18 K219 P.S. 219 K Parapets<br />

18 K219 P.S. 219 K Roofs<br />

18 K232 I.S. 232 K Classroom Connectivity<br />

18 K232 I.S. 232 K Classroom Connectivity<br />

18 K232 I.S. 232 K Classroom Connectivity<br />

18 K232 I.S. 232 K Classroom Connectivity<br />

18 K232 I.S. 232 K Classroom Connectivity<br />

18 K232 I.S. 232 K Domestic Piping<br />

18 K232 I.S. 232 K Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

18 K232 I.S. 232 K New/Retrofit Telephone/Intercom System<br />

18 K233 P.S. 233 K Cimate Control<br />

18 K233 P.S. 233 K Classroom Connectivity<br />

18 K233 P.S. 233 K IP Digital Video Surveillance<br />

18 K233 P.S. 233 K Windows<br />

18 K235 P.S. 235 K Classroom Connectivity<br />

18 K235 P.S. 235 K Exterior Masonry<br />

18 K235 P.S. 235 K Gymnasium Upgrade<br />

18 K235 P.S. 235 K Lighting Fixtures<br />

18 K235 P.S. 235 K Low-Voltage Electrical Systems<br />

18 K235 P.S. 235 K New/Retrofit Telephone/Intercom System<br />

18 K235 P.S. 235 K Parapets<br />

18 K242 P.S. 235 ANNEX K Classroom Connectivity<br />

18 K242 P.S. 235 ANNEX K Classroom Connectivity<br />

18 K242 P.S. 235 ANNEX K Emergency Stabilization<br />

18 K242 P.S. 235 ANNEX K Low-Voltage Electrical Systems<br />

18 K242 P.S. 235 ANNEX K New/Retrofit Telephone/Intercom System<br />

18 K244 P.S. 244 K Classroom Connectivity<br />

18 K244 P.S. 244 K Low-Voltage Electrical Systems<br />

18 K244 P.S. 244 K New/Retrofit Telephone/Intercom System<br />

18 K252 I.S. 252 K Classroom Connectivity<br />

18 K268 P.S. 268 K Classroom Connectivity<br />

18 K272 P.S. 272 K Classroom Connectivity<br />

18 K272 P.S. 272 K IP Digital Video Surveillance<br />

18 K279 P.S. 279 K Classroom Connectivity<br />

18 K279 P.S. 279 K New/Retrofit Telephone/Intercom System<br />

18 K285 I.S. 285 K Cafeteria / Multipurpose Room Upgrade<br />

18 K285 I.S. 285 K Classroom Connectivity<br />

18 K285 I.S. 285 K Flood Elimination<br />

18 K285 I.S. 285 K Heating Plant Upgrade<br />

18 K285 I.S. 285 K IP Digital Video Surveillance


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

18 K285 I.S. 285 K Low-Voltage Electrical Systems<br />

18 K366 SHIRLEY CHISHOLM CAMPUS K Technology<br />

18 K860 P.S. 219 ANNEX K Low-Voltage Electrical Systems<br />

18 K860 P.S. 219 ANNEX K Room Conversions/Partitioning<br />

18 K860 P.S. 219 ANNEX K Science Lab Upgrades<br />

18 K860 P.S. 219 ANNEX K Science Lab Upgrades<br />

19 K007 P.S. 7 K Classroom Connectivity<br />

19 K013 P.S. 13 K Classroom Connectivity<br />

19 K013 P.S. 13 K New/Retrofit Telephone/Intercom System<br />

19 K013 P.S. 13 K Playground Redevelopment<br />

19 K065 P.S. 65 K Lighting Fixtures<br />

19 K072 P.S. 72 K Classroom Connectivity<br />

19 K072 P.S. 72 K Low-Voltage Electrical Systems<br />

19 K072 P.S. 72 K New/Retrofit Telephone/Intercom System<br />

19 K072 P.S. 72 K Science Lab Upgrades<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Auditorium Upgrade<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Cafeteria / Multipurpose Room Upgrade<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Classroom Connectivity<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Domestic Piping<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Lighting Fixtures<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K Low-Voltage Electrical Systems<br />

19 K<strong>10</strong>8 P.S. <strong>10</strong>8 K New/Retrofit Telephone/Intercom System<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Classroom Connectivity<br />

19 K<strong>14</strong>9 P.S. <strong>14</strong>9 K Classroom Connectivity<br />

19 K158 P.S. 158 K Classroom Connectivity<br />

19 K158 P.S. 158 K Exterior Masonry<br />

19 K158 P.S. 158 K Flood Elimination<br />

19 K158 P.S. 158 K Low-Voltage Electrical Systems<br />

19 K159 P.S. 159 K Classroom Connectivity<br />

19 K159 P.S. 159 K Lighting Fixtures<br />

19 K159 P.S. 159 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

19 K166 I.S. 166 K Classroom Connectivity<br />

19 K166 I.S. 166 K Classroom Connectivity<br />

19 K166 I.S. 166 K Classroom Connectivity<br />

19 K166 I.S. 166 K New/Retrofit Telephone/Intercom System<br />

19 K171 I.S. 171 K Classroom Connectivity<br />

19 K171 I.S. 171 K Classroom Connectivity<br />

19 K171 I.S. 171 K Exterior Masonry<br />

19 K171 I.S. 171 K Parapets<br />

19 K174 P.S. 174 K Classroom Connectivity<br />

19 K190 P.S. 190 K Classroom Connectivity<br />

19 K190 P.S. 190 K Exterior Masonry<br />

19 K190 P.S. 190 K IP Digital Video Surveillance<br />

19 K202 P.S. 202 K Classroom Connectivity<br />

19 K202 P.S. 202 K IP Digital Video Surveillance<br />

19 K202 P.S. 202 K Low-Voltage Electrical Systems<br />

19 K202 P.S. 202 K New/Retrofit Telephone/Intercom System<br />

19 K213 P.S. 213 K Classroom Connectivity<br />

19 K213 P.S. 213 K Lighting Fixtures<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Classroom Connectivity<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Exterior Masonry<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Flood Elimination<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Parapets<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Roofs<br />

19 K2<strong>14</strong> P.S. 2<strong>14</strong> K Windows<br />

19 K218 I.S. 218 K Classroom Connectivity<br />

19 K218 I.S. 218 K Science Lab Upgrades<br />

19 K218 I.S. 218 K Walk In Freezer Replacement<br />

19 K224 P.S. 224 K Classroom Connectivity<br />

19 K260 P.S. 260 K Classroom Connectivity<br />

19 K260 P.S. 260 K New/Retrofit Telephone/Intercom System<br />

19 K273 P.S. 273 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

19 K273 P.S. 273 K Exterior Masonry<br />

19 K273 P.S. 273 K Lighting Fixtures<br />

19 K273 P.S. 273 K New/Retrofit Telephone/Intercom System<br />

19 K273 P.S. 273 K Parapets<br />

19 K273 P.S. 273 K Roofs<br />

19 K290 P.S. 290 K Classroom Connectivity<br />

19 K290 P.S. 290 K New/Retrofit Telephone/Intercom System<br />

19 K292 I.S. 292 K Classroom Connectivity<br />

19 K292 I.S. 292 K Exterior Masonry<br />

19 K292 I.S. 292 K New/Retrofit Telephone/Intercom System<br />

19 K292 I.S. 292 K Walk In Freezer Replacement<br />

19 K302 I.S. 302 K Classroom Connectivity<br />

19 K302 I.S. 302 K Emergency Stabilization<br />

19 K306 P.S. 306 K Classroom Connectivity<br />

19 K306 P.S. 306 K Classroom Connectivity<br />

19 K328 P.S. 328 K Classroom Connectivity<br />

19 K328 P.S. 328 K Gymnasium Upgrade<br />

19 K328 P.S. 328 K Lighting Fixtures<br />

19 K345 P.S. 345 K Classroom Connectivity<br />

19 K345 P.S. 345 K New/Retrofit Telephone/Intercom System<br />

19 K346 P.S. 346 K Classroom Connectivity<br />

19 K346 P.S. 346 K Classroom Connectivity<br />

19 K346 P.S. 346 K Low-Voltage Electrical Systems<br />

19 K346 P.S. 346 K New/Retrofit Telephone/Intercom System<br />

19 K798 CESIAH TORO MULLANE SCHOOL K Classroom Connectivity<br />

19 K8<strong>14</strong> CYPRESS HILLS COMMUNITY SCHOOL K Classroom Connectivity<br />

19 K949 P.S. 2<strong>14</strong> TRANSPORTABLE K Classroom Connectivity<br />

19 K974 I.S. 302 TRANSPORTABLE K Classroom Connectivity<br />

20 K048 P.S. 48 K Classroom Connectivity<br />

20 K062 I.S. 62 K Classroom Connectivity<br />

20 K062 I.S. 62 K IP Digital Video Surveillance


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

20 K062 I.S. 62 K Lighting Fixtures<br />

20 K069 P.S. 69 K Classroom Connectivity<br />

20 K069 P.S. 69 K Domestic Piping<br />

20 K069 P.S. 69 K New/Retrofit Telephone/Intercom System<br />

20 K<strong>10</strong>2 P.S. <strong>10</strong>2 K Accessibility<br />

20 K<strong>10</strong>2 P.S. <strong>10</strong>2 K Classroom Connectivity<br />

20 K<strong>10</strong>2 P.S. <strong>10</strong>2 K Lighting Fixtures<br />

20 K<strong>10</strong>2 P.S. <strong>10</strong>2 K New/Retrofit Telephone/Intercom System<br />

20 K<strong>10</strong>4 P.S. <strong>10</strong>4 K Classroom Connectivity<br />

20 K<strong>10</strong>4 P.S. <strong>10</strong>4 K New/Retrofit Telephone/Intercom System<br />

20 K<strong>10</strong>4 P.S. <strong>10</strong>4 K Parapets<br />

20 K<strong>10</strong>5 P.S. <strong>10</strong>5 K Classroom Connectivity<br />

20 K112 P.S. 112 K Classroom Connectivity<br />

20 K112 P.S. 112 K IP Digital Video Surveillance<br />

20 K112 P.S. 112 K New/Retrofit Telephone/Intercom System<br />

20 K127 P.S. 127 K Classroom Connectivity<br />

20 K127 P.S. 127 K Domestic Piping<br />

20 K127 P.S. 127 K Lighting Fixtures<br />

20 K127 P.S. 127 K Low-Voltage Electrical Systems<br />

20 K160 P.S. 160 K Classroom Connectivity<br />

20 K160 P.S. 160 K Lighting Fixtures<br />

20 K160 P.S. 160 K New/Retrofit Telephone/Intercom System<br />

20 K163 P.S. 163 K Classroom Connectivity<br />

20 K163 P.S. 163 K Lighting Fixtures<br />

20 K163 P.S. 163 K New/Retrofit Telephone/Intercom System<br />

20 K163 P.S. 163 K Parapets<br />

20 K163 P.S. 163 K Roofs<br />

20 K164 P.S. 164 K Classroom Connectivity<br />

20 K164 P.S. 164 K Domestic Piping<br />

20 K164 P.S. 164 K Exterior Masonry<br />

20 K164 P.S. 164 K Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

20 K164 P.S. 164 K Playground Redevelopment<br />

20 K170 P.S. 170 K Classroom Connectivity<br />

20 K170 P.S. 170 K Lighting Fixtures<br />

20 K176 P.S. 176 K Classroom Connectivity<br />

20 K176 P.S. 176 K Playground Redevelopment<br />

20 K176 P.S. 176 K Walk In Freezer Replacement<br />

20 K179 P.S. 179 K Classroom Connectivity<br />

20 K179 P.S. 179 K Paved Area-Blacktop<br />

20 K180 P.S. 180 K Classroom Connectivity<br />

20 K180 P.S. 180 K Containerization<br />

20 K180 P.S. 180 K IP Digital Video Surveillance<br />

20 K180 P.S. 180 K Low-Voltage Electrical Systems<br />

20 K180 P.S. 180 K New/Retrofit Telephone/Intercom System<br />

20 K185 P.S. 185 K Classroom Connectivity<br />

20 K185 P.S. 185 K Exterior Masonry<br />

20 K185 P.S. 185 K Parapets<br />

20 K185 P.S. 185 K Windows<br />

20 K186 P.S. 186 K Classroom Connectivity<br />

20 K186 P.S. 186 K Lighting Fixtures<br />

20 K186 P.S. 186 K Toilets-Students<br />

20 K192 P.S. 192 K Classroom Connectivity<br />

20 K192 P.S. 192 K Exterior Masonry<br />

20 K192 P.S. 192 K New/Retrofit Telephone/Intercom System<br />

20 K192 P.S. 192 K Parapets<br />

20 K200 P.S. 200 K Classroom Connectivity<br />

20 K200 P.S. 200 K Exterior Masonry<br />

20 K200 P.S. 200 K New/Retrofit Telephone/Intercom System<br />

20 K201 I.S. 201 K Classroom Connectivity<br />

20 K201 I.S. 201 K Exterior Masonry<br />

20 K201 I.S. 201 K Low-Voltage Electrical Systems<br />

20 K201 I.S. 201 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

20 K201 I.S. 201 K Parapets<br />

20 K201 I.S. 201 K Walk In Freezer Replacement<br />

20 K204 P.S. 204 K Classroom Connectivity<br />

20 K204 P.S. 204 K Flood Elimination<br />

20 K204 P.S. 204 K Low-Voltage Electrical Systems<br />

20 K204 P.S. 204 K New/Retrofit Telephone/Intercom System<br />

20 K204 P.S. 204 K Parapets<br />

20 K204 P.S. 204 K Playground Redevelopment<br />

20 K205 P.S. 205 K Classroom Connectivity<br />

20 K220 I.S. 220 K Auditorium Upgrade<br />

20 K220 I.S. 220 K Auditorium Upgrade<br />

20 K220 I.S. 220 K Classroom Connectivity<br />

20 K220 I.S. 220 K Kitchen Areas<br />

20 K220 I.S. 220 K Library Upgrades<br />

20 K223 I.S. 223 K Classroom Connectivity<br />

20 K223 I.S. 223 K Classroom Connectivity<br />

20 K223 I.S. 223 K Classroom Connectivity<br />

20 K223 I.S. 223 K Flood Elimination<br />

20 K223 I.S. 223 K IP Digital Video Surveillance<br />

20 K223 I.S. 223 K Lighting Fixtures<br />

20 K223 I.S. 223 K New/Retrofit Telephone/Intercom System<br />

20 K227 I.S. 227 K Classroom Connectivity<br />

20 K227 I.S. 227 K Classroom Connectivity<br />

20 K227 I.S. 227 K Flood Elimination<br />

20 K227 I.S. 227 K New/Retrofit Telephone/Intercom System<br />

20 K229 P.S. 229 K Classroom Connectivity<br />

20 K229 P.S. 229 K Playground Redevelopment<br />

20 K237 LUCRETIA MARCIGLIANO CAMPUS K Classroom Connectivity<br />

20 K247 P.S. 247 K Classroom Connectivity<br />

20 K247 P.S. 247 K Kitchen Areas<br />

20 K247 P.S. 247 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

20 K259 I.S. 259 K Classroom Connectivity<br />

20 K259 I.S. 259 K Emergency Lighting And Fire Safety Retrofits<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K Classroom Connectivity<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K Elevators<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K IP Digital Video Surveillance<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K Low-Voltage Electrical Systems<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K Low-Voltage Electrical Systems<br />

20 K486 I.S. 187 K Classroom Connectivity<br />

20 K486 I.S. 187 K Library Upgrades<br />

20 K486 I.S. 187 K Low-Voltage Electrical Systems<br />

20 K486 I.S. 187 K New/Retrofit Telephone/Intercom System<br />

20 K807 P.S./ I.S. 163 K Classroom Connectivity<br />

20 K940 I.S. 30 K Classroom Connectivity<br />

20 K940 I.S. 30 K New/Retrofit Telephone/Intercom System<br />

20 K971 P.S. 971 K Classroom Connectivity<br />

21 K043 I.S. 98 K Classroom Connectivity<br />

21 K043 I.S. 98 K Classroom Connectivity<br />

21 K043 I.S. 98 K Classroom Connectivity<br />

21 K043 I.S. 98 K Gymnasium Upgrade<br />

21 K043 I.S. 98 K Walk In Freezer Replacement<br />

21 K090 P.S. 90 K Classroom Connectivity<br />

21 K090 P.S. 90 K Lighting Fixtures<br />

21 K090 P.S. 90 K Lighting Fixtures<br />

21 K090 P.S. 90 K Low-Voltage Electrical Systems<br />

21 K090 P.S. 90 K New/Retrofit Telephone/Intercom System<br />

21 K095 P.S. 95 K Classroom Connectivity<br />

21 K095 P.S. 95 K Exterior Masonry<br />

21 K095 P.S. 95 K New/Retrofit Telephone/Intercom System<br />

21 K095 P.S. 95 K Windows<br />

21 K096 I.S. 96 K Classroom Connectivity<br />

21 K096 I.S. 96 K Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

21 K096 I.S. 96 K Exterior Masonry<br />

21 K096 I.S. 96 K Flood Elimination<br />

21 K096 I.S. 96 K Lighting Fixtures<br />

21 K096 I.S. 96 K Toilets-Students<br />

21 K097 P.S. 97 K Classroom Connectivity<br />

21 K097 P.S. 97 K Exterior Masonry<br />

21 K097 P.S. 97 K Lighting Fixtures<br />

21 K097 P.S. 97 K New/Retrofit Telephone/Intercom System<br />

21 K097 P.S. 97 K Parapets<br />

21 K097 P.S. 97 K Roofs<br />

21 K097 P.S. 97 K Ventilation<br />

21 K099 P.S. 99 K Classroom Connectivity<br />

21 K099 P.S. 99 K Lighting Fixtures<br />

21 K099 P.S. 99 K New/Retrofit Telephone/Intercom System<br />

21 K<strong>10</strong>0 P.S. <strong>10</strong>0 K Classroom Connectivity<br />

21 K<strong>10</strong>1 P.S. <strong>10</strong>1 K Classroom Connectivity<br />

21 K<strong>10</strong>1 P.S. <strong>10</strong>1 K IP Digital Video Surveillance<br />

21 K<strong>10</strong>1 P.S. <strong>10</strong>1 K New/Retrofit Telephone/Intercom System<br />

21 K121 P.S. 121 K Classroom Connectivity<br />

21 K121 P.S. 121 K Lighting Fixtures<br />

21 K121 P.S. 121 K Parapets<br />

21 K128 P.S. 128 (TANDEM K280) K Classroom Connectivity<br />

21 K128 P.S. 128 (TANDEM BROOKLYN STUDIO) K Lighting Fixtures<br />

21 K128 P.S. 128 (TANDEM K280) K New/Retrofit Telephone/Intercom System<br />

21 K153 P.S. 153 K Classroom Connectivity<br />

21 K153 P.S. 153 K Exterior Masonry<br />

21 K153 P.S. 153 K Flood Elimination<br />

21 K153 P.S. 153 K Lighting Fixtures<br />

21 K153 P.S. 153 K New/Retrofit Telephone/Intercom System<br />

21 K153 P.S. 153 K Parapets<br />

21 K177 P.S. 177 K Auditorium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

21 K177 P.S. 177 K Classroom Connectivity<br />

21 K177 P.S. 177 K New/Retrofit Telephone/Intercom System<br />

21 K188 P.S. 188 K Classroom Connectivity<br />

21 K188 P.S. 188 K Gymnasium Upgrade<br />

21 K199 P.S. 199 K Classroom Connectivity<br />

21 K199 P.S. 199 K New/Retrofit Telephone/Intercom System<br />

21 K209 P.S. 209 K Classroom Connectivity<br />

21 K209 P.S. 209 K Lighting Fixtures<br />

21 K209 P.S. 209 K New/Retrofit Telephone/Intercom System<br />

21 K212 P.S. 212 K Classroom Connectivity<br />

21 K212 P.S. 212 K Kitchen Areas<br />

21 K212 P.S. 212 K Low-Voltage Electrical Systems<br />

21 K212 P.S. 212 K New/Retrofit Telephone/Intercom System<br />

21 K215 P.S. 215 K Classroom Connectivity<br />

21 K216 P.S. 216 K Classroom Connectivity<br />

21 K216 P.S. 216 K Exterior Masonry<br />

21 K216 P.S. 216 K Flood Elimination<br />

21 K216 P.S. 216 K Lighting Fixtures<br />

21 K216 P.S. 216 K New/Retrofit Telephone/Intercom System<br />

21 K216 P.S. 216 K Parapets<br />

21 K216 P.S. 216 K Reinforcing Support Elements<br />

21 K225 P.S. 225 K Classroom Connectivity<br />

21 K225 P.S. 225 K Electrical Systems<br />

21 K225 P.S. 225 K Flood Elimination<br />

21 K225 P.S. 225 K Low-Voltage Electrical Systems<br />

21 K225 P.S. 225 K New/Retrofit Telephone/Intercom System<br />

21 K225 P.S. 225 K Windows<br />

21 K226 P.S. 226 K Classroom Connectivity<br />

21 K226 P.S. 226 K Flood Elimination<br />

21 K226 P.S. 226 K Lighting Fixtures<br />

21 K226 P.S. 226 K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

21 K228 I.S. 228 K Classroom Connectivity<br />

21 K228 I.S. 228 K Low-Voltage Electrical Systems<br />

21 K228 I.S. 228 K New/Retrofit Telephone/Intercom System<br />

21 K228 I.S. 228 K Room Conversions/Partitioning<br />

21 K238 P.S. 238 K Classroom Connectivity<br />

21 K238 P.S. 238 K Lighting Fixtures<br />

21 K238 P.S. 238 K New/Retrofit Telephone/Intercom System<br />

21 K238 P.S. 238 K Room Conversions/Partitioning<br />

21 K239 I.S. 239 K Classroom Connectivity<br />

21 K253 P.S. 253 K Classroom Connectivity<br />

21 K253 P.S. 253 K Climate Control<br />

21 K253 P.S. 253 K Heating Plant Upgrade<br />

21 K253 P.S. 253 K Lighting Fixtures<br />

21 K281 I.S. 281 K Classroom Connectivity<br />

21 K281 I.S. 281 K Walk In Freezer Replacement<br />

21 K288 P.S. 288 K Classroom Connectivity<br />

21 K288 P.S. 288 K Floors<br />

21 K288 P.S. 288 K Lighting Fixtures<br />

21 K288 P.S. 288 K New/Retrofit Telephone/Intercom System<br />

21 K303 I.S. 303 K Classroom Connectivity<br />

21 K303 I.S. 303 K Emergency Stabilization<br />

21 K303 I.S. 303 K IP Digital Video Surveillance<br />

21 K303 I.S. 303 K New/Retrofit Telephone/Intercom System<br />

21 K303 I.S. 303 K Paved Area-Concrete<br />

21 K303 I.S. 303 K Science Lab Upgrades<br />

21 K303 I.S. 303 K Walk In Freezer Replacement<br />

21 K329 P.S. 329 K Classroom Connectivity<br />

21 K329 P.S. 329 K Roofs<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Classroom Connectivity<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Exterior Masonry<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Fencing


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K IP Digital Video Surveillance<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Low-Voltage Electrical Systems<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Parapets<br />

22 K0<strong>14</strong> I.S. <strong>14</strong> K Roofs<br />

22 K052 P.S. 52 K Classroom Connectivity<br />

22 K052 P.S. 52 K Lighting Fixtures<br />

22 K052 P.S. 52 K New/Retrofit Telephone/Intercom System<br />

22 K078 I.S. 78 K Classroom Connectivity<br />

22 K078 I.S. 78 K IP Digital Video Surveillance<br />

22 K078 I.S. 78 K Lighting Fixtures<br />

22 K119 P.S. 119 K Classroom Connectivity<br />

22 K119 P.S. 119 K Domestic Piping<br />

22 K119 P.S. 119 K Low-Voltage Electrical Systems<br />

22 K139 P.S. 139 K Classroom Connectivity<br />

22 K139 P.S. 139 K Exterior Masonry<br />

22 K152 P.S. 152 K Classroom Connectivity<br />

22 K152 P.S. 152 K Exterior Masonry<br />

22 K152 P.S. 152 K Flood Elimination<br />

22 K152 P.S. 152 K New/Retrofit Telephone/Intercom System<br />

22 K152 P.S. 152 K Parapets<br />

22 K152 P.S. 152 K Reinforcing Support Elements<br />

22 K152 P.S. 152 K Windows<br />

22 K193 P.S. 193 K Classroom Connectivity<br />

22 K193 P.S. 193 K Lighting Fixtures<br />

22 K193 P.S. 193 K New/Retrofit Telephone/Intercom System<br />

22 K194 P.S. 194 K Classroom Connectivity<br />

22 K194 P.S. 194 K Lighting Fixtures<br />

22 K194 P.S. 194 K New/Retrofit Telephone/Intercom System<br />

22 K194 P.S. 194 K Roofs<br />

22 K194 P.S. 194 K Toilets-Students<br />

22 K195 P.S. 195 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

22 K195 P.S. 195 K Domestic Piping<br />

22 K195 P.S. 195 K New/Retrofit Telephone/Intercom System<br />

22 K197 P.S. 197 K Classroom Connectivity<br />

22 K197 P.S. 197 K Classroom Connectivity<br />

22 K197 P.S. 197 K Classroom Connectivity<br />

22 K197 P.S. 197 K New/Retrofit Telephone/Intercom System<br />

22 K197 P.S. 197 K Parapets<br />

22 K197 P.S. 197 K Room Conversions/Partitioning<br />

22 K198 P.S. 198 K Classroom Connectivity<br />

22 K198 P.S. 198 K IP Digital Video Surveillance<br />

22 K198 P.S. 198 K Lighting Fixtures<br />

22 K198 P.S. 198 K Playground Redevelopment<br />

22 K203 P.S. 203 K Classroom Connectivity<br />

22 K206 P.S. 206 K Classroom Connectivity<br />

22 K206 P.S. 206 K Flood Elimination<br />

22 K206 P.S. 206 K Low-Voltage Electrical Systems<br />

22 K206 P.S. 206 K New/Retrofit Telephone/Intercom System<br />

22 K206 P.S. 206 K Parapets<br />

22 K206 P.S. 206 K Roofs<br />

22 K207 P.S. 207 K Classroom Connectivity<br />

22 K207 P.S. 207 K Exterior Masonry<br />

22 K207 P.S. 207 K Flood Elimination<br />

22 K207 P.S. 207 K Lighting Fixtures<br />

22 K207 P.S. 207 K Roofs<br />

22 K217 P.S. 217 K Classroom Connectivity<br />

22 K217 P.S. 217 K New/Retrofit Telephone/Intercom System<br />

22 K217 P.S. 217 K Playground Redevelopment<br />

22 K222 P.S. 222 K Classroom Connectivity<br />

22 K222 P.S. 222 K Exterior Masonry<br />

22 K222 P.S. 222 K Lighting Fixtures<br />

22 K222 P.S. 222 K Roofs


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

22 K234 I.S. 234 K Classroom Connectivity<br />

22 K234 I.S. 234 K Lighting Fixtures<br />

22 K234 I.S. 234 K New/Retrofit Telephone/Intercom System<br />

22 K234 I.S. 234 K Parapets<br />

22 K234 I.S. 234 K Roofs<br />

22 K234 I.S. 234 K Windows<br />

22 K236 P.S. 236 K Classroom Connectivity<br />

22 K240 I.S. 240 K Classroom Connectivity<br />

22 K240 I.S. 240 K Flood Elimination<br />

22 K240 I.S. 240 K Low-Voltage Electrical Systems<br />

22 K240 I.S. 240 K New/Retrofit Telephone/Intercom System<br />

22 K240 I.S. 240 K Parapets<br />

22 K251 P.S. 251 K Classroom Connectivity<br />

22 K251 P.S. 251 K Feedwater Tank System<br />

22 K251 P.S. 251 K New/Retrofit Telephone/Intercom System<br />

22 K254 P.S. 254 K Classroom Connectivity<br />

22 K254 P.S. 254 K Lighting Fixtures<br />

22 K254 P.S. 254 K New/Retrofit Telephone/Intercom System<br />

22 K255 P.S. 255 K Classroom Connectivity<br />

22 K255 P.S. 255 K New/Retrofit Telephone/Intercom System<br />

22 K269 P.S. 269 K Classroom Connectivity<br />

22 K269 P.S. 269 K IP Digital Video Surveillance<br />

22 K269 P.S. 269 K New/Retrofit Telephone/Intercom System<br />

22 K277 P.S. 277 K Classroom Connectivity<br />

22 K277 P.S. 277 K Lighting Fixtures<br />

22 K278 I.S. 278 K Classroom Connectivity<br />

22 K278 I.S. 278 K Classroom Connectivity<br />

22 K278 I.S. 278 K Climate Control<br />

22 K278 I.S. 278 K Lighting Fixtures<br />

22 K312 P.S. 312 K Classroom Connectivity<br />

22 K312 P.S. 312 K Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

22 K395 P.S./I.S. 395 K Classroom Connectivity<br />

22 K395 P.S./I.S. 395 K Classroom Connectivity<br />

22 K395 P.S./I.S. 395 K IP Digital Video Surveillance<br />

22 K395 P.S./I.S. 395 K New/Retrofit Telephone/Intercom System<br />

22 K735 P.S. 245 K Classroom Connectivity<br />

22 K735 P.S. 245 K New/Retrofit Telephone/Intercom System<br />

22 K735 P.S. 245 K Toilets-Students<br />

22 K826 P.S. 245 K Classroom Connectivity<br />

22 K849 P.S. 134 K Classroom Connectivity<br />

22 K849 P.S. 134 K Library Upgrades<br />

22 K852 P.S. 326 K Classroom Connectivity<br />

22 K852 P.S. 326 K Lighting Fixtures<br />

22 K852 P.S. 326 K New/Retrofit Telephone/Intercom System<br />

22 K864 P.S. 361 (OLD 89) K Classroom Connectivity<br />

22 K864 P.S. 361 (OLD 89) K Low-Voltage Electrical Systems<br />

23 K041 P.S. 41 K Classroom Connectivity<br />

23 K041 P.S. 41 K Exterior Masonry<br />

23 K041 P.S. 41 K IP Digital Video Surveillance<br />

23 K041 P.S. 41 K Lighting Fixtures<br />

23 K041 P.S. 41 K Parapets<br />

23 K041 P.S. 41 K Room Conversions/Partitioning<br />

23 K055 I.S. 55 K Classroom Connectivity<br />

23 K055 I.S. 55 K Exterior Masonry<br />

23 K055 I.S. 55 K IP Digital Video Surveillance<br />

23 K055 I.S. 55 K Lighting Fixtures<br />

23 K055 I.S. 55 K Safety Systems<br />

23 K055 I.S. 55 K Walk In Freezer Replacement<br />

23 K055 I.S. 55 K Windows<br />

23 K073 P.S. 73 K Classroom Connectivity<br />

23 K073 P.S. 73 K Exterior Masonry<br />

23 K073 P.S. 73 K Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

23 K073 P.S. 73 K Lighting Fixtures<br />

23 K073 P.S. 73 K Low-Voltage Electrical Systems<br />

23 K073 P.S. 73 K Parapets<br />

23 K073 P.S. 73 K Roofs<br />

23 K137 P.S. 137 K Classroom Connectivity<br />

23 K137 P.S. 137 K Exterior Masonry<br />

23 K137 P.S. 137 K Parapets<br />

23 K150 P.S. 150 K Cafeteria / Multipurpose Room Upgrade<br />

23 K150 P.S. 150 K Classroom Connectivity<br />

23 K150 P.S. 150 K Classroom Connectivity<br />

23 K150 P.S. 150 K Lighting Fixtures<br />

23 K150 P.S. 150 K Ventilation<br />

23 K155 P.S. 155 K Classroom Connectivity<br />

23 K155 P.S. 155 K Lighting Fixtures<br />

23 K155 P.S. 155 K New/Retrofit Telephone/Intercom System<br />

23 K165 P.S. 165 K Classroom Connectivity<br />

23 K165 P.S. 165 K Lighting Fixtures<br />

23 K178 P.S. 178 K Classroom Connectivity<br />

23 K178 P.S. 178 K IP Digital Video Surveillance<br />

23 K183 P.S. 183 K Classroom Connectivity<br />

23 K183 P.S. 183 K Domestic Piping<br />

23 K183 P.S. 183 K Lighting Fixtures<br />

23 K184 P.S. 184 K Cafeteria / Multipurpose Room Upgrade<br />

23 K184 P.S. 184 K Classroom Connectivity<br />

23 K184 P.S. 184 K Exterior Masonry<br />

23 K184 P.S. 184 K Flood Elimination<br />

23 K184 P.S. 184 K Lighting Fixtures<br />

23 K184 P.S. 184 K Reinforcing Support Elements<br />

23 K263 P.S./I.S. 323 K Classroom Connectivity<br />

23 K263 P.S./I.S. 323 K New/Retrofit Telephone/Intercom System<br />

23 K271 I.S. 271 K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

23 K271 I.S. 271 K Classroom Connectivity<br />

23 K271 I.S. 271 K Classroom Connectivity<br />

23 K271 I.S. 271 K Electrical Systems<br />

23 K271 I.S. 271 K Electrical Systems<br />

23 K271 I.S. 271 K Lighting Fixtures<br />

23 K271 I.S. 271 K New/Retrofit Telephone/Intercom System<br />

23 K271 I.S. 271 K Walk In Freezer Replacement<br />

23 K275 I.S. 275 K Classroom Connectivity<br />

23 K275 I.S. 275 K Classroom Connectivity<br />

23 K275 I.S. 275 K Classroom Connectivity<br />

23 K275 I.S. 275 K Classroom Connectivity<br />

23 K275 I.S. 275 K Classroom Connectivity<br />

23 K275 I.S. 275 K Electrical Systems<br />

23 K275 I.S. 275 K Lighting Fixtures<br />

23 K275 I.S. 275 K Parapets<br />

23 K275 I.S. 275 K Room Conversions/Partitioning<br />

23 K275 I.S. 275 K Room Conversions/Partitioning<br />

23 K275 I.S. 275 K Walk In Freezer Replacement<br />

23 K284 P.S. 284 K Auditorium Upgrade<br />

23 K284 P.S. 284 K Classroom Connectivity<br />

23 K284 P.S. 284 K Electrical Systems<br />

23 K284 P.S. 284 K Exterior Masonry<br />

23 K284 P.S. 284 K IP Digital Video Surveillance<br />

23 K284 P.S. 284 K New/Retrofit Telephone/Intercom System<br />

23 K298 P.S. 298 K Classroom Connectivity<br />

23 K298 P.S. 298 K Emergency Stabilization<br />

23 K298 P.S. 298 K Lighting Fixtures<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Electrical Systems<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Exterior Masonry<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Lighting Fixtures<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Playground Redevelopment


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Science Lab Upgrades<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Windows<br />

23 K332 P.S. 332 K Classroom Connectivity<br />

23 K332 P.S. 332 K Exterior Masonry<br />

23 K332 P.S. 332 K Lighting Fixtures<br />

23 K332 P.S. 332 K Technology<br />

23 K356 P.S. 156 K Classroom Connectivity<br />

23 K356 P.S. 156 K New/Retrofit Telephone/Intercom System<br />

23 K854 P.S. 178 AX (BED STUY ECC 1) K Playground Redevelopment<br />

23 K854 P.S. 178 AX (BED STUY ECC 1) K Ventilation<br />

24 Q005 I.S. 5 Q Classroom Connectivity<br />

24 Q005 I.S. 5 Q Low-Voltage Electrical Systems<br />

24 Q005 I.S. 5 Q New/Retrofit Telephone/Intercom System<br />

24 Q005 I.S. 5 Q Ventilation<br />

24 Q007 P.S. 7 Q Classroom Connectivity<br />

24 Q007 P.S. 7 Q New/Retrofit Telephone/Intercom System<br />

24 Q012 P.S. 12 Q Classroom Connectivity<br />

24 Q012 P.S. 12 Q Exterior Masonry<br />

24 Q013 P.S. 13 Q Classroom Connectivity<br />

24 Q013 P.S. 13 Q Emergency Stabilization<br />

24 Q013 P.S. 13 Q Lighting Fixtures<br />

24 Q013 P.S. 13 Q New/Retrofit Telephone/Intercom System<br />

24 Q0<strong>14</strong> P.S. <strong>14</strong> Q Classroom Connectivity<br />

24 Q0<strong>14</strong> P.S. <strong>14</strong> Q Classroom Connectivity<br />

24 Q0<strong>14</strong> P.S. <strong>14</strong> Q Lighting Fixtures<br />

24 Q019 P.S. 19 Q Cafeteria / Multipurpose Room Upgrade<br />

24 Q019 P.S. 19 Q Classroom Connectivity<br />

24 Q019 P.S. 19 Q Exterior Masonry<br />

24 Q019 P.S. 19 Q Flood Elimination<br />

24 Q019 P.S. 19 Q IP Digital Video Surveillance<br />

24 Q019 P.S. 19 Q Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

24 Q019 P.S. 19 Q Parapets<br />

24 Q019 P.S. 19 Q Roofs<br />

24 Q028 P.S. 28 (ECC) Q Classroom Connectivity<br />

24 Q049 P.S./I.S. 49 Q Classroom Connectivity<br />

24 Q058 P.S. 58 Q Classroom Connectivity<br />

24 Q058 P.S. 58 Q New/Retrofit Telephone/Intercom System<br />

24 Q061 I.S. 61 Q Classroom Connectivity<br />

24 Q061 I.S. 61 Q Elevators And Escalators<br />

24 Q061 I.S. 61 Q Lighting Fixtures<br />

24 Q061 I.S. 61 Q New/Retrofit Telephone/Intercom System<br />

24 Q068 P.S. 68 Q Auditorium Upgrade<br />

24 Q068 P.S. 68 Q Classroom Connectivity<br />

24 Q068 P.S. 68 Q Emergency Stabilization<br />

24 Q068 P.S. 68 Q Roofs<br />

24 Q071 P.S. 71 Q Classroom Connectivity<br />

24 Q073 I.S. 73 Q Classroom Connectivity<br />

24 Q073 I.S. 73 Q Low-Voltage Electrical Systems<br />

24 Q081 P.S. 81 Q Classroom Connectivity<br />

24 Q081 P.S. 81 Q Classroom Connectivity<br />

24 Q081 P.S. 81 Q Exterior Masonry<br />

24 Q081 P.S. 81 Q Reinforcing Support Elements<br />

24 Q087 P.S. 87 Q Classroom Connectivity<br />

24 Q087 P.S. 87 Q New/Retrofit Telephone/Intercom System<br />

24 Q088 P.S. 88 Q Classroom Connectivity<br />

24 Q088 P.S. 88 Q Fencing<br />

24 Q088 P.S. 88 Q Lighting Fixtures<br />

24 Q088 P.S. 88 Q New/Retrofit Telephone/Intercom System<br />

24 Q088 P.S. 88 Q Parapets<br />

24 Q088 P.S. 88 Q Roofs<br />

24 Q089 P.S. 89 Q A/C Split System<br />

24 Q089 P.S. 89 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

24 Q089 P.S. 89 Q Classroom Connectivity<br />

24 Q089 P.S. 89 Q Flood Elimination<br />

24 Q089 P.S. 89 Q IP Digital Video Surveillance<br />

24 Q089 P.S. 89 Q New/Retrofit Telephone/Intercom System<br />

24 Q089 P.S. 89 Q Parapets<br />

24 Q089 P.S. 89 Q Roofs<br />

24 Q091 P.S. 91 Q Classroom Connectivity<br />

24 Q091 P.S. 91 Q New/Retrofit Telephone/Intercom System<br />

24 Q093 I.S. 93 Q Classroom Connectivity<br />

24 Q093 I.S. 93 Q Flood Elimination<br />

24 Q093 I.S. 93 Q IP Digital Video Surveillance<br />

24 Q<strong>10</strong>2 P.S./I.S. <strong>10</strong>2 Q Classroom Connectivity<br />

24 Q113 P.S./I.S. 113 Q Classroom Connectivity<br />

24 Q113 P.S./I.S. 113 Q Lighting Fixtures<br />

24 Q113 P.S./I.S. 113 Q New/Retrofit Telephone/Intercom System<br />

24 Q119 I.S. 119 Q Classroom Connectivity<br />

24 Q119 I.S. 119 Q IP Digital Video Surveillance<br />

24 Q119 I.S. 119 Q Playground Redevelopment<br />

24 Q125 I.S. 125 Q Classroom Connectivity<br />

24 Q<strong>14</strong>3 P.S. <strong>14</strong>3 Q Classroom Connectivity<br />

24 Q<strong>14</strong>3 P.S. <strong>14</strong>3 Q IP Digital Video Surveillance<br />

24 Q153 P.S. 153 Q Classroom Connectivity<br />

24 Q153 P.S. 153 Q New/Retrofit Telephone/Intercom System<br />

24 Q199 P.S. 199 Q Classroom Connectivity<br />

24 Q199 P.S. 199 Q Lighting Fixtures<br />

24 Q199 P.S. 199 Q New/Retrofit Telephone/Intercom System<br />

24 Q229 P.S. 229 Q Classroom Connectivity<br />

24 Q229 P.S. 229 Q Elevators And Escalators<br />

24 Q239 P.S. 239 Q Classroom Connectivity<br />

24 Q239 P.S. 239 Q Classroom Connectivity<br />

24 Q239 P.S. 239 Q New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

24 Q239 P.S. 239 Q Paved Area-Blacktop<br />

24 Q245 P.S. 245 ECC (@ SENECA AVE) Q Classroom Connectivity<br />

24 Q247 P.S. /I.S. 128 Q Classroom Connectivity<br />

24 Q260 P.S. 307 Q Classroom Connectivity<br />

24 Q269 P.S./I.S. 269 Q Classroom Connectivity<br />

24 Q269 P.S./I.S. 269 Q Exterior Masonry<br />

24 Q269 P.S./I.S. 269 Q Roofs<br />

24 Q721 P.S. 16 (OLD Q721 SPED) Q Classroom Connectivity<br />

24 Q721 P.S. 16 (OLD Q721 SPED) Q Classroom Connectivity<br />

24 Q721 P.S. 16 (OLD Q721 SPED) Q Classroom Connectivity<br />

24 Q721 P.S. 16 (OLD Q721 SPED) Q New/Retrofit Telephone/Intercom System<br />

24 Q777 P.S. 199 ANNEX (@ ST. TERESA'S) Q Low-Voltage Electrical Systems<br />

24 Q848 P.S. 81 ANNEX (OLD 75) Q Exterior Masonry<br />

24 Q848 P.S. 81 ANNEX (OLD 75) Q Flood Elimination<br />

24 Q849 I.S. 77 Q Classroom Connectivity<br />

24 Q849 I.S. 77 Q New/Retrofit Telephone/Intercom System<br />

24 Q873 I.S. 73 MINISCHOOL Q Classroom Connectivity<br />

24 Q873 I.S. 73 MINISCHOOL Q Roofs<br />

24 Q877 51ST AVENUE ACADEMY Q Classroom Connectivity<br />

25 Q020 P.S. 20 Q Classroom Connectivity<br />

25 Q021 P.S. 21 Q Classroom Connectivity<br />

25 Q021 P.S. 21 Q Exterior Masonry<br />

25 Q021 P.S. 21 Q New/Retrofit Telephone/Intercom System<br />

25 Q021 P.S. 21 Q Parapets<br />

25 Q021 P.S. 21 Q Roofs<br />

25 Q021 P.S. 21 Q Safety Systems<br />

25 Q022 P.S. 22 Q Classroom Connectivity<br />

25 Q022 P.S. 22 Q Emergency Stabilization<br />

25 Q022 P.S. 22 Q New/Retrofit Telephone/Intercom System<br />

25 Q024 P.S. 24 Q Classroom Connectivity<br />

25 Q024 P.S. 24 Q Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

25 Q024 P.S. 24 Q Exterior Masonry<br />

25 Q024 P.S. 24 Q New/Retrofit Telephone/Intercom System<br />

25 Q024 P.S. 24 Q Parapets<br />

25 Q025 J.H.S. 25 Q Classroom Connectivity<br />

25 Q025 J.H.S. 25 Q Classroom Connectivity<br />

25 Q025 J.H.S. 25 Q Exterior Masonry<br />

25 Q025 J.H.S. 25 Q IP Digital Video Surveillance<br />

25 Q025 J.H.S. 25 Q Parapets<br />

25 Q025 J.H.S. 25 Q Roofs<br />

25 Q029 P.S. 29 ADDITION Q Classroom Connectivity<br />

25 Q029 P.S. 29 ADDITION Q New/Retrofit Telephone/Intercom System<br />

25 Q029 P.S. 29 Q Room Conversions/Partitioning<br />

25 Q032 P.S. 32 Q Classroom Connectivity<br />

25 Q032 P.S. 32 Q Lighting Fixtures<br />

25 Q079 P.S. 79 Q Classroom Connectivity<br />

25 Q079 P.S. 79 Q Domestic Piping<br />

25 Q079 P.S. 79 Q Exterior Masonry<br />

25 Q079 P.S. 79 Q Parapets<br />

25 Q079 P.S. 79 Q Roofs<br />

25 Q079 P.S. 79 Q Windows<br />

25 Q<strong>10</strong>7 P.S. <strong>10</strong>7 Q Classroom Connectivity<br />

25 Q<strong>10</strong>7 P.S. <strong>10</strong>7 Q Elevators And Escalators<br />

25 Q<strong>10</strong>7 P.S. <strong>10</strong>7 Q New/Retrofit Telephone/Intercom System<br />

25 Q120 P.S. 120 Q Classroom Connectivity<br />

25 Q120 P.S. 120 Q New/Retrofit Telephone/Intercom System<br />

25 Q129 P.S. 129 Q Classroom Connectivity<br />

25 Q129 P.S. 129 Q IP Digital Video Surveillance<br />

25 Q129 P.S. 129 Q New/Retrofit Telephone/Intercom System<br />

25 Q130 P.S. 130 Q Classroom Connectivity<br />

25 Q154 P.S. 154 Q Classroom Connectivity<br />

25 Q154 P.S. 154 Q Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

25 Q154 P.S. 154 Q New/Retrofit Telephone/Intercom System<br />

25 Q163 P.S. 163 Q Classroom Connectivity<br />

25 Q163 P.S. 163 Q New/Retrofit Telephone/Intercom System<br />

25 Q164 P.S. 164 Q Classroom Connectivity<br />

25 Q164 P.S. 164 Q Low-Voltage Electrical Systems<br />

25 Q165 P.S. 165 Q Auditorium Upgrade<br />

25 Q165 P.S. 165 Q Classroom Connectivity<br />

25 Q168 J.H.S. 168 Q Classroom Connectivity<br />

25 Q168 J.H.S. 168 Q Classroom Connectivity<br />

25 Q168 J.H.S. 168 Q Climate Control<br />

25 Q168 J.H.S. 168 Q Low-Voltage Electrical Systems<br />

25 Q168 J.H.S. 168 Q New/Retrofit Telephone/Intercom System<br />

25 Q168 J.H.S. 168 Q Science Lab Upgrades<br />

25 Q169 P.S. 169 Q Classroom Connectivity<br />

25 Q169 P.S. 169 Q Emergency Stabilization<br />

25 Q169 P.S. 169 Q New/Retrofit Telephone/Intercom System<br />

25 Q169 P.S. 169 Q Science Lab Upgrades<br />

25 Q184 P.S. 184 Q Classroom Connectivity<br />

25 Q184 P.S. 184 Q Electrical Systems<br />

25 Q185 J.H.S. 185 Q Auditorium Upgrade<br />

25 Q185 J.H.S. 185 Q Classroom Connectivity<br />

25 Q185 J.H.S. 185 Q Low-Voltage Electrical Systems<br />

25 Q185 J.H.S. 185 Q Parapets<br />

25 Q185 J.H.S. 185 Q Roofs<br />

25 Q185 J.H.S. 185 Q Safety Systems<br />

25 Q185 J.H.S. 185 Q Windows<br />

25 Q189 J.H.S. 189 Q Classroom Connectivity<br />

25 Q189 J.H.S. 189 Q Classroom Connectivity<br />

25 Q189 J.H.S. 189 Q Kitchen Areas<br />

25 Q189 J.H.S. 189 Q Lighting Fixtures<br />

25 Q189 J.H.S. 189 Q Low-Voltage Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

25 Q189 J.H.S. 189 Q New/Retrofit Telephone/Intercom System<br />

25 Q193 P.S. 193 Q Classroom Connectivity<br />

25 Q193 P.S. 193 Q IP Digital Video Surveillance<br />

25 Q193 P.S. 193 Q Low-Voltage Electrical Systems<br />

25 Q194 J.H.S. 194 Q Classroom Connectivity<br />

25 Q194 J.H.S. 194 Q Lighting Fixtures<br />

25 Q200 P.S. 200 Q Classroom Connectivity<br />

25 Q200 P.S. 200 Q Kitchen Areas<br />

25 Q201 P.S. 201 Q Classroom Connectivity<br />

25 Q201 P.S. 201 Q Exterior Masonry<br />

25 Q201 P.S. 201 Q New/Retrofit Telephone/Intercom System<br />

25 Q209 P.S. 209 Q Classroom Connectivity<br />

25 Q2<strong>14</strong> P.S. 2<strong>14</strong> Q Classroom Connectivity<br />

25 Q2<strong>14</strong> P.S. 2<strong>14</strong> Q Parapets<br />

25 Q219 P.S. 219 Q Classroom Connectivity<br />

25 Q219 P.S. 219 Q Low-Voltage Electrical Systems<br />

25 Q237 J.H.S. 237 Q Classroom Connectivity<br />

25 Q237 J.H.S. 237 Q Low-Voltage Electrical Systems<br />

25 Q237 J.H.S. 237 Q New/Retrofit Telephone/Intercom System<br />

25 Q237 J.H.S. 237 Q Science Lab Upgrades<br />

25 Q242 P.S. 242 - (ECC) Q Classroom Connectivity<br />

25 Q242 P.S. 242 - (ECC) Q New/Retrofit Telephone/Intercom System<br />

25 Q244 P.S. 244 ECC (@ FRANKLIN AVE) Q Classroom Connectivity<br />

25 Q499 P.S./I.S. 499 Q Classroom Connectivity<br />

25 Q499 P.S./I.S. 499 Q New/Retrofit Telephone/Intercom System<br />

26 Q018 P.S. 18 Q Classroom Connectivity<br />

26 Q018 P.S. 18 Q Electrical Systems<br />

26 Q018 P.S. 18 Q Exterior Masonry<br />

26 Q018 P.S. 18 Q Lighting Fixtures<br />

26 Q018 P.S. 18 Q New/Retrofit Telephone/Intercom System<br />

26 Q018 P.S. 18 Q Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

26 Q018 P.S. 18 Q Roofs<br />

26 Q026 P.S. 26 Q Classroom Connectivity<br />

26 Q026 P.S. 26 Q Electrical Systems<br />

26 Q026 P.S. 26 Q New/Retrofit Telephone/Intercom System<br />

26 Q031 P.S. 31 Q Classroom Connectivity<br />

26 Q031 P.S. 31 Q Low-Voltage Electrical Systems<br />

26 Q031 P.S. 31 Q New/Retrofit Telephone/Intercom System<br />

26 Q041 P.S. 41 Q Classroom Connectivity<br />

26 Q041 P.S. 41 Q Classroom Connectivity<br />

26 Q041 P.S. 41 Q New/Retrofit Telephone/Intercom System<br />

26 Q041 P.S. 41 Q Parapets<br />

26 Q046 P.S. 46 Q Auditorium Upgrade<br />

26 Q046 P.S. 46 Q Classroom Connectivity<br />

26 Q046 P.S. 46 Q Interior Spaces<br />

26 Q067 J.H.S. 67 Q Classroom Connectivity<br />

26 Q067 J.H.S. 67 Q Emergency Stabilization<br />

26 Q067 J.H.S. 67 Q IP Digital Video Surveillance<br />

26 Q074 I.S. 74 Q Classroom Connectivity<br />

26 Q074 I.S. 74 Q New/Retrofit Telephone/Intercom System<br />

26 Q094 P.S. 94 Q Classroom Connectivity<br />

26 Q094 P.S. 94 Q Exterior Masonry<br />

26 Q094 P.S. 94 Q Flood Elimination<br />

26 Q098 P.S. 98 Q Classroom Connectivity<br />

26 Q098 P.S. 98 Q Domestic Piping<br />

26 Q115 P.S. 115 Q Classroom Connectivity<br />

26 Q115 P.S. 115 Q Exterior Masonry<br />

26 Q115 P.S. 115 Q New/Retrofit Telephone/Intercom System<br />

26 Q133 P.S. 133 Q Classroom Connectivity<br />

26 Q133 P.S. 133 Q New/Retrofit Telephone/Intercom System<br />

26 Q158 J.H.S. 158 Q Classroom Connectivity<br />

26 Q158 J.H.S. 158 Q Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

26 Q158 J.H.S. 158 Q New/Retrofit Telephone/Intercom System<br />

26 Q159 P.S. 159 Q Classroom Connectivity<br />

26 Q159 P.S. 159 Q Emergency Stabilization<br />

26 Q162 P.S. 162 Q Classroom Connectivity<br />

26 Q162 P.S. 162 Q Lighting Fixtures<br />

26 Q172 J.H.S. 172 Q Classroom Connectivity<br />

26 Q172 J.H.S. 172 Q Electrical Systems<br />

26 Q173 P.S. 173 Q Classroom Connectivity<br />

26 Q173 P.S. 173 Q New/Retrofit Telephone/Intercom System<br />

26 Q173 P.S. 173 Q Playground Redevelopment<br />

26 Q178 P.S. 178 Q Classroom Connectivity<br />

26 Q179 P.S. 179 Q Classroom Connectivity<br />

26 Q179 P.S. 179 Q New/Retrofit Telephone/Intercom System<br />

26 Q186 P.S. 186 Q Classroom Connectivity<br />

26 Q186 P.S. 186 Q Electrical Systems<br />

26 Q186 P.S. 186 Q Flood Elimination<br />

26 Q186 P.S. 186 Q Low-Voltage Electrical Systems<br />

26 Q186 P.S. 186 Q New/Retrofit Telephone/Intercom System<br />

26 Q188 P.S. 188 Q Classroom Connectivity<br />

26 Q191 P.S. 191 Q Classroom Connectivity<br />

26 Q203 P.S. 203 Q Classroom Connectivity<br />

26 Q205 P.S. 205 Q Classroom Connectivity<br />

26 Q205 P.S. 205 Q Classroom Connectivity<br />

26 Q205 P.S. 205 Q Domestic Piping<br />

26 Q205 P.S. 205 Q New/Retrofit Telephone/Intercom System<br />

26 Q213 P.S. 213 Q Classroom Connectivity<br />

26 Q213 P.S. 213 Q Classroom Connectivity<br />

26 Q213 P.S. 213 Q Electrical Systems<br />

26 Q213 P.S. 213 Q Exterior Masonry<br />

26 Q213 P.S. 213 Q Parapets<br />

26 Q213 P.S. 213 Q Roofs


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

26 Q216 J.H.S. 216 Q Classroom Connectivity<br />

26 Q216 J.H.S. 216 Q Flood Elimination<br />

26 Q216 J.H.S. 216 Q Paved Area-Concrete<br />

26 Q221 P.S. 221 Q Classroom Connectivity<br />

26 Q221 P.S. 221 Q Lighting Fixtures<br />

26 Q266 P.S./I.S. 266 Q Classroom Connectivity<br />

26 Q266 P.S./I.S. 266 Q Classroom Connectivity<br />

26 Q266 P.S./I.S. 266 Q New/Retrofit Telephone/Intercom System<br />

26 QALP PS 23 @ HILLSIDE PSYCH Q Technology<br />

27 Q042 P.S. 42 Q Classroom Connectivity<br />

27 Q042 P.S. 42 Q New/Retrofit Telephone/Intercom System<br />

27 Q043 P.S. 43 Q Classroom Connectivity<br />

27 Q043 P.S. 43 Q Classroom Connectivity<br />

27 Q043 P.S. 43 Q Low-Voltage Electrical Systems<br />

27 Q043 P.S. 43 Q New/Retrofit Telephone/Intercom System<br />

27 Q045 P.S. 45 Q Classroom Connectivity<br />

27 Q045 P.S. 45 Q Exterior Masonry<br />

27 Q045 P.S. 45 Q Flood Elimination<br />

27 Q045 P.S. 45 Q New/Retrofit Telephone/Intercom System<br />

27 Q045 P.S. 45 Q Parapets<br />

27 Q045 P.S. 45 Q Paved Area-Blacktop<br />

27 Q045 P.S. 45 Q Playground Redevelopment<br />

27 Q047 P.S. 47 Q Classroom Connectivity<br />

27 Q047 P.S. 47 Q Exterior Masonry<br />

27 Q047 P.S. 47 Q New/Retrofit Telephone/Intercom System<br />

27 Q047 P.S. 47 Q Roofs<br />

27 Q047 P.S. 47 Q Windows<br />

27 Q051 P.S. 51 (ECC) Q Classroom Connectivity<br />

27 Q051 P.S. 51 (ECC) Q Exterior Masonry<br />

27 Q053 I.S. 53 Q Classroom Connectivity<br />

27 Q053 I.S. 53 Q Science Lab Upgrades


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

27 Q056 P.S. 56 (OLD R HILL AX) Q Classroom Connectivity<br />

27 Q056 P.S. 56 (OLD R HILL AX) Q Domestic Piping<br />

27 Q056 P.S. 56 (OLD R HILL AX) Q New/Retrofit Telephone/Intercom System<br />

27 Q060 P.S. 60 Q Classroom Connectivity<br />

27 Q060 P.S. 60 Q Lighting Fixtures<br />

27 Q060 P.S. 60 Q New/Retrofit Telephone/Intercom System<br />

27 Q062 P.S. 62 Q Classroom Connectivity<br />

27 Q062 P.S. 62 Q IP Digital Video Surveillance<br />

27 Q062 P.S. 62 Q New/Retrofit Telephone/Intercom System<br />

27 Q062 P.S. 62 Q Playground Redevelopment<br />

27 Q063 P.S. 63 Q Classroom Connectivity<br />

27 Q063 P.S. 63 Q IP Digital Video Surveillance<br />

27 Q063 P.S. 63 Q New/Retrofit Telephone/Intercom System<br />

27 Q064 P.S. 64 Q Classroom Connectivity<br />

27 Q064 P.S. 64 Q Exterior Masonry<br />

27 Q064 P.S. 64 Q New/Retrofit Telephone/Intercom System<br />

27 Q064 P.S. 64 Q Parapets<br />

27 Q066 P.S. 66 Q Classroom Connectivity<br />

27 Q066 P.S. 66 Q Domestic Piping<br />

27 Q066 P.S. 66 Q Parapets<br />

27 Q090 P.S. 90 Q Classroom Connectivity<br />

27 Q090 P.S. 90 Q Lighting Fixtures<br />

27 Q090 P.S. 90 Q New/Retrofit Telephone/Intercom System<br />

27 Q090 P.S. 90 Q Parapets<br />

27 Q096 P.S. 96 Q Classroom Connectivity<br />

27 Q096 P.S. 96 Q New/Retrofit Telephone/Intercom System<br />

27 Q097 P.S. 97 Q Classroom Connectivity<br />

27 Q097 P.S. 97 Q Exterior Masonry<br />

27 Q097 P.S. 97 Q Parapets<br />

27 Q097 P.S. 97 Q Safety Systems<br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0 Q Exterior Masonry<br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0 Q Flood Elimination<br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0 Q Lighting Fixtures<br />

27 Q<strong>10</strong>0 P.S. <strong>10</strong>0 Q Parapets<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Classroom Connectivity<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Electrical Systems<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Exterior Masonry<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Lighting Fixtures<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q New/Retrofit Telephone/Intercom System<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Parapets<br />

27 Q<strong>10</strong>4 P.S. <strong>10</strong>4 Q Windows<br />

27 Q<strong>10</strong>5 P.S. <strong>10</strong>5 Q Classroom Connectivity<br />

27 Q<strong>10</strong>5 P.S. <strong>10</strong>5 Q IP Digital Video Surveillance<br />

27 Q<strong>10</strong>5 P.S. <strong>10</strong>5 Q New/Retrofit Telephone/Intercom System<br />

27 Q<strong>10</strong>6 P.S. <strong>10</strong>6 Q Accessibility<br />

27 Q<strong>10</strong>6 P.S. <strong>10</strong>6 Q Classroom Connectivity<br />

27 Q<strong>10</strong>6 P.S. <strong>10</strong>6 Q Low-Voltage Electrical Systems<br />

27 Q<strong>10</strong>8 P.S. <strong>10</strong>8 Q Classroom Connectivity<br />

27 Q<strong>10</strong>8 P.S. <strong>10</strong>8 Q New/Retrofit Telephone/Intercom System<br />

27 Q1<strong>14</strong> P.S. 1<strong>14</strong> Q Classroom Connectivity<br />

27 Q123 P.S. 123 Q Classroom Connectivity<br />

27 Q123 P.S. 123 Q Classroom Connectivity<br />

27 Q124 P.S. 124 Q Classroom Connectivity<br />

27 Q137 M.S. 137 Q Classroom Connectivity<br />

27 Q137 M.S. 137 Q New/Retrofit Telephone/Intercom System<br />

27 Q<strong>14</strong>6 P.S. <strong>14</strong>6 Q Cafeteria / Multipurpose Room Upgrade<br />

27 Q<strong>14</strong>6 P.S. <strong>14</strong>6 Q Classroom Connectivity<br />

27 Q<strong>14</strong>6 P.S. <strong>14</strong>6 Q New/Retrofit Telephone/Intercom System<br />

27 Q155 P.S. 155 Q Classroom Connectivity<br />

27 Q155 P.S. 155 Q Classroom Connectivity<br />

27 Q155 P.S. 155 Q IP Digital Video Surveillance


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

27 Q180 I.S. 323 (OLD IS 180) Q Classroom Connectivity<br />

27 Q180 I.S. 323 (OLD IS 180) Q IP Digital Video Surveillance<br />

27 Q180 I.S. 323 (OLD IS 180) Q New/Retrofit Telephone/Intercom System<br />

27 Q183 P.S. 183 Q Classroom Connectivity<br />

27 Q183 P.S. 183 Q Emergency Stabilization<br />

27 Q183 P.S. 183 Q Lighting Fixtures<br />

27 Q183 P.S. 183 Q Low-Voltage Electrical Systems<br />

27 Q183 P.S. 183 Q New/Retrofit Telephone/Intercom System<br />

27 Q183 P.S. 183 Q Paved Area-Concrete<br />

27 Q183 P.S. 183 Q Roofs<br />

27 Q183 P.S. 183 Q Ventilation<br />

27 Q197 P.S. 197 Q Classroom Connectivity<br />

27 Q197 P.S. 197 Q Lighting Fixtures<br />

27 Q197 P.S. 197 Q New/Retrofit Telephone/Intercom System<br />

27 Q198 I.S. 198 Q Classroom Connectivity<br />

27 Q198 I.S. 198 Q Science Lab Upgrades<br />

27 Q202 I.S. 202 Q Classroom Connectivity<br />

27 Q202 I.S. 202 Q New/Retrofit Telephone/Intercom System<br />

27 Q207 P.S. 207 Q Classroom Connectivity<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Classroom Connectivity<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Emergency Stabilization<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Exterior Masonry<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Parapets<br />

27 Q2<strong>10</strong> I.S. 2<strong>10</strong> Q Roofs<br />

27 Q215 P.S. 215 Q Auditorium Upgrade<br />

27 Q215 P.S. 215 Q Classroom Connectivity<br />

27 Q215 P.S. 215 Q Exterior Masonry<br />

27 Q215 P.S. 215 Q Low-Voltage Electrical Systems<br />

27 Q215 P.S. 215 Q Parapets<br />

27 Q215 P.S. 215 Q Roofs<br />

27 Q223 P.S. 223 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

27 Q223 P.S. 223 Q Exterior Masonry<br />

27 Q223 P.S. 223 Q IP Digital Video Surveillance<br />

27 Q223 P.S. 223 Q Lighting Fixtures<br />

27 Q223 P.S. 223 Q Parapets<br />

27 Q223 P.S. 223 Q Roofs<br />

27 Q223 P.S. 223 Q Windows<br />

27 Q225 P.S. 225 Q Classroom Connectivity<br />

27 Q225 P.S. 225 Q New/Retrofit Telephone/Intercom System<br />

27 Q225 P.S. 225 Q Playground Redevelopment<br />

27 Q226 I.S. 226 Q Classroom Connectivity<br />

27 Q226 I.S. 226 Q Gymnasium Upgrade<br />

27 Q226 I.S. 226 Q New/Retrofit Telephone/Intercom System<br />

27 Q232 P.S. 232 Q Classroom Connectivity<br />

27 Q232 P.S. 232 Q Emergency Stabilization<br />

27 Q253 P.S. 253 Q Classroom Connectivity<br />

27 Q253 P.S. 253 Q Classroom Connectivity<br />

27 Q254 P.S. 254 Q Classroom Connectivity<br />

27 Q254 P.S. 254 Q Classroom Connectivity<br />

27 Q262 P.S. 262 Q Classroom Connectivity<br />

27 Q273 P.S. 273 Q Classroom Connectivity<br />

27 Q884 P.S. 65 Q Classroom Connectivity<br />

27 Q884 P.S. 65 Q New/Retrofit Telephone/Intercom System<br />

28 Q003 P.S. 303 Q Classroom Connectivity<br />

28 Q008 J.H.S. 8 Q Classroom Connectivity<br />

28 Q008 J.H.S. 8 Q Lighting Fixtures<br />

28 Q008 J.H.S. 8 Q Roofs<br />

28 Q008 J.H.S. 8 Q Science Lab Upgrades<br />

28 Q030 P.S. 30 Q Classroom Connectivity<br />

28 Q030 P.S. 30 Q Domestic Piping<br />

28 Q030 P.S. 30 Q New/Retrofit Telephone/Intercom System<br />

28 Q040 P.S. 40 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

28 Q040 P.S. 40 Q Classroom Connectivity<br />

28 Q040 P.S. 40 Q Electrical Systems<br />

28 Q040 P.S. 40 Q Exterior Masonry<br />

28 Q040 P.S. 40 Q IP Digital Video Surveillance<br />

28 Q040 P.S. 40 Q Parapets<br />

28 Q040 P.S. 40 Q Playground Redevelopment<br />

28 Q040 P.S. 40 Q Toilets-Students<br />

28 Q048 P.S. 48 Q IP Digital Video Surveillance<br />

28 Q050 P.S. 50 Q Classroom Connectivity<br />

28 Q050 P.S. 50 Q Parapets<br />

28 Q050 P.S. 50 Q Playground Redevelopment<br />

28 Q050 P.S. 50 Q Roofs<br />

28 Q054 P.S. 54 Q Classroom Connectivity<br />

28 Q054 P.S. 54 Q Exterior Masonry<br />

28 Q054 P.S. 54 Q Lighting Fixtures<br />

28 Q054 P.S. 54 Q Parapets<br />

28 Q055 P.S. 55 Q Classroom Connectivity<br />

28 Q055 P.S. 55 Q Exterior Masonry<br />

28 Q055 P.S. 55 Q New/Retrofit Telephone/Intercom System<br />

28 Q055 P.S. 55 Q Parapets<br />

28 Q072 J.H.S. 72 Q Classroom Connectivity<br />

28 Q072 J.H.S. 72 Q Emergency Stabilization<br />

28 Q072 J.H.S. 72 Q Lighting Fixtures<br />

28 Q072 J.H.S. 72 Q Low-Voltage Electrical Systems<br />

28 Q080 P.S. 80 Q Classroom Connectivity<br />

28 Q080 P.S. 80 Q New/Retrofit Telephone/Intercom System<br />

28 Q082 P.S. 82 Q Classroom Connectivity<br />

28 Q086 P.S. 86 Q Classroom Connectivity<br />

28 Q086 P.S. 86 Q New/Retrofit Telephone/Intercom System<br />

28 Q099 P.S. 99 Q Classroom Connectivity<br />

28 Q099 P.S. 99 Q Lighting Fixtures


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

28 Q<strong>10</strong>1 P.S. <strong>10</strong>1 Q Classroom Connectivity<br />

28 Q<strong>10</strong>1 P.S. <strong>10</strong>1 Q Flood Elimination<br />

28 Q<strong>10</strong>1 P.S. <strong>10</strong>1 Q New/Retrofit Telephone/Intercom System<br />

28 Q117 P.S. 117 Q Classroom Connectivity<br />

28 Q117 P.S. 117 Q Exterior Masonry<br />

28 Q117 P.S. 117 Q Flood Elimination<br />

28 Q117 P.S. 117 Q New/Retrofit Telephone/Intercom System<br />

28 Q117 P.S. 117 Q Parapets<br />

28 Q121 P.S. 121 Q Classroom Connectivity<br />

28 Q121 P.S. 121 Q Floors<br />

28 Q121 P.S. 121 Q New/Retrofit Telephone/Intercom System<br />

28 Q121 P.S. 121 Q Reinforcing Cinder Concrete Slabs<br />

28 Q139 P.S. 139 Q Classroom Connectivity<br />

28 Q139 P.S. 139 Q Exterior Masonry<br />

28 Q139 P.S. 139 Q New/Retrofit Telephone/Intercom System<br />

28 Q139 P.S. 139 Q Parapets<br />

28 Q139 P.S. 139 Q Roofs<br />

28 Q<strong>14</strong>0 P.S. <strong>14</strong>0 Q Classroom Connectivity<br />

28 Q<strong>14</strong>0 P.S. <strong>14</strong>0 Q New/Retrofit Telephone/Intercom System<br />

28 Q<strong>14</strong>4 P.S. <strong>14</strong>4 Q Classroom Connectivity<br />

28 Q157 J.H.S. 157 Q Classroom Connectivity<br />

28 Q157 J.H.S. 157 Q Climate Control<br />

28 Q157 J.H.S. 157 Q Lighting Fixtures<br />

28 Q157 J.H.S. 157 Q Low-Voltage Electrical Systems<br />

28 Q157 J.H.S. 157 Q New/Retrofit Telephone/Intercom System<br />

28 Q157 J.H.S. 157 Q Parapets<br />

28 Q160 P.S. 160 Q Classroom Connectivity<br />

28 Q160 P.S. 160 Q Flood Elimination<br />

28 Q160 P.S. 160 Q Windows<br />

28 Q161 P.S. 161 Q Classroom Connectivity<br />

28 Q161 P.S. 161 Q Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

28 Q161 P.S. 161 Q Flood Elimination<br />

28 Q161 P.S. 161 Q New/Retrofit Telephone/Intercom System<br />

28 Q161 P.S. 161 Q Parapets<br />

28 Q161 P.S. 161 Q Roofs<br />

28 Q161 P.S. 161 Q Windows<br />

28 Q167 I.S./ H.S. 167 Q Classroom Connectivity<br />

28 Q167 I.S./ H.S. 167 Q Classroom Connectivity<br />

28 Q174 P.S. 174 Q Classroom Connectivity<br />

28 Q174 P.S. 174 Q Domestic Piping<br />

28 Q174 P.S. 174 Q Low-Voltage Electrical Systems<br />

28 Q175 P.S. 175 Q Classroom Connectivity<br />

28 Q190 J.H.S. 190 Q Auditorium Upgrade<br />

28 Q190 J.H.S. 190 Q Classroom Connectivity<br />

28 Q190 J.H.S. 190 Q Lighting Fixtures<br />

28 Q190 J.H.S. 190 Q New/Retrofit Telephone/Intercom System<br />

28 Q196 P.S. 196 Q Classroom Connectivity<br />

28 Q196 P.S. 196 Q Exterior Masonry<br />

28 Q196 P.S. 196 Q Parapets<br />

28 Q196 P.S. 196 Q Roofs<br />

28 Q206 P.S. 206 Q Accessibility<br />

28 Q206 P.S. 206 Q Classroom Connectivity<br />

28 Q206 P.S. 206 Q Electrical Systems<br />

28 Q206 P.S. 206 Q Electrical Systems<br />

28 Q206 P.S. 206 Q Low-Voltage Electrical Systems<br />

28 Q217 I.S. 217 Q Classroom Connectivity<br />

28 Q217 I.S. 217 Q IP Digital Video Surveillance<br />

28 Q220 P.S. 220 Q Classroom Connectivity<br />

28 Q220 P.S. 220 Q Lighting Fixtures<br />

28 Q276 ILLIAM WORDSWORTH EDUCATIONAL COM Q Classroom Connectivity<br />

28 Q882 P.S. 182 Q Classroom Connectivity<br />

28 Q882 P.S. 182 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

28 Q882 P.S. 182 Q Lighting Fixtures<br />

29 Q015 P.S. 15 Q Classroom Connectivity<br />

29 Q015 P.S. 15 Q Exterior Masonry<br />

29 Q033 P.S. 33 Q Classroom Connectivity<br />

29 Q033 P.S. 33 Q Playground Redevelopment<br />

29 Q034 P.S. 34 Q Classroom Connectivity<br />

29 Q035 P.S. 35 Q Classroom Connectivity<br />

29 Q036 P.S. 36 Q Classroom Connectivity<br />

29 Q037 P.S. 37 Q Classroom Connectivity<br />

29 Q037 P.S. 37 Q Elevators And Escalators<br />

29 Q037 P.S. 37 Q Flood Elimination<br />

29 Q037 P.S. 37 Q Lighting Fixtures<br />

29 Q037 P.S. 37 Q New/Retrofit Telephone/Intercom System<br />

29 Q038 P.S. 38 Q Classroom Connectivity<br />

29 Q038 P.S. 38 Q Classroom Connectivity<br />

29 Q038 P.S. 38 Q Gymnasium Upgrade<br />

29 Q052 P.S. 52 Q Classroom Connectivity<br />

29 Q052 P.S. 52 Q New/Retrofit Telephone/Intercom System<br />

29 Q059 I.S. 59 Q Classroom Connectivity<br />

29 Q059 I.S. 59 Q New/Retrofit Telephone/Intercom System<br />

29 Q059 I.S. 59 Q Playground Redevelopment<br />

29 Q059 I.S. 59 Q Room Conversions/Partitioning<br />

29 Q059 I.S. 59 Q School Improvement and Restructuring<br />

29 Q095 P.S. 95 Q Classroom Connectivity<br />

29 Q095 P.S. 95 Q Lighting Fixtures<br />

29 Q<strong>10</strong>9 I.S. <strong>10</strong>9 Q Classroom Connectivity<br />

29 Q<strong>10</strong>9 I.S. <strong>10</strong>9 Q New/Retrofit Telephone/Intercom System<br />

29 Q116 P.S. 116 Q Classroom Connectivity<br />

29 Q116 P.S. 116 Q Lighting Fixtures<br />

29 Q116 P.S. 116 Q New/Retrofit Telephone/Intercom System<br />

29 Q118 P.S. 118 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

29 Q118 P.S. 118 Q Domestic Piping<br />

29 Q131 P.S. 131 Q Classroom Connectivity<br />

29 Q131 P.S. 131 Q Classroom Connectivity<br />

29 Q132 P.S. 132 Q Classroom Connectivity<br />

29 Q132 P.S. 132 Q Electrical Systems<br />

29 Q132 P.S. 132 Q New/Retrofit Telephone/Intercom System<br />

29 Q132 P.S. 132 Q Reinforcing Cinder Concrete Slabs<br />

29 Q134 P.S. 134 Q Classroom Connectivity<br />

29 Q134 P.S. 134 Q New/Retrofit Telephone/Intercom System<br />

29 Q134 P.S. 134 Q Toilets-Students<br />

29 Q135 P.S. 135 Q Classroom Connectivity<br />

29 Q135 P.S. 135 Q Elevators And Escalators<br />

29 Q135 P.S. 135 Q Flood Elimination<br />

29 Q135 P.S. 135 Q Lighting Fixtures<br />

29 Q135 P.S. 135 Q New/Retrofit Telephone/Intercom System<br />

29 Q135 P.S. 135 Q Parapets<br />

29 Q136 P.S. 136 Q Classroom Connectivity<br />

29 Q136 P.S. 136 Q Parapets<br />

29 Q136 P.S. 136 Q Windows<br />

29 Q138 P.S. 138 Q Auditorium Upgrade<br />

29 Q138 P.S. 138 Q Classroom Connectivity<br />

29 Q138 P.S. 138 Q IP Digital Video Surveillance<br />

29 Q138 P.S. 138 Q Lighting Fixtures<br />

29 Q138 P.S. 138 Q Playground Redevelopment<br />

29 Q<strong>14</strong>7 P.S. <strong>14</strong>7 Q Classroom Connectivity<br />

29 Q<strong>14</strong>7 P.S. <strong>14</strong>7 Q Flood Elimination<br />

29 Q<strong>14</strong>7 P.S. <strong>14</strong>7 Q IP Digital Video Surveillance<br />

29 Q<strong>14</strong>7 P.S. <strong>14</strong>7 Q New/Retrofit Telephone/Intercom System<br />

29 Q156 P.S. 156 Q Auditorium Upgrade<br />

29 Q156 P.S. 156 Q Classroom Connectivity<br />

29 Q156 P.S. 156 Q Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

29 Q156 P.S. 156 Q IP Digital Video Surveillance<br />

29 Q156 P.S. 156 Q Low-Voltage Electrical Systems<br />

29 Q156 P.S. 156 Q Parapets<br />

29 Q176 P.S. 176 Q Classroom Connectivity<br />

29 Q176 P.S. 176 Q Classroom Connectivity<br />

29 Q176 P.S. 176 Q New/Retrofit Telephone/Intercom System<br />

29 Q181 P.S. 181 Q Classroom Connectivity<br />

29 Q181 P.S. 181 Q IP Digital Video Surveillance<br />

29 Q181 P.S. 181 Q New/Retrofit Telephone/Intercom System<br />

29 Q192 I.S. 192 Q Classroom Connectivity<br />

29 Q192 I.S. 192 Q Classroom Connectivity<br />

29 Q192 I.S. 192 Q Lighting Fixtures<br />

29 Q195 P.S. 195 Q Classroom Connectivity<br />

29 Q195 P.S. 195 Q New/Retrofit Telephone/Intercom System<br />

29 Q208 P.S./I.S. 208 Q Classroom Connectivity<br />

29 Q208 P.S./I.S. 208 Q New/Retrofit Telephone/Intercom System<br />

29 Q231 I.S. 231 (TANDEM Q251) Q Auditorium Upgrade<br />

29 Q231 I.S. 231 (TANDEM Q251) Q Classroom Connectivity<br />

29 Q231 I.S. 231 (TANDEM Q251) Q Low-Voltage Electrical Systems<br />

29 Q231 I.S. 231 (TANDEM Q251) Q New/Retrofit Telephone/Intercom System<br />

29 Q231 I.S. 231 (TANDEM Q251) Q Science Lab Upgrades<br />

29 Q238 I.S. 238 Q Classroom Connectivity<br />

29 Q238 I.S. 238 Q IP Digital Video Surveillance<br />

29 Q238 I.S. 238 Q New/Retrofit Telephone/Intercom System<br />

29 Q251 P.S. 251 (TANDEM Q231) Q Classroom Connectivity<br />

29 Q251 P.S. 251 (TANDEM Q231) Q Elevators And Escalators<br />

29 Q251 P.S. 251 (TANDEM Q231) Q New/Retrofit Telephone/Intercom System<br />

29 Q251 P.S. 251 (TANDEM Q231) Q Paved Area-Blacktop<br />

29 Q263 P.S. /I.S 295 Q Classroom Connectivity<br />

29 Q263 P.S. /I.S 295 Q Gymnasium Upgrade<br />

29 Q263 P.S. /I.S 295 Q New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

29 Q268 P.S. 268 Q Classroom Connectivity<br />

29 Q268 P.S. 268 Q New/Retrofit Telephone/Intercom System<br />

29 Q270 P.S. 270 Q Classroom Connectivity<br />

29 Q270 P.S. 270 Q IP Digital Video Surveillance<br />

29 Q270 P.S. 270 Q New/Retrofit Telephone/Intercom System<br />

30 Q002 P.S. 2 Q Classroom Connectivity<br />

30 Q002 P.S. 2 Q New/Retrofit Telephone/Intercom System<br />

30 Q0<strong>10</strong> I.S. <strong>10</strong> Q Classroom Connectivity<br />

30 Q0<strong>10</strong> I.S. <strong>10</strong> Q Flood Elimination<br />

30 Q0<strong>10</strong> I.S. <strong>10</strong> Q Low-Voltage Electrical Systems<br />

30 Q0<strong>10</strong> I.S. <strong>10</strong> Q Parapets<br />

30 Q0<strong>10</strong> I.S. <strong>10</strong> Q Roofs<br />

30 Q011 P.S. 11 Q Classroom Connectivity<br />

30 Q011 P.S. 11 Q New/Retrofit Telephone/Intercom System<br />

30 Q017 P.S. 17 Q Classroom Connectivity<br />

30 Q017 P.S. 17 Q Lighting Fixtures<br />

30 Q017 P.S. 17 Q New/Retrofit Telephone/Intercom System<br />

30 Q069 P.S. 69 Q Classroom Connectivity<br />

30 Q069 P.S. 69 Q Parapets<br />

30 Q070 P.S. 70 Q Classroom Connectivity<br />

30 Q070 P.S. 70 ADDITION Q Emergency Stabilization<br />

30 Q070 P.S. 70 Q New/Retrofit Telephone/Intercom System<br />

30 Q076 P.S. 76 Q Classroom Connectivity<br />

30 Q076 P.S. 76 Q New/Retrofit Telephone/Intercom System<br />

30 Q076 P.S. 76 Q Parapets<br />

30 Q084 P.S. 84 Q Classroom Connectivity<br />

30 Q084 P.S. 84 Q Lighting Fixtures<br />

30 Q085 P.S. 85 Q Classroom Connectivity<br />

30 Q085 P.S. 85 Q Domestic Piping<br />

30 Q085 P.S. 85 Q Exterior Masonry<br />

30 Q085 P.S. 85 Q Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

30 Q085 P.S. 85 Q Low-Voltage Electrical Systems<br />

30 Q085 P.S. 85 Q Roofs<br />

30 Q092 P.S. 92 Q Classroom Connectivity<br />

30 Q092 P.S. 92 Q Classroom Connectivity<br />

30 Q092 P.S. 92 Q New/Retrofit Telephone/Intercom System<br />

30 Q111 P.S. 111 Q Auditorium Upgrade<br />

30 Q111 P.S. 111 Q Classroom Connectivity<br />

30 Q111 P.S. 111 Q IP Digital Video Surveillance<br />

30 Q111 P.S. 111 Q Low-Voltage Electrical Systems<br />

30 Q111 P.S. 111 Q Science Lab Upgrades<br />

30 Q112 P.S. 112 Q Classroom Connectivity<br />

30 Q112 P.S. 112 Q Electrical Systems<br />

30 Q112 P.S. 112 Q IP Digital Video Surveillance<br />

30 Q122 P.S. 122 Q Cafeteria / Multipurpose Room Upgrade<br />

30 Q122 P.S. 122 Q Classroom Connectivity<br />

30 Q122 P.S. 122 Q New/Retrofit Telephone/Intercom System<br />

30 Q126 I.S. 126 Q Classroom Connectivity<br />

30 Q127 P.S. 127 Q Classroom Connectivity<br />

30 Q127 P.S. 127 Q Flood Elimination<br />

30 Q127 P.S. 127 Q New/Retrofit Telephone/Intercom System<br />

30 Q127 P.S. 127 Q Parapets<br />

30 Q<strong>14</strong>1 I.S. <strong>14</strong>1 Q Classroom Connectivity<br />

30 Q<strong>14</strong>1 I.S. <strong>14</strong>1 Q Electrical Systems<br />

30 Q<strong>14</strong>1 I.S. <strong>14</strong>1 Q Parapets<br />

30 Q<strong>14</strong>5 I.S. <strong>14</strong>5 Q Classroom Connectivity<br />

30 Q<strong>14</strong>5 I.S. <strong>14</strong>5 Q Toilets-Students<br />

30 Q<strong>14</strong>8 P.S. <strong>14</strong>8 Q Auditorium Upgrade<br />

30 Q<strong>14</strong>8 P.S. <strong>14</strong>8 Q Classroom Connectivity<br />

30 Q<strong>14</strong>8 P.S. <strong>14</strong>8 Q New/Retrofit Telephone/Intercom System<br />

30 Q<strong>14</strong>9 P.S. <strong>14</strong>9 Q Classroom Connectivity<br />

30 Q<strong>14</strong>9 P.S. <strong>14</strong>9 Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

30 Q<strong>14</strong>9 P.S. <strong>14</strong>9 Q New/Retrofit Telephone/Intercom System<br />

30 Q150 P.S. 150 Q Classroom Connectivity<br />

30 Q150 P.S. 150 Q Lighting Fixtures<br />

30 Q151 P.S. 151 Q Auditorium Upgrade<br />

30 Q151 P.S. 151 Q Classroom Connectivity<br />

30 Q151 P.S. 151 Q Domestic Piping<br />

30 Q151 P.S. 151 Q New/Retrofit Telephone/Intercom System<br />

30 Q151 P.S. 151 Q Playground Redevelopment<br />

30 Q152 P.S. 152 Q Classroom Connectivity<br />

30 Q152 P.S. 152 Q Lighting Fixtures<br />

30 Q166 P.S. 166 Q Classroom Connectivity<br />

30 Q171 P.S. 171 Q Classroom Connectivity<br />

30 Q171 P.S. 171 Q Exterior Masonry<br />

30 Q171 P.S. 171 Q Parapets<br />

30 Q204 I.S. 204 Q Classroom Connectivity<br />

30 Q204 I.S. 204 Q Classroom Connectivity<br />

30 Q204 I.S. 204 Q Classroom Connectivity<br />

30 Q204 I.S. 204 Q Gymnasium Upgrade<br />

30 Q204 I.S. 204 Q Lighting Fixtures<br />

30 Q204 I.S. 204 Q New/Retrofit Telephone/Intercom System<br />

30 Q204 I.S. 204 Q Science Lab Upgrades<br />

30 Q204 I.S. 204 Q Science Lab Upgrades<br />

30 Q212 P.S. 212 Q Classroom Connectivity<br />

30 Q212 P.S. 212 Q New/Retrofit Telephone/Intercom System<br />

30 Q212 P.S. 212 Q Room Conversions/Partitioning<br />

30 Q222 P.S. 222 (ECC) Q Classroom Connectivity<br />

30 Q222 P.S. 222 (ECC) Q New/Retrofit Telephone/Intercom System<br />

30 Q227 I.S. 227 Q Auditorium Upgrade<br />

30 Q227 I.S. 227 Q Classroom Connectivity<br />

30 Q227 I.S. 227 Q New/Retrofit Telephone/Intercom System<br />

30 Q228 P.S. 228 (ECC) Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

30 Q228 P.S. 228 (ECC) Q New/Retrofit Telephone/Intercom System<br />

30 Q230 I.S. 230 Q Classroom Connectivity<br />

30 Q230 I.S. 230 Q Classroom Connectivity<br />

30 Q230 I.S. 230 Q Exterior Masonry<br />

30 Q230 I.S. 230 Q Library Upgrades<br />

30 Q234 P.S. 234 Q Classroom Connectivity<br />

30 Q234 P.S. 234 Q Low-Voltage Electrical Systems<br />

30 Q234 P.S. 234 Q New/Retrofit Telephone/Intercom System<br />

30 Q280 P.S. 280 Q Classroom Connectivity<br />

30 Q292 P.S. 92 Q Classroom Connectivity<br />

30 Q292 P.S. 92 Q Exterior Masonry<br />

30 Q292 P.S. 92 Q Parapets<br />

30 Q292 P.S. 92 Q Paved Area-Concrete<br />

30 Q292 P.S. 92 Q Windows<br />

30 Q768 P.S. 78 ANNEX Q Classroom Connectivity<br />

30 Q797 PS 150 ANNEX Q Low-Voltage Electrical Systems<br />

30 Q868 P.S. 78 (ECC) Q Classroom Connectivity<br />

30 Q868 P.S. 78 (ECC) Q New/Retrofit Telephone/Intercom System<br />

31 R001 P.S. 1 R Classroom Connectivity<br />

31 R002 I.S. 2 R Classroom Connectivity<br />

31 R002 I.S. 2 R Gymnasium Upgrade<br />

31 R002 I.S. 2 R Low-Voltage Electrical Systems<br />

31 R002 I.S. 2 R New/Retrofit Telephone/Intercom System<br />

31 R002 I.S. 2 R Room Conversions/Partitioning<br />

31 R003 P.S. 3 R Classroom Connectivity<br />

31 R003 P.S. 3 R Emergency Stabilization<br />

31 R003 P.S. 3 R Exterior Masonry<br />

31 R003 P.S. 3 R New/Retrofit Telephone/Intercom System<br />

31 R003 P.S. 3 R Playground Redevelopment<br />

31 R003 P.S. 3 R Roofs<br />

31 R003 P.S. 3 R Room Conversions/Partitioning


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R003 P.S. 3 R Windows<br />

31 R004 P.S. 4 R Classroom Connectivity<br />

31 R004 P.S. 4 R Classroom Connectivity<br />

31 R004 P.S. 4 R Elevators and Escalators<br />

31 R004 P.S. 4 R Flood Elimination<br />

31 R004 P.S. 4 R New/Retrofit Telephone/Intercom System<br />

31 R004 P.S. 4 R Safety Systems<br />

31 R004 P.S. 4 R Windows<br />

31 R005 P.S. 5 R Classroom Connectivity<br />

31 R006 P.S. 6 R Classroom Connectivity<br />

31 R006 P.S. 6 R New/Retrofit Telephone/Intercom System<br />

31 R007 I.S. 7 R Classroom Connectivity<br />

31 R007 I.S. 7 R Emergency Stabilization<br />

31 R007 I.S. 7 R Flood Elimination<br />

31 R007 I.S. 7 R IP Digital Video Surveillance<br />

31 R007 I.S. 7 R New/Retrofit Telephone/Intercom System<br />

31 R007 I.S. 7 R Roofs<br />

31 R008 P.S. 8 R Classroom Connectivity<br />

31 R008 P.S. 8 R Domestic Piping<br />

31 R011 P.S. 11 R Classroom Connectivity<br />

31 R011 P.S. 11 R Exterior Masonry<br />

31 R011 P.S. 11 R Lighting Fixtures<br />

31 R011 P.S. 11 R New/Retrofit Telephone/Intercom System<br />

31 R011 P.S. 11 R Parapets<br />

31 R011 P.S. 11 R Playground Redevelopment<br />

31 R011 P.S. 11 R Roofs<br />

31 R011 P.S. 11 R Toilets-Students<br />

31 R011 P.S. 11 R Windows<br />

31 R013 P.S. 13 R Classroom Connectivity<br />

31 R013 P.S. 13 R Fencing<br />

31 R013 P.S. 13 R New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R013 P.S. 13 R Paved Area-Blacktop<br />

31 R0<strong>14</strong> P.S. <strong>14</strong> R Classroom Connectivity<br />

31 R0<strong>14</strong> P.S. <strong>14</strong> R Lighting Fixtures<br />

31 R0<strong>14</strong> P.S. <strong>14</strong> R New/Retrofit Telephone/Intercom System<br />

31 R016 P.S. 16 R Classroom Connectivity<br />

31 R016 P.S. 16 R Lighting Fixtures<br />

31 R016 P.S. 16 R New/Retrofit Telephone/Intercom System<br />

31 R018 P.S. 18 R Classroom Connectivity<br />

31 R018 P.S. 18 R Heating Plant Upgrade<br />

31 R018 P.S. 18 R IP Digital Video Surveillance<br />

31 R018 P.S. 18 R Lighting Fixtures<br />

31 R018 P.S. 18 R Paved Area-Blacktop<br />

31 R019 P.S. 19 R Classroom Connectivity<br />

31 R019 P.S. 19 R Flood Elimination<br />

31 R019 P.S. 19 R IP Digital Video Surveillance<br />

31 R019 P.S. 19 R Low-Voltage Electrical Systems<br />

31 R019 P.S. 19 R New/Retrofit Telephone/Intercom System<br />

31 R019 P.S. 19 R Parapets<br />

31 R020 P.S. 20 R Classroom Connectivity<br />

31 R020 P.S. 20 R New/Retrofit Telephone/Intercom System<br />

31 R021 P.S. 21 R Classroom Connectivity<br />

31 R022 P.S. 22 R Classroom Connectivity<br />

31 R022 P.S. 22 R IP Digital Video Surveillance<br />

31 R022 P.S. 22 R Lighting Fixtures<br />

31 R023 P.S. 23 R Classroom Connectivity<br />

31 R023 P.S. 23 R IP Digital Video Surveillance<br />

31 R023 P.S. 23 R Paved Area-Blacktop<br />

31 R023 P.S. 23 R Playground Redevelopment<br />

31 R024 I.S. 24 R Classroom Connectivity<br />

31 R024 I.S. 24 R Elevators And Escalators<br />

31 R024 I.S. 24 R Gymnasium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R024 I.S. 24 R Low-Voltage Electrical Systems<br />

31 R024 I.S. 24 R New/Retrofit Telephone/Intercom System<br />

31 R026 P.S. 26 R Classroom Connectivity<br />

31 R027 I.S. 27 R Classroom Connectivity<br />

31 R027 I.S. 27 R Heating Plant Upgrade<br />

31 R027 I.S. 27 R New/Retrofit Telephone/Intercom System<br />

31 R029 P.S. 29 R Classroom Connectivity<br />

31 R029 P.S. 29 R Exterior Masonry<br />

31 R029 P.S. 29 R Heating Plant Upgrade<br />

31 R029 P.S. 29 R New/Retrofit Telephone/Intercom System<br />

31 R029 P.S. 29 R Parapets<br />

31 R029 P.S. 29 R Roofs<br />

31 R030 P.S. 30 R Classroom Connectivity<br />

31 R030 P.S. 30 R Domestic Piping<br />

31 R031 P.S. 31 R Classroom Connectivity<br />

31 R032 P.S. 32 R Classroom Connectivity<br />

31 R032 P.S. 32 R Lighting Fixtures<br />

31 R034 I.S. 34 (OLD TOTTENVILLE) R Classroom Connectivity<br />

31 R034 I.S. 34 (OLD TOTTENVILLE) R New/Retrofit Telephone/Intercom System<br />

31 R035 P.S. 35 R Classroom Connectivity<br />

31 R035 P.S. 35 R Exterior Masonry<br />

31 R035 P.S. 35 R Heating Plant Upgrade<br />

31 R036 P.S. 36 R Classroom Connectivity<br />

31 R036 P.S. 36 R Parapets<br />

31 R038 P.S. 38 R Classroom Connectivity<br />

31 R039 P.S. 39 R Classroom Connectivity<br />

31 R039 P.S. 39 R New/Retrofit Telephone/Intercom System<br />

31 R041 P.S. 41 R Classroom Connectivity<br />

31 R041 P.S. 41 R Lighting Fixtures<br />

31 R041 P.S. 41 R New/Retrofit Telephone/Intercom System<br />

31 R042 P.S. 42 R Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R042 P.S. 42 R IP Digital Video Surveillance<br />

31 R042 P.S. 42 R Lighting Fixtures<br />

31 R043 JEROME PARKER CAMPUS R Classroom Connectivity<br />

31 R044 P.S. 44 R Classroom Connectivity<br />

31 R044 P.S. 44 R New/Retrofit Telephone/Intercom System<br />

31 R044 P.S. 44 R New/Retrofit Telephone/Intercom System<br />

31 R045 P.S. 45 R Auditorium Upgrade<br />

31 R045 P.S. 45 R Classroom Connectivity<br />

31 R045 P.S. 45 R Exterior Masonry<br />

31 R045 P.S. 45 R IP Digital Video Surveillance<br />

31 R045 P.S. 45 R Library Upgrades<br />

31 R045 P.S. 45 R New/Retrofit Telephone/Intercom System<br />

31 R046 P.S. 46 R Auditorium Upgrade<br />

31 R046 P.S. 46 R Classroom Connectivity<br />

31 R046 P.S. 46 R Low-Voltage Electrical Systems<br />

31 R046 P.S. 46 R Windows<br />

31 R048 P.S. 48 R Classroom Connectivity<br />

31 R048 P.S. 48 R New/Retrofit Telephone/Intercom System<br />

31 R049 I.S. 49 R Classroom Connectivity<br />

31 R049 I.S. 49 R Room Conversions/Partitioning<br />

31 R049 I.S. 49 R Science Lab Upgrades<br />

31 R050 P.S. 50 R Classroom Connectivity<br />

31 R050 P.S. 50 R Climate Control<br />

31 R050 P.S. 50 R Heating Plant Upgrade<br />

31 R050 P.S. 50 R Lighting Fixtures<br />

31 R051 I.S. 51 R Classroom Connectivity<br />

31 R051 I.S. 51 R Domestic Piping<br />

31 R051 I.S. 51 R IP Digital Video Surveillance<br />

31 R051 I.S. 51 R Low-Voltage Electrical Systems<br />

31 R051 I.S. 51 R New/Retrofit Telephone/Intercom System<br />

31 R052 P.S. 52 R Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R052 P.S. 52 R Elevators and Escalators<br />

31 R052 P.S. 52 R New/Retrofit Telephone/Intercom System<br />

31 R053 P.S. 53 R Classroom Connectivity<br />

31 R053 P.S. 53 R IP Digital Video Surveillance<br />

31 R053 P.S. 53 R Library Upgrades<br />

31 R053 P.S. 53 R New/Retrofit Telephone/Intercom System<br />

31 R053 P.S. 53 R Paved Area-Concrete<br />

31 R054 P.S. 54 R Classroom Connectivity<br />

31 R054 P.S. 54 R New/Retrofit Telephone/Intercom System<br />

31 R054 P.S. 54 R Playground Redevelopment<br />

31 R055 P.S. 55 R Classroom Connectivity<br />

31 R055 P.S. 55 R Elevators and Escalators<br />

31 R055 P.S. 55 R Low-Voltage Electrical Systems<br />

31 R056 P.S. 56 R Classroom Connectivity<br />

31 R056 P.S. 56 R New/Retrofit Telephone/Intercom System<br />

31 R056 P.S. 56 R Paved Area-Blacktop<br />

31 R057 P.S. 57 R Classroom Connectivity<br />

31 R057 P.S. 57 R Lighting Fixtures<br />

31 R057 P.S. 57 R New/Retrofit Telephone/Intercom System<br />

31 R057 P.S. 57 R Playground Redevelopment<br />

31 R057 P.S. 57 R Playground Redevelopment<br />

31 R058 P.S. 58 R Classroom Connectivity<br />

31 R058 P.S. 58 R New/Retrofit Telephone/Intercom System<br />

31 R060 P.S. 60 R A/C Split System<br />

31 R060 P.S. 60 R Classroom Connectivity<br />

31 R060 P.S. 60 R New/Retrofit Telephone/Intercom System<br />

31 R061 I.S. 61 R Classroom Connectivity<br />

31 R061 I.S. 61 R Exterior Masonry<br />

31 R061 I.S. 61 R Flood Elimination<br />

31 R061 I.S. 61 R Low-Voltage Electrical Systems<br />

31 R061 I.S. 61 R New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

31 R061 I.S. 61 R Parapets<br />

31 R069 P.S. 69 R Classroom Connectivity<br />

31 R069 P.S. 69 R Domestic Piping<br />

31 R072 I.S. 72 R A/C Split System<br />

31 R072 I.S. 72 R Classroom Connectivity<br />

31 R072 I.S. 72 R New/Retrofit Telephone/Intercom System<br />

31 R072 I.S. 72 R Parapets<br />

31 R072 I.S. 72 R Roofs<br />

31 R075 I.S. 75 R Classroom Connectivity<br />

31 R075 I.S. 75 R Domestic Piping<br />

31 R075 I.S. 75 R Low-Voltage Electrical Systems<br />

31 R075 I.S. 75 R Room Conversions/Partitioning<br />

31 R080 REGION 7/ ROC F R Low-Voltage Electrical Systems<br />

31 R080 REGION 7/ ROC F R Room Conversions/Partitioning<br />

31 R829 ARTHUR D. PHILLIPS SCHOOL R Classroom Connectivity<br />

31 R829 ARTHUR D. PHILLIPS SCHOOL R Roofs<br />

31 R831 P.S. 16 ANNEX R Classroom Connectivity<br />

31 R844 P.S. 36 ANNEX R Toilets-Students<br />

31 R861 ELIZABETH A. CONNELLY CAMPUS R Classroom Connectivity<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B) R Classroom Connectivity<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B) R Classroom Connectivity<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B) R IP Digital Video Surveillance<br />

31 R880 P.S. 80 (PETR COMPL-BLDG B) R New/Retrofit Telephone/Intercom System<br />

31 R885 P.S. 80 AX(PETR COMPL-BLDG D) R Room Conversions/Partitioning<br />

32 K045 P.S. 45 K Classroom Connectivity<br />

32 K045 P.S. 45 K New/Retrofit Telephone/Intercom System<br />

32 K075 P.S. 75 K Classroom Connectivity<br />

32 K075 P.S. 75 K Exterior Masonry<br />

32 K075 P.S. 75 K Flood Elimination<br />

32 K075 P.S. 75 K Parapets<br />

32 K075 P.S. 75 K Roofs


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

32 K086 P.S. 86 K Classroom Connectivity<br />

32 K086 P.S. 86 K Low-Voltage Electrical Systems<br />

32 K086 P.S. 86 K New/Retrofit Telephone/Intercom System<br />

32 K<strong>10</strong>6 P.S. <strong>10</strong>6 K Classroom Connectivity<br />

32 K<strong>10</strong>6 P.S. <strong>10</strong>6 K Roofs<br />

32 K<strong>10</strong>6 P.S. <strong>10</strong>6 K Windows<br />

32 K111 I.S. 111 K Classroom Connectivity<br />

32 K111 I.S. 111 K Room Conversions/Partitioning<br />

32 K116 P.S. 116 K Boiler Conversion<br />

32 K116 P.S. 116 K Classroom Connectivity<br />

32 K116 P.S. 116 K Climate Control<br />

32 K123 P.S. 123 K Classroom Connectivity<br />

32 K123 P.S. 123 K Low-Voltage Electrical Systems<br />

32 K123 P.S. 123 K New/Retrofit Telephone/Intercom System<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Auditorium Upgrade<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Classroom Connectivity<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Electrical Systems<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Exterior Masonry<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Flood Elimination<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Parapets<br />

32 K<strong>14</strong>5 P.S. <strong>14</strong>5 K Safety Systems<br />

32 K151 P.S. 151 K Classroom Connectivity<br />

32 K151 P.S. 151 K Domestic Piping<br />

32 K151 P.S. 151 K New/Retrofit Telephone/Intercom System<br />

32 K162 I.S. 162 K Classroom Connectivity<br />

32 K274 P.S. 274 K Classroom Connectivity<br />

32 K274 P.S. 274 K IP Digital Video Surveillance<br />

32 K274 P.S. 274 K Lighting Fixtures<br />

32 K274 P.S. 274 K New/Retrofit Telephone/Intercom System<br />

32 K291 I.S. 291 K Classroom Connectivity<br />

32 K291 I.S. 291 K Playground Redevelopment


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

32 K296 I.S. 296 K Classroom Connectivity<br />

32 K296 I.S. 296 K Gymnasium Upgrade<br />

32 K296 I.S. 296 K Lighting Fixtures<br />

32 K296 I.S. 296 K Lighting Fixtures<br />

32 K296 I.S. 296 K Technology<br />

32 K296 I.S. 296 K Technology<br />

32 K296 I.S. 296 K Technology<br />

32 K296 I.S. 296 K Walk In Freezer Replacement<br />

32 K299 P.S. 299 K Classroom Connectivity<br />

32 K299 P.S. 299 K Lighting Fixtures<br />

32 K299 P.S. 299 K New/Retrofit Telephone/Intercom System<br />

32 K376 P.S. 376A K Classroom Connectivity<br />

32 K377 P.S. 377 K Classroom Connectivity<br />

32 K377 P.S. 377 K New/Retrofit Telephone/Intercom System<br />

32 K383 I.S. 383 K Boiler Conversion<br />

32 K383 I.S. 383 K Classroom Connectivity<br />

32 K383 I.S. 383 K Climate Control<br />

32 K383 I.S. 383 K Low-Voltage Electrical Systems<br />

32 K383 I.S. 383 K New/Retrofit Telephone/Intercom System<br />

32 K383 I.S. 383 K Playground Redevelopment<br />

32 K384 P.S. 384 K Classroom Connectivity<br />

32 K384 P.S. 384 K Playground Redevelopment<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Classroom Connectivity<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Exterior Masonry<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Flood Elimination<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Parapets<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Reinforcing Support Elements<br />

32 K865 SECOND OPPORTUNITY SCHOOL K Roofs<br />

33M M825 UFT USE M Classroom Connectivity<br />

33Q Q800 DIV SCHOOL FACILITIES Q Air Conditioning Retrofit<br />

33Q Q801 BUREAU OF SUPPLIES Q Communications Control Center


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

33Q Q801 BUREAU OF SUPPLIES Q Electrical Systems<br />

33Q Q801 BUREAU OF SUPPLIES Q Elevators And Escalators<br />

33Q Q801 OSSS / DSF Q Parapets<br />

75K K085 P.S. 753 (OLD P85/STERLING HS) K Classroom Connectivity<br />

75K K085 P.S. 753 (OLD P85/STERLING HS) K Emergency Stabilization<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Classroom Connectivity<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Exterior Masonry<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Flood Elimination<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Interior Spaces<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Low-Voltage Electrical Systems<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K New/Retrofit Telephone/Intercom System<br />

75K K<strong>14</strong>8 P.S. 373 (OLD P<strong>14</strong>8) K Parapets<br />

75K K286 P.S. 811 (OLD P286) K Classroom Connectivity<br />

75K K286 P.S. 811 (OLD P286) K Exterior Masonry<br />

75K K286 P.S. 811 (OLD P286) K Roofs<br />

75K K286 P.S. 811 (OLD P286) K Windows<br />

75K K369 P.S. 369 (COY COX SCHOOL) K Classroom Connectivity<br />

75K K369 P.S. 369 (COY COX SCHOOL) K Gymnasium Upgrade<br />

75K K369 P.S. 369 (COY COX SCHOOL) K Low-Voltage Electrical Systems<br />

75K K369 P.S. 369 (COY COX SCHOOL) K New/Retrofit Telephone/Intercom System<br />

75K K369 P.S. 369 (COY COX SCHOOL) K Toilets-Students<br />

75K K370 P.S. 370 K Classroom Connectivity<br />

75K K370 P.S. 370 K Exterior Masonry<br />

75K K370 P.S. 370 K Flood Elimination<br />

75K K370 P.S. 370 K Parapets<br />

75K K370 P.S. 370 K Roofs<br />

75K K370 P.S. 370 K Windows<br />

75K K371 P.S. 371 (OLD 615) K Cafeteria / Multipurpose Room Upgrade<br />

75K K371 P.S. 371 (OLD 615) K Classroom Connectivity<br />

75K K371 P.S. 371 (OLD 615) K Low-Voltage Electrical Systems<br />

75K K371 P.S. 371 (OLD 615) K New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

75K K396 P.S. 396 (TANDEM K327-D23) K Classroom Connectivity<br />

75K K396 P.S. 396 (TANDEM K327-D23) K Lighting Fixtures<br />

75K K722 P.S. 721 OTC K Air Conditioning Retrofit<br />

75K K722 P.S. 721 OTC K Athletic Fields<br />

75K K722 P.S. 721 OTC K Classroom Connectivity<br />

75K K834 P.S. 372 (OUR LADY OF PEACE) K Classroom Connectivity<br />

75K K834 P.S. 372 (OUR LADY OF PEACE) K Code Compliance<br />

75K K834 P.S. 372 (OUR LADY OF PEACE) K Lighting Fixtures<br />

75K K838 P.S. 53 (OLD P838) K Classroom Connectivity<br />

75K K857 P.S. 36 ANNEX K Classroom Connectivity<br />

75K K857 P.S. 36 ANNEX K Lighting Fixtures<br />

75K K857 P.S. 36 ANNEX K New/Retrofit Telephone/Intercom System<br />

75K K902 P.S. 77 ANNEX K Classroom Connectivity<br />

75K K902 P.S. 77 ANNEX K Exterior Masonry<br />

75K K902 P.S. 77 ANNEX K Parapets<br />

75K K902 P.S. 77 ANNEX K Paved Area-Concrete<br />

75K K902 P.S. 77 ANNEX K Roofs<br />

75K K902 P.S. 77 ANNEX K Safety Systems<br />

75K K902 P.S. 77 ANNEX K Windows<br />

75M M058 P.S. 35 (OLD 58/MNHT HS) M Classroom Connectivity<br />

75M M058 P.S. 35 (OLD 58/MNHT HS) M Exterior Masonry<br />

75M M058 P.S. 35 (OLD 58/MNHT HS) M New/Retrofit Telephone/Intercom System<br />

75M M058 P.S. 35 (OLD 58/MNHT HS) M Parapets<br />

75M M058 P.S. 35 (OLD 58/MNHT HS) M Roofs<br />

75M M079 P.S. 79 (MULT. HANDICAP) M Classroom Connectivity<br />

75M M079 P.S. 79 (MULT. HANDICAP) M Flood Elimination<br />

75M M079 P.S. 79 (MULT. HANDICAP) M Paved Area-Concrete<br />

75M M079 P.S. 79 (MULT. HANDICAP) M Roofs<br />

75M M169 P.S. 169 (ECF) M Classroom Connectivity<br />

75M M169 P.S. 169 (ECF) M New/Retrofit Telephone/Intercom System<br />

75M M751 P.S. 751 (CAR.DEV/OLD 25) M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

75M M751 P.S. 751 (CAR.DEV/OLD 25) M Low-Voltage Electrical Systems<br />

75M M841 P.S. 811 (OLD P<strong>14</strong>8/LIVINGS HS) M Classroom Connectivity<br />

75M M841 P.S. 811 (OLD P<strong>14</strong>8/LIVINGS HS) M Room Conversions/Partitioning<br />

75M M844 P.S. 138 ANNEX (OLD M047 AX) M Exterior Masonry<br />

75M M844 P.S. 138 ANNEX (OLD M047 AX) M Parapets<br />

75M M844 P.S. 138 ANNEX (OLD M047 AX) M Roofs<br />

75Q L001 PS 256 @ ST MARY FAMILY SERVICES Q Classroom Connectivity<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Classroom Connectivity<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Exterior Masonry<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Flood Elimination<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Kitchen Areas<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q New/Retrofit Telephone/Intercom System<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Parapets<br />

75Q Q009 P.S. 9 (W REED SCHOOL) Q Room Conversions/Partitioning<br />

75Q Q075 P.S. 75 (R PEARY SCHOOL) Q Classroom Connectivity<br />

75Q Q075 P.S. 75 (R PEARY SCHOOL) Q New/Retrofit Telephone/Intercom System<br />

75Q Q<strong>14</strong>2 P.S. 752 (OLD J<strong>14</strong>2) Q Classroom Connectivity<br />

75Q Q<strong>14</strong>2 P.S. 752 (OLD J<strong>14</strong>2) Q Elevators And Escalators<br />

75Q Q177 P.S. 177 Q Classroom Connectivity<br />

75Q Q177 P.S. 177 Q Flood Elimination<br />

75Q Q177 P.S. 177 Q New/Retrofit Telephone/Intercom System<br />

75Q Q722 P.S. 721 (OTC) Q Classroom Connectivity<br />

75Q Q722 P.S. 721 (OTC) Q Domestic Piping<br />

75Q Q722 P.S. 721 (OTC) Q Technology<br />

75Q Q811 P.S. 811 (OLD 187) Q Classroom Connectivity<br />

75Q Q811 P.S. 811 (OLD 187) Q Low-Voltage Electrical Systems<br />

75Q Q811 P.S. 811 (OLD 187) Q New/Retrofit Telephone/Intercom System<br />

75Q Q816 P.S. 256 ANNEX Q Low-Voltage Electrical Systems<br />

75Q Q835 P.S. 233 MINISCHOOL1 (OLD P134) Q New/Retrofit Telephone/Intercom System<br />

75Q Q875 P.S. 233 MINISCHOOL2 (OLD P752) Q Exterior Masonry<br />

75Q Q875 P.S. 233 MINISCHOOL2 (OLD P752) Q Low-Voltage Electrical Systems


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

75Q Q875 P.S. 233 MINISCHOOL2 (OLD P752) Q Windows<br />

75Q QAPM QUEENS CHILDREN'S CENTER Q Classroom Connectivity<br />

75R R040 P.S. 373 (OLD P40) R Classroom Connectivity<br />

75R R040 P.S. 373 (OLD P40) R IP Digital Video Surveillance<br />

75R R040 P.S. 373 (OLD P40) R Lighting Fixtures<br />

75R R040 P.S. 373 (OLD P40) R Parapets<br />

75R R040 P.S. 373 (OLD P40) R Paved Area-Concrete<br />

75R R040 P.S. 373 (OLD P40) R Playground Redevelopment<br />

75R R040 P.S. 373 (OLD P40) R Roofs<br />

75R R722 P.S. 722 (OTC) R Classroom Connectivity<br />

75R R722 P.S. 722 (OTC) R Exterior Masonry<br />

75R R722 P.S. 722 (OTC) R Low-Voltage Electrical Systems<br />

75R R722 P.S. 722 (OTC) R Parapets<br />

75R R840 P.S. 37 ( OLD I24X) R Classroom Connectivity<br />

75R R840 P.S. 37 ( OLD I24X) R Windows<br />

75X X012 P.S. 12 X Classroom Connectivity<br />

75X X012 P.S. 12 X Exterior Masonry<br />

75X X012 P.S. 12 X Windows<br />

75X X034 P.S. 34 X Classroom Connectivity<br />

75X X034 P.S. 34 X New/Retrofit Telephone/Intercom System<br />

75X X084 P.S. 811 (OLD I84) X Boiler Conversion<br />

75X X084 P.S. 811 (OLD I84) X Classroom Connectivity<br />

75X X084 P.S. 811 (OLD I84) X Climate Control<br />

75X X084 P.S. 811 (OLD I84) X Elevators And Escalators<br />

75X X136 P.S. 186 (OLD J136) X Classroom Connectivity<br />

75X X136 P.S. 186 (OLD J136) X Exterior Masonry<br />

75X X136 P.S. 186 (OLD J136) X Flood Elimination<br />

75X X136 P.S. 186 (OLD J136) X Low-Voltage Electrical Systems<br />

75X X136 P.S. 186 (OLD J136) X School Improvement and Restructuring<br />

75X X155 P.S. 754 (OLD IS155) X Classroom Connectivity<br />

75X X155 P.S. 754 (OLD IS155) X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

75X X155 P.S. 754 (OLD IS155) X Classroom Connectivity<br />

75X X155 P.S. 754 (OLD IS155) X Electrical Systems<br />

75X X155 P.S. 754 (OLD IS155) X Flood Elimination<br />

75X X155 P.S. 754 (OLD IS155) X Windows<br />

75X X701 P.S. <strong>10</strong> X Classroom Connectivity<br />

75X X722 P.S. 721 (OTC) X Classroom Connectivity<br />

78K K175 TEACHERS PREP HS(OL REDIRECTION) K IP Digital Video Surveillance<br />

78K K175 TEACHERS PREP HS(OL REDIRECTION) K New/Retrofit Telephone/Intercom System<br />

78K K175 TEACHERS PREP HS(OL REDIRECTION) K Science Lab Upgrades<br />

78K K313 ADAMS STREET EDUCATIONAL CAMPUS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Classroom Connectivity<br />

78K K400 LAFAYETTE HS K Flood Elimination<br />

78K K400 LAFAYETTE HS K Low-Voltage Electrical Systems<br />

78K K400 LAFAYETTE HS K New/Retrofit Telephone/Intercom System<br />

78K K400 LAFAYETTE HS K School Improvement and Restructuring<br />

78K K405 MIDWOOD HS K Auditorium Upgrade<br />

78K K405 MIDWOOD HS K Classroom Connectivity<br />

78K K405 MIDWOOD HS K Electrical Systems<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Auditorium Upgrade<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Cafeteria / Multipurpose Room Upgrade<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Classroom Connectivity<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Electrical Systems<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Exterior Masonry<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Fencing<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Flood Elimination


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K IP Digital Video Surveillance<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Low-Voltage Electrical Systems<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K New/Retrofit Telephone/Intercom System<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Parapets<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Paved Area-Blacktop<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Reinforcing Support Elements<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Safety Systems<br />

78K K4<strong>10</strong> ABRAHAM LINCOLN HS K Windows<br />

78K K415 SAMUEL J. TILDEN HS K Classroom Connectivity<br />

78K K420 FRANKLIN K. LANE HS Q Room Conversions/Partitioning<br />

78K K425 JAMES MADISON HS K Classroom Connectivity<br />

78K K425 JAMES MADISON HS K Electrical Systems<br />

78K K425 JAMES MADISON HS K Floors<br />

78K K425 JAMES MADISON HS K IP Digital Video Surveillance<br />

78K K425 JAMES MADISON HS K New/Retrofit Telephone/Intercom System<br />

78K K425 JAMES MADISON HS K Science Lab Upgrades<br />

78K K425 JAMES MADISON HS K Walk In Freezer Replacement<br />

78K K430 BROOKLYN TECH HS K Classroom Connectivity<br />

78K K430 BROOKLYN TECH HS K Lighting Fixtures<br />

78K K430 BROOKLYN TECH HS K New/Retrofit Telephone/Intercom System<br />

78K K430 BROOKLYN TECH HS K Roofs<br />

78K K435 THOMAS JEFFERSON HS K Classroom Connectivity<br />

78K K435 THOMAS JEFFERSON HS K Room Conversions/Partitioning<br />

78K K440 PROSPECT HEIGHTS HS K Classroom Connectivity<br />

78K K440 PROSPECT HEIGHTS HS K New/Retrofit Telephone/Intercom System<br />

78K K445 NEW UTRECHT HS K Classroom Connectivity<br />

78K K445 MAUREEN GOLDFARB K IP Digital Video Surveillance<br />

78K K445 NEW UTRECHT HS K New/Retrofit Telephone/Intercom System<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Classroom Connectivity<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Classroom Connectivity<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Classroom Connectivity<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Elevators And Escalators<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K New/Retrofit Telephone/Intercom System<br />

78K K450 GRAND STREET CAMPUS (OLD E.D.HS) K Room Conversions/Partitioning<br />

78K K455 BOYS & GIRLS HS K Boiler Conversion<br />

78K K455 BOYS & GIRLS HS K Classroom Connectivity<br />

78K K455 BOYS & GIRLS HS K Climate Control<br />

78K K455 BOYS & GIRLS HS K Library Upgrades<br />

78K K455 BOYS & GIRLS HS K Room Conversions/Partitioning<br />

78K K458 BOYS HS (OLD) K Classroom Connectivity<br />

78K K458 BOYS HS (OLD) K Electrical Systems<br />

78K K458 BOYS HS (OLD) K Library Upgrades<br />

78K K458 BOYS HS (OLD) K Lighting Fixtures<br />

78K K458 BOYS HS (OLD) K New/Retrofit Telephone/Intercom System<br />

78K K460 JOHN JAY HS K Classroom Connectivity<br />

78K K460 JOHN JAY HS K Classroom Connectivity<br />

78K K460 JOHN JAY HS K Classroom Connectivity<br />

78K K460 JOHN JAY HS K Climate Control<br />

78K K460 JOHN JAY HS K Electrical Systems<br />

78K K460 JOHN JAY HS K Elevators And Escalators<br />

78K K460 JOHN JAY HS K Heating Plant Upgrade<br />

78K K460 JOHN JAY HS K Low-Voltage Electrical Systems<br />

78K K460 JOHN JAY HS K Room Conversions/Partitioning<br />

78K K460 JOHN JAY HS K School Improvement and Restructuring<br />

78K K460 JOHN JAY HS K School Improvement and Restructuring<br />

78K K465 ERASMUS HALL CAMPUS K Classroom Connectivity<br />

78K K465 ERASMUS HALL CAMPUS K Low-Voltage Electrical Systems<br />

78K K465 ERASMUS HALL CAMPUS K New/Retrofit Telephone/Intercom System<br />

78K K470 GEORGE W. WINGATE HS K Classroom Connectivity<br />

78K K470 GEORGE W. WINGATE HS K Elevators And Escalators<br />

78K K470 GEORGE W. WINGATE HS K Emergency Stabilization


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K470 GEORGE W. WINGATE HS K Lighting Fixtures<br />

78K K470 GEORGE W. WINGATE HS K New/Retrofit Telephone/Intercom System<br />

78K K480 BUSHWICK HS K Classroom Connectivity<br />

78K K480 BUSHWICK HS K Classroom Connectivity<br />

78K K480 BUSHWICK HS K Classroom Connectivity<br />

78K K480 BUSHWICK HS K Classroom Connectivity<br />

78K K480 BUSHWICK HS K Classroom Connectivity<br />

78K K480 BUSHWICK HS K Low-Voltage Electrical Systems<br />

78K K480 BUSHWICK HS K Walk In Freezer Replacement<br />

78K K485 TELECOM. ARTS & TECH. K Classroom Connectivity<br />

78K K485 TELECOM. ARTS & TECH. K Exterior Masonry<br />

78K K485 TELECOM. ARTS & TECH. K IP Digital Video Surveillance<br />

78K K485 TELECOM. ARTS & TECH. K Roofs<br />

78K K490 FORT HAMILTON HS K Auditorium Upgrade<br />

78K K490 FORT HAMILTON HS K Classroom Connectivity<br />

78K K490 FORT HAMILTON HS K Climate Control<br />

78K K490 FORT HAMILTON HS K Heating Plant Upgrade<br />

78K K490 FORT HAMILTON HS K New/Retrofit Telephone/Intercom System<br />

78K K490 FORT HAMILTON HS K Room Conversions/Partitioning<br />

78K K490 FORT HAMILTON HS K Science Lab Upgrades<br />

78K K495 SHEEPSHEAD BAY HS K Classroom Connectivity<br />

78K K495 SHEEPSHEAD BAY HS K Exterior Masonry<br />

78K K495 SHEEPSHEAD BAY HS K Flood Elimination<br />

78K K495 SHEEPSHEAD BAY HS K Parapets<br />

78K K495 SHEEPSHEAD BAY HS K Roofs<br />

78K K500 CANARSIE HS K Classroom Connectivity<br />

78K K500 CANARSIE HS K Classroom Connectivity<br />

78K K500 CANARSIE HS K Classroom Connectivity<br />

78K K500 CANARSIE HS K Elevators And Escalators<br />

78K K500 CANARSIE HS K Gymnasium Upgrade<br />

78K K500 CANARSIE HS K Room Conversions/Partitioning


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K500 CANARSIE HS K Room Conversions/Partitioning<br />

78K K500 CANARSIE HS K Walk In Freezer Replacement<br />

78K K505 FRANKLIN D. ROOSEVELT HS K Classroom Connectivity<br />

78K K505 FRANKLIN D. ROOSEVELT HS K Elevators<br />

78K K505 FRANKLIN D. ROOSEVELT HS K Heating Plant Upgrade<br />

78K K505 FRANKLIN D. ROOSEVELT HS K IP Digital Video Surveillance<br />

78K K505 FRANKLIN D. ROOSEVELT HS K New/Retrofit Telephone/Intercom System<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Classroom Connectivity<br />

78K K515 SOUTH SHORE HS K Elevators And Escalators<br />

78K K515 SOUTH SHORE HS K New/Retrofit Telephone/Intercom System<br />

78K K515 SOUTH SHORE HS K Parapets<br />

78K K515 SOUTH SHORE HS K School Improvement and Restructuring<br />

78K K520 PACIFIC ALT HS K Classroom Connectivity<br />

78K K520 PACIFIC ALT HS K Classroom Connectivity<br />

78K K520 PACIFIC ALT HS K IP Digital Video Surveillance<br />

78K K525 EDWARD R. MURROW HS K Classroom Connectivity<br />

78K K525 EDWARD R. MURROW HS K Exterior Masonry<br />

78K K525 EDWARD R. MURROW HS K New/Retrofit Telephone/Intercom System<br />

78K K525 EDWARD R. MURROW HS K Parapets<br />

78K K525 EDWARD R. MURROW HS K Paved Area-Blacktop<br />

78K K525 EDWARD R. MURROW HS K Roofs<br />

78K K535 LEON GOLDSTEIN HS K Classroom Connectivity<br />

78K K535 LEON GOLDSTEIN HS K Classroom Connectivity<br />

78K K535 LEON GOLDSTEIN HS K Code Compliance<br />

78K K535 LEON GOLDSTEIN HS K New/Retrofit Telephone/Intercom System<br />

78K K540 JOHN DEWEY HS K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K540 JOHN DEWEY HS K New/Retrofit Telephone/Intercom System<br />

78K K540 JOHN DEWEY HS K Walk In Freezer Replacement<br />

78K K555 BKLYN COLL ACAD (AT BKLYN COLL) K Classroom Connectivity<br />

78K K564 SUNSET PARK HS K Classroom Connectivity<br />

78K K580 GEORGE WESTINGHOUSE VOC HS K Classroom Connectivity<br />

78K K580 GEORGE WESTINGHOUSE VOC HS K New/Retrofit Telephone/Intercom System<br />

78K K590 MIDDLE COLLEGE HS K Classroom Connectivity<br />

78K K590 MIDDLE COLLEGE HS K IP Digital Video Surveillance<br />

78K K590 MIDDLE COLLEGE HS K New/Retrofit Telephone/Intercom System<br />

78K K590 MIDDLE COLLEGE HS K Room Conversions/Partitioning<br />

78K K600 CLARA BARTON HS K Classroom Connectivity<br />

78K K600 CLARA BARTON HS K Elevators and Escalators<br />

78K K600 CLARA BARTON HS K Room Conversions/Partitioning<br />

78K K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS K Classroom Connectivity<br />

78K K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS K Classroom Connectivity<br />

78K K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS K Low-Voltage Electrical Systems<br />

78K K6<strong>10</strong> AUTOMOTIVE TRADES VOC HS K Room Conversions/Partitioning<br />

78K K615 E NY VOC HS OF TRANSIT TECH. K Classroom Connectivity<br />

78K K615 E NY VOC HS OF TRANSIT TECH. K Low-Voltage Electrical Systems<br />

78K K620 WILLIAM E. GRADY VOC HS K Classroom Connectivity<br />

78K K620 WILLIAM E. GRADY VOC HS K IP Digital Video Surveillance<br />

78K K620 WILLIAM E. GRADY VOC HS K New/Retrofit Telephone/Intercom System<br />

78K K625 ROBESON HS COMP&BUS TC (A HML) K Classroom Connectivity<br />

78K K625 ROBESON HS COMP&BUS TC (A HML) K Classroom Connectivity<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Classroom Connectivity<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Classroom Connectivity<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Classroom Connectivity<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Classroom Connectivity<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K Elevators And Escalators<br />

78K K650 HARRY VANARSDALE VOC HS(WHITNEY) K New/Retrofit Telephone/Intercom System<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Classroom Connectivity<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Classroom Connectivity<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Code Compliance<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Lighting Fixtures<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Low-Voltage Electrical Systems<br />

78K K655 BKLYN HS OF THE ARTS (OL S J HL) K Roofs<br />

78K K656 BKLYN HS OF THE ARTS AX (S J HL) K Elevators And Escalators<br />

78K K656 BKLYN HS OF THE ARTS AX (S J HL) K Room Conversions/Partitioning<br />

78K K660 WILLIAM MAXWELL CTE HS K Classroom Connectivity<br />

78K K660 WILLIAM MAXWELL CTE HS K Flood Elimination<br />

78K K660 WILLIAM MAXWELL CTE HS K Roofs<br />

78K K721 BROOKLYN STUDIO (TANDEM K128) K Classroom Connectivity<br />

78K K721 BROOKLYN STUDIO (TANDEM K128) K Lighting Fixtures<br />

78K K728 LIBERATION DIPLOMA PLUS H.S. K Classroom Connectivity<br />

78K K728 LIBERATION DIPLOMA PLUS H.S. K Classroom Connectivity<br />

78K K743 ADULT LRNG CTR (OLD GRLS HS) K Lighting Fixtures<br />

78K K778 EL PUENTE HS K Classroom Connectivity<br />

78K K779 ALL CITY LEADERSHIP SCHOOL K Classroom Connectivity<br />

78K K781 WEST BROOKLYN COMMUNITY HS K Classroom Connectivity<br />

78K K781 WEST BROOKLYN COMMUNITY HS K Heating Plant Upgrade<br />

78K K804 COBBLE HILL SCL OF AMR STD (OL6) K Classroom Connectivity<br />

78K K804 COBBLE HILL SCL OF AMR STD (OL6) K Exterior Masonry<br />

78K K804 COBBLE HILL SCL OF AMR STD (OL6) K Flood Elimination<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Classroom Connectivity<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Classroom Connectivity<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Classroom Connectivity<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Classroom Connectivity<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Fire System Sprinklers<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Flood Elimination<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Lighting Fixtures<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Parapets


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K805 WATER'S EDGE EDUCATIONAL COMPLEX K Roofs<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Classroom Connectivity<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Classroom Connectivity<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Exterior Masonry<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Flood Elimination<br />

78K K806 METROPOLITAN CORPORATE ACAD. K New/Retrofit Telephone/Intercom System<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Playground Redevelopment<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Room Conversions/Partitioning<br />

78K K806 METROPOLITAN CORPORATE ACAD. K Room Conversions/Partitioning<br />

78K K819 EAST NY FAMILY ACADEMY K Classroom Connectivity<br />

78K K819 EAST NY FAMILY ACADEMY K IP Digital Video Surveillance<br />

78K K819 EAST NY FAMILY ACADEMY K Lighting Fixtures<br />

78K K824 W.E.B. DUBOIS HS K Classroom Connectivity<br />

78K K825 SOUTH BROOKLYN COMM. HS K Classroom Connectivity<br />

78K K825 SOUTH BROOKLYN COMM. HS K New/Retrofit Telephone/Intercom System<br />

78K K871 COMM SCHL COMP ED (PRG GIRLS) K New/Retrofit Telephone/Intercom System<br />

78K K894 HS FOR PUBLIC SERVICE-ENY K Classroom Connectivity<br />

78K K906 FREEDOM ACADEMY K Classroom Connectivity<br />

78K K906 FREEDOM ACADEMY K Classroom Connectivity<br />

78K K907 BROWNSVILLE DIPLOMA PLUS HS K Classroom Connectivity<br />

78K K907 BROWNSVILLE DIPLOMA PLUS HS K IP Digital Video Surveillance<br />

78K K907 BROWNSVILLE DIPLOMA PLUS HS K New/Retrofit Telephone/Intercom System<br />

78K K909 ACORN COMMUNITY HS K Classroom Connectivity<br />

78K K909 ACORN COMMUNITY HS K Classroom Connectivity<br />

78K K909 ACORN COMMUNITY HS K New/Retrofit Telephone/Intercom System<br />

78K K913 EBC HS FOR PUB. SERV. - BUSHWICK K New/Retrofit Telephone/Intercom System<br />

78K K9<strong>14</strong> BENJAMIN BANNEKER ACADEMY K Classroom Connectivity<br />

78K K9<strong>14</strong> BENJAMIN BANNEKER ACADEMY K IP Digital Video Surveillance<br />

78K K9<strong>14</strong> BENJAMIN BANNEKER ACADEMY K New/Retrofit Telephone/Intercom System<br />

78K K917 BKLYN COLL ACAD (BRIDGES TO K) K IP Digital Video Surveillance<br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE K Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE K Classroom Connectivity<br />

78K K920 EL PUENTE ACAD FOR PEACE&JUSTICE K New/Retrofit Telephone/Intercom System<br />

78K K932 HIGH SCHOOL SUSPENSION CENTER K IP Digital Video Surveillance<br />

78K K932 HIGH SCHOOL SUSPENSION CENTER K Lighting Fixtures<br />

78K K977 TELECOM. ARTS & TECH. HS TRANS K Playground Redevelopment<br />

78K K987 ACORN SCHOOL FOR SOCIAL JUSTICE K Classroom Connectivity<br />

78K K987 ACORN SCHOOL FOR SOCIAL JUSTICE K New/Retrofit Telephone/Intercom System<br />

78K K994 BEDFORD ACADEMY K Classroom Connectivity<br />

78M M066 RICHARD R GREEN HS OF TEACHING M Classroom Connectivity<br />

78M M066 RICHARD R GREEN HS OF TEACHING M New/Retrofit Telephone/Intercom System<br />

78M M066 RICHARD R GREEN HS OF TEACHING M Room Conversions/Partitioning<br />

78M M081 MID-MAN ADULT LRNG CTR (81) M Electrical Systems<br />

78M M081 MID-MAN ADULT LRNG CTR (81) M Ventilation<br />

78M M097 BARD COLLEGE HS (OLD M097) M Classroom Connectivity<br />

78M M097 BARD COLLEGE HS (OLD M097) M New/Retrofit Telephone/Intercom System<br />

78M M097 BARD COLLEGE HS (OLD M097) M Safety Systems<br />

78M M<strong>10</strong>7 THE HERITAGE SCHOOL M Classroom Connectivity<br />

78M M136 I.S. 136 M Classroom Connectivity<br />

78M M136 I.S. 136 M New/Retrofit Telephone/Intercom System<br />

78M M136 I.S. 136 M Parapets<br />

78M M136 I.S. 136 M Roofs<br />

78M M136 I.S. 136 M Safety Systems<br />

78M M282 BROADWAY EDUCATION CAMPUS M Classroom Connectivity<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M Classroom Connectivity<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M Exterior Masonry<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M Gymnasium Upgrade<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M New/Retrofit Telephone/Intercom System<br />

78M M435 MANHTN CT FOR MATH & SCI. HS M Parapets<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M Classroom Connectivity<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M New/Retrofit Telephone/Intercom System<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M Room Conversions/Partitioning


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M School Improvement and Restructuring<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M Science Lab Upgrades<br />

78M M440 BAYARD RUSTIN EDUCATIONAL COMP M Technology<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Classroom Connectivity<br />

78M M445 SEWARD PARK HS M Exterior Masonry<br />

78M M445 SEWARD PARK HS M Flood Elimination<br />

78M M445 SEWARD PARK HS M Parapets<br />

78M M445 SEWARD PARK HS M Roofs<br />

78M M445 SEWARD PARK HS M Walk In Freezer Replacement<br />

78M M445 SEWARD PARK HS M Windows<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Classroom Connectivity<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Electrical Systems<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Exterior Masonry<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Flood Elimination<br />

78M M446 UNIVERSITY NEIGHBORHOOD M IP Digital Video Surveillance<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Low-Voltage Electrical Systems<br />

78M M446 UNIVERSITY NEIGHBORHOOD M New/Retrofit Telephone/Intercom System<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Parapets<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Roofs<br />

78M M451 LIBERTY HS M Classroom Connectivity<br />

78M M451 LIBERTY HS M IP Digital Video Surveillance<br />

78M M460 WASHINGTON IRVING HS M Auditorium Upgrade<br />

78M M460 WASHINGTON IRVING HS M Classroom Connectivity<br />

78M M460 WASHINGTON IRVING HS M Elevators And Escalators<br />

78M M460 WASHINGTON IRVING HS M Gymnasium Upgrade


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M460 WASHINGTON IRVING HS M New/Retrofit Telephone/Intercom System<br />

78M M460 WASHINGTON IRVING HS M Room Conversions/Partitioning<br />

78M M460 WASHINGTON IRVING HS M School Improvement and Restructuring<br />

78M M460 WASHINGTON IRVING HS M Science Lab Upgrades<br />

78M M465 G. WASHINGTON HS EDUC. CAMPUS M Classroom Connectivity<br />

78M M465 G. WASHINGTON HS EDUC. CAMPUS M New/Retrofit Telephone/Intercom System<br />

78M M470 LOUIS D. BRANDEIS HS M Classroom Connectivity<br />

78M M470 LOUIS D. BRANDEIS HS M Electrical Systems<br />

78M M470 LOUIS D. BRANDEIS HS M Gymnasium Upgrade<br />

78M M470 LOUIS D. BRANDEIS HS M Interior Spaces<br />

78M M470 LOUIS D. BRANDEIS HS M New/Retrofit Telephone/Intercom System<br />

78M M470 LOUIS D. BRANDEIS HS M Technology<br />

78M M470 LOUIS D. BRANDEIS HS M Toilets-Students<br />

78M M475 HEALTH PROFESSIONS HS (OL STY) M Classroom Connectivity<br />

78M M475 HEALTH PROFESSIONS HS (OL STY) M Classroom Connectivity<br />

78M M475 HEALTH PROFESSIONS HS (OL STY) M Classroom Connectivity<br />

78M M475 HEALTH PROFESSIONS HS (OL STY) M New/Retrofit Telephone/Intercom System<br />

78M M477 STUYVESANT HS (NEW) M Classroom Connectivity<br />

78M M477 STUYVESANT HS (NEW) M Classroom Connectivity<br />

78M M477 STUYVESANT HS (NEW) M Elevators And Escalators<br />

78M M477 STUYVESANT HS (NEW) M New/Retrofit Telephone/Intercom System<br />

78M M480 JULIA RICHMAN ED. COMPLEX M Classroom Connectivity<br />

78M M480 JULIA RICHMAN ED. COMPLEX M Classroom Connectivity<br />

78M M480 JULIA RICHMAN ED. COMPLEX M Code Compliance<br />

78M M480 JULIA RICHMAN ED. COMPLEX M New/Retrofit Telephone/Intercom System<br />

78M M480 JULIA RICHMAN ED. COMPLEX M Toilets-Students<br />

78M M485 FIORELLO LAGUARDIA HS M Classroom Connectivity<br />

78M M485 FIORELLO LAGUARDIA HS M Low-Voltage Electrical Systems<br />

78M M485 FIORELLO LAGUARDIA HS M New/Retrofit Telephone/Intercom System<br />

78M M485 FIORELLO LAGUARDIA HS M New/Retrofit Telephone/Intercom System<br />

78M M485 FIORELLO LAGUARDIA HS M Roofs


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M485 FIORELLO LAGUARDIA HS M Windows<br />

78M M486 J. K. ONASSIS HS FOR INT CAREERS M Classroom Connectivity<br />

78M M486 J. K. ONASSIS HS FOR INT CAREERS M IP Digital Video Surveillance<br />

78M M486 J. K. ONASSIS HS FOR INT CAREERS M New/Retrofit Telephone/Intercom System<br />

78M M490 MARTIN LUTHER KING, JR. HS M Auditorium Upgrade<br />

78M M490 MARTIN LUTHER KING, JR. HS M Classroom Connectivity<br />

78M M490 MARTIN LUTHER KING, JR. HS M Classroom Connectivity<br />

78M M490 MARTIN LUTHER KING, JR. HS M Safety Systems<br />

78M M495 PARK EAST HS M Classroom Connectivity<br />

78M M495 PARK EAST HS M Exterior Masonry<br />

78M M495 PARK EAST HS M Parapets<br />

78M M495 PARK EAST HS M Roofs<br />

78M M495 PARK EAST HS M Windows<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201) M Classroom Connectivity<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201) M New/Retrofit Telephone/Intercom System<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201) M Parapets<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201) M Room Conversions/Partitioning<br />

78M M501 ARTHUR SCHOMBURG HS (IS 201) M Walk In Freezer Replacement<br />

78M M505 WEST SIDE ALT HS (OLD 179) M New/Retrofit Telephone/Intercom System<br />

78M M506 EDWARD A. REYNOLDS WEST SIDE HS M Classroom Connectivity<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91) M Classroom Connectivity<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91) M Classroom Connectivity<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91) M Classroom Connectivity<br />

78M M5<strong>10</strong> FORSYTH HS (AUXSVC-OLD 91) M IP Digital Video Surveillance<br />

78M M520 MURRY BERGTRAUM HS (ECF) M Classroom Connectivity<br />

78M M520 MURRY BERGTRAUM HS (ECF) M Lighting Fixtures<br />

78M M520 MURRY BERGTRAUM HS (ECF) M New/Retrofit Telephone/Intercom System<br />

78M M520 MURRY BERGTRAUM HS (ECF) M Room Conversions/Partitioning<br />

78M M535 PARK WEST HS (ECF) M Air Conditioning Retrofit<br />

78M M535 PARK WEST HS (ECF) M Cimate Control<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity<br />

78M M535 PARK WEST HS (ECF) M Classroom Connectivity<br />

78M M535 PARK WEST HS (ECF) M Heating Plant Upgrade<br />

78M M535 PARK WEST HS (ECF) M New/Retrofit Telephone/Intercom System<br />

78M M535 PARK WEST HS (ECF) M School Improvement and Restructuring<br />

78M M540 A. PHILLIP RANDOLPH HS M Classroom Connectivity<br />

78M M540 A. PHILLIP RANDOLPH HS M IP Digital Video Surveillance<br />

78M M600 FASHION INDUSTRIES VOC HS M Classroom Connectivity<br />

78M M600 FASHION INDUSTRIES VOC HS M Classroom Connectivity<br />

78M M600 FASHION INDUSTRIES VOC HS M Low-Voltage Electrical Systems<br />

78M M600 FASHION INDUSTRIES VOC HS M New/Retrofit Telephone/Intercom System<br />

78M M600 FASHION INDUSTRIES VOC HS M Room Conversions/Partitioning<br />

78M M600 FASHION INDUSTRIES VOC HS M Windows<br />

78M M615 CHELSEA VOC HS M Classroom Connectivity<br />

78M M615 CHELSEA VOC HS M Domestic Piping<br />

78M M615 CHELSEA VOC HS M New/Retrofit Telephone/Intercom System<br />

78M M620 NORMAN THOMAS HS (ECF) M Classroom Connectivity<br />

78M M620 NORMAN THOMAS HS (ECF) M Classroom Connectivity<br />

78M M620 NORMAN THOMAS HS (ECF) M Low-Voltage Electrical Systems<br />

78M M620 NORMAN THOMAS HS (ECF) M Room Conversions/Partitioning<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Boiler Conversion<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Classroom Connectivity<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Classroom Connectivity<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Classroom Connectivity<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Climate Control<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Library Upgrades<br />

78M M625 HS OF GRAPHIC COMMUNICATION ARTS M Walk In Freezer Replacement<br />

78M M630 ART & DESIGN VOC HS (TNDEM M059) M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M630 ART & DESIGN VOC HS (TNDEM M059) M New/Retrofit Telephone/Intercom System<br />

78M M641 CITY AS SCHOOL (OLD 95) M Classroom Connectivity<br />

78M M641 CITY AS SCHOOL (OLD 95) M Classroom Connectivity<br />

78M M641 CITY AS SCHOOL (OLD 95) M Classroom Connectivity<br />

78M M641 CITY AS SCHOOL (OLD 95) M Electrical Systems<br />

78M M641 CITY AS SCHOOL (OLD 95) M Floors<br />

78M M641 CITY AS SCHOOL (OLD 95) M Low-Voltage Electrical Systems<br />

78M M641 CITY AS SCHOOL (OLD 95) M New/Retrofit Telephone/Intercom System<br />

78M M645 OLD MANHATTAN VOC/TECH HS M Classroom Connectivity<br />

78M M645 OLD MANHATTAN VOC/TECH HS M New/Retrofit Telephone/Intercom System<br />

78M M645 OLD MANHATTAN VOC/TECH HS M Roofs<br />

78M M646 SCL COOP TECH ED (MNH VOC HS) M Classroom Connectivity<br />

78M M646 SCL COOP TECH ED (MNH VOC HS) M New/Retrofit Telephone/Intercom System<br />

78M M661 MNHT COMP NIGHT&DAY (OL BACN X) M Classroom Connectivity<br />

78M M807 HARVEY MILK SCHOOL M Classroom Connectivity<br />

78M M812 HS FOR MATH, SCI & ENGINEERING M Classroom Connectivity<br />

78M M812 HS FOR MATH, SCI & ENGINEERING M Classroom Connectivity<br />

78M M826 SUSPENDED PEDAGOGUE CENTER M Classroom Connectivity<br />

78M M833 HS FOR ECONOMICS & FINANCE M Auditorium Upgrade<br />

78M M833 HS FOR ECONOMICS & FINANCE M Classroom Connectivity<br />

78M M833 HS FOR ECONOMICS & FINANCE M Elevators And Escalators<br />

78M M833 HS FOR ECONOMICS & FINANCE M IP Digital Video Surveillance<br />

78M M834 HS FOR ENVIRONMENTAL STUDIES M Classroom Connectivity<br />

78M M834 HS FOR ENVIRONMENTAL STUDIES M IP Digital Video Surveillance<br />

78M M834 HS FOR ENVIRONMENTAL STUDIES M New/Retrofit Telephone/Intercom System<br />

78M M835 THE COMMUNITY PREPARATORY HS M Classroom Connectivity<br />

78M M837 BEACON HS M Classroom Connectivity<br />

78M M873 MANHATTAN VILLAGE ACADEMY M Classroom Connectivity<br />

78M M874 SCHOOL FOR THE PHYSICAL CITY M Classroom Connectivity<br />

78M M876 GREGORIO LUPERON PREP. SCHOOL M Technology<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES M Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES M Classroom Connectivity<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES M IP Digital Video Surveillance<br />

78M M883 LEGACY HS FOR INTEGR. STUDIES M New/Retrofit Telephone/Intercom System<br />

78M M894 HS FOR LEADERSHIP & PUBLIC SER M Classroom Connectivity<br />

78M M894 HS FOR LEADERSHIP & PUBLIC SER M IP Digital Video Surveillance<br />

78M M894 HS FOR LEADERSHIP & PUBLIC SER M New/Retrofit Telephone/Intercom System<br />

78M M895 YOUNG WOMEN'S LEADERSHIP HS M Classroom Connectivity<br />

78M M895 YOUNG WOMEN'S LEADERSHIP HS M New/Retrofit Telephone/Intercom System<br />

78M M897 UNITY HS M New/Retrofit Telephone/Intercom System<br />

78M M911 HARLEM RENAISSANCE HS (OLD M24) M Auditorium Upgrade<br />

78M M911 HARLEM RENAISSANCE HS (OLD M24) M Classroom Connectivity<br />

78M M911 HARLEM RENAISSANCE HS (OLD M24) M New/Retrofit Telephone/Intercom System<br />

78M M920 SATELLITE ACADEMY M Classroom Connectivity<br />

78M M920 SATELLITE ACADEMY M New/Retrofit Telephone/Intercom System<br />

78M M970 THURGOOD MARSHALL ACAD. M Classroom Connectivity<br />

78M M970 THURGOOD MARSHALL ACAD. M New/Retrofit Telephone/Intercom System<br />

78Q K420 FRANKLIN K. LANE HS Q Classroom Connectivity<br />

78Q K420 FRANKLIN K. LANE HS Q Classroom Connectivity<br />

78Q K420 FRANKLIN K. LANE HS Q Classroom Connectivity<br />

78Q K420 FRANKLIN K. LANE HS Q Classroom Connectivity<br />

78Q K420 FRANKLIN K. LANE HS Q Classroom Connectivity<br />

78Q Q023 QUEENS ACADEMY HS Q Classroom Connectivity<br />

78Q Q023 QUEENS ACADEMY HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q023 QUEENS ACADEMY HS Q Toilets-Students<br />

78Q Q400 AUGUST MARTIN HS Q Classroom Connectivity<br />

78Q Q400 AUGUST MARTIN HS Q Exterior Masonry<br />

78Q Q400 AUGUST MARTIN HS Q IP Digital Video Surveillance<br />

78Q Q400 AUGUST MARTIN HS Q Parapets<br />

78Q Q400 AUGUST MARTIN HS Q Roofs<br />

78Q Q405 BAYSIDE HS Q Classroom Connectivity<br />

78Q Q405 BAYSIDE HS Q Elevators And Escalators


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78Q Q405 BAYSIDE HS Q Flood Elimination<br />

78Q Q405 BAYSIDE HS Q Low-Voltage Electrical Systems<br />

78Q Q405 BAYSIDE HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q405 BAYSIDE HS Q Parapets<br />

78Q Q405 BAYSIDE HS Q Roofs<br />

78Q Q4<strong>10</strong> BEACH CHANNEL HS Q Classroom Connectivity<br />

78Q Q4<strong>10</strong> BEACH CHANNEL HS Q Elevators And Escalators<br />

78Q Q4<strong>10</strong> BEACH CHANNEL HS Q Low-Voltage Electrical Systems<br />

78Q Q415 BENJAMIN N. CARDOZO HS Q Classroom Connectivity<br />

78Q Q415 BENJAMIN N. CARDOZO HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q420 SPRINGFIELD GARDENS HS Q Classroom Connectivity<br />

78Q Q420 SPRINGFIELD GARDENS HS Q IP Digital Video Surveillance<br />

78Q Q420 SPRINGFIELD GARDENS HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q425 JOHN BOWNE HS Q Classroom Connectivity<br />

78Q Q425 JOHN BOWNE HS Q Elevators and Escalators<br />

78Q Q425 JOHN BOWNE HS Q Low-Voltage Electrical Systems<br />

78Q Q430 FRANCIS LEWIS HS Q Classroom Connectivity<br />

78Q Q435 MARTIN VAN BUREN HS Q Classroom Connectivity<br />

78Q Q435 MARTIN VAN BUREN HS Q Lighting Fixtures<br />

78Q Q435 MARTIN VAN BUREN HS Q Low-Voltage Electrical Systems<br />

78Q Q435 MARTIN VAN BUREN HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q440 FOREST HILLS HS Q Classroom Connectivity<br />

78Q Q441 FOREST HILLS AF Q Paved Area-Concrete<br />

78Q Q445 WILLIAM C. BRYANT HS Q Classroom Connectivity<br />

78Q Q445 WILLIAM C. BRYANT HS Q Exterior Masonry<br />

78Q Q445 WILLIAM C. BRYANT HS Q Low-Voltage Electrical Systems<br />

78Q Q445 WILLIAM C. BRYANT HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q445 WILLIAM C. BRYANT HS Q Parapets<br />

78Q Q445 WILLIAM C. BRYANT HS Q Roofs<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Classroom Connectivity<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Exterior Masonry<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Flood Elimination<br />

78Q Q450 NEWCOMERS HIGH SCHOOL (OLD LIC) Q Parapets<br />

78Q Q451 ACADEMY OF AMERICAN STUD HS AX Q Classroom Connectivity<br />

78Q Q451 ACADEMY OF AMERICAN STUD HS AX Q New/Retrofit Telephone/Intercom System<br />

78Q Q452 LONG ISLAND CITY HS (NEW) Q Classroom Connectivity<br />

78Q Q452 LONG ISLAND CITY HS (NEW) Q Exterior Masonry<br />

78Q Q452 LONG ISLAND CITY HS (NEW) Q Flood Elimination<br />

78Q Q452 LONG ISLAND CITY HS (NEW) Q IP Digital Video Surveillance<br />

78Q Q452 LONG ISLAND CITY HS (NEW) Q New/Retrofit Telephone/Intercom System<br />

78Q Q453 LONG ISLAND CITY AF Q Athletic Fields<br />

78Q Q455 NEWTOWN HS Q Classroom Connectivity<br />

78Q Q455 NEWTOWN HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X) Q Classroom Connectivity<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X) Q Lighting Fixtures<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X) Q Windows<br />

78Q Q460 FLUSHING HS Q Classroom Connectivity<br />

78Q Q460 FLUSHING HS Q Lighting Fixtures<br />

78Q Q460 FLUSHING HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q465 FAR ROCKAWAY HS Q Auditorium Upgrade<br />

78Q Q465 FAR ROCKAWAY HS Q Classroom Connectivity<br />

78Q Q465 FAR ROCKAWAY HS Q Classroom Connectivity<br />

78Q Q465 FAR ROCKAWAY HS Q Elevators And Escalators<br />

78Q Q465 FAR ROCKAWAY HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q470 JAMAICA HS Q Classroom Connectivity<br />

78Q Q470 JAMAICA HS Q Classroom Connectivity<br />

78Q Q470 JAMAICA HS Q Classroom Connectivity<br />

78Q Q470 JAMAICA HS Q Climate Control<br />

78Q Q470 JAMAICA HS Q Heating Plant Upgrade<br />

78Q Q470 JAMAICA HS Q Library Upgrades<br />

78Q Q470 JAMAICA HS Q New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78Q Q470 JAMAICA HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q470 JAMAICA HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q470 JAMAICA HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q470 JAMAICA HS Q Room Conversions/Partitioning<br />

78Q Q470 JAMAICA HS Q Windows<br />

78Q Q475 RICHMOND HILL HS Q Classroom Connectivity<br />

78Q Q475 RICHMOND HILL HS Q IP Digital Video Surveillance<br />

78Q Q475 RICHMOND HILL HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q475 RICHMOND HILL HS Q Roofs<br />

78Q Q475 RICHMOND HILL HS Q Science Lab Upgrades<br />

78Q Q480 JOHN ADAMS HS Q Classroom Connectivity<br />

78Q Q480 JOHN ADAMS HS Q Exterior Masonry<br />

78Q Q480 JOHN ADAMS HS Q Parapets<br />

78Q Q480 JOHN ADAMS HS Q Room Conversions/Partitioning<br />

78Q Q485 GROVER CLEVELAND HS Q Classroom Connectivity<br />

78Q Q485 GROVER CLEVELAND HS Q Emergency Stabilization<br />

78Q Q485 GROVER CLEVELAND HS Q Exterior Masonry<br />

78Q Q485 GROVER CLEVELAND HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q485 GROVER CLEVELAND HS Q Paved Area-Concrete<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Classroom Connectivity<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Flood Elimination<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Parapets<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Roofs<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Room Conversions/Partitioning<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Room Conversions/Partitioning<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q Safety Systems<br />

78Q Q490 CAMPUS MAGNET HS (JACKSON) Q School Improvement and Restructuring<br />

78Q Q505 HILLCREST HS Q Classroom Connectivity<br />

78Q Q505 HILLCREST HS Q Emergency Stabilization<br />

78Q Q505 HILLCREST HS Q IP Digital Video Surveillance<br />

78Q Q505 HILLCREST HS Q New/Retrofit Telephone/Intercom System


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78Q Q515 TOWNSEND HARRIS HS Q Air Conditioning Retrofit<br />

78Q Q515 TOWNSEND HARRIS HS Q Classroom Connectivity<br />

78Q Q515 TOWNSEND HARRIS HS Q Classroom Connectivity<br />

78Q Q515 TOWNSEND HARRIS HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q520 MIDDLE COLLEGE CAMPUS Q Classroom Connectivity<br />

78Q Q530 INTERNATIONAL HS (BLDG M @LAGUA) Q Classroom Connectivity<br />

78Q Q566 QNS HS OF TEACH., LIB. ARTS&SCI Q Classroom Connectivity<br />

78Q Q566 QNS HS OF TEACH., LIB. ARTS&SCI Q Classroom Connectivity<br />

78Q Q570 FRANK SINATRA HIGH SCHOOL Q Classroom Connectivity<br />

78Q Q595 AUX. SERV. - JAMAICA LEARN CT Q Classroom Connectivity<br />

78Q Q600 QUEENS VOC HS Q Classroom Connectivity<br />

78Q Q600 QUEENS VOC HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q6<strong>10</strong> AVIATION HS Q Classroom Connectivity<br />

78Q Q6<strong>10</strong> AVIATION HS Q Elevators And Escalators<br />

78Q Q620 THOMAS A. EDISON VOC HS Q Classroom Connectivity<br />

78Q Q620 THOMAS A. EDISON VOC HS Q Domestic Piping<br />

78Q Q620 THOMAS A. EDISON VOC HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q650 HS FOR CONST.TRADES,ENGG.,& ARCH Q Classroom Connectivity<br />

78Q Q650 HS FOR CONST.TRADES,ENGG.,& ARCH Q Classroom Connectivity<br />

78Q Q650 HS FOR CONST.TRADES,ENGG.,& ARCH Q IP Digital Video Surveillance<br />

78Q Q680 GATEWAY TO HEALTH & SCI (DASNY) Q Classroom Connectivity<br />

78Q Q680 GATEWAY TO HEALTH & SCI (DASNY) Q IP Digital Video Surveillance<br />

78Q Q680 GATEWAY TO HEALTH & SCI (DASNY) Q New/Retrofit Telephone/Intercom System<br />

78Q Q686 METROPOLITAN AVENUE CAMPUS Q Classroom Connectivity<br />

78Q Q690 HS FOR LAW ENFORCEMENT Q Classroom Connectivity<br />

78Q Q690 HS FOR LAW ENFORCEMENT Q New/Retrofit Telephone/Intercom System<br />

78Q Q695 ATEWAY TO HEALTH SCIENCES SECONDA Q Classroom Connectivity<br />

78Q Q707 R. F. KENNEDY COMM. MIDDLE/HS Q Classroom Connectivity<br />

78Q Q707 R. F. KENNEDY COMM. MIDDLE/HS Q Kitchen Areas<br />

78Q Q707 R. F. KENNEDY COMM. MIDDLE/HS Q New/Retrofit Telephone/Intercom System<br />

78Q Q725 HS FOR INFORMATION TECH Q Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78Q Q725 HS FOR INFORMATION TECH Q IP Digital Video Surveillance<br />

78Q Q735 QUEENS HIGH SCHOOL COMPLEX Q Classroom Connectivity<br />

78Q Q735 QUEENS HIGH SCHOOL COMPLEX Q Classroom Connectivity<br />

78Q Q739 YOUNG W. LEADERSHIP SCL ASTORIA Q Classroom Connectivity<br />

78Q Q739 YOUNG W. LEADERSHIP SCL ASTORIA Q New/Retrofit Telephone/Intercom System<br />

78Q Q744 ELMHURST EDUCATIONAL CAMPUS Q Classroom Connectivity<br />

78Q Q744 ELMHURST EDUCATIONAL CAMPUS Q Classroom Connectivity<br />

78Q Q744 ELMHURST EDUCATIONAL CAMPUS Q Classroom Connectivity<br />

78Q Q774 QUEENS HS FOR THE SCIENCES Q Classroom Connectivity<br />

78Q Q774 QUEENS HS FOR THE SCIENCES Q Classroom Connectivity<br />

78Q Q774 QUEENS HS FOR THE SCIENCES Q New/Retrofit Telephone/Intercom System<br />

78Q Q792 NORTH QUEENS COMMUNITY HS Q Classroom Connectivity<br />

78Q Q792 NORTH QUEENS COMMUNITY HS Q Low-Voltage Electrical Systems<br />

78Q Q798 BACCALAUREATE SCL FOR GLOBAL ED Q Classroom Connectivity<br />

78Q Q798 BACCALAUREATE SCL FOR GLOBAL ED Q New/Retrofit Telephone/Intercom System<br />

78Q Q799 CAMBRIA HEIGHTS ACADEMY Q Classroom Connectivity<br />

78Q Q891 R. F. WAGNER SEC SCL ARTS & TECH Q Classroom Connectivity<br />

78Q Q891 R. F. WAGNER SEC SCL ARTS & TECH Q New/Retrofit Telephone/Intercom System<br />

78Q Q891 R. F. WAGNER SEC SCL ARTS & TECH Q Room Conversions/Partitioning<br />

78Q Q898 IDA B. WELLS FAMILY CENTER Q New/Retrofit Telephone/Intercom System<br />

78R R435 NEW DORP HS (NEW) R Classroom Connectivity<br />

78R R435 NEW DORP HS (NEW) R New/Retrofit Telephone/Intercom System<br />

78R R435 NEW DORP HS (NEW) R Walk In Freezer Replacement<br />

78R R440 STATEN ISLAND TECHNICAL HS R Classroom Connectivity<br />

78R R440 STATEN ISLAND TECHNICAL HS R Exterior Masonry<br />

78R R440 STATEN ISLAND TECHNICAL HS R Flood Elimination<br />

78R R440 STATEN ISLAND TECHNICAL HS R New/Retrofit Telephone/Intercom System<br />

78R R440 STATEN ISLAND TECHNICAL HS R Parapets<br />

78R R440 STATEN ISLAND TECHNICAL HS R Room Conversions/Partitioning<br />

78R R445 PORT RICHMOND HS R Classroom Connectivity<br />

78R R445 PORT RICHMOND HS R Exterior Masonry


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78R R445 PORT RICHMOND HS R Low-Voltage Electrical Systems<br />

78R R445 PORT RICHMOND HS R New/Retrofit Telephone/Intercom System<br />

78R R445 PORT RICHMOND HS R Parapets<br />

78R R450 CURTIS HS R Classroom Connectivity<br />

78R R450 CURTIS HS R Exterior Masonry<br />

78R R450 CURTIS HS R New/Retrofit Telephone/Intercom System<br />

78R R450 CURTIS HS R Parapets<br />

78R R450 CURTIS HS R Roofs<br />

78R R450 CURTIS HS R Science Lab Upgrades<br />

78R R450 CURTIS HS R Waste System<br />

78R R450 CURTIS HS R Windows<br />

78R R455 TOTTENVILLE HS R Classroom Connectivity<br />

78R R455 TOTTENVILLE HS R Classroom Connectivity<br />

78R R455 TOTTENVILLE HS R Elevators And Escalators<br />

78R R455 TOTTENVILLE HS R New/Retrofit Telephone/Intercom System<br />

78R R455 TOTTENVILLE HS R Room Conversions/Partitioning<br />

78R R455 TOTTENVILLE HS R Waste System<br />

78R R455 TOTTENVILLE HS R Windows<br />

78R R456 TOTTENVILLE AF R Athletic Fields<br />

78R R460 SUSAN E. WAGNER HS R Classroom Connectivity<br />

78R R460 SUSAN E. WAGNER HS R Paved Area-Blacktop<br />

78R R470 CONCORD HS (OLD 12) R Classroom Connectivity<br />

78R R470 CONCORD HS (OLD 12) R Exterior Masonry<br />

78R R470 CONCORD HS (OLD 12) R Flood Elimination<br />

78R R470 CONCORD HS (OLD 12) R New/Retrofit Telephone/Intercom System<br />

78R R470 CONCORD HS (OLD 12) R Roofs<br />

78R R470 CONCORD HS (OLD 12) R Windows<br />

78R R600 RALPH MCKEE VOC HS R Classroom Connectivity<br />

78R R600 RALPH MCKEE VOC HS R New/Retrofit Telephone/Intercom System<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE X Classroom Connectivity<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE X Classroom Connectivity<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE X Classroom Connectivity<br />

78X X039 NEW SCH FOR ARTS AND SCIENCE X Room Conversions/Partitioning<br />

78X X099 REV. J.A. POLITE AVE SCHOOL CAMPUS X Classroom Connectivity<br />

78X X362 I.S./H.S. 362 X Classroom Connectivity<br />

78X X362 I.S./H.S. 362 X IP Digital Video Surveillance<br />

78X X392 ASITA MARIA CENTER FOR ARTS AND EDUC X Classroom Connectivity<br />

78X X392 ASITA MARIA CENTER FOR ARTS AND EDUC X Classroom Connectivity<br />

78X X400 MORRIS HS X Classroom Connectivity<br />

78X X400 MORRIS HS X Exterior Masonry<br />

78X X400 MORRIS HS X New/Retrofit Telephone/Intercom System<br />

78X X400 MORRIS HS X Room Conversions/Partitioning<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Boiler Conversion<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Classroom Connectivity<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Classroom Connectivity<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Climate Control<br />

78X X401 BRONX REGIONAL HS (OLD 133) X IP Digital Video Surveillance<br />

78X X401 BRONX REGIONAL HS (OLD 133) X New/Retrofit Telephone/Intercom System<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Room Conversions/Partitioning<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Technology<br />

78X X401 BRONX REGIONAL HS (OLD 133) X Technology<br />

78X X405 HERBERT H. LEHMAN HS X Classroom Connectivity<br />

78X X405 HERBERT H. LEHMAN HS X Emergency Lighting And Fire Safety Retrofits<br />

78X X405 HERBERT H. LEHMAN HS X Interior Spaces<br />

78X X405 HERBERT H. LEHMAN HS X IP Digital Video Surveillance<br />

78X X405 HERBERT H. LEHMAN HS X Low-Voltage Electrical Systems<br />

78X X406 LEHMAN AF X Athletic Fields<br />

78X X4<strong>10</strong> WILLIAM H. TAFT HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

ADDED PROJECTS<br />

District Bldg ID School Boro Program Category<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Classroom Connectivity<br />

78X X415 CHRISTOPHER COLUMBUS HS X Electrical Systems<br />

78X X415 CHRISTOPHER COLUMBUS HS X Paved Area-Blacktop<br />

78X X415 CHRISTOPHER COLUMBUS HS X Room Conversions/Partitioning<br />

78X X420 JAMES MONROE CAMPUS X Classroom Connectivity<br />

78X X420 JAMES MONROE CAMPUS X New/Retrofit Telephone/Intercom System<br />

78X X420 JAMES MONROE CAMPUS X Science Lab Upgrades<br />

78X X423 JAMES MONROE HS CAMPUS ANNEX X Classroom Connectivity<br />

78X X423 JAMES MONROE HS CAMPUS ANNEX X Classroom Connectivity<br />

78X X425 EVANDER CHILDS HS X Classroom Connectivity<br />

78X X425 EVANDER CHILDS HS X Classroom Connectivity<br />

78X X425 EVANDER CHILDS HS X Heating Plant Pump Assembly<br />

78X X430 WALTON HS X Classroom Connectivity<br />

78X X430 WALTON HS X Lighting Fixtures<br />

78X X435 THEODORE ROOSEVELT HS X Classroom Connectivity<br />

78X X435 THEODORE ROOSEVELT HS X Classroom Connectivity<br />

78X X435 THEODORE ROOSEVELT HS X Classroom Connectivity<br />

78X X435 THEODORE ROOSEVELT HS X Classroom Connectivity


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

CANCELLED PROJECTS<br />

District Bld ID School Boro Program Category Reason<br />

05 M133 P.S. 133 M Boiler Conversion Alternate Project Prioritized<br />

05 M133 P.S. 133 M Climate Control Alternate Project Prioritized<br />

07 X001 P.S. 1 X Boiler Conversion Alternate Project Prioritized<br />

07 X001 P.S. 1 X Climate Control Alternate Project Prioritized<br />

09 X132 P.S. 132 X Boiler Conversion Alternate Project Prioritized<br />

09 X132 P.S. 132 X Climate Control Alternate Project Prioritized<br />

09 X166 I.S. 166 X Elevators and Escalators Alternate Project Prioritized<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X HVAC System Alternate Project Prioritized<br />

<strong>10</strong> X115 I.S. 399 (OLD X HS/115) X Air Conditioning Retrofit Alternate Project Prioritized<br />

12 X129 I.S. 129 (PAIRED W P234) X Boiler Conversion Alternate Project Prioritized<br />

12 X129 I.S. 129 (PAIRED W P234) X Climate Control Alternate Project Prioritized<br />

13 K044 P.S. 44 K Boiler Conversion Alternate Project Prioritized<br />

13 K044 P.S. 44 K Climate Control Alternate Project Prioritized<br />

13 K067 P.S. 67 K Accessibility Alternate Project Prioritized<br />

<strong>14</strong> K071 I.S. 71 K Boiler Conversion Alternate Project Prioritized<br />

<strong>14</strong> K071 I.S. 71 K Climate Control Alternate Project Prioritized<br />

15 K088 I.S. 88 K HVAC Alternate Project Prioritized<br />

23 K073 P.S. 73 K Accessibility Alternate Project Prioritized<br />

26 Q074 I.S. 74 Q Elevators and Escalators Alternate Project Prioritized<br />

28 Q048 P.S. 48 Q School Safety Alternate Project Prioritized<br />

28 Q080 P.S. 80 Q Flood Elimination Alternate Project Prioritized<br />

29 Q136 P.S. 136 Q Flood Elimination Alternate Project Prioritized<br />

29 Q208 P.S./I.S. 208 Q Fencing Alternate Project Prioritized<br />

32 K116 P.S. 116 K Boiler Conversion Alternate Project Prioritized<br />

32 K116 P.S. 116 K Climate Control Alternate Project Prioritized<br />

78Q Q425 JOHN BOWNE HS Q Roofs Alternate Project Prioritized<br />

78Q Q425 JOHN BOWNE HS Q Exterior Masonry Alternate Project Prioritized<br />

78Q Q425 JOHN BOWNE HS Q Electrical Systems Alternate Project Prioritized<br />

78Q Q425 JOHN BOWNE HS Q Interior Spaces Alternate Project Prioritized<br />

78X X405 HERBERT H. LEHMAN HS X Air Conditioning Split System Alternate Project Prioritized<br />

78K K520 PACIFIC ALT HS K School Safety Lease Term Not Capital Eligible


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

CANCELLED PROJECTS<br />

District Bld ID School Boro Program Category Reason<br />

01 M061 P.S. 61 M Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

02 M001 P.S. 1 M Library Upgrades No Capital Work Required<br />

02 M033 P.S. 33 M Windows No Capital Work Required<br />

02 M033 P.S. 33 M Exterior Masonry No Capital Work Required<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M Paved Area-Blacktop No Capital Work Required<br />

02 M047 J.H.S. 47 (SCH FOR THE DEAF) M Low-Voltage Electrical Systems No Capital Work Required<br />

02 M051 P.S. 51 M School Safety No Capital Work Required<br />

02 M130 P.S. 130 M Floors No Capital Work Required<br />

02 M130 P.S. 130 M Interior Spaces No Capital Work Required<br />

02 M130 P.S. 130 M Technology No Capital Work Required<br />

02 M198 P.S. 198 M Cafeteria / Multipurpose Room Upgrade No Capital Work Required<br />

03 M180 P.S. 180 M Windows No Capital Work Required<br />

04 M112 P.S. 112 (TANDEM M206) M Climate Control No Capital Work Required<br />

04 M117 J.H.S. 117 M Exterior Masonry No Capital Work Required<br />

06 M128 P.S. 128 M Windows No Capital Work Required<br />

06 M128 P.S. 128 M Flood Elimination No Capital Work Required<br />

06 M132 P.S. 132 M Toilets-Students No Capital Work Required<br />

06 M223 I.S. 223 (MOTT HALL) M Technology No Capital Work Required<br />

08 X075 P.S. 75 X Windows No Capital Work Required<br />

09 X1<strong>14</strong> P.S. 1<strong>14</strong> X Auditorium Upgrade No Capital Work Required<br />

09 X117 I.S. 117 X Heating Plant Upgrade No Capital Work Required<br />

<strong>10</strong> X008 P.S. 8 X Low-Voltage Electrical Systems No Capital Work Required<br />

<strong>10</strong> X037 P.S. 37 X Code Compliance No Capital Work Required<br />

<strong>10</strong> X056 P.S. 56 X Heating Plant Upgrade No Capital Work Required<br />

<strong>10</strong> X283 JONAS BRONCK ACADEMY X Technology No Capital Work Required<br />

<strong>10</strong> X859 P.S. 315 X Code Compliance No Capital Work Required<br />

11 X<strong>10</strong>5 P.S. <strong>10</strong>5 X Prior Plan Completion Cost No Capital Work Required<br />

11 X<strong>14</strong>4 I.S. <strong>14</strong>4 X Safety Systems No Capital Work Required<br />

11 X181 I.S. 181 X Electrical Systems No Capital Work Required<br />

12 X067 P.S. 67 X Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

12 X098 I.S. 98 X Toilets-Students No Capital Work Required


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

CANCELLED PROJECTS<br />

District Bld ID School Boro Program Category Reason<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Parapets No Capital Work Required<br />

<strong>14</strong> K031 P.S. 31 (OLD 126) K Exterior Masonry No Capital Work Required<br />

<strong>14</strong> K196 P.S. 196 K Low-Voltage Electrical Systems No Capital Work Required<br />

<strong>14</strong> K318 I.S. 318 K Windows No Capital Work Required<br />

16 K021 P.S. 21 K Flood Elimination No Capital Work Required<br />

17 K874 I.S. 340 (OLD 249 AX) K Safety Systems No Capital Work Required<br />

18 K068 I.S. 68 K Ansul Systems No Capital Work Required<br />

18 K115 P.S. 115 K Flood Elimination No Capital Work Required<br />

18 K233 P.S. 233 K Windows No Capital Work Required<br />

20 K<strong>10</strong>4 P.S. <strong>10</strong>4 K Technology No Capital Work Required<br />

20 K163 P.S. 163 K Technology No Capital Work Required<br />

20 K220 I.S. 220 K Reinforcing Support Elements No Capital Work Required<br />

20 K940 I.S. 30 K Technology No Capital Work Required<br />

21 K099 P.S. 99 K Technology No Capital Work Required<br />

21 K128 P.S. 128 (TANDEM K280) K Technology No Capital Work Required<br />

21 K153 P.S. 153 K Technology No Capital Work Required<br />

22 K217 P.S. 217 K Technology No Capital Work Required<br />

23 K327 P.S. 327 (TANDEM K396-D75) K Windows No Capital Work Required<br />

24 Q113 P.S./I.S. 113 Q Technology No Capital Work Required<br />

26 Q067 J.H.S. 67 Q Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

26 Q216 J.H.S. 216 Q Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

27 Q063 P.S. 63 Q Technology No Capital Work Required<br />

27 Q202 I.S. 202 Q Technology No Capital Work Required<br />

27 Q202 I.S. 202 Q Technology No Capital Work Required<br />

27 Q223 P.S. 223 Q Roofs No Capital Work Required<br />

27 Q232 P.S. 232 Q Flood Elimination No Capital Work Required<br />

28 Q055 P.S. 55 Q Technology No Capital Work Required<br />

28 Q117 P.S. 117 Q Technology No Capital Work Required<br />

29 Q015 P.S. 15 Q Parapets No Capital Work Required<br />

29 Q015 P.S. 15 Q Flood Elimination No Capital Work Required<br />

29 Q263 P.S. /I.S 295 Q Technology No Capital Work Required


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

CANCELLED PROJECTS<br />

District Bld ID School Boro Program Category Reason<br />

30 Q017 P.S. 17 Q Technology No Capital Work Required<br />

30 Q126 I.S. 126 Q Floors No Capital Work Required<br />

30 Q126 I.S. 126 Q Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

30 Q126 I.S. 126 Q Safety Systems No Capital Work Required<br />

30 Q<strong>14</strong>1 I.S. <strong>14</strong>1 Q Flood Elimination No Capital Work Required<br />

30 Q230 I.S. 230 Q Library Upgrades No Capital Work Required<br />

30 Q234 P.S. 234 Q Low-Voltage Electrical Systems No Capital Work Required<br />

31 R011 P.S. 11 R Technology No Capital Work Required<br />

31 R035 P.S. 35 R Exterior Masonry No Capital Work Required<br />

75K K371 P.S. 371 (OLD 615) K Technology No Capital Work Required<br />

75K K857 P.S. 36 ANNEX K Technology No Capital Work Required<br />

75Q Q075 P.S. 75 (R PEARY SCHOOL) Q Windows No Capital Work Required<br />

75Q Q075 P.S. 75 (R PEARY SCHOOL) Q Reinforcing Support Elements No Capital Work Required<br />

75X X034 P.S. 34 X Technology No Capital Work Required<br />

78K K515 SOUTH SHORE HS K Windows No Capital Work Required<br />

78M M446 UNIVERSITY NEIGHBORHOOD M Technology No Capital Work Required<br />

78M M630 ART & DESIGN VOC HS (TNDEM M059) M Technology No Capital Work Required<br />

78M M895 YOUNG WOMEN'S LEADERSHIP HS M Technology No Capital Work Required<br />

78M M895 YOUNG WOMEN'S LEADERSHIP HS M Room Conversions/Partitioning No Capital Work Required<br />

78Q Q023 QUEENS ACADEMY HS Q Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X) Q Roofs No Capital Work Required<br />

78Q Q456 HS FOR ARTS AND BUS. (OL NUTN X) Q Exterior Masonry No Capital Work Required<br />

78Q Q739 YOUNG WOMEN'S LEADERSHIP ACADEMY Q Technology No Capital Work Required<br />

78R R445 PORT RICHMOND HS R Low-Voltage Electrical Systems No Capital Work Required<br />

78R R450 CURTIS HS R Heating Plant Upgrade No Capital Work Required<br />

78X X420 JAMES MONROE CAMPUS X Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

78X X425 EVANDER CHILDS HS X Reinforcing Cinder Concrete Slabs No Capital Work Required<br />

05 M123 P.S. 123 M Lighting Fixtures Reclassified<br />

07 X151 I.S. 151 X Flood Elimination Reclassified<br />

09 X862 P.S. 63 MINISCHOOL X Paved Area-Concrete Reclassified<br />

20 K3<strong>14</strong> P.S. 3<strong>14</strong> K Low-Voltage Electrical Systems Reclassified


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

CANCELLED PROJECTS<br />

District Bld ID School Boro Program Category Reason<br />

24 Q019 P.S. 19 Q School Safety Reclassified<br />

24 Q777 P.S. 199 ANNEX (@ ST. TERESA'S) Q Low-Voltage Electrical Systems Reclassified<br />

26 Q173 P.S. 173 Q Paved Area-Blacktop Reclassified<br />

78M M535 PARK WEST HS (ECF) M Reinforcing Support Elements Reclassified<br />

78M M620 NORMAN THOMAS HS (ECF) M Flood Elimination Reclassified<br />

78M M620 NORMAN THOMAS HS (ECF) M Roofs Reclassified<br />

78M M620 NORMAN THOMAS HS (ECF) M Exterior Masonry Reclassified<br />

78X X421 MONROE AF X Athletic Fields Reclassified<br />

03 M<strong>14</strong>5 P.S. <strong>14</strong>5 M Room Conversions/Partitioning School Management Directive<br />

15 K136 I.S. 136 K School Safety School Management Directive<br />

19 K190 P.S. 190 K School Safety School Management Directive<br />

22 K864 P.S. 361 (OLD 89) K Playground Redevelopment School Management Directive<br />

24 Q0<strong>14</strong> P.S. <strong>14</strong> Q Playground Redevelopment School Management Directive<br />

26 Q203 P.S. 203 Q Safety Systems School Management Directive<br />

27 Q<strong>10</strong>6 P.S. <strong>10</strong>6 Q Accessibility School Management Directive<br />

29 Q156 P.S. 156 Q Playground Redevelopment School Management Directive<br />

31 R080 REGION 7/ ROC F R Room Conversions/Partitioning School Management Directive<br />

01 M061 P.S. 61 M Gymnasium Upgrade Work Previously Completed<br />

06 M192 P.S. 192 M Exterior Masonry Work Previously Completed<br />

09 X082 I.S. 232 X Library Upgrades Work Previously Completed<br />

<strong>10</strong> X032 P.S. 32 X Flood Elimination Work Previously Completed<br />

11 X112 P.S. 112 X Lighting Fixtures Work Previously Completed<br />

12 X061 P.S. 61 X Ansul Systems Work Previously Completed<br />

19 K190 P.S. 190 K Flood Elimination Work Previously Completed<br />

20 K201 I.S. 201 K Kitchen Areas Work Previously Completed<br />

24 Q007 P.S. 7 Q Heating Plant Upgrade Work Previously Completed<br />

26 Q213 P.S. 213 Q Reinforcing Cinder Concrete Slabs Work Previously Completed<br />

29 Q251 P.S. 251 (TANDEM Q231) Q Technology Work Previously Completed


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Manhattan<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

0.00<br />

0.00<br />

0.00<br />

0.09<br />

0.00<br />

0.90<br />

0.59<br />

0.00<br />

0.00<br />

2.49<br />

0.01<br />

1.82<br />

0.04<br />

12.77<br />

0.00<br />

0.00<br />

1.47<br />

1.76<br />

0.00<br />

0.04<br />

0.03<br />

11.97<br />

<strong>10</strong>.35<br />

0.00<br />

12.33<br />

28.02<br />

1.85<br />

3.24<br />

0.15<br />

3.31<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.05<br />

0.00<br />

5.34<br />

2.79<br />

0.00<br />

0.00<br />

1.78<br />

0.03<br />

1.08<br />

0.01<br />

5.81<br />

0.00<br />

0.00<br />

0.66<br />

1.09<br />

0.00<br />

0.03<br />

0.12<br />

23.49<br />

<strong>10</strong>.05<br />

0.00<br />

18.82<br />

32.03<br />

0.41<br />

1.51<br />

0.05<br />

1.74<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.06<br />

0.00<br />

8.75<br />

5.19<br />

0.00<br />

0.00<br />

6.57<br />

1.45<br />

1.68<br />

0.42<br />

6.36<br />

6.47<br />

0.00<br />

0.94<br />

0.48<br />

0.00<br />

0.30<br />

9.05<br />

8.98<br />

5.86<br />

0.00<br />

12.21<br />

20.35<br />

1.98<br />

2.76<br />

1.29<br />

1.16<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.00<br />

15.49<br />

4.26<br />

0.00<br />

0.00<br />

3.56<br />

21.29<br />

1.20<br />

0.03<br />

1.64<br />

0.19<br />

0.00<br />

0.08<br />

0.16<br />

0.00<br />

0.<strong>10</strong><br />

0.26<br />

17.64<br />

22.56<br />

0.00<br />

20.32<br />

8.06<br />

3.05<br />

4.03<br />

3.38<br />

4.13<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

18.89<br />

4.42<br />

0.00<br />

0.00<br />

17.47<br />

4.30<br />

1.12<br />

0.60<br />

0.55<br />

0.00<br />

0.00<br />

0.00<br />

0.68<br />

0.00<br />

4.02<br />

0.00<br />

0.05<br />

0.25<br />

0.00<br />

0.00<br />

<strong>10</strong>.81<br />

0.16<br />

0.08<br />

2.74<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.21<br />

0.00<br />

49.38<br />

17.26<br />

0.00<br />

0.00<br />

31.86<br />

27.09<br />

6.90<br />

1.<strong>10</strong><br />

27.13<br />

6.67<br />

0.00<br />

3.16<br />

4.17<br />

0.00<br />

4.50<br />

9.46<br />

62.<strong>14</strong><br />

49.06<br />

0.00<br />

63.68<br />

99.26<br />

7.45<br />

11.62<br />

7.63<br />

<strong>10</strong>.35<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Manhattan<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

E. System Replacements<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

5.42<br />

0.64<br />

3.56<br />

0.09<br />

0.00<br />

0.00<br />

0.79<br />

1.06<br />

0.00<br />

0.00<br />

0.47<br />

1.70<br />

2.04<br />

1.31<br />

0.60<br />

0.00<br />

0.00<br />

0.63<br />

0.19<br />

0.00<br />

0.00<br />

1.83<br />

1.35<br />

0.22<br />

0.66<br />

0.06<br />

0.00<br />

0.00<br />

4.42<br />

4.50<br />

0.00<br />

0.00<br />

0.25<br />

2.57<br />

0.88<br />

0.57<br />

0.01<br />

0.00<br />

0.00<br />

3.65<br />

4.53<br />

0.00<br />

0.00<br />

0.09<br />

I. State of Good Repair Total:<br />

1.24<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.32<br />

2.37<br />

0.00<br />

0.00<br />

0.46<br />

<strong>10</strong>5.28 115.22 113.80 <strong>14</strong>3.75 70.54<br />

81.07<br />

0.01<br />

0.00<br />

1.43<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

9.67<br />

0.01<br />

0.00<br />

1.21<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

75.78<br />

0.01<br />

0.00<br />

3.18<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

95.15<br />

0.00<br />

0.00<br />

0.87<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

25.79<br />

0.00<br />

0.00<br />

8.98<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

12.29<br />

3.78<br />

6.09<br />

0.76<br />

0.00<br />

0.00<br />

9.80<br />

12.66<br />

0.00<br />

0.00<br />

3.11<br />

548.58<br />

287.46<br />

0.03<br />

0.00<br />

15.67<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Manhattan<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

II. System Expansion<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

39.50<br />

28.63<br />

0.00<br />

23.32<br />

0.00<br />

46.50<br />

5.85<br />

0.00<br />

8.97<br />

0.00<br />

13.24<br />

133.20<br />

0.00<br />

3.83<br />

0.00<br />

21.<strong>10</strong><br />

30.01<br />

0.00<br />

2.49<br />

0.00<br />

II. System Expansion Total:<br />

4.00<br />

38.87<br />

0.00<br />

73.87<br />

0.00<br />

173.97 72.20 229.24 <strong>14</strong>9.63 151.51<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

0.82<br />

0.00<br />

0.00<br />

0.00<br />

III. Educational Enhancements Total:<br />

0.86<br />

0.00<br />

0.00<br />

0.00<br />

0.33<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.82 0.86 0.33 0.02 0.00<br />

0.00<br />

0.00<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

V. Ancillary Facilities Total:<br />

124.34<br />

236.57<br />

0.00<br />

112.49<br />

0.00<br />

776.56<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

2.02<br />

0.00<br />

0.00<br />

0.00<br />

2.02<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Manhattan<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

Yearly Totals for Manhattan<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

3.69<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

4.81<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

3.08<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

11.45<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

2.79<br />

0.00<br />

3.69 4.81 3.08 11.45 2.79<br />

VI. Emergency, Unspecified and Misc. Total:<br />

283.76 193.09 346.44 304.86 224.84<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

25.82<br />

0.00<br />

25.82<br />

Manhattan Grand Total: $1,352.99


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Manhattan<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

L 02 DSF0000709405 PROJECT #5 98 May-13 Jun-<strong>14</strong> Jul-15 9.68<br />

0.00 8.31 1.37<br />

* 02 DSF0000687090 P.S. 59 (MEETH) 374 May-09 Nov-<strong>10</strong> Sep-12 0.00<br />

0.00 0.00 0.00<br />

* 02 DSF0000687092 PS/IS 281 640 Apr-09 Jul-<strong>10</strong> Jul-13 <strong>10</strong>7.90 33.36 74.54 0.00<br />

02<br />

DSF00004243<strong>14</strong><br />

Needed to<br />

Complete<br />

PROJECT #4 806 May-<strong>14</strong> Aug-15 Mar-18 <strong>10</strong>9.24<br />

0.08 2.02 <strong>10</strong>7.<strong>14</strong><br />

* 02 DSF0000688179 P.S. 51 321 Mar-09 Jul-<strong>10</strong> Jul-13 38.16<br />

0.27 37.90 0.00<br />

* 02 DSF0000687091 P.S. 340 518 Jun-<strong>10</strong> Jul-12 May-<strong>14</strong> 112.97 63.28 49.69 0.00<br />

* 02 DSF0000417357 P.S. 343 712 Nov-11 Mar-13 Aug-15 77.<strong>10</strong><br />

0.00 71.42 5.68<br />

* L 02 DSF0000709406 P.S. 816 126 Jun-11 Jun-12 Sep-12 3.62<br />

0.00 3.62 0.00<br />

* 02 DSF00007<strong>10</strong>937 I.S/H.S. 868 307 Aug-11 Jun-12 Apr-15 52.50<br />

0.01 49.56 2.93<br />

* 03 DSF0000730952 P.S./I.S. 342 (RIVERSIDE CENTER) 692 Apr-11 Jul-<strong>14</strong> Sep-16 62.77<br />

0.00 4.65 58.13<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Replacement Projects<br />

Borough of Manhattan<br />

(in millions)<br />

Actual /<br />

Funding<br />

Forecast Design Constr Est. Total Est. Previous Req'd Needed to<br />

District Project # School<br />

Capacity Start Start Compl Cost Appropriations FY<strong>10</strong>-<strong>14</strong> Complete<br />

* 02 DSF00007<strong>10</strong>937 MANHATTAN HIGH SCHOOL<br />

Replacement Aug-11 Jun-12 Apr-15 72.85 0.01 68.76 4.07<br />

* 02 DSF0000688179 P.S. 51<br />

Replacement Mar-09 Jul-<strong>10</strong> Jul-13 39.22 0.28 38.94 0.00<br />

* L 02 DSF00007<strong>10</strong>330 I.S. 260 Replacement Apr-<strong>10</strong> Jul-<strong>10</strong> Sep-<strong>10</strong> 6.58 0.00 6.58 0.00<br />

* L 78M DSF0000622556 BROADWAY EDUCATION CAMPUS Replacement Jun-09 Jun-<strong>10</strong> Jun-11 30.01 0.15 29.87 0.00<br />

* 78M DSF00007<strong>10</strong>361 BEACON HIGH SCHOOL<br />

Replacement Feb-11 Jun-12 May-15 167.38 0.00 157.15 <strong>10</strong>.23<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

01 P.S. 15 - Manhattan<br />

DSF0000739189 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

01 N.E.S.T (OLD J22) - Manhattan<br />

01 P.S. 34 - Manhattan<br />

01 J.H.S. 56 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

1,<strong>14</strong>0,684<br />

P.S. 15 - Manhattan Total: $1,<strong>14</strong>0,684<br />

DSF0000622567 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

1,130,084<br />

N.E.S.T (OLD J22) - Manhattan Total: $1,130,084<br />

DSF0000673138 Safety and Security - Safety and Security - Safety Systems<br />

2012<br />

EXTERIOR:Doors:Doors and Frames<br />

255,153<br />

P.S. 34 - Manhattan Total: $255,153<br />

DSF0000754297 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

DSF0000775532 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775533 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

28,419<br />

<strong>10</strong>4,000<br />

<strong>10</strong>4,000


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

01 J.H.S. 60 - Manhattan<br />

01 P.S. 61 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

J.H.S. 56 - Manhattan Total: $236,419<br />

DSF0000673490 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

672,356<br />

J.H.S. 60 - Manhattan Total: $672,356<br />

DSF0000545299 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000673505 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000718472 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000718473 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000718482 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

DSF0000752926 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753096 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

175,520<br />

50,632<br />

1,507,511<br />

2,213,915<br />

1,440,989<br />

4,911,588<br />

132,754


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

01 P.S. 63 - Manhattan<br />

01 P.S. 1<strong>10</strong> - Manhattan<br />

01 P.S. 137 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000762665 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000775645 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

1,204,819<br />

684,932<br />

P.S. 61 - Manhattan Total: $12,322,660<br />

DSF0000687192 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

DSF0000739730 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

21,193<br />

3,169,361<br />

P.S. 63 - Manhattan Total: $3,190,554<br />

DSF0000673933 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000740<strong>14</strong>8 State of Good Repair - System Replacements - Floors<br />

2013<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

796,554<br />

520,623<br />

P.S. 1<strong>10</strong> - Manhattan Total: $1,317,177<br />

DSF0000674324 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

1,179,981


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

01 P.S. <strong>14</strong>2 - Manhattan<br />

01 P.S. 188 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000689648 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

411,006<br />

P.S. 137 - Manhattan Total: $1,590,987<br />

DSF0000674360 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Elevators<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000674369 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

TOILET ROOM - STUDENT:Lighting:Lighting Fixture - Fluorescent<br />

451,848<br />

2,734,862<br />

P.S. <strong>14</strong>2 - Manhattan Total: $3,186,7<strong>10</strong><br />

DSF0000674823 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

DSF00006986<strong>10</strong> State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

DSF0000698611 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF00007<strong>10</strong>074 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF00007<strong>10</strong>087 State of Good Repair - System Replacements - Roofs<br />

2011<br />

5,052,086<br />

2,084,700<br />

5,319,519<br />

186,<strong>14</strong>4<br />

2,696,689


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 P.S. 1 - Manhattan<br />

02 P.S. 3 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000719807 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

1,297,729<br />

P.S. 188 - Manhattan Total: $16,636,867<br />

DSF0000672745 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000753069 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000761938 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

DSF0000775641 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

2,544,374<br />

536,416<br />

1,204,819<br />

684,932<br />

P.S. 1 - Manhattan Total: $4,970,541<br />

DSF0000672778 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000672785 State of Good Repair - Building Upgrade - Interior Spaces<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Ceiling<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Door(s)<br />

2,967,945<br />

1,916,518


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 P.S. 6 - Manhattan<br />

02 P.S. 11 - Manhattan<br />

02 I.S. 17 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Wall<br />

INTERIOR:Stairs: Interior<br />

DSF0000717792 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000739021 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000739022 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000755256 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

953,452<br />

4,480,849<br />

217,227<br />

121,083<br />

P.S. 3 - Manhattan Total: $<strong>10</strong>,657,073<br />

DSF0000762022 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 6 - Manhattan Total: $684,932<br />

DSF0000762<strong>10</strong>5 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 11 - Manhattan Total: $1,204,819


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 P.S. 40 - Manhattan<br />

02 P.S. 41 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000672961 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000688164 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

550,033<br />

1,833,747<br />

I.S. 17 - Manhattan Total: $2,383,779<br />

DSF0000718155 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000718157 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000718159 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF000073<strong>14</strong>53 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

258,576<br />

727,469<br />

3,338,780<br />

951,342<br />

P.S. 40 - Manhattan Total: $5,276,167<br />

DSF0000697084 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000697093 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2011<br />

INTERIOR:Auditorium:Ceiling<br />

1,407,190<br />

341,574


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF00007<strong>10</strong>358 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000739412 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

SCA0000008767 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

02 J.H.S. 47 (SCH FOR THE DEAF) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

1,255,909<br />

1,061,198<br />

1,723,773<br />

P.S. 41 - Manhattan Total: $5,789,645<br />

DSF00006733<strong>10</strong> State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Dumbwaiters<br />

CONVEYING:Elevators<br />

INTERCOM SYSTEM:Elevator<br />

DSF00007<strong>10</strong>075 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF00007<strong>10</strong>090 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Accessibility<br />

DSF0000739531 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

1,088,<strong>14</strong>9<br />

220,026<br />

44,224<br />

1,034,453


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 I.S. 70 - Manhattan<br />

02 I.S. <strong>10</strong>4 - Manhattan<br />

02 P.S. 111 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

J.H.S. 47 (SCH FOR THE DEAF) - Manhattan Total: $2,386,852<br />

DSF0000417541 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000417543 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:ROOFING:ROOFING<br />

DSF0000417545 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:WINDOWS<br />

DSF0000544281 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:PARAPETS<br />

4,630,595<br />

1,657,544<br />

2,949,000<br />

2,808,117<br />

I.S. 70 - Manhattan Total: $12,045,256<br />

DSF0000718882 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

831,417<br />

I.S. <strong>10</strong>4 - Manhattan Total: $831,417


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 P.S. 116 - Manhattan<br />

02 P.S. 124 (ECF) - Manhattan<br />

02 P.S. 130 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000673949 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

DSF0000718925 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

329,421<br />

990,506<br />

P.S. 111 - Manhattan Total: $1,319,928<br />

DSF0000775600 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

3,6<strong>14</strong>,458<br />

P.S. 116 - Manhattan Total: $3,6<strong>14</strong>,458<br />

DSF0000697962 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000697963 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

488,628<br />

1,311,582<br />

P.S. 124 (ECF) - Manhattan Total: $1,800,209<br />

DSF0000753044 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2013<br />

CONVEYING:ELEVATORS<br />

428,098


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 I.S. 131 - Manhattan<br />

02 I.S. 167 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

SCA00000<strong>10</strong>431 State of Good Repair - System Replacements - Windows<br />

2011<br />

1,537,742<br />

P.S. 130 - Manhattan Total: $1,965,840<br />

DSF00007<strong>10</strong>273 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000740430 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000740431 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000763412 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000763413 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

528,767<br />

5,201,134<br />

861,624<br />

957,019<br />

1,959,182<br />

I.S. 131 - Manhattan Total: $9,507,726<br />

DSF0000740873 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

327,471


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

02 P.S. 198 - Manhattan<br />

02 P.S./I.S. 217 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000763838 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

I.S. 167 - Manhattan Total: $1,012,402<br />

DSF0000741188 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

Waste System<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SEWAGE / WASTE PIPING<br />

DSF0000752399 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000764<strong>14</strong>0 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000775602 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

881,625<br />

528,201<br />

821,918<br />

3,6<strong>14</strong>,458<br />

P.S. 198 - Manhattan Total: $5,846,202<br />

DSF0000675115 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000675116 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000675117 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

1,788,347<br />

3,857,875<br />

2,034,528


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>071 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

02 SCHL OF THE FUTURE (OLD BACON) - Manhattan<br />

03 I.S. 44 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

1,796,744<br />

P.S./I.S. 217 - Manhattan Total: $9,477,494<br />

DSF00006<strong>10</strong>077 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF00006<strong>10</strong>078 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000675733 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000699450 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000741897 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

243,943<br />

2,516,003<br />

748,861<br />

1,603,241<br />

1,<strong>14</strong>0,684<br />

SCHL OF THE FUTURE (OLD BACON) - Manhattan Total: $6,252,732<br />

DSF0000739460 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

1,<strong>14</strong>0,684


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 P.S. 75 - Manhattan<br />

03 P.S. 84 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

I.S. 44 - Manhattan Total: $1,<strong>14</strong>0,684<br />

DSF0000607945 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000739818 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752897 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000775607 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

DSF0000775608 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

99,457<br />

1,428,765<br />

517,9<strong>14</strong><br />

821,918<br />

821,918<br />

P.S. 75 - Manhattan Total: $3,689,972<br />

DSF0000673699 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

912,347


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 I.S. 88 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

P.S. 84 - Manhattan Total: $912,347<br />

DSF0000673740 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000753151 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Library Upgrades<br />

INTERIOR:LIBRARY:Ceiling<br />

INTERIOR:LIBRARY:Floor Finish<br />

INTERIOR:LIBRARY:Walls<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

DSF0000754247 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

DSF0000755258 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000775788 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>14</strong><br />

Technology<br />

1,180,368<br />

544,346<br />

420,838<br />

266,841<br />

<strong>10</strong>2,740


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 P.S. 241 - Manhattan<br />

03 I.S. 118 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

I.S. 88 - Manhattan Total: $2,515,132<br />

DSF0000406612 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000718946 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF000073<strong>10</strong>99 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

HEATING PLANT:BOILER AUXILIARIES<br />

DSF0000740181 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Electrical Systems<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

571,447<br />

821,918<br />

3,6<strong>14</strong>,458<br />

1,225,946<br />

P.S. 241 - Manhattan Total: $6,233,768<br />

DSF0000688278 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

INTERIOR:Structural:Roof Structure<br />

701,851<br />

I.S. 118 - Manhattan Total: $701,851


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 P.S. 242 (OLD P<strong>14</strong>4) - Manhattan<br />

03 P.S. <strong>14</strong>5 - Manhattan<br />

DSF0000674404 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

DSF0000719382 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000719383 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

290,352<br />

1,412,878<br />

1,159,279<br />

P.S. 242 (OLD P<strong>14</strong>4) - Manhattan Total: $2,862,5<strong>10</strong><br />

DSF0000775605 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

DSF0000775606 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

03 P.S. <strong>14</strong>9 (TANDEM M207) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

3,6<strong>14</strong>,458<br />

821,918<br />

P.S. <strong>14</strong>5 - Manhattan Total: $4,436,376<br />

DSF0000731388 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

DSF0000731389 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

DSF0000775557 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

3,113,532<br />

1,306,185<br />

60,357<br />

P.S. <strong>14</strong>9 (TANDEM M207) - Manhattan Total: $4,480,074


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 P.S. 165 - Manhattan<br />

03 P.S. 166 - Manhattan<br />

03 P.S. 180 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000698440 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000719616 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000719618 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000719619 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

1,426,587<br />

765,538<br />

157,224<br />

481,716<br />

P.S. 165 - Manhattan Total: $2,831,066<br />

DSF0000740854 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

DSF0000752875 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

318,676<br />

1,<strong>14</strong>0,684<br />

P.S. 166 - Manhattan Total: $1,459,360<br />

DSF0000740976 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000763951 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

2,416,<strong>14</strong>7<br />

1,201,674<br />

P.S. 180 - Manhattan Total: $3,617,821


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

03 P.S. 191 - Manhattan<br />

03 P.S. 199 - Manhattan<br />

DSF0000719858 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000719859 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753<strong>14</strong>0 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

1,363,124<br />

5,715,330<br />

773,196<br />

P.S. 191 - Manhattan Total: $7,851,650<br />

DSF0000741194 Reinforcing Cinder Concrete Slabs<br />

2013<br />

INTERIOR:STRUCTURAL:FLOOR STRUCTURE<br />

DSF0000754296 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

03 P.S. 208 (TANDEM M185) - Manhattan<br />

04 P.S. 7 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

313,355<br />

36,035<br />

P.S. 199 - Manhattan Total: $349,389<br />

DSF0000775534 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

52,000<br />

P.S. 208 (TANDEM M185) - Manhattan Total: $52,000


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

04 I.S. 13 - Manhattan<br />

04 I.S. 45 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000731398 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000752344 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752345 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

126,644<br />

3,309,187<br />

2,291,361<br />

P.S. 7 - Manhattan Total: $5,727,193<br />

DSF0000739182 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000775535 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775536 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

789,516<br />

52,000<br />

52,000<br />

I.S. 13 - Manhattan Total: $893,516<br />

DSF0000673270 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000673271 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000673272 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

506,227<br />

1,283,336<br />

5,516,158


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000718256 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

INTERIOR:AUDITORIUM:Window Curtains/Shades/Blinds<br />

DSF0000775537 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775538 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

04 P.S. 50 (UDC & ECF) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

Technology<br />

984,860<br />

<strong>14</strong>6,000<br />

<strong>10</strong>4,000<br />

I.S. 45 - Manhattan Total: $8,540,580<br />

DSF0000622650 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

2,816,300


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

04 P.S. 83 - Manhattan<br />

04 P.S. 96 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Fuel Systems<br />

DSF0000673342 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000673352 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000739575 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>14</strong><br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

1,277,094<br />

615,235<br />

346,531<br />

P.S. 50 (UDC & ECF) - Manhattan Total: $5,055,161<br />

DSF0000739877 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

1,<strong>14</strong>0,684<br />

P.S. 83 - Manhattan Total: $1,<strong>14</strong>0,684<br />

DSF0000673794 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Playgrounds:Pavement<br />

DSF0000673796 State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

1,115,951<br />

734,721


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

04 I.S. 99 - Manhattan<br />

04 P.S. <strong>10</strong>1 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

P.S. 96 - Manhattan Total: $1,850,671<br />

DSF000073<strong>14</strong>15 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000740042 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

SCA0000018233 State of Good Repair - System Replacements - Parapets<br />

2013<br />

SCA00000183<strong>14</strong> State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

197,955<br />

1,242,603<br />

4,059,004<br />

812,567<br />

I.S. 99 - Manhattan Total: $6,312,129<br />

DSF00007<strong>10</strong>205 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Electrical Systems<br />

DSF0000731352 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF000073<strong>14</strong>03 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000752346 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752347 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

543,195<br />

TBD<br />

51,624<br />

4,134,811<br />

116,307


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000753<strong>14</strong>8 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000775539 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775540 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

04 P.S. 112 (TANDEM M206) - Manhattan<br />

04 J.H.S. 117 - Manhattan<br />

Technology<br />

130,292<br />

52,000<br />

92,640<br />

P.S. <strong>10</strong>1 - Manhattan Total: $5,120,868<br />

DSF00007<strong>10</strong>098 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

DSF00007<strong>10</strong>099 State of Good Repair - System Replacements - Roofs<br />

2011<br />

DSF00007<strong>10</strong><strong>10</strong>0 State of Good Repair - System Replacements - Parapets<br />

2011<br />

DSF0000752352 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

891,645<br />

653,011<br />

151,745<br />

884,248<br />

P.S. 112 (TANDEM M206) - Manhattan Total: $2,580,649<br />

DSF0000752858 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

04 P.S. 38 (OLD M121) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

261,507<br />

J.H.S. 117 - Manhattan Total: $261,507


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

04 P.S. <strong>14</strong>6 - Manhattan<br />

04 P.S. 155 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000740282 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

1,097,<strong>14</strong>7<br />

P.S. 38 (OLD M121) - Manhattan Total: $1,097,<strong>14</strong>7<br />

DSF0000752350 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752351 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

2,806,461<br />

584,083<br />

P.S. <strong>14</strong>6 - Manhattan Total: $3,390,543<br />

DSF0000674535 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000674537 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000674538 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

529,353<br />

1,563,351<br />

691,384


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

04 P.S. 171 - Manhattan<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

P.S. 155 - Manhattan Total: $2,784,088<br />

DSF0000609055 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

04 P.S. 206 (TANDEM M112) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

1,026,631<br />

P.S. 171 - Manhattan Total: $1,026,631<br />

DSF0000698795 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000698798 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000698799 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000698800 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000698805 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

400,125<br />

2,644,212<br />

561,227<br />

1,546,217<br />

333,475


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 I.S. <strong>10</strong> (TANDEM M200) - Manhattan<br />

05 P.S. 30 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

SITE:Sidewalks<br />

P.S. 206 (TANDEM M112) - Manhattan Total: $5,485,256<br />

DSF0000607188 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000775642 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

<strong>10</strong>,350,162<br />

684,932<br />

I.S. <strong>10</strong> (TANDEM M200) - Manhattan Total: $11,035,093<br />

DSF0000696989 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF0000718084 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Incandescent<br />

DSF0000731353 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

DSF0000731354 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

DSF0000739324 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

487,827<br />

TBD<br />

TBD<br />

TBD<br />

446,658


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 36 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DOMESTIC WATER SYSTEM<br />

DSF0000775541 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

52,000<br />

P.S. 30 - Manhattan Total: $986,486<br />

DSF0000673<strong>14</strong>3 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:Elevators<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000673<strong>14</strong>5 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000673<strong>14</strong>6 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>10</strong><br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

INTERIOR:Structural:Roof Structure<br />

DSF0000673<strong>14</strong>7 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000673<strong>14</strong>8 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000673<strong>14</strong>9 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Soffits<br />

512,689<br />

1,033,986<br />

1,544,047<br />

1,555,739<br />

1,935,641<br />

2,987,526


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 I.S. 172 (OLD 43) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000718132 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752394 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

449,905<br />

905,800<br />

P.S. 36 - Manhattan Total: $<strong>10</strong>,925,333<br />

DSF0000607552 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

DSF0000688317 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF00007<strong>10</strong>357 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000718218 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

DSF0000739453 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>14</strong><br />

1,492,224<br />

1,<strong>10</strong>7,258<br />

71,599<br />

<strong>10</strong>3,113<br />

982,163


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 46 - Manhattan<br />

05 P.S. 92 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:SCOREBOARD<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

I.S. 172 (OLD 43) - Manhattan Total: $3,756,358<br />

DSF0000775644 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 46 - Manhattan Total: $684,932<br />

DSF0000673768 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:ELEVATORS<br />

CONVEYING:SIDEWALK ELEVATOR<br />

INTERCOM SYSTEM:ELEVATOR<br />

DSF0000697635 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000730942 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:WINDOWS<br />

DSF0000731386 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

DSF0000739964 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

857,571<br />

2,398,719<br />

723,134<br />

2,976,353<br />

441,120


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 123 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000752821 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000775542 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

1,798,137<br />

<strong>10</strong>4,000<br />

P.S. 92 - Manhattan Total: $9,299,034<br />

DSF0000740294 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000740297 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Electrical Systems<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000752348 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752349 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

DSF0000763274 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

2,007,476<br />

200,669<br />

3,564,847<br />

1,450,572<br />

671,388


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 125 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000763275 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

374,136<br />

P.S. 123 - Manhattan Total: $8,269,087<br />

DSF0000697981 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

2011<br />

Electrical Systems<br />

DSF00007<strong>10</strong>019 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

2011<br />

Room Conversions/Partitioning<br />

DSF00007<strong>10</strong>022 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

2011<br />

Science Lab Upgrades<br />

DSF0000731<strong>14</strong>8 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

2012<br />

Room Conversions/Partitioning<br />

DSF0000731205 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

2012<br />

Science Lab Upgrades<br />

DSF0000753050 Educational Enhancements - Educational Enhancements - Charter/Innovative Schools<br />

20<strong>14</strong><br />

Toilets-Students<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

183,070<br />

29,940<br />

3,426,338<br />

138,285<br />

98,159<br />

1,559,165<br />

P.S. 125 - Manhattan Total: $5,434,957


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 133 - Manhattan<br />

05 P.S. 154 - Manhattan<br />

05 P.S. 161 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000763455 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 133 - Manhattan Total: $1,204,819<br />

DSF0000608871 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

3,459,944<br />

P.S. 154 - Manhattan Total: $3,459,944<br />

DSF0000674583 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Retaining Walls<br />

DSF00007<strong>10</strong>242 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>253 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000740786 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

1,098,525<br />

2,293,690<br />

1,211,1<strong>10</strong><br />

1,295,639


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 I.S. 195 (ECF) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

P.S. 161 - Manhattan Total: $5,898,965<br />

DSF0000622651 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000674938 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000688513 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000709438 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000731204 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000775543 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775544 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

3,093,861<br />

1,034,782<br />

1,493,471<br />

84,440<br />

162,792<br />

<strong>10</strong>4,000<br />

137,600<br />

I.S. 195 (ECF) - Manhattan Total: $6,1<strong>10</strong>,947


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

05 P.S. 197 - Manhattan<br />

06 P.S. 5 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000719942 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000719947 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000719948 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000741153 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

482,088<br />

876,401<br />

3,002,059<br />

762,2<strong>14</strong><br />

P.S. 197 - Manhattan Total: $5,122,762<br />

DSF00007178<strong>14</strong> Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000739054 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000739055 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

2,396,335<br />

2,759,568<br />

723,275


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 28 - Manhattan<br />

06 P.S. 48 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000739062 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

Ventilation<br />

VENTILATION:EXHAUST FAN<br />

562,273<br />

P.S. 5 - Manhattan Total: $6,441,451<br />

DSF0000718057 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF0000739298 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000739299 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000739300 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

638,497<br />

3,331,835<br />

869,521<br />

2,374,564<br />

P.S. 28 - Manhattan Total: $7,2<strong>14</strong>,416


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 I.S. 52 - Manhattan<br />

06 I.S. 90 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000673334 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000739543 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000739546 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

1,861,038<br />

1,056,407<br />

2,636,953<br />

P.S. 48 - Manhattan Total: $5,554,398<br />

DSF0000718360 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF0000718384 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2012<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

CAFETERIA:LOCAL SOUND SYSTEM<br />

INTERIOR:CAFETERIA:Floor Finish<br />

812,344<br />

366,801<br />

I.S. 52 - Manhattan Total: $1,179,<strong>14</strong>5<br />

DSF0000754254 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

<strong>10</strong>8,382


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 98 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

I.S. 90 - Manhattan Total: $<strong>10</strong>8,382<br />

DSF0000406479 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:PAVING - VEHICULAR AREA<br />

DSF0000740030 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000740031 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

DSF0000763012 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000763013 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF00007630<strong>14</strong> State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

1,609,460<br />

2,073,774<br />

668,<strong>10</strong>9<br />

504,086<br />

429,443<br />

223,456<br />

P.S. 98 - Manhattan Total: $5,508,327


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 115 - Manhattan<br />

06 P.S. 128 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000697848 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000718972 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000718973 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:PARAPETS<br />

DSF0000740202 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Electrical Systems<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000775789 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

2,574,821<br />

1,094,745<br />

293,643<br />

195,621<br />

200,000<br />

P.S. 115 - Manhattan Total: $4,358,829<br />

DSF0000740368 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000740370 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000763346 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

<strong>10</strong>3,034<br />

4,345,945<br />

821,918


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 132 - Manhattan<br />

06 I.S. <strong>14</strong>3 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000775601 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

3,6<strong>14</strong>,458<br />

P.S. 128 - Manhattan Total: $8,885,354<br />

DSF0000687201 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000740450 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

21,634<br />

1,<strong>14</strong>0,684<br />

P.S. 132 - Manhattan Total: $1,162,318<br />

DSF0000674385 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000674387 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000674388 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Stair Railings<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

354,439<br />

2,393,154<br />

2,185,008


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 152 - Manhattan<br />

06 I.S. 164 - Manhattan<br />

06 P.S. 173 - Manhattan<br />

06 P.S. 178 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DSF0000687202 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

20,572<br />

I.S. <strong>14</strong>3 - Manhattan Total: $4,953,174<br />

DSF0000740683 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

1,<strong>14</strong>0,684<br />

P.S. 152 - Manhattan Total: $1,<strong>14</strong>0,684<br />

DSF0000719602 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

917,851<br />

I.S. 164 - Manhattan Total: $917,851<br />

DSF0000698522 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

604,993<br />

P.S. 173 - Manhattan Total: $604,993<br />

DSF0000751883 State of Good Repair - System Replacements - Roofs<br />

2013<br />

1,980,636


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 P.S. 189 - Manhattan<br />

06 P.S. 192 - Manhattan<br />

06 I.S. 218 - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Roofing<br />

P.S. 178 - Manhattan Total: $1,980,636<br />

DSF0000752877 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,<strong>14</strong>0,684<br />

P.S. 189 - Manhattan Total: $1,<strong>14</strong>0,684<br />

DSF000074<strong>10</strong>85 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

SCA0000019313 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

806,863<br />

2,207,135<br />

P.S. 192 - Manhattan Total: $3,013,998<br />

DSF0000675053 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000675054 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF00007<strong>10</strong>084 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

322,780<br />

1,983,175<br />

157,744


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

06 ALTERNATIVE LEARNING CENTER - Manhattan<br />

06 I.S. 528 - Manhattan<br />

I.S. 218 - Manhattan Total: $2,463,698<br />

DSF0000407643 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

912,461<br />

ALTERNATIVE LEARNING CENTER - Manhattan Total: $912,461<br />

DSF0000720463 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000720465 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

DSF0000741684 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000741685 State of Good Repair - System Replacements - Parapets<br />

2012<br />

75M P.S. 35 (OLD 58/MNHT HS) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:PARAPETS<br />

233,612<br />

7<strong>14</strong>,924<br />

832,279<br />

315,184<br />

I.S. 528 - Manhattan Total: $2,095,999<br />

DSF0000718439 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000739673 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

1,530,374<br />

865,978


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000762628 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000762631 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

75M P.S. 79 (MULT. HANDICAP) - Manhattan<br />

EXTERIOR:EXTERIOR WALLS<br />

1,701,043<br />

155,485<br />

P.S. 35 (OLD 58/MNHT HS) - Manhattan Total: $4,252,879<br />

DSF0000718621 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000739850 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000739852 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000739858 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

75M P.S. 751 (CAR.DEV/OLD 25) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

947,068<br />

887,046<br />

1,222,548<br />

212,753<br />

P.S. 79 (MULT. HANDICAP) - Manhattan Total: $3,269,415<br />

DSF0000675768 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000675773 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2011<br />

INTERIOR:Library:Floor Finish<br />

573,586<br />

907,168


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

DSF0000720683 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000720691 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2012<br />

75M P.S. 811 (OLD P<strong>14</strong>8/LIVINGS HS) - Manhattan<br />

999,728<br />

805,672<br />

P.S. 751 (CAR.DEV/OLD 25) - Manhattan Total: $3,286,156<br />

DSF0000622225 Safety and Security - Safety and Security - Code Compliance<br />

2011<br />

DSF0000687352 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

75M P.S. 138 ANNEX (OLD M047 AX) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

2,636,361<br />

<strong>10</strong>8,406<br />

P.S. 811 (OLD P<strong>14</strong>8/LIVINGS HS) - Manhattan Total: $2,744,768<br />

DSF0000675917 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000675921 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000675922 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000675923 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

305,434<br />

1,357,155<br />

1,281,367<br />

7,996,115


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Exterior Walls<br />

78M RICHARD R GREEN HS OF TEACHING - Manhattan<br />

P.S. 138 ANNEX (OLD M047 AX) - Manhattan Total: $<strong>10</strong>,940,071<br />

DSF0000673567 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2011<br />

CAFETERIA/MULTIPURPOSE ROOM:Theater Lighting System:Theater Lighting<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Floor Finish<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Stage and Fixed Equipment:Stage<br />

DSF0000732425 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78M MID MAN ADULT LRNG CTR (81) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

1,188,184<br />

198,498<br />

RICHARD R GREEN HS OF TEACHING - Manhattan Total: $1,386,682<br />

DSF0000406326 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Ventilation<br />

MOTOR STARTER/CONTACTOR<br />

VENTILATION:DUCT - REGISTER/DIFFUSER<br />

VENTILATION:DUCTWORK, METAL<br />

VENTILATION:EXHAUST FANS<br />

VENTILATION:SUPPLY FAN<br />

DSF0000673666 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

5,052,209<br />

1,620,715


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78M I.S. 136 - Manhattan<br />

SWITCHBOARD<br />

MID MAN ADULT LRNG CTR (81) - Manhattan Total: $6,672,924<br />

DSF0000674308 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000698<strong>14</strong>1 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000698<strong>14</strong>2 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000698151 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

78M MANHTN CT FOR MATH & SCI. HS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

LIGHTING - EXTERIOR SECURITY<br />

6,716,226<br />

1,998,072<br />

362,276<br />

<strong>10</strong>7,128<br />

I.S. 136 - Manhattan Total: $9,183,701<br />

DSF0000675<strong>14</strong>1 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Retaining Walls<br />

DSF0000709434 State of Good Repair - Building Upgrade - Interior Spaces<br />

2011<br />

DSF0000720<strong>10</strong>3 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:SCOREBOARD<br />

INTERIOR:GYMNASIUM:Ceiling<br />

INTERIOR:GYMNASIUM:Door(s)<br />

2,2<strong>10</strong>,575<br />

1,159,922<br />

1,344,456


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

INTERIOR:GYMNASIUM:Fixed Equipment<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

INTERIOR:GYMNASIUM:Seating<br />

INTERIOR:GYMNASIUM:Walls<br />

DSF0000741305 Climate Control<br />

2013<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000752400 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000755234 Heating Plant Upgrade<br />

2013<br />

HEATING<br />

HEATING PLANT:BOILER AUXILIARIES<br />

HEATING PLANT:BOILER SYSTEM<br />

DSF0000764273 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000775751 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

78M BAYARD RUSTIN EDUCATIONAL COMP - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

1,894,881<br />

2,778,118<br />

1,564,878<br />

250,327<br />

844,723<br />

MANHTN CT FOR MATH & SCI. HS - Manhattan Total: $12,047,880<br />

DSF0000687197 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

44,224


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000709436 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000709440 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF00007<strong>10</strong>031 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Library Upgrades<br />

INTERIOR:Library:Built-in Furnishing<br />

INTERIOR:Library:Ceiling<br />

INTERIOR:Library:Door(s)<br />

INTERIOR:Library:Floor Finish<br />

INTERIOR:Library:Wall<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

DSF00007<strong>10</strong>076 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000731<strong>14</strong>7 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000752935 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78M SEWARD PARK HS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

Room Conversions/Partitioning<br />

518,946<br />

3,278,741<br />

2,137,180<br />

150,617<br />

640,284<br />

361,<strong>10</strong>2<br />

BAYARD RUSTIN EDUCATIONAL COMP - Manhattan Total: $7,131,094


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000675183 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

DSF0000675196 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2011<br />

INTERIOR:Cafeteria:Ceiling<br />

INTERIOR:Cafeteria:Floor Finish<br />

INTERIOR:Cafeteria:Wall<br />

DSF0000741344 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000741345 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000741354 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000755253 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000755254 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000755255 State of Good Repair - System Replacements - Roofs<br />

2013<br />

78M UNIVERSITY NEIGHBORHOOD - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

1,559,259<br />

1,213,088<br />

3,618,715<br />

9,660,440<br />

655,359<br />

183,961<br />

858,371<br />

1,769,297<br />

SEWARD PARK HS - Manhattan Total: $19,518,490<br />

DSF0000698968 State of Good Repair - System Replacements - Floors<br />

2011<br />

343,519


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000720164 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000720165 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000741361 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000741364 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000741366 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000752827 State of Good Repair - System Replacements - Roofs<br />

2012<br />

78M WASHINGTON IRVING HS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

2,183,922<br />

882,294<br />

1,<strong>14</strong>0,684<br />

1,096,770<br />

271,212<br />

667,652<br />

UNIVERSITY NEIGHBORHOOD - Manhattan Total: $6,586,052<br />

DSF0000675235 State of Good Repair - System Replacements - Domestic Piping<br />

2012<br />

1,450,151


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DOMESTIC WATER SYSTEM<br />

DSF0000675241 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Gymnasium:Flooring<br />

DSF0000687194 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000698989 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

DSF0000720204 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

INTERIOR:AUDITORIUM:Walls<br />

DSF0000730985 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Room Conversions/Partitioning<br />

DSF0000753068 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78M G. WASHINGTON HS EDUC. CAMPUS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

1,332,188<br />

41,115<br />

253,557<br />

1,407,291<br />

637,882<br />

552,709<br />

WASHINGTON IRVING HS - Manhattan Total: $5,674,892<br />

DSF0000675272 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

801,879


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78M LOUIS D. BRANDEIS HS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Doors:Lintels<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

G. WASHINGTON HS EDUC. CAMPUS - Manhattan Total: $801,879<br />

DSF0000720254 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

INTERIOR:GYMNASIUM:Seating<br />

INTERIOR:LOCKER ROOM<br />

DSF0000731138 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000731<strong>14</strong>0 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF000074<strong>14</strong>50 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Electrical Systems<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF000074<strong>14</strong>66 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Interior Spaces<br />

5,444,696<br />

60,878<br />

131,763<br />

413,125<br />

604,688


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Walls<br />

DSF0000752396 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000752516 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Technology<br />

DSF0000752844 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000752862 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Toilets-Students<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

DSF0000752936 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78M HEALTH PROFESSIONS HS (OL STY) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

381,<strong>14</strong>8<br />

774,000<br />

187,337<br />

3,654,055<br />

492,735<br />

LOUIS D. BRANDEIS HS - Manhattan Total: $12,<strong>14</strong>4,425<br />

DSF0000675322 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Cafeteria:Ceiling<br />

INTERIOR:Cafeteria:Floor Finish<br />

460,921


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000720265 State of Good Repair - System Replacements - Floors<br />

2013<br />

78M STUYVESANT HS (NEW) - Manhattan<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

2,002,134<br />

HEALTH PROFESSIONS HS (OL STY) - Manhattan Total: $2,463,054<br />

DSF0000675329 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000675331 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000689642 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

DSF0000699080 State of Good Repair - Rehabilitation of Physical Education Facilities - Swimming Pools<br />

2012<br />

78M JULIA RICHMAN ED. COMPLEX - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Pools<br />

4,413,298<br />

4,497,127<br />

129,999<br />

3,001,642<br />

STUYVESANT HS (NEW) - Manhattan Total: $12,042,066<br />

DSF0000699094 State of Good Repair - Rehabilitation of Physical Education Facilities - Swimming Pools<br />

2012<br />

INTERIOR:LOCKER ROOM<br />

DSF00007<strong>10</strong>025 Safety and Security - Safety and Security - Code Compliance<br />

2011<br />

DSF0000720302 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

6,453,553<br />

77,986<br />

4,324,837


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78M FIORELLO LAGUARDIA HS - Manhattan<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

JULIA RICHMAN ED. COMPLEX - Manhattan Total: $<strong>10</strong>,856,376<br />

DSF0000609721 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000675371 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000741529 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

78M MARTIN LUTHER KING, JR. HS - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

6,509,917<br />

3,855,999<br />

1,<strong>14</strong>0,684<br />

FIORELLO LAGUARDIA HS - Manhattan Total: $11,506,600<br />

DSF0000407881 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

FUNCTIONAL AREAS:AUDITORIUM:STAGE LIGHTING/CONTROLS<br />

LIGHTING - STAGE THEATER<br />

DSF0000407883 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:DOORS:DOORS<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY<br />

1,281,476<br />

679,581


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78M PARK EAST HS - Manhattan<br />

DSF0000487764 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

Code Compliance<br />

DSF0000687154 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

Code Compliance<br />

2,030,654<br />

3,066,021<br />

MARTIN LUTHER KING, JR. HS - Manhattan Total: $7,057,732<br />

DSF0000699165 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000699166 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF00007<strong>10</strong>322 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

SCA0000008967 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

78M ARTHUR SCHOMBURG HS (IS 201) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

807,203<br />

1,071,007<br />

357,045<br />

1,202,374<br />

PARK EAST HS - Manhattan Total: $3,437,629<br />

DSF0000689644 State of Good Repair - System Replacements - Roofs<br />

2011<br />

DSF00007<strong>10</strong>272 State of Good Repair - System Replacements - Parapets<br />

2011<br />

5,639,256<br />

564,888


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000732423 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

78M MURRY BERGTRAUM HS (ECF) - Manhattan<br />

<strong>10</strong>6,112<br />

ARTHUR SCHOMBURG HS (IS 201) - Manhattan Total: $6,3<strong>10</strong>,256<br />

DSF0000687080 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

78M PARK WEST HS (ECF) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

252,4<strong>14</strong><br />

MURRY BERGTRAUM HS (ECF) - Manhattan Total: $252,4<strong>14</strong><br />

DSF0000687155 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Code Compliance<br />

DSF00007<strong>10</strong>960 Safety and Security - Safety and Security - Code Compliance<br />

2012<br />

DSF0000731151 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

DSF0000741699 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING PLANT:BOILER AUXILIARIES<br />

HEATING PLANT:BOILER SYSTEM<br />

HEATING PLANT:FUEL SYSTEMS<br />

DSF0000753034 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000753035 State of Good Repair - Building Upgrade - Air Conditioning Retrofit<br />

2012<br />

<strong>10</strong>,466,739<br />

5,341,3<strong>14</strong><br />

1,153,289<br />

1,240,215<br />

2,475,094<br />

6,668,812


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

SCA0000019673 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

78M FASHION INDUSTRIES VOC HS - Manhattan<br />

415,926<br />

PARK WEST HS (ECF) - Manhattan Total: $27,761,389<br />

DSF0000720511 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000741739 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000755246 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78M CHELSEA VOC HS - Manhattan<br />

7,025,878<br />

1,<strong>14</strong>0,684<br />

503,288<br />

FASHION INDUSTRIES VOC HS - Manhattan Total: $8,669,850<br />

DSF0000622566 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000775646 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

78M NORMAN THOMAS HS (ECF) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

DOMESTIC WATER SYSTEM<br />

241,240<br />

684,932<br />

CHELSEA VOC HS - Manhattan Total: $926,172<br />

DSF0000675621 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,818,164


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000731200 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

78M HS OF GRAPHIC COMMUNICATION ARTS - Manhattan<br />

432,980<br />

NORMAN THOMAS HS (ECF) - Manhattan Total: $2,251,<strong>14</strong>4<br />

DSF0000688265 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000709437 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF000073<strong>10</strong>13 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000752391 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78M CITY AS SCHOOL (OLD 95) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

Library Upgrades<br />

717,658<br />

635,003<br />

188,<strong>14</strong>0<br />

822,006<br />

HS OF GRAPHIC COMMUNICATION ARTS - Manhattan Total: $2,362,807<br />

DSF00006<strong>10</strong>019 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

2012<br />

INTERIOR:Structural:Floor Structure<br />

DSF00006<strong>10</strong>028 State of Good Repair - System Replacements - Floors<br />

2012<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000741840 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

501,389<br />

1,232,071<br />

552,098


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000752401 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

78M OLD MANHATTAN VOC/TECH HS - Manhattan<br />

188,206<br />

CITY AS SCHOOL (OLD 95) - Manhattan Total: $2,473,764<br />

DSF0000675704 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000675705 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000675706 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Cornice<br />

EXTERIOR:Exterior Walls<br />

DSF0000709490 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

78M SCL COOP TECH ED (MNH VOC HS) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

3,303,469<br />

2,473,248<br />

4,006,695<br />

1,273,826<br />

OLD MANHATTAN VOC/TECH HS - Manhattan Total: $11,057,239<br />

DSF0000675719 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000675720 State of Good Repair - System Replacements - Parapets<br />

2011<br />

1,433,979<br />

1,055,923


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Parapets<br />

DSF0000675721 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000675722 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

78M HS FOR ECONOMICS & FINANCE - Manhattan<br />

EXTERIOR:Exterior Walls<br />

3,474,872<br />

1,896,767<br />

SCL COOP TECH ED (MNH VOC HS) - Manhattan Total: $7,861,541<br />

DSF0000408231 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000675835 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

78M LEGACY HS FOR INTEGR. STUDIES - Manhattan<br />

INTERIOR:Auditorium:Fixed Seating<br />

1,134,931<br />

180,499<br />

HS FOR ECONOMICS & FINANCE - Manhattan Total: $1,315,430<br />

DSF0000709491 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

78M HARLEM RENAISSANCE HS (OLD M24) - Manhattan<br />

* Building scheduled for an Exterior Mod<br />

475,670<br />

LEGACY HS FOR INTEGR. STUDIES - Manhattan Total: $475,670<br />

DSF00006<strong>10</strong>443 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Auditorium:Stage<br />

594,<strong>10</strong>4<br />

HARLEM RENAISSANCE HS (OLD M24) - Manhattan Total: $594,<strong>10</strong>4


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Bronx<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

0.00<br />

0.00<br />

7.09<br />

0.19<br />

0.00<br />

1.91<br />

4.35<br />

0.00<br />

0.00<br />

8.62<br />

1.60<br />

3.13<br />

5.60<br />

7.98<br />

0.00<br />

0.00<br />

13.48<br />

0.94<br />

2.51<br />

6.79<br />

0.26<br />

16.50<br />

6.40<br />

0.00<br />

16.73<br />

22.78<br />

2.02<br />

13.29<br />

3.12<br />

1.08<br />

0.05<br />

0.00<br />

0.00<br />

1.35<br />

0.16<br />

0.00<br />

23.86<br />

16.64<br />

0.00<br />

0.00<br />

2.73<br />

0.17<br />

2.90<br />

0.64<br />

13.49<br />

0.00<br />

0.00<br />

3.05<br />

0.07<br />

4.62<br />

3.57<br />

0.15<br />

16.88<br />

6.63<br />

0.00<br />

16.36<br />

41.94<br />

0.42<br />

2.96<br />

0.31<br />

1.01<br />

0.06<br />

0.00<br />

0.00<br />

0.39<br />

0.11<br />

0.00<br />

22.49<br />

8.57<br />

0.00<br />

0.00<br />

5.50<br />

2.34<br />

1.03<br />

1.89<br />

<strong>10</strong>.05<br />

0.00<br />

0.00<br />

1.28<br />

0.19<br />

1.19<br />

1.43<br />

0.09<br />

11.24<br />

18.76<br />

0.00<br />

2.34<br />

22.89<br />

6.49<br />

4.81<br />

0.24<br />

1.73<br />

0.01<br />

0.00<br />

0.00<br />

0.11<br />

0.01<br />

0.00<br />

17.57<br />

3.41<br />

0.00<br />

0.00<br />

21.85<br />

13.08<br />

0.84<br />

1.01<br />

8.88<br />

0.37<br />

0.00<br />

1.04<br />

2.73<br />

0.<strong>10</strong><br />

2.<strong>14</strong><br />

0.03<br />

7.12<br />

8.42<br />

0.00<br />

3.71<br />

23.74<br />

2.80<br />

3.06<br />

3.59<br />

0.13<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

3.71<br />

1.21<br />

0.00<br />

0.00<br />

2.57<br />

18.00<br />

1.76<br />

0.00<br />

0.68<br />

0.00<br />

0.00<br />

0.01<br />

0.00<br />

0.00<br />

6.03<br />

0.00<br />

1.00<br />

0.98<br />

0.00<br />

0.08<br />

3.23<br />

0.11<br />

0.12<br />

2.20<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.93<br />

0.47<br />

0.00<br />

69.53<br />

34.18<br />

0.00<br />

0.00<br />

41.27<br />

35.20<br />

9.66<br />

9.<strong>14</strong><br />

41.08<br />

0.37<br />

0.00<br />

18.87<br />

3.92<br />

8.42<br />

19.96<br />

0.54<br />

52.75<br />

41.19<br />

0.00<br />

39.22<br />

1<strong>14</strong>.58<br />

11.84<br />

24.25<br />

9.47<br />

3.95<br />

0.12


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Bronx<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

E. System Replacements<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

2.94<br />

8.03<br />

3.26<br />

0.30<br />

0.00<br />

0.01<br />

1.47<br />

0.11<br />

0.00<br />

0.00<br />

0.74<br />

2.07<br />

2.29<br />

1.84<br />

0.38<br />

0.00<br />

0.00<br />

1.07<br />

0.24<br />

0.00<br />

0.00<br />

1.00<br />

1.32<br />

1.01<br />

2.41<br />

0.16<br />

0.00<br />

0.00<br />

1.20<br />

0.26<br />

0.00<br />

0.00<br />

1.08<br />

1.19<br />

0.16<br />

1.34<br />

0.01<br />

0.00<br />

0.00<br />

7.77<br />

2.28<br />

0.00<br />

0.00<br />

1.47<br />

I. State of Good Repair Total:<br />

1.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.03<br />

1.61<br />

0.00<br />

0.00<br />

0.18<br />

163.30 168.86 132.51 139.95 45.52<br />

135.50<br />

1.89<br />

0.00<br />

1.<strong>10</strong><br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

16.59<br />

2.<strong>14</strong><br />

0.00<br />

0.37<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

15.69<br />

1.03<br />

0.00<br />

0.22<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

23.01<br />

9.57<br />

0.00<br />

2.03<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

69.35<br />

<strong>10</strong>0.89<br />

0.00<br />

55.47<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.53<br />

11.48<br />

8.85<br />

0.84<br />

0.00<br />

0.02<br />

12.54<br />

4.49<br />

0.00<br />

0.00<br />

4.47<br />

650.13<br />

260.13<br />

115.51<br />

0.00<br />

59.19<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Bronx<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

II. System Expansion<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

1.44<br />

0.11<br />

0.00<br />

0.<strong>10</strong><br />

0.00<br />

6.92<br />

0.01<br />

0.00<br />

0.77<br />

0.00<br />

1.47<br />

0.00<br />

0.00<br />

15.13<br />

0.00<br />

<strong>10</strong>.00<br />

4.59<br />

0.00<br />

1.61<br />

0.00<br />

II. System Expansion Total:<br />

0.00<br />

51.66<br />

0.00<br />

36.38<br />

0.00<br />

<strong>14</strong>0.<strong>14</strong> 26.80 33.53 50.81 313.75<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

0.62<br />

0.00<br />

0.00<br />

0.00<br />

III. Educational Enhancements Total:<br />

1.16<br />

0.00<br />

0.00<br />

0.00<br />

0.19<br />

0.00<br />

0.00<br />

0.00<br />

0.57<br />

0.00<br />

0.00<br />

0.00<br />

0.05<br />

0.00<br />

0.00<br />

0.00<br />

0.62 1.16 0.19 0.57 0.05<br />

0.00<br />

0.00<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

V. Ancillary Facilities Total:<br />

19.83<br />

56.37<br />

0.00<br />

53.99<br />

0.00<br />

565.02<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

2.58<br />

0.00<br />

0.00<br />

0.00<br />

2.58<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Bronx<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

Yearly Totals for Bronx<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

4.97<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.12<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

5.50<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.74<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

3.47<br />

0.00<br />

4.97 8.12 5.50 8.74 3.47<br />

VI. Emergency, Unspecified and Misc. Total:<br />

309.03 204.94 171.72 200.06 362.78<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

30.80<br />

0.00<br />

30.80<br />

Bronx Grand Total: $1,248.54


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Bronx<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

L 08 DSF0000752870 PROJECT #2 350 Apr-13 Jun-<strong>14</strong> Jun-16 9.<strong>10</strong><br />

0.00 7.88 1.22<br />

08<br />

DSF0000752871<br />

Needed to<br />

Complete<br />

PROJECT #1 350 Apr-13 Jun-<strong>14</strong> Jun-16 25.89<br />

0.00 23.19 2.69<br />

* 09 DSF0000417427 IS 285 391 May-09 Jun-<strong>10</strong> May-13 54.47<br />

0.18 54.29 0.00<br />

* <strong>10</strong> DSF0000752872 P.S. 56 ADDITION 350 Oct-12 Oct-13 Jan-16 35.33<br />

0.00 31.50 3.84<br />

L <strong>10</strong> DSF0000709407 PROJECT #2 416 May-13 Jun-<strong>14</strong> Jul-16 37.71<br />

0.00 32.47 5.25<br />

* <strong>10</strong> DSF0000418128 PS/IS 177 640 Apr-09 Jun-<strong>10</strong> Mar-<strong>14</strong> 77.35<br />

8.02 69.33 0.00<br />

* 11 DSF0000752490 P.S. 96 ADDITION 408 May-12 Jul-13 Aug-15 43.36<br />

0.06 38.86 4.43<br />

* 11 DSF0000665736 P.S. <strong>10</strong>6 ADDITION 356 Jun-12 Jul-13 Sep-15 44.90<br />

0.04 40.21 4.65<br />

11<br />

DSF0000731123<br />

PROJECT #1 333 Apr-13 Jun-<strong>14</strong> Aug-16 41.35<br />

0.00 37.18 4.17<br />

* 11 DSF0000688281 PS 292 379 Jun-09 Mar-<strong>10</strong> Apr-13 49.87<br />

3.64 46.23 0.00<br />

* L 11 DSF0000752873 P.S. 311 350 Dec-12 Dec-13 Sep-15 11.70<br />

0.00 <strong>10</strong>.04 1.65<br />

* L 11 DSF0000752874 P.S. 3<strong>14</strong> 350 Nov-12 Sep-13 Sep-15 8.43<br />

0.00 7.26 1.17<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Replacement Projects<br />

Borough of Bronx<br />

(in millions)<br />

Actual /<br />

Funding<br />

Forecast Design Constr Est. Total Est. Previous Req'd Needed to<br />

District Project # School<br />

Capacity Start Start Compl Cost Appropriations FY<strong>10</strong>-<strong>14</strong> Complete<br />

* L <strong>10</strong> DSF0000732170 P.S. 51 Replacement Aug-11 Jun-12 Sep-<strong>14</strong> 8.00 0.00 7.73 0.27<br />

* L 78X DSF00007<strong>10</strong><strong>10</strong>7 SUSPENSION CENTER Replacement Sep-<strong>10</strong> Aug-11 Jun-13 <strong>10</strong>.96 0.00 <strong>10</strong>.96 0.00<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 1 - Bronx<br />

07 P.S. 5 - Bronx<br />

07 P.S. 18 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000616726 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Drinking Fountains<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Playgrounds:Play Equipment<br />

586,697<br />

P.S. 1 - Bronx Total: $586,697<br />

DSF0000682187 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

DSF0000775800 State of Good Repair - System Replacements - Kitchen Areas<br />

2013<br />

KITCHEN<br />

902,430<br />

25,000<br />

P.S. 5 - Bronx Total: $927,430<br />

DSF0000616985 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF00007<strong>10</strong>246 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

HEATING PLANT:Boiler Auxiliaries<br />

436,894<br />

3,945,050


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 25 - Bronx<br />

07 P.S. 277 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>255 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

485,725<br />

P.S. 18 - Bronx Total: $4,867,669<br />

DSF0000731332 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

INTERIOR:GYMNASIUM:Ceiling<br />

DSF0000775658 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

345,674<br />

684,932<br />

P.S. 25 - Bronx Total: $1,030,606<br />

DSF0000622459 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:ROOFING:ROOFING<br />

EXTERIOR:ROOFING:SPECIALTIES<br />

DSF0000622460 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000705643 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000705655 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

Ventilation<br />

VENTILATION:Metal Ductwork<br />

1,392,340<br />

13,630,431<br />

387,454<br />

392,278


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 220 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

VENTILATION:Supply Fan<br />

DSF00007<strong>10</strong>032 State of Good Repair - System Replacements - Windows<br />

2011<br />

DSF0000727057 State of Good Repair - System Replacements - Floors<br />

2013<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

DSF0000748402 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Walls<br />

2,879,806<br />

781,958<br />

1,155,130<br />

P.S. 277 - Bronx Total: $20,619,396<br />

DSF0000705800 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING<br />

DSF0000727220 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000731<strong>10</strong>3 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

64,794<br />

1,299,586<br />

2,893,839<br />

P.S. 220 - Bronx Total: $4,258,219


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 43 - Bronx<br />

07 P.S. 49 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000682767 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000727289 State of Good Repair - System Replacements - Toilets-Students<br />

2012<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

DSF0000752898 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

1,<strong>14</strong>0,970<br />

1,205,952<br />

1,009,683<br />

P.S. 43 - Bronx Total: $3,356,605<br />

DSF0000748733 State of Good Repair - System Replacements - Parapets<br />

20<strong>14</strong><br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

1,061,900<br />

P.S. 49 - Bronx Total: $1,061,900


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 65 - Bronx<br />

07 J.H.S. 222 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000749020 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - HID<br />

INTERIOR:CAFETERIA:Floor Finish<br />

INTERIOR:MULTI-PURPOSE ROOM:Door(s)<br />

INTERIOR:MULTI-PURPOSE ROOM:Floor Finish<br />

MULTIPURPOSE ROOM:LIGHTING:Lighting Fixture - Incandescent<br />

DSF0000775515 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775621 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000775653 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

1,024,216<br />

52,000<br />

1,204,819<br />

684,932<br />

P.S. 65 - Bronx Total: $2,965,967<br />

DSF0000684629 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000684632 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000684633 State of Good Repair - System Replacements - Windows<br />

2011<br />

339,013<br />

518,290<br />

9,474,432


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 J.H.S. <strong>14</strong>9 - Bronx<br />

07 I.S. 151 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Windows<br />

DSF0000684634 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000709489 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000754299 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

2,991,894<br />

2,369,225<br />

841,441<br />

J.H.S. 222 - Bronx Total: $16,534,296<br />

DSF0000687204 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000753094 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

35,427<br />

230,551<br />

J.H.S. <strong>14</strong>9 - Bronx Total: $265,979<br />

DSF0000684885 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

DSF0000684886 State of Good Repair - System Replacements - Windows<br />

2011<br />

1,481,992<br />

2,673,319


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 154 - Bronx<br />

07 P.S. 156 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Windows<br />

DSF0000684887 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong><strong>10</strong>9 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

1,075,066<br />

4,531,431<br />

I.S. 151 - Bronx Total: $9,761,808<br />

DSF0000684951 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000750629 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

FIXTURES:STUDENT:Drinking Fountain<br />

FIXTURES:STUDENT:Sink And Fountain Combo Unit<br />

632,989<br />

807,240<br />

P.S. 154 - Bronx Total: $1,440,229<br />

DSF0000415826 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000707904 Waste System<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sewage / Waste Piping<br />

540,528<br />

181,870


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 157 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Vent Piping<br />

DSF00007<strong>10</strong>1<strong>10</strong> State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

DSF00007<strong>10</strong>111 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000732430 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000750681 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed H/C Lift<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

1,588,727<br />

4,227,016<br />

282,415<br />

1,412,633<br />

P.S. 156 - Bronx Total: $8,233,189<br />

DSF00007<strong>10</strong>244 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

3,250,065


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 P.S. 161 - Bronx<br />

07 I.S. 162 - Bronx<br />

07 J.H.S. 203 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000752857 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

70,550<br />

P.S. 157 - Bronx Total: $3,320,615<br />

DSF0000750757 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000750758 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

2,837,257<br />

4,456,012<br />

P.S. 161 - Bronx Total: $7,293,270<br />

DSF000073<strong>14</strong>04 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

190,557<br />

I.S. 162 - Bronx Total: $190,557<br />

DSF00007<strong>10</strong>263 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>267 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

2,167,315<br />

1,676,688


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

07 I.S. 184 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000750997 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000754248 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

DSF0000775516 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775517 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

2,430,668<br />

755,850<br />

209,000<br />

258,400<br />

J.H.S. 203 - Bronx Total: $7,497,921<br />

DSF0000619971 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000685371 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF00007<strong>10</strong>264 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

950,396<br />

3,535,808<br />

2,052,857


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. <strong>14</strong> - Bronx<br />

08 P.S. 36 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>268 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

1,859,961<br />

I.S. 184 - Bronx Total: $8,399,023<br />

DSF0000752892 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

875,808<br />

P.S. <strong>14</strong> - Bronx Total: $875,808<br />

DSF0000617303 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

AUDITORIUM:Local Sound System<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

INTERIOR:Auditorium:Stage<br />

DSF0000622427 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

SITE:PLAYGROUNDS:MATTING<br />

SITE:PLAYGROUNDS:PLAY EQUIPMENT<br />

DSF0000682687 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000687205 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

802,022<br />

479,071<br />

1,093,501<br />

41,487


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 48 - Bronx<br />

08 I.S. 302 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

Electrical Systems<br />

P.S. 36 - Bronx Total: $2,416,081<br />

DSF0000705952 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

SITE:Retaining Walls<br />

845,656<br />

P.S. 48 - Bronx Total: $845,656<br />

DSF00004<strong>14</strong>223 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL<br />

DSF0000682936 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000682938 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000682939 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000682940 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

DSF0000682947 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

1,323,415<br />

1,572,294<br />

2,323,440<br />

2,086,484<br />

2,177,226<br />

2,131,794


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 333 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000682956 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

DSF0000687206 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000727434 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000748787 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Ventilation<br />

VENTILATION:EXHAUST FAN<br />

VENTILATION:METAL DUCTWORK<br />

219,994<br />

20,981<br />

1,294,679<br />

605,<strong>14</strong>0<br />

I.S. 302 - Bronx Total: $13,755,447<br />

DSF0000683080 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000706<strong>14</strong>3 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Parapets<br />

6,566,581<br />

2,922,777


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 69 - Bronx<br />

08 P.S. 71 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000706<strong>14</strong>6 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

DSF0000709433 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

DSF0000727589 State of Good Repair - System Replacements - Floors<br />

2012<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

DSF000073<strong>10</strong>09 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF000073<strong>10</strong><strong>10</strong> State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

20,707<br />

4,415,471<br />

1,352,139<br />

1,249,813<br />

1,137,248<br />

P.S. 333 - Bronx Total: $17,664,737<br />

DSF00007<strong>10</strong>065 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:Exterior Walls<br />

DSF0000749093 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000752826 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

4,797,160<br />

553,572<br />

205,993<br />

P.S. 69 - Bronx Total: $5,556,726<br />

DSF0000727804 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

GROUNDING SYSTEM<br />

797,577


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 72 - Bronx<br />

08 I.S. 201 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

PANEL BOARD<br />

SWITCHBOARD<br />

P.S. 71 - Bronx Total: $797,577<br />

DSF00004<strong>14</strong>530 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:STUDENT<br />

TOILET ROOMS<br />

DSF0000732428 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2013<br />

SITE:PLAYGROUNDS:Benches<br />

SITE:PLAYGROUNDS:Safety Surfacing<br />

1,234,503<br />

517,162<br />

P.S. 72 - Bronx Total: $1,751,665<br />

DSF0000544<strong>14</strong>7 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000706402 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

DSF0000749192 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Door(s)<br />

INTERIOR:CAFETERIA:Floor Finish<br />

65,726<br />

37,975<br />

770,8<strong>14</strong><br />

I.S. 201 - Bronx Total: $874,5<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 75 - Bronx<br />

08 I.S. <strong>10</strong>1 - Bronx<br />

08 P.S. <strong>10</strong>7 - Bronx<br />

08 I.S. 301 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>259 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000731127 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

2,407,120<br />

709,203<br />

P.S. 75 - Bronx Total: $3,116,323<br />

DSF0000683869 State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

455,448<br />

I.S. <strong>10</strong>1 - Bronx Total: $455,448<br />

DSF0000754448 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

40,803<br />

P.S. <strong>10</strong>7 - Bronx Total: $40,803<br />

DSF0000750043 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

1,245,423<br />

I.S. 301 - Bronx Total: $1,245,423


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 I.S. 123 - Bronx<br />

08 I.S. 125 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000731137 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

Air Conditioning Split System<br />

AIR CONDITIONING:DX Split System<br />

268,120<br />

I.S. 123 - Bronx Total: $268,120<br />

DSF0000684359 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Retaining Walls<br />

SITE:Stairs/ramps: Exterior<br />

DSF0000730943 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000750<strong>10</strong>3 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000750<strong>10</strong>4 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000750113 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

DSF00007501<strong>14</strong> State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Incandescent<br />

1,618,653<br />

162,224<br />

2,740,649<br />

4,597,435<br />

87,737<br />

292,203


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 130 - Bronx<br />

08 I.S. 131 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000750117 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

DSF0000775564 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000775793 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

1,993,873<br />

1,904,193<br />

250,000<br />

I.S. 125 - Bronx Total: $13,646,968<br />

DSF0000619047 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

315,207<br />

P.S. 130 - Bronx Total: $315,207<br />

DSF0000684462 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000684463 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

3,728,212<br />

2,700,637


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 138 - Bronx<br />

08 P.S. <strong>14</strong>0 - Bronx<br />

08 I.S. 174 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

DSF0000684478 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

DSF0000688366 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

1,081,200<br />

270,615<br />

I.S. 131 - Bronx Total: $7,780,664<br />

DSF0000687209 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

40,286<br />

P.S. 138 - Bronx Total: $40,286<br />

DSF000073<strong>10</strong>98 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

HEATING PLANT:BOILER AUXILIARIES<br />

HEATING PLANT:BOILER SYSTEM<br />

HEATING PLANT:FUEL SYSTEMS<br />

2,884,846<br />

P.S. <strong>14</strong>0 - Bronx Total: $2,884,846<br />

DSF00006852<strong>14</strong> State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Dumbwaiters<br />

CONVEYING:Elevators<br />

787,3<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

08 P.S. 182 - Bronx<br />

08 I.S. 192 - Bronx<br />

09 P.S. 4 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000729546 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2012<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

DSF0000729549 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:STAIRS/RAMPS: EXTERIOR<br />

655,613<br />

166,442<br />

I.S. 174 - Bronx Total: $1,609,365<br />

DSF0000685325 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000688289 State of Good Repair - System Replacements - Windows<br />

2011<br />

1,151,839<br />

3,245,156<br />

P.S. 182 - Bronx Total: $4,396,996<br />

DSF0000416135 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000688512 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

384,242<br />

237,462<br />

I.S. 192 - Bronx Total: $621,704<br />

DSF0000726689 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000748022 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

5,099,993<br />

170,887


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 11 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000753061 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000775521 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

716,326<br />

<strong>10</strong>4,000<br />

P.S. 4 - Bronx Total: $6,091,205<br />

DSF0000682280 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000682282 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000682283 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000682284 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

980,553<br />

1,842,987<br />

1,439,252<br />

3,622,201<br />

P.S. 11 - Bronx Total: $7,884,993


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 I.S. 22 - Bronx<br />

09 P.S. 28 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000705543 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000705545 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000705546 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Exterior Walls<br />

DSF0000771219 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

590,9<strong>10</strong><br />

1,949,815<br />

2,850,287<br />

1,265,060<br />

I.S. 22 - Bronx Total: $6,656,073<br />

DSF0000682569 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000682570 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000688416 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000727077 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

684,604<br />

3,588,277<br />

2,205,726<br />

54,849


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 42 - Bronx<br />

09 P.S. 53 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000748409 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,<strong>14</strong>0,684<br />

P.S. 28 - Bronx Total: $7,674,<strong>14</strong>0<br />

DSF0000727264 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

787,235<br />

P.S. 42 - Bronx Total: $787,235<br />

DSF0000727466 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000748801 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

911,082<br />

1,295,137


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 55 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

INTERIOR:AUDITORIUM:Walls<br />

INTERIOR:AUDITORIUM:Window Curtains/Shades/Blinds<br />

P.S. 53 - Bronx Total: $2,206,219<br />

DSF0000682991 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>112 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000727494 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000748815 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000752828 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

DSF0000754495 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000775518 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

1,804,945<br />

61,906<br />

1,<strong>10</strong>9,064<br />

694,005<br />

43,478<br />

<strong>10</strong>5,407<br />

186,051


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 58 - Bronx<br />

09 P.S. 63 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

Technology<br />

P.S. 55 - Bronx Total: $4,004,855<br />

DSF0000683047 Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000683049 Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000771818 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,809,385<br />

4,471,9<strong>14</strong><br />

1,204,819<br />

P.S. 58 - Bronx Total: $7,486,119<br />

DSF0000617757 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

DSF0000727656 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2012<br />

INTERIOR:CAFETERIA:Door(s)<br />

292,590<br />

757,139


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 64 - Bronx<br />

09 P.S. 70 - Bronx<br />

09 P.S. 73 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:CAFETERIA:Floor Finish<br />

INTERIOR:MULTI-PURPOSE ROOM:Door(s)<br />

INTERIOR:MULTI-PURPOSE ROOM:Floor Finish<br />

MULTIPURPOSE ROOM:LIGHTING:Lighting Fixture - Fluorescent<br />

P.S. 63 - Bronx Total: $1,049,729<br />

DSF0000683163 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

TOILET ROOM - STUDENT:Lighting:Lighting Fixture - Fluorescent<br />

825,991<br />

P.S. 64 - Bronx Total: $825,991<br />

DSF0000683285 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>10</strong><br />

Waste System<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sewage / Waste Piping<br />

3,776,697<br />

P.S. 70 - Bronx Total: $3,776,697<br />

DSF0000622598 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000709411 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

601,373<br />

2,684,797


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 I.S. 232 - Bronx<br />

09 P.S. 88 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000727828 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000749171 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

2,262,409<br />

1,546,482<br />

P.S. 73 - Bronx Total: $7,095,061<br />

DSF0000706546 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000706551 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

659,601<br />

19,350<br />

I.S. 232 - Bronx Total: $678,951<br />

DSF0000728130 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000749446 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

670,442<br />

1,162,753


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 90 - Bronx<br />

09 P.S. 199 - Bronx<br />

09 P.S. 1<strong>10</strong> - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000749449 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

221,201<br />

P.S. 88 - Bronx Total: $2,054,396<br />

DSF0000683684 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000706711 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Retaining Walls<br />

DSF0000749490 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

DSF0000775649 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

1,992,234<br />

495,227<br />

44,000<br />

649,026<br />

P.S. 90 - Bronx Total: $3,180,487<br />

DSF0000728397 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,008,039<br />

P.S. 199 - Bronx Total: $1,008,039<br />

DSF0000728513 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

821,918


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 1<strong>14</strong> - Bronx<br />

09 I.S. 117 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000731<strong>10</strong>6 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

HEATING PLANT:BOILER AUXILIARIES<br />

DSF0000753054 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

3,6<strong>14</strong>,458<br />

352,706<br />

P.S. 1<strong>10</strong> - Bronx Total: $4,789,081<br />

DSF0000772875 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 1<strong>14</strong> - Bronx Total: $1,204,819<br />

DSF0000728651 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

DSF0000731130 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

DSF0000749978 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000749981 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

372,662<br />

26,756<br />

786,394<br />

1,260,988


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 126 (ECF) - Bronx<br />

09 P.S. 132 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000749984 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>14</strong><br />

Toilets-Students<br />

FIXTURES:STUDENT:Toilet<br />

SCA0000019633 State of Good Repair - System Replacements - Parapets<br />

2013<br />

813,946<br />

2,383,163<br />

I.S. 117 - Bronx Total: $5,643,909<br />

DSF0000684373 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000684375 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000684376 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000684377 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Exterior Walls<br />

118,970<br />

4,003,278<br />

297,037<br />

1,8<strong>10</strong>,271<br />

P.S. 126 (ECF) - Bronx Total: $6,229,556<br />

DSF0000622398 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

2011<br />

6,978,978


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 I.S. <strong>14</strong>5 - Bronx<br />

09 I.S. 339 (OLD <strong>14</strong>7) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000750220 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,151,389<br />

P.S. 132 - Bronx Total: $8,130,367<br />

DSF0000729126 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

559,872<br />

I.S. <strong>14</strong>5 - Bronx Total: $559,872<br />

DSF0000619396 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000684803 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Paving - Vehicular Area:Concrete<br />

SITE:Retaining Walls<br />

DSF0000690213 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

DSF0000707706 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF00007<strong>10</strong>262 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

462,290<br />

266,980<br />

3,898,984<br />

1,387,791<br />

2,627,362


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 I.S. 219 (OLD <strong>14</strong>8) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>274 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000731153 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

528,901<br />

643,231<br />

I.S. 339 (OLD <strong>14</strong>7) - Bronx Total: $9,815,538<br />

DSF0000619423 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000684823 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000684832 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Retaining Walls<br />

DSF0000684836 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2011<br />

INTERIOR:Gymnasium:Sliding-folding Partition<br />

DSF0000709441 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000730944 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000731193 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

INTERIOR:GYMNASIUM:Seating<br />

1,248,028<br />

3,775,441<br />

888,582<br />

673,803<br />

288,512<br />

85,568<br />

<strong>10</strong>2,635


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 163 - Bronx<br />

09 I.S. 166 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000773457 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

51,370<br />

I.S. 219 (OLD <strong>14</strong>8) - Bronx Total: $7,113,938<br />

DSF0000687111 State of Good Repair - Major Modernizations and Rehabilitations - Interior<br />

Modernizations<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Wall<br />

DSF0000708003 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

4,204,<strong>14</strong>5<br />

270,004<br />

P.S. 163 - Bronx Total: $4,474,<strong>14</strong>9<br />

DSF0000688195 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000708027 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING<br />

DSF00007<strong>10</strong>333 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000729477 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000729496 Waste System<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SEWAGE / WASTE PIPING<br />

432,172<br />

127,070<br />

205,173<br />

1,1<strong>10</strong>,259<br />

1,425,435


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S. 170 (ECC) - Bronx<br />

DSF000073<strong>10</strong><strong>14</strong> Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

153,484<br />

I.S. 166 - Bronx Total: $3,453,593<br />

DSF0000752822 Safety and Security - Safety and Security - Code Compliance<br />

2013<br />

09 P.S. 4 ANNEX (P171 ECC) - Bronx<br />

232,179<br />

P.S. 170 (ECC) - Bronx Total: $232,179<br />

DSF0000729528 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

09 P.S. 11 ANNEX (P172 ECC) - Bronx<br />

09 P.S. 236 - Bronx<br />

SITE:RETAINING WALLS<br />

116,185<br />

P.S. 4 ANNEX (P171 ECC) - Bronx Total: $116,185<br />

DSF00007<strong>10</strong>113 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

34,8<strong>10</strong><br />

P.S. 11 ANNEX (P172 ECC) - Bronx Total: $34,8<strong>10</strong><br />

DSF0000775647 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

09 P.S. 230/I.S. 229 (UDC) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 236 - Bronx Total: $684,932<br />

DSF0000685530 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Elevators<br />

1,151,248


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

09 P.S./I.S. 218 - Bronx<br />

09 P.S. 204 - Bronx<br />

<strong>10</strong> P.S. 3 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000687211 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF00007<strong>10</strong>266 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>269 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

49,088<br />

2,351,825<br />

1,204,161<br />

P.S. 230/I.S. 229 (UDC) - Bronx Total: $4,756,322<br />

DSF0000732429 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2013<br />

421,297<br />

P.S./I.S. 218 - Bronx Total: $421,297<br />

DSF0000775796 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

250,000<br />

P.S. 204 - Bronx Total: $250,000<br />

DSF00007<strong>10</strong>966 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

32,057


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 7 - Bronx<br />

<strong>10</strong> P.S. 8 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

P.S. 3 - Bronx Total: $32,057<br />

DSF00007<strong>10</strong>021 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

DSF00007<strong>10</strong>117 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000726739 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000726743 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000726744 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

684,697<br />

1,773,307<br />

1,002,118<br />

2,972,971<br />

562,765<br />

P.S. 7 - Bronx Total: $6,995,858<br />

DSF0000748092 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

636,908<br />

P.S. 8 - Bronx Total: $636,908


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 9 (OLD 115) - Bronx<br />

<strong>10</strong> P.S. 15 - Bronx<br />

<strong>10</strong> P.S. 20 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000726770 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752356 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752357 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

1,057,672<br />

3,6<strong>14</strong>,458<br />

821,918<br />

P.S. 9 (OLD 115) - Bronx Total: $5,494,048<br />

DSF0000544711 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

Science Lab Upgrades<br />

DSF0000752398 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

759,933<br />

69,<strong>14</strong>1<br />

P.S. 15 - Bronx Total: $829,074<br />

DSF0000705505 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000752856 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

1,856,615<br />

204,960<br />

P.S. 20 - Bronx Total: $2,061,575


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 23 - Bronx<br />

<strong>10</strong> P.S. 24 - Bronx<br />

<strong>10</strong> P.S. 396 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000622346 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Ventilation<br />

MOTOR STARTER/CONTACTOR<br />

VENTILATION:EXHAUST FANS<br />

DSF0000771247 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>14</strong><br />

2,115,097<br />

32,329<br />

P.S. 23 - Bronx Total: $2,<strong>14</strong>7,426<br />

DSF0000726989 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000726991 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

DSF0000752867 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

2,471,038<br />

704,158<br />

1,097,906<br />

P.S. 24 - Bronx Total: $4,273,<strong>10</strong>2<br />

DSF0000413866 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,269,341


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 32 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000682523 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:ELEVATORS<br />

CONVEYING:SIDEWALK ELEVATOR<br />

INTERCOM SYSTEM:ELEVATOR<br />

DSF0000748380 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

746,932<br />

244,469<br />

P.S. 396 - Bronx Total: $2,260,742<br />

DSF0000413951 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

DSF0000413956 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

INTERIOR:STRUCTURAL:ROOF STRUCTURE<br />

DSF0000413963 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Cafeteria/Multi-Purpose Room:Floor Finish<br />

DSF0000682630 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000727128 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

800,785<br />

13,360,972<br />

1,508,368<br />

3,749,<strong>10</strong>1<br />

1,277,605


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 33 - Bronx<br />

<strong>10</strong> P.S. 46 - Bronx<br />

<strong>10</strong> P.S. 56 ADDITION - Bronx<br />

* Building scheduled for an Exterior Mod<br />

P.S. 32 - Bronx Total: $20,696,832<br />

DSF0000682646 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000682648 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Cornice<br />

EXTERIOR:Exterior Walls<br />

DSF0000687162 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Specialties<br />

DSF0000752358 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752359 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

259,054<br />

2,587,586<br />

909,926<br />

3,6<strong>14</strong>,458<br />

821,918<br />

P.S. 33 - Bronx Total: $8,192,942<br />

DSF0000682842 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

369,049<br />

P.S. 46 - Bronx Total: $369,049<br />

DSF0000775656 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 59 - Bronx<br />

<strong>10</strong> P.S. 79 - Bronx<br />

<strong>10</strong> I.S. 80/P.S. 280 - Bronx<br />

<strong>10</strong> P.S. 81 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DOMESTIC WATER SYSTEM<br />

P.S. 56 ADDITION - Bronx Total: $684,932<br />

DSF0000727571 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2012<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

367,650<br />

P.S. 59 - Bronx Total: $367,650<br />

DSF0000687249 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

473,400<br />

P.S. 79 - Bronx Total: $473,400<br />

DSF0000688367 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

1,602,596<br />

I.S. 80/P.S. 280 - Bronx Total: $1,602,596<br />

DSF0000706526 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000749316 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

725,070<br />

508,067


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 85 - Bronx<br />

<strong>10</strong> P.S. 86 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Floor Finish<br />

P.S. 81 - Bronx Total: $1,233,137<br />

DSF0000683592 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Retaining Walls<br />

SITE:Sidewalks<br />

SITE:Stairs/ramps: Exterior<br />

DSF0000687353 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

2,542,477<br />

22,243<br />

P.S. 85 - Bronx Total: $2,564,720<br />

DSF0000683606 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

CONVEYING:Sidewalk / Ash Hoist<br />

INTERCOM SYSTEM:Elevator<br />

DSF00007<strong>10</strong>992 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

DSF0000728089 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

997,688<br />

37,975<br />

331,197


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 91 - Bronx<br />

<strong>10</strong> P.S. 94 - Bronx<br />

<strong>10</strong> P.S. 95 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000731385 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

SCA0000016173 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

2,661,151<br />

1,889,818<br />

P.S. 86 - Bronx Total: $5,917,828<br />

DSF0000728178 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

550,073<br />

P.S. 91 - Bronx Total: $550,073<br />

DSF0000728240 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000728241 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000749564 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

3,598,462<br />

1,072,558<br />

99,289<br />

P.S. 94 - Bronx Total: $4,770,309<br />

DSF0000706796 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

37,975


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> I.S. 399 (OLD X HS/115) - Bronx<br />

<strong>10</strong> I.S. 118 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

P.S. 95 - Bronx Total: $37,975<br />

DSF0000707152 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

DSF0000707153 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

DSF0000709430 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

DSF00007<strong>10</strong>115 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000749929 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000749945 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>14</strong><br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

86,177<br />

290,619<br />

3,833,571<br />

520,499<br />

873,864<br />

234,349<br />

I.S. 399 (OLD X HS/115) - Bronx Total: $5,839,080<br />

DSF0000618835 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>10</strong><br />

INTERIOR:Library:Built-in Furnishing<br />

INTERIOR:Library:Door(s)<br />

INTERIOR:Library:Wall<br />

1,313,409


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> I.S. 391 (UDC) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

LIBRARY:Lighting Fixture - Fluorescent<br />

DSF0000684216 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000684221 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000684223 State of Good Repair - System Replacements - Fencing<br />

20<strong>10</strong><br />

SITE:Fences<br />

DSF0000752425 Code Compliance<br />

2013<br />

567,013<br />

700,245<br />

241,120<br />

365,000<br />

I.S. 118 - Bronx Total: $3,186,787<br />

DSF0000622642 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000623315 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000684575 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000684580 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

4,605,468<br />

2,785,052<br />

984,537<br />

821,<strong>14</strong>0


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> M.S./H.S. <strong>14</strong>1 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000684581 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000687212 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000752454 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Air Conditioning Split System<br />

AIR CONDITIONING:CHILLED WATER SYSTEM:Chilled Water Piping<br />

AIR CONDITIONING:CHILLED WATER SYSTEM:Chilled Water Pump<br />

AIR CONDITIONING:CHILLED WATER SYSTEM:Cold Water Piping (A/C Make-up)<br />

AIR CONDITIONING:CHILLED WATER SYSTEM:Water Cooled Chiller<br />

AIR CONDITIONING:COOLING TOWER<br />

731,353<br />

17,835<br />

611,351<br />

I.S. 391 (UDC) - Bronx Total: $<strong>10</strong>,556,736<br />

DSF0000684674 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING PLANT:Boiler System<br />

DSF0000709404 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

DSF0000729056 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

INTERIOR:GYMNASIUM:Ceiling<br />

4,129,907<br />

950,806<br />

126,918<br />

M.S./H.S. <strong>14</strong>1 - Bronx Total: $5,207,631


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> I.S. <strong>14</strong>3 - Bronx<br />

<strong>10</strong> P.S. 205A (ECF) - Bronx<br />

<strong>10</strong> I.S. 206B - Bronx<br />

<strong>10</strong> P.S. 209 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000545281 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

384,242<br />

I.S. <strong>14</strong>3 - Bronx Total: $384,242<br />

DSF0000688508 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Ventilation<br />

DSF0000729783 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

421,026<br />

60,000<br />

P.S. 205A (ECF) - Bronx Total: $481,026<br />

DSF0000685495 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Air Conditioning Split System<br />

AIR CONDITIONING:Chilled Water System:Air Cooled Condenser<br />

DSF0000775643 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

155,931<br />

684,932<br />

I.S. 206B - Bronx Total: $840,863<br />

DSF0000416199 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

HEATING PLANT<br />

VENTILATION<br />

1,235,216


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 279 - Bronx<br />

<strong>10</strong> P.S. 340 - Bronx<br />

<strong>10</strong> P.S. 360 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

P.S. 209 - Bronx Total: $1,235,216<br />

DSF0000685565 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Site Walls (not Retaining Walls)<br />

SITE:Stairs/ramps: Exterior<br />

DSF0000687260 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000688418 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000688419 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

1,523,069<br />

1,390,698<br />

382,788<br />

443,582<br />

P.S. 279 - Bronx Total: $3,740,137<br />

DSF0000752855 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

185,746<br />

P.S. 340 - Bronx Total: $185,746<br />

DSF0000709170 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

949,013


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>10</strong> P.S. 8 MINISCHOOL - Bronx<br />

11 P.S. 16 - Bronx<br />

11 P.S. 19 - Bronx<br />

11 P.S. 21 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

P.S. 360 - Bronx Total: $949,013<br />

DSF0000775563 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

130,741<br />

P.S. 8 MINISCHOOL - Bronx Total: $130,741<br />

DSF00007<strong>10</strong>015 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

196,704<br />

P.S. 16 - Bronx Total: $196,704<br />

DSF000073<strong>14</strong>00 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000753128 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

64,634<br />

883,721<br />

P.S. 19 - Bronx Total: $948,355<br />

DSF0000705518 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

1,<strong>14</strong>1,962


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 41 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000705520 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000705521 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Exterior Walls<br />

DSF000071<strong>10</strong>96 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000748281 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000771198 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

1,825,551<br />

2,467,095<br />

1,068,642<br />

994,657<br />

1,204,819<br />

P.S. 21 - Bronx Total: $8,702,726<br />

DSF0000682731 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

641,993


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 68 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000727243 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000752360 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752361 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

844,626<br />

3,6<strong>14</strong>,458<br />

821,918<br />

P.S. 41 - Bronx Total: $5,922,995<br />

DSF0000617867 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

DSF0000683237 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

CONVEYING:Sidewalk / Ash Hoist<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000683239 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

498,543<br />

955,<strong>10</strong>2<br />

2<strong>10</strong>,133


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 76 - Bronx<br />

11 P.S. 78 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000749082 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Sliding-folding Partition<br />

1,043,002<br />

P.S. 68 - Bronx Total: $2,706,781<br />

DSF0000544666 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

DSF0000683386 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000683388 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000683389 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

DSF0000688417 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

99,744<br />

265,896<br />

1,312,185<br />

3,091,812<br />

669,615<br />

P.S. 76 - Bronx Total: $5,439,252


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 89 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000683426 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000706482 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2011<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

INTERIOR:Auditorium:Door(s)<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

INTERIOR:Auditorium:Stage<br />

DSF00007<strong>10</strong>324 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

INTERIOR:Toilet Rooms - Students<br />

DSF0000727927 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

DSF0000731121 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

DSF000073<strong>14</strong>55 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000732200 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

540,<strong>14</strong>8<br />

1,081,973<br />

205,532<br />

60,201<br />

628,072<br />

267,313<br />

31,438<br />

P.S. 78 - Bronx Total: $2,8<strong>14</strong>,677<br />

DSF0000618286 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

890,589


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 96 ADDITION - Bronx<br />

11 P.S. 97 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000687213 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000709424 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

17,944<br />

815,739<br />

P.S. 89 - Bronx Total: $1,724,272<br />

DSF0000618411 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

461,272<br />

P.S. 96 ADDITION - Bronx Total: $461,272<br />

DSF00007496<strong>14</strong> State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000749616 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

752,019<br />

2,157,035


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. <strong>10</strong>5 - Bronx<br />

11 P.S. <strong>10</strong>6 ADDITION - Bronx<br />

11 P.S. <strong>10</strong>8 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000772575 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000772576 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

233,228<br />

1,159,811<br />

P.S. 97 - Bronx Total: $4,302,093<br />

DSF0000622357 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:DRAINAGE SYSTEM<br />

SITE:PAVING - NON-VEHICULAR AREA:CONCRETE<br />

DSF0000749738 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

3,012,306<br />

615,8<strong>10</strong><br />

P.S. <strong>10</strong>5 - Bronx Total: $3,628,117<br />

DSF0000728440 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

1,043,259<br />

P.S. <strong>10</strong>6 ADDITION - Bronx Total: $1,043,259


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 111 - Bronx<br />

11 P.S. 112 - Bronx<br />

11 I.S. 113 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000707007 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

1,315,150<br />

P.S. <strong>10</strong>8 - Bronx Total: $1,315,150<br />

DSF0000415136 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:PLAYGROUNDS/PLAY EQUIPMENT<br />

546,405<br />

P.S. 111 - Bronx Total: $546,405<br />

DSF0000728556 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000728557 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000749875 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

2,<strong>10</strong>8,691<br />

2,015,032<br />

1,195,<strong>14</strong>4<br />

P.S. 112 - Bronx Total: $5,318,866<br />

DSF0000618720 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

47,084


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 121 - Bronx<br />

11 I.S. 127 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000684<strong>10</strong>3 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000684111 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

AUDITORIUM:House Lighting:Lighting Fixture - Fluorescent<br />

AUDITORIUM:House Lighting:Lighting Fixture - Incandescent<br />

AUDITORIUM:Theater Lighting System:Dimming System<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

DSF0000688509 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

4,801,<strong>14</strong>1<br />

379,801<br />

1,752,067<br />

I.S. 113 - Bronx Total: $6,980,094<br />

DSF0000773021 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>14</strong><br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

730,000<br />

P.S. 121 - Bronx Total: $730,000<br />

DSF0000619006 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000752427 Accessibility<br />

2013<br />

59,219<br />

<strong>10</strong>9,500<br />

I.S. 127 - Bronx Total: $168,719


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 I.S. 135 - Bronx<br />

11 I.S. <strong>14</strong>2 - Bronx<br />

11 I.S. <strong>14</strong>4 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000684530 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000684531 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000687215 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000709508 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

DSF0000775795 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

3,418,190<br />

2,546,647<br />

32,883<br />

1,989,619<br />

250,000<br />

I.S. 135 - Bronx Total: $8,237,339<br />

DSF0000752369 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

230,542<br />

I.S. <strong>14</strong>2 - Bronx Total: $230,542<br />

DSF0000684731 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

1,905,267


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 160 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000684732 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000684733 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000709428 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DSF0000752363 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

DSF0000752364 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

345,578<br />

3,366,761<br />

1<strong>10</strong>,5<strong>10</strong><br />

3,6<strong>14</strong>,458<br />

821,918<br />

I.S. <strong>14</strong>4 - Bronx Total: $<strong>10</strong>,164,491<br />

DSF0000685081 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000685082 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000685083 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000685084 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

320,045<br />

234,680<br />

2,976,192<br />

264,088


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

11 P.S. 175 - Bronx<br />

DSF0000750741 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

SITE:SIDEWALKS:Site Sidewalk and Walkways<br />

16,207<br />

P.S. 160 - Bronx Total: $3,811,212<br />

DSF00006871<strong>10</strong> State of Good Repair - Major Modernizations and Rehabilitations - Interior<br />

Modernizations<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Ceiling<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Door(s)<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Wall<br />

DSF0000709459 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

11 P.S./I.S. 189 (@STEENWICK AVE) - Bronx<br />

11 P.S./I.S. 194 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

4,719,471<br />

1,844,662<br />

P.S. 175 - Bronx Total: $6,564,133<br />

DSF0000688189 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

636,259<br />

P.S./I.S. 189 (@STEENWICK AVE) - Bronx Total: $636,259<br />

DSF0000686641 Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000709<strong>14</strong>7 Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>064 Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

537,086<br />

1,453,178<br />

676,599


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 6 - Bronx<br />

12 P.S. 44 - Bronx<br />

12 P.S. 47 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Specialties<br />

P.S./I.S. 194 - Bronx Total: $2,666,862<br />

DSF0000682221 State of Good Repair - Building Upgrade - Interior Spaces<br />

20<strong>10</strong><br />

INTERIOR:Stairs: Interior<br />

DSF0000688260 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>10</strong><br />

INTERIOR:Structural:Roof Structure<br />

DSF00007053<strong>10</strong> State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

1,118,695<br />

826,4<strong>14</strong><br />

2,087,523<br />

P.S. 6 - Bronx Total: $4,032,632<br />

DSF0000705879 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

DSF0000727299 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DSF0000727301 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

PANEL BOARD<br />

SWITCHBOARD<br />

29,1<strong>14</strong><br />

733,327<br />

964,482<br />

P.S. 44 - Bronx Total: $1,726,923<br />

DSF0000682859 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

835,079


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 50 - Bronx<br />

12 P.S. 57 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000688364 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

DSF0000748702 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

661,965<br />

385,516<br />

P.S. 47 - Bronx Total: $1,882,559<br />

DSF0000682915 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000727428 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

1,185,324<br />

1,003,879<br />

P.S. 50 - Bronx Total: $2,189,203<br />

DSF0000752859 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000752890 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

<strong>14</strong>4,166<br />

693,058


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 61 - Bronx<br />

12 P.S. 67 - Bronx<br />

12 P.S. 195 - Bronx<br />

12 I.S. 98 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

P.S. 57 - Bronx Total: $837,224<br />

DSF00007<strong>10</strong>038 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

538,397<br />

P.S. 61 - Bronx Total: $538,397<br />

DSF0000617849 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000706270 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

2012<br />

INTERIOR:Structural:Floor Structure<br />

DSF0000754570 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

2,220,317<br />

1,185,734<br />

532,845<br />

P.S. 67 - Bronx Total: $3,938,896<br />

DSF0000683406 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>10</strong><br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

245,418<br />

P.S. 195 - Bronx Total: $245,418<br />

DSF0000683831 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Retaining Walls<br />

430,809


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 I.S. 216 - Bronx<br />

DSF0000728327 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2012<br />

INTERIOR:CAFETERIA:Floor Finish<br />

DSF0000749628 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000749630 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000749631 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

293,300<br />

285,870<br />

2,553,526<br />

117,591<br />

I.S. 98 - Bronx Total: $3,681,097<br />

DSF0000622641 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000687188 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

12 I.S. 129 (PAIRED W P234) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

CLIMATE CONTROL SYSTEM<br />

3,520,<strong>10</strong>9<br />

2,380,717<br />

I.S. 216 - Bronx Total: $5,900,826<br />

DSF0000707391 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

3,325,944<br />

I.S. 129 (PAIRED W P234) - Bronx Total: $3,325,944


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 134 - Bronx<br />

12 P.S. 150 - Bronx<br />

12 I.S. 158 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000728927 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000728928 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000750244 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000752824 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

1,032,853<br />

2,640,719<br />

1,723,024<br />

231,054<br />

P.S. 134 - Bronx Total: $5,627,649<br />

DSF0000684872 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

SITE:Retaining Walls<br />

1,053,763<br />

P.S. 150 - Bronx Total: $1,053,763<br />

DSF0000622645 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000688515 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

3,728,209<br />

1,239,5<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 2<strong>14</strong> - Bronx<br />

12 P.S. 211 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000707932 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:Structural:Foundation Walls<br />

1,356,777<br />

I.S. 158 - Bronx Total: $6,324,496<br />

DSF0000729498 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000731390 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

DSF0000775799 State of Good Repair - Building Upgrade - Air Conditioning Retrofit<br />

2013<br />

1,767,825<br />

2,739,927<br />

369,178<br />

P.S. 2<strong>14</strong> - Bronx Total: $4,876,931<br />

DSF0000545279 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

INTERCOM SYSTEM:ELEVATORS<br />

DSF0000685420 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

DSF0000708257 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF00007<strong>10</strong>265 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

181,408<br />

1,616,862<br />

2,1<strong>14</strong>,952<br />

2,338,960


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

12 P.S. 198 - Bronx<br />

75X P.S. 12 - Bronx<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF0000775528 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775529 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

156,000<br />

38,999<br />

P.S. 211 - Bronx Total: $6,447,181<br />

DSF0000622648 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000688516 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

1,933,021<br />

2,801,629<br />

P.S. 198 - Bronx Total: $4,734,651<br />

DSF0000616899 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000616900 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILLARY SIGNAL / BELL SYSTEM<br />

1,350,425<br />

1,713,532


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75X P.S. 811 (OLD I84) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

DSF0000616905 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000726813 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000748153 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000748154 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

SCA0000005431 State of Good Repair - System Replacements - Parapets<br />

2013<br />

4,419,203<br />

1,179,909<br />

1,<strong>14</strong>5,152<br />

620,884<br />

577,063<br />

P.S. 12 - Bronx Total: $11,006,168<br />

DSF00004<strong>14</strong>732 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000622640 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

384,242<br />

2,269,871


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75X P.S. 186 (OLD J136) - Bronx<br />

75X P.S. 754 (OLD IS155) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Fuel Systems<br />

DSF0000687218 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF00006885<strong>14</strong> State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

21,667<br />

2,477,532<br />

P.S. 811 (OLD I84) - Bronx Total: $5,153,312<br />

DSF0000684553 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000684558 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Stairs/ramps: Exterior<br />

DSF0000730948 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Elevators and Escalators<br />

DSF0000750284 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Low-Voltage Electrical Systems<br />

FIRE ALARM SYSTEM<br />

635,571<br />

304,518<br />

2,534,150<br />

1,0<strong>14</strong>,840<br />

P.S. 186 (OLD J136) - Bronx Total: $4,489,078


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000684991 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

CAFETERIA:Lighting:Lighting Fixture - Fluorescent<br />

CAFETERIA:Local Sound System<br />

INTERIOR:Cafeteria:Ceiling<br />

INTERIOR:Cafeteria:Floor Finish<br />

INTERIOR:Cafeteria:Wall<br />

DSF00007<strong>10</strong>039 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DSF0000750647 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000750649 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

78X NEW SCH FOR ARTS AND SCIENCE - Bronx<br />

827,999<br />

992,712<br />

9,738,645<br />

1,269,343<br />

P.S. 754 (OLD IS155) - Bronx Total: $12,828,698<br />

DSF00007<strong>10</strong>008 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78X REV. J.A. POLITE AVE SCHOOL CAMPUS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

269,598<br />

NEW SCH FOR ARTS AND SCIENCE - Bronx Total: $269,598<br />

DSF0000688293 Code Compliance<br />

20<strong>10</strong><br />

1,718,636


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X MORRIS HS - Bronx<br />

DSF0000709449 Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

DSF0000709460 Parapets<br />

20<strong>10</strong><br />

DSF0000709461 Exterior Masonry<br />

20<strong>10</strong><br />

DSF0000709462 Roofs<br />

20<strong>10</strong><br />

187,308<br />

6<strong>10</strong>,181<br />

2,599,064<br />

1,516,063<br />

REV. J.A. POLITE AVE SCHOOL CAMPUS - Bronx Total: $6,631,252<br />

DSF0000622639 Safety and Security - Safety and Security - Code Compliance<br />

2011<br />

DSF00007<strong>10</strong>042 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000729895 Exterior Masonry<br />

2012<br />

78X BRONX REGIONAL HS (OLD 133) - Bronx<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

6,843,767<br />

980,302<br />

24,475,016<br />

MORRIS HS - Bronx Total: $32,299,085<br />

DSF0000731391 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2012<br />

DSF0000731392 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

DSF0000753095 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

DSF0000775530 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

3,688,989<br />

1,433,826<br />

612,802<br />

<strong>10</strong>4,000


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

Technology<br />

DSF0000775531 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78X HERBERT H. LEHMAN HS - Bronx<br />

78X LEHMAN AF - Bronx<br />

* Building scheduled for an Exterior Mod<br />

Technology<br />

<strong>10</strong>4,000<br />

BRONX REGIONAL HS (OLD 133) - Bronx Total: $5,943,617<br />

DSF0000689643 Safety and Security - Safety and Security - Emergency Lighting and Fire Safety Retrofits<br />

20<strong>10</strong><br />

EMERGENCY LIGHTING<br />

DSF0000709454 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000751280 State of Good Repair - Building Upgrade - Interior Spaces<br />

2013<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Ceiling<br />

916,380<br />

1,422,433<br />

2,7<strong>14</strong>,732<br />

HERBERT H. LEHMAN HS - Bronx Total: $5,053,544<br />

DSF0000416283 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

2011<br />

DOMESTIC WATER SYSTEM<br />

DRAIN/WASTE/VENT AND STORM SYSTEM<br />

SITE:IRRIGATION SYSTEM<br />

SITE:PAVING - NON-VEHICULAR AREA<br />

SITE:PLAYING SURFACE<br />

SITE:RUNNING TRACK<br />

SITE:SEATING<br />

4,664,287


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X CHRISTOPHER COLUMBUS HS - Bronx<br />

SITE:SIDEWALKS<br />

SITE:WATER FOUNTAINS<br />

LEHMAN AF - Bronx Total: $4,664,287<br />

DSF0000620273 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000685683 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000708477 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

GAS SERVICE:Gas Distribution Piping<br />

DSF0000775749 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

78X JAMES MONROE CAMPUS - Bronx<br />

78X EVANDER CHILDS HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

797,835<br />

527,715<br />

61,954<br />

500,000<br />

CHRISTOPHER COLUMBUS HS - Bronx Total: $1,887,504<br />

DSF0000620300 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000731189 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

93,263<br />

374,169<br />

JAMES MONROE CAMPUS - Bronx Total: $467,432


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X CHILDS AF - Bronx<br />

DSF0000685736 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000687216 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000688300 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000688520 Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

DSF0000708518 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

1,302,992<br />

30,880<br />

130,766<br />

530,<strong>14</strong>0<br />

46,449<br />

EVANDER CHILDS HS - Bronx Total: $2,041,227<br />

DSF0000708531 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

2012<br />

78X THEODORE ROOSEVELT HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

ATHLETIC FIELD:Exterior Lighting<br />

982,565<br />

CHILDS AF - Bronx Total: $982,565<br />

DSF0000708562 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

1,701,738


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X DEWITT CLINTON HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000708566 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000752900 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

1,888,5<strong>10</strong><br />

1,624,890<br />

THEODORE ROOSEVELT HS - Bronx Total: $5,215,138<br />

DSF0000416389 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF00006858<strong>10</strong> State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000688296 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Walls<br />

DSF0000688298 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000688518 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Specialties<br />

DSF0000708586 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

438,839<br />

4,5<strong>10</strong>,591<br />

261,112<br />

416,093<br />

2,934,783<br />

79,1<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X CLINTON AF - Bronx<br />

DSF0000754394 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

543,871<br />

DEWITT CLINTON HS - Bronx Total: $9,184,403<br />

DSF0000416406 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

20<strong>10</strong><br />

78X BRONX HS OF SCIENCE - Bronx<br />

* Building scheduled for an Exterior Mod<br />

SITE:PLAYING SURFACE<br />

2,872,041<br />

CLINTON AF - Bronx Total: $2,872,041<br />

DSF0000685845 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000685846 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Paving - Vehicular Area:Concrete<br />

DSF0000688188 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF000075<strong>14</strong>33 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF000075<strong>14</strong>37 State of Good Repair - System Replacements - Roofs<br />

2013<br />

1,243,525<br />

247,956<br />

<strong>14</strong>,950<br />

2,771,266<br />

229,502


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF000075<strong>14</strong>39 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000754376 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

SITE:STAIRS/RAMPS: EXTERIOR<br />

DSF0000754377 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

78X ADLAI E. STEVENSON HS - Bronx<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

3<strong>14</strong>,636<br />

421,565<br />

901,887<br />

BRONX HS OF SCIENCE - Bronx Total: $6,<strong>14</strong>5,287<br />

DSF0000622563 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

DSF0000730134 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

78X HARRY S. TRUMAN HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

6,233,297<br />

84,656<br />

ADLAI E. STEVENSON HS - Bronx Total: $6,317,953<br />

DSF0000751503 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

LIGHTING - SECURITY LIGHTS<br />

DSF0000752889 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

6<strong>10</strong>,177<br />

1,173,950<br />

HARRY S. TRUMAN HS - Bronx Total: $1,784,127


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X SOUTH BRONX HS (OLD 38) - Bronx<br />

78X JOHN F. KENNEDY HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>009 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000752429 Science Lab Upgrades<br />

2013<br />

489,811<br />

58,400<br />

SOUTH BRONX HS (OLD 38) - Bronx Total: $548,211<br />

DSF0000487776 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

Code Compliance<br />

DSF0000685945 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000775522 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775523 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775524 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

<strong>10</strong>,463,313<br />

1,6<strong>10</strong>,694<br />

208,000<br />

208,000<br />

208,000


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X ALFRED E. SMITH HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

DSF0000775525 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775526 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775527 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

208,000<br />

208,000<br />

208,000<br />

JOHN F. KENNEDY HS - Bronx Total: $13,322,007<br />

DSF00004165<strong>10</strong> State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF0000730228 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CHIMNEY<br />

DSF0000730230 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

DSF0000730945 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000730946 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

520,072<br />

1,4<strong>10</strong>,619<br />

30,650<br />

234,730<br />

67,630


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X JANE ADDAMS HS - Bronx<br />

DSF000073<strong>10</strong>08 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Room Conversions/Partitioning<br />

DSF0000732441 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754512 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000775682 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

1,288,526<br />

300,183<br />

558,353<br />

200,000<br />

ALFRED E. SMITH HS - Bronx Total: $4,6<strong>10</strong>,763<br />

DSF0000775519 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78X SAMUEL GOMPERS VOC HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

Technology<br />

52,000<br />

JANE ADDAMS HS - Bronx Total: $52,000<br />

DSF0000753124 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

883,<strong>14</strong>5


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000775520 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78X GRACE H. DODGE VOC HS - Bronx<br />

Technology<br />

<strong>10</strong>4,000<br />

SAMUEL GOMPERS VOC HS - Bronx Total: $987,<strong>14</strong>5<br />

DSF0000751613 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752365 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000752366 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000752397 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000753053 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754499 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

78X HEALTH OPPORTUNITIES HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

1,301,222<br />

401,681<br />

<strong>14</strong>2,337<br />

256,225<br />

123,904<br />

560,088<br />

GRACE H. DODGE VOC HS - Bronx Total: $2,785,458<br />

DSF000073<strong>10</strong>15 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

2,119,544


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78X OFFSITE ED. SERV. (0LD 124) - Bronx<br />

HEALTH OPPORTUNITIES HS - Bronx Total: $2,119,544<br />

DSF0000775113 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

78X HS @ EAST TREMONT AVE - Bronx<br />

78X BATHGATE HS - Bronx<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

OFFSITE ED. SERV. (0LD 124) - Bronx Total: $1,204,819<br />

DSF0000731188 Room Conversions/Partitioning<br />

2012<br />

16,179,218<br />

HS @ EAST TREMONT AVE - Bronx Total: $16,179,218<br />

DSF0000752825 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

<strong>14</strong>9,980<br />

BATHGATE HS - Bronx Total: $<strong>14</strong>9,980


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Brooklyn<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

0.00<br />

0.00<br />

0.00<br />

0.<strong>10</strong><br />

0.00<br />

0.69<br />

3.31<br />

0.00<br />

0.00<br />

8.95<br />

0.77<br />

2.38<br />

1.00<br />

13.02<br />

0.55<br />

0.00<br />

3.71<br />

7.06<br />

6.<strong>14</strong><br />

6.64<br />

1.76<br />

29.64<br />

29.78<br />

0.00<br />

24.51<br />

92.50<br />

6.25<br />

19.36<br />

1.02<br />

7.15<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.02<br />

0.00<br />

9.49<br />

7.93<br />

0.00<br />

0.00<br />

8.37<br />

0.02<br />

2.03<br />

0.13<br />

<strong>10</strong>.15<br />

0.03<br />

0.00<br />

0.47<br />

0.75<br />

0.94<br />

3.57<br />

0.28<br />

16.46<br />

13.12<br />

0.00<br />

<strong>14</strong>.52<br />

51.95<br />

2.53<br />

9.18<br />

0.04<br />

1.57<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

1.33<br />

3.02<br />

0.00<br />

0.00<br />

6.33<br />

0.89<br />

0.70<br />

0.03<br />

15.95<br />

0.06<br />

0.00<br />

1.01<br />

0.94<br />

0.42<br />

4.13<br />

0.<strong>14</strong><br />

33.35<br />

33.65<br />

0.00<br />

12.08<br />

58.01<br />

2.81<br />

2.64<br />

0.24<br />

5.98<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

<strong>10</strong>.86<br />

5.37<br />

0.00<br />

0.00<br />

39.61<br />

75.00<br />

1.64<br />

0.01<br />

18.79<br />

0.00<br />

0.00<br />

6.70<br />

0.01<br />

-0.19<br />

2.80<br />

0.53<br />

7.45<br />

24.36<br />

0.00<br />

24.00<br />

60.11<br />

18.45<br />

65.77<br />

7.60<br />

2.97<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

3.61<br />

1.08<br />

0.00<br />

0.00<br />

16.15<br />

59.41<br />

1.04<br />

0.00<br />

3.21<br />

0.00<br />

0.00<br />

4.12<br />

0.28<br />

0.17<br />

6.24<br />

0.00<br />

2.44<br />

4.81<br />

0.00<br />

9.88<br />

5.87<br />

0.<strong>10</strong><br />

0.24<br />

3.05<br />

0.09<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.<strong>14</strong><br />

0.00<br />

25.98<br />

20.70<br />

0.00<br />

0.00<br />

79.41<br />

136.09<br />

7.78<br />

1.17<br />

61.13<br />

0.63<br />

0.00<br />

16.01<br />

9.03<br />

7.47<br />

23.38<br />

2.71<br />

89.34<br />

<strong>10</strong>5.71<br />

0.00<br />

84.99<br />

268.44<br />

30.<strong>14</strong><br />

97.19<br />

11.96<br />

17.76<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Brooklyn<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

E. System Replacements<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

5.26<br />

3.62<br />

1.71<br />

0.91<br />

0.00<br />

0.11<br />

3.45<br />

7.30<br />

0.00<br />

0.00<br />

2.06<br />

1.61<br />

3.46<br />

0.74<br />

0.38<br />

0.00<br />

0.01<br />

0.71<br />

0.75<br />

0.00<br />

0.00<br />

1.56<br />

0.19<br />

2.56<br />

0.17<br />

0.35<br />

0.00<br />

0.00<br />

2.39<br />

3.49<br />

0.00<br />

0.00<br />

0.54<br />

6.46<br />

4.28<br />

1.39<br />

0.30<br />

0.00<br />

0.00<br />

6.43<br />

6.64<br />

0.00<br />

0.00<br />

0.79<br />

I. State of Good Repair Total:<br />

2.22<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.17<br />

1.99<br />

0.00<br />

0.00<br />

0.15<br />

290.67 162.79 193.40 398.13 126.34<br />

169.42<br />

3.12<br />

0.00<br />

2.49<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

15.47<br />

2.51<br />

0.00<br />

1.06<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

89.25<br />

1.83<br />

0.00<br />

13.22<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

115.83<br />

3.47<br />

0.00<br />

7.34<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

295.20<br />

35.41<br />

0.00<br />

13.29<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

15.73<br />

13.92<br />

4.00<br />

1.94<br />

0.00<br />

0.12<br />

13.<strong>14</strong><br />

20.18<br />

0.00<br />

0.00<br />

5.<strong>10</strong><br />

1,171.32<br />

685.17<br />

46.34<br />

0.00<br />

37.39<br />

0.00<br />

0.01<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Brooklyn<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

II. System Expansion<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

3.32<br />

0.32<br />

0.00<br />

20.16<br />

0.00<br />

4.89<br />

0.37<br />

0.00<br />

1.30<br />

0.00<br />

<strong>10</strong>.58<br />

0.44<br />

0.00<br />

1.45<br />

0.00<br />

40.23<br />

0.13<br />

0.00<br />

3.66<br />

0.00<br />

II. System Expansion Total:<br />

0.00<br />

0.00<br />

0.00<br />

46.36<br />

0.00<br />

198.82 25.60 116.76 170.66 390.26<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

1.76<br />

0.00<br />

0.00<br />

0.00<br />

III. Educational Enhancements Total:<br />

1.62<br />

0.00<br />

0.00<br />

0.00<br />

0.67<br />

0.00<br />

0.00<br />

0.00<br />

0.27<br />

0.00<br />

0.00<br />

0.00<br />

0.98<br />

0.00<br />

0.00<br />

0.00<br />

1.76 1.62 0.67 0.27 0.98<br />

0.00<br />

0.00<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

V. Ancillary Facilities Total:<br />

59.01<br />

1.25<br />

0.00<br />

72.93<br />

0.00<br />

902.11<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

5.30<br />

0.00<br />

0.00<br />

0.00<br />

5.30<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Brooklyn<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

Yearly Totals for Brooklyn<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

4.97<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

5.70<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.50<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

<strong>10</strong>.95<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.02<br />

0.00<br />

4.97 5.70 8.50 <strong>10</strong>.95 1.02<br />

VI. Emergency, Unspecified and Misc. Total:<br />

496.21 195.72 319.34 580.01 518.60<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

31.16<br />

0.00<br />

31.16<br />

Brooklyn Grand Total: $2,<strong>10</strong>9.88


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Brooklyn<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* 13 DSF0000687093 I.S. 611 333 May-12 Jul-13 Sep-15 27.17<br />

0.04 24.31 2.83<br />

L <strong>14</strong> DSF0000687094 PROJECT #1 612 Jan-<strong>14</strong> Jul-15 Dec-17 61.27<br />

0.04 0.90 60.33<br />

15<br />

DSF0000730949<br />

Needed to<br />

Complete<br />

PROJECT #1 482 Apr-13 Jun-<strong>14</strong> Aug-16 60.66<br />

0.00 54.17 6.49<br />

* L 15 DSF0000687095 P.S. 333 332 Apr-<strong>10</strong> Jun-12 May-<strong>14</strong> 16.55<br />

0.00 16.55 0.00<br />

* 15 DSF0000730968 P.S./I.S. 437 757 Feb-11 Jul-12 Apr-15 <strong>10</strong>6.18<br />

0.<strong>14</strong> 98.05 7.98<br />

15<br />

DSF0000488526<br />

PROJECT #2 406 Apr-13 Jun-<strong>14</strong> Jul-16 51.12<br />

0.07 45.92 5.13<br />

* L 15 DSF0000775561 P.S. 763 256 Nov-12 Jun-13 Sep-13 5.23<br />

0.00 5.23 0.00<br />

* 20 DSF0000417375 P.S. 170 ADDITION 240 Jul-12 Jul-13 Aug-15 41.09<br />

0.24 36.62 4.24<br />

20<br />

DSF0000690222<br />

PROJECT #1 640 Mar-13 Jun-<strong>14</strong> Jun-16 89.13<br />

0.00 79.62 9.51<br />

* 20 DSF0000687<strong>10</strong>6 PS 3<strong>10</strong> THE SCHOOL FOR FUTURE<br />

LEADERS<br />

367 Jan-09 Jun-<strong>10</strong> Aug-12<br />

* 20 DSF0000417409 P.S. 331 708 Mar-09 Jul-<strong>10</strong> May-13 84.31 13.15 71.15 0.00<br />

* L 20 DSF0000775562 P.S. 768 256 Nov-12 Oct-13 Jun-15 11.66<br />

0.00 <strong>10</strong>.01 1.65<br />

20<br />

DSF0000754571<br />

PROJECT #5 161 May-13 Jun-<strong>14</strong> Sep-15 22.71<br />

0.00 20.41 2.30<br />

* 22 DSF0000425868 PS/IS 338 757 May-<strong>10</strong> Jun-13 Jun-16 91.53<br />

0.20 83.86 7.47<br />

* 22 DSF0000690224 P.S. 438 456 Dec-12 Mar-<strong>14</strong> Mar-17 53.57<br />

0.00 47.83 5.73<br />

* 78K DSF0000622354 SPRING CREEK EDUCATIONAL<br />

CAMPUS<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

1,202 Apr-08 Jul-09 Sep-12<br />

44.83<br />

<strong>10</strong>4.30<br />

4.91<br />

4.53<br />

39.92<br />

99.77<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Replacement Projects<br />

Borough of Brooklyn<br />

(in millions)<br />

Actual /<br />

Funding<br />

Forecast Design Constr Est. Total Est. Previous Req'd Needed to<br />

District Project # School<br />

Capacity Start Start Compl Cost Appropriations FY<strong>10</strong>-<strong>14</strong> Complete<br />

* L 78K DSF0000544842 ALL CITY LEADERSHIP SCHOOL Replacement Oct-07 Jun-<strong>10</strong> Jan-13 43.15 2.20 40.95 0.00<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 P.S. 3 - Brooklyn<br />

13 P.S. 8 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000690333 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000690334 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Stairs/ramps: Exterior<br />

DSF00007<strong>10</strong>745 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

SITE:Playgrounds:Safety Surfacing<br />

DSF00007<strong>10</strong>746 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000755393 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,095,783<br />

3,666,006<br />

159,093<br />

525,438<br />

1,204,819<br />

P.S. 3 - Brooklyn Total: $6,651,<strong>14</strong>0<br />

DSF0000732640 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

919,665


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 P.S. 9 - Brooklyn<br />

13 P.S. 11 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000732641 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000775574 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000775575 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

2,831,447<br />

443,799<br />

742,290<br />

P.S. 8 - Brooklyn Total: $4,937,201<br />

DSF0000665923 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000775558 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

1,458,548<br />

49,508<br />

P.S. 9 - Brooklyn Total: $1,508,056<br />

DSF0000400131 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

FUNCTIONAL AREAS:AUDITORIUM:FIXED SEATING<br />

FUNCTIONAL AREAS:AUDITORIUM:STAGE LIGHTING/CONTROLS<br />

LIGHTING - STAGE THEATER<br />

DSF0000732697 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

460,253<br />

1,393,123


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 P.S. 20 - Brooklyn<br />

13 P.S. 44 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

P.S. 11 - Brooklyn Total: $1,853,375<br />

DSF0000666122 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF00007<strong>10</strong>991 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000711549 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Library Upgrades<br />

INTERIOR:LIBRARY:Built-in Furnishing<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

DSF000073<strong>14</strong><strong>14</strong> Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF000073<strong>14</strong>63 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

2,700,642<br />

1,888,164<br />

517,567<br />

86,765<br />

1,967,423<br />

P.S. 20 - Brooklyn Total: $7,160,561<br />

DSF0000733232 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

898,249


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 P.S. 46 - Brooklyn<br />

13 P.S. 54 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 44 - Brooklyn Total: $898,249<br />

DSF0000666535 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000754497 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

295,731<br />

150,178<br />

P.S. 46 - Brooklyn Total: $445,909<br />

DSF0000600841 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000600843 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000600844 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

DSF0000666645 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

922,659<br />

690,998<br />

1,702,840<br />

523,<strong>10</strong>1


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

* Building scheduled for an Exterior Mod<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000666653 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

DSF0000666656 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000666661 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Auditorium:Ceiling<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Wall<br />

DSF0000666663 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

DSF0000712047 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

DSF0000712051 State of Good Repair - System Replacements - Floors<br />

2013<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

DSF0000754373 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

204,018<br />

170,656<br />

386,176<br />

174,845<br />

611,717<br />

357,363<br />

1,449,495


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 P.S. 67 - Brooklyn<br />

13 P.S. 93 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 54 - Brooklyn Total: $7,193,867<br />

DSF0000712216 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000712218 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000733554 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000733560 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

1,194,232<br />

1,752,037<br />

723,684<br />

852,459<br />

P.S. 67 - Brooklyn Total: $4,522,412<br />

DSF0000667<strong>14</strong>9 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000733860 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

2,1<strong>10</strong>,486<br />

978,128


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

13 I.S. 117 - Brooklyn<br />

13 P.S. 282 - Brooklyn<br />

<strong>14</strong> P.S. 16 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 93 - Brooklyn Total: $3,088,613<br />

DSF0000667546 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

DSF0000687219 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000688<strong>14</strong>1 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

1,094,715<br />

17,281<br />

237,963<br />

I.S. 117 - Brooklyn Total: $1,349,959<br />

DSF0000670198 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Playgrounds:Fencing<br />

SITE:Playgrounds:Pavement<br />

SITE:Playgrounds:Play Equipment<br />

SITE:Playgrounds:Safety Surfacing<br />

6<strong>10</strong>,450<br />

P.S. 282 - Brooklyn Total: $6<strong>10</strong>,450


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 17 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000666061 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2011<br />

CAFETERIA:Lighting:Lighting Fixture - Fluorescent<br />

INTERIOR:Cafeteria:Ceiling<br />

INTERIOR:Cafeteria:Door(s)<br />

INTERIOR:Cafeteria:Floor Finish<br />

DSF0000752876 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,968,069<br />

1,167,112<br />

P.S. 16 - Brooklyn Total: $3,135,181<br />

DSF0000622526 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000690566 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000690568 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000690569 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF000073<strong>10</strong>16 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF000073<strong>10</strong>17 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:PARAPETS<br />

384,072<br />

680,359<br />

1,734,531<br />

3,552,800<br />

897,133<br />

1,866,027


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 18 - Brooklyn<br />

<strong>14</strong> P.S. 31 (OLD 126) - Brooklyn<br />

<strong>14</strong> I.S. 33 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 17 - Brooklyn Total: $9,1<strong>14</strong>,921<br />

DSF0000732835 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000732837 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

218,508<br />

2,311,394<br />

P.S. 18 - Brooklyn Total: $2,529,902<br />

DSF0000733028 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

675,481<br />

P.S. 31 (OLD 126) - Brooklyn Total: $675,481<br />

DSF0000545297 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000732175 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000732176 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754489 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

412,591<br />

672,020<br />

200,000<br />

195,203


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 34 - Brooklyn<br />

<strong>14</strong> I.S. 49 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000775506 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775507 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

52,000<br />

52,000<br />

I.S. 33 - Brooklyn Total: $1,583,8<strong>14</strong><br />

DSF00007<strong>10</strong>092 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

1,628,934<br />

P.S. 34 - Brooklyn Total: $1,628,934<br />

DSF00006902<strong>14</strong> Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000709506 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF0000733307 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000775792 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>14</strong><br />

Gymnasium Upgrade<br />

154,235<br />

601,245<br />

3,078,496<br />

1,606,426


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> J.H.S. 50 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

I.S. 49 - Brooklyn Total: $5,440,402<br />

DSF0000622368 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000666583 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

20<strong>10</strong><br />

INTERIOR:Structural:Floor Structure<br />

DSF0000711996 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

DSF0000733328 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000733329 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753<strong>14</strong>9 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Electrical Systems<br />

PANEL BOARD<br />

386,054<br />

942,927<br />

901,073<br />

2,021,376<br />

3,817,461<br />

95,328


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 59 - Brooklyn<br />

<strong>14</strong> I.S. 71 - Brooklyn<br />

<strong>14</strong> P.S. 84 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000775508 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

156,000<br />

J.H.S. 50 - Brooklyn Total: $8,320,219<br />

DSF0000754498 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000775509 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

300,178<br />

52,000<br />

P.S. 59 - Brooklyn Total: $352,178<br />

DSF0000733600 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000733604 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

2,425,683<br />

4,407,684<br />

I.S. 71 - Brooklyn Total: $6,833,368


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 1<strong>10</strong> - Brooklyn<br />

<strong>14</strong> P.S. 120 - Brooklyn<br />

<strong>14</strong> J.H.S. 126 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000709451 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

79,990<br />

P.S. 84 - Brooklyn Total: $79,990<br />

DSF00007<strong>10</strong>277 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000712766 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000775791 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

1,259,501<br />

3,029,<strong>10</strong>2<br />

150,000<br />

P.S. 1<strong>10</strong> - Brooklyn Total: $4,438,603<br />

DSF0000709456 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

SITE:Playgrounds:Play Equipment<br />

SITE:Playgrounds:Safety Surfacing<br />

161,717<br />

P.S. 120 - Brooklyn Total: $161,717<br />

DSF0000544678 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000712999 State of Good Repair - System Replacements - Windows<br />

2012<br />

48,318<br />

2,843,007


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 132 - Brooklyn<br />

<strong>14</strong> P.S. <strong>14</strong>7 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:WINDOWS<br />

DSF0000752902 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

244,394<br />

J.H.S. 126 - Brooklyn Total: $3,135,718<br />

DSF0000622220 Safety and Security - Safety and Security - Code Compliance<br />

2011<br />

DSF0000667730 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000667731 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000667732 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

1,832,179<br />

1,3<strong>14</strong>,281<br />

2,582,463<br />

3,934,617<br />

P.S. 132 - Brooklyn Total: $9,663,540<br />

DSF0000667912 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF00007<strong>10</strong>247 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

1,050,575<br />

81,048


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 157 - Brooklyn<br />

<strong>14</strong> P.S. 196 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. <strong>14</strong>7 - Brooklyn Total: $1,131,623<br />

DSF0000734736 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

CAFETERIA:LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Floor Finish<br />

SCA00000<strong>10</strong>433 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

718,491<br />

2,155,000<br />

P.S. 157 - Brooklyn Total: $2,873,491<br />

DSF00007<strong>14</strong>008 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF00007<strong>14</strong>0<strong>10</strong> State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000735319 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000752903 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

1,387,285<br />

1,800,785<br />

1,934,715<br />

344,008<br />

P.S. 196 - Brooklyn Total: $5,466,793


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 250 - Brooklyn<br />

<strong>14</strong> I.S. 318 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000736265 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000736276 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

DSF0000759184 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

2,841,575<br />

81,629<br />

56,4<strong>14</strong><br />

P.S. 250 - Brooklyn Total: $2,979,619<br />

DSF0000695043 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000695045 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Exterior Walls<br />

DSF000073<strong>10</strong>11 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

665,335<br />

3,<strong>10</strong>1,204<br />

1,021,362<br />

I.S. 318 - Brooklyn Total: $4,787,901


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

<strong>14</strong> P.S. 380 - Brooklyn<br />

15 P.S. 1 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000545298 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000687344 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Playgrounds:Pavement<br />

DSF0000716323 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF0000716327 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000716329 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000755257 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

251,329<br />

1,299,670<br />

1,773,683<br />

660,436<br />

2,461,097<br />

245,306<br />

P.S. 380 - Brooklyn Total: $6,691,521


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. <strong>10</strong> - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000417443 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:ROOFING:ROOFING<br />

EXTERIOR:ROOFING:SPECIALTIES<br />

DSF0000711203 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000732544 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000755358 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000755362 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000755364 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000775595 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

1,817,919<br />

977,001<br />

3,949,507<br />

821,918<br />

1,224,342<br />

472,125<br />

3,6<strong>14</strong>,458<br />

P.S. 1 - Brooklyn Total: $12,877,268<br />

DSF0000732677 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

781,504


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. 15 - Brooklyn<br />

15 P.S. 27 - Brooklyn<br />

15 P.S. 29 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. <strong>10</strong> - Brooklyn Total: $781,504<br />

DSF00007<strong>10</strong>238 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Library Upgrades<br />

DSF00007<strong>10</strong>331 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

707,368<br />

<strong>14</strong>0,579<br />

P.S. 15 - Brooklyn Total: $847,947<br />

DSF0000666221 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

705,618<br />

P.S. 27 - Brooklyn Total: $705,618<br />

DSF0000690737 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000690739 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000690740 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

921,921<br />

1,672,726<br />

4,2<strong>14</strong>,490


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. 32 - Brooklyn<br />

15 P.S. 38 - Brooklyn<br />

15 P.S. 39 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000711681 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

1,211,680<br />

P.S. 29 - Brooklyn Total: $8,020,817<br />

DSF0000753112 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

977,345<br />

P.S. 32 - Brooklyn Total: $977,345<br />

DSF0000733139 State of Good Repair - System Replacements - Roofs<br />

20<strong>14</strong><br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000753113 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

1,431,919<br />

503,152<br />

P.S. 38 - Brooklyn Total: $1,935,070<br />

DSF0000711819 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF000073<strong>10</strong>81 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

1,139,209<br />

3,773,776<br />

P.S. 39 - Brooklyn Total: $4,912,985


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 I.S. 51 - Brooklyn<br />

15 I.S. 88 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000712015 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Fluorescent<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:SCOREBOARD<br />

INTERIOR:GYMNASIUM:Ceiling<br />

6<strong>14</strong>,560<br />

I.S. 51 - Brooklyn Total: $6<strong>14</strong>,560<br />

DSF0000622349 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000733772 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000733773 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

DSF0000753032 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000775609 State of Good Repair - Building Upgrade - Boiler Conversion<br />

20<strong>14</strong><br />

209,454<br />

477,804<br />

2,517,139<br />

840,334<br />

3,6<strong>14</strong>,458


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. 94 - Brooklyn<br />

15 P.S. 124 - Brooklyn<br />

15 P.S. 130 - Brooklyn<br />

15 P.S. 131 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF00007756<strong>10</strong> State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>14</strong><br />

DSF0000775790 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

821,918<br />

200,000<br />

I.S. 88 - Brooklyn Total: $8,681,<strong>10</strong>6<br />

DSF0000622437 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

509,484<br />

P.S. 94 - Brooklyn Total: $509,484<br />

DSF0000692046 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

231,068<br />

P.S. 124 - Brooklyn Total: $231,068<br />

DSF0000667691 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

1,742,433<br />

P.S. 130 - Brooklyn Total: $1,742,433<br />

DSF0000713049 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:STAIRS/RAMPS: EXTERIOR<br />

202,038<br />

P.S. 131 - Brooklyn Total: $202,038


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 I.S. 136 - Brooklyn<br />

15 J.H.S. <strong>14</strong>2 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000601972 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

DSF0000667790 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000713<strong>10</strong>5 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:STAIRS/RAMPS: EXTERIOR<br />

DSF0000757249 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000775639 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

1,411,393<br />

1,073,435<br />

240,046<br />

1,204,819<br />

684,932<br />

I.S. 136 - Brooklyn Total: $4,6<strong>14</strong>,625<br />

DSF0000667866 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000667873 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

2,209,995<br />

636,432


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. 169 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000667875 State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

DSF0000688172 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000688173 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Cornice<br />

DSF0000688174 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000690215 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

DSF0000713190 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000731527 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000734515 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

319,248<br />

2,215,771<br />

9,872,664<br />

3,054,749<br />

51,528<br />

506,671<br />

288,361<br />

563,323<br />

J.H.S. <strong>14</strong>2 - Brooklyn Total: $19,718,741<br />

DSF0000622439 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

492,422


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 P.S. 172 - Brooklyn<br />

15 P.S. 230 - Brooklyn<br />

15 P.S. 261 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

SITE:PLAYGROUNDS:MATTING<br />

SITE:PLAYGROUNDS:PLAY EQUIPMENT<br />

DSF0000622527 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000668285 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIFE SAFETY:Steel Stairs<br />

LIGHTING - EXTERIOR SECURITY<br />

161,832<br />

681,4<strong>14</strong><br />

P.S. 169 - Brooklyn Total: $1,335,669<br />

DSF0000753116 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

887,749<br />

P.S. 172 - Brooklyn Total: $887,749<br />

DSF0000622213 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

325,032<br />

P.S. 230 - Brooklyn Total: $325,032<br />

DSF0000775640 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 261 - Brooklyn Total: $684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

15 J.H.S. 293 - Brooklyn<br />

15 P.S. 295 - Brooklyn<br />

16 P.S. 5 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000715732 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

SITE:PAVING - STUDENT USE:Asphalt<br />

DSF0000752934 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754287 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

786,901<br />

1,179,228<br />

335,257<br />

J.H.S. 293 - Brooklyn Total: $2,301,386<br />

DSF0000622366 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

150,040<br />

P.S. 295 - Brooklyn Total: $150,040<br />

DSF0000711254 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000711255 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000711256 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

2,928,611<br />

313,548<br />

1,864,002


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 P.S. 21 - Brooklyn<br />

16 P.S. 25 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

DSF0000732196 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

569,305<br />

P.S. 5 - Brooklyn Total: $5,675,467<br />

DSF0000711561 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000711562 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000711563 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000711568 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

SITE:PAVING - STUDENT USE:Asphalt<br />

864,636<br />

855,915<br />

1,784,<strong>10</strong>3<br />

47,024<br />

P.S. 21 - Brooklyn Total: $3,551,677


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 P.S. 26 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000711622 State of Good Repair - System Replacements - Toilets-Students<br />

2012<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

DSF0000711632 Safety and Security - Safety and Security - Safety Systems<br />

2012<br />

SECURITY:INTRUSION ALARM<br />

1,698,<strong>14</strong>6<br />

219,897<br />

P.S. 25 - Brooklyn Total: $1,918,042<br />

DSF00007<strong>10</strong>240 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>251 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000711642 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

DSF0000732972 State of Good Repair - System Replacements - Roofs<br />

2012<br />

2,919,630<br />

1,666,9<strong>10</strong><br />

1,495,254<br />

3,330,784


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 I.S. 35 - Brooklyn<br />

16 P.S. 40 - Brooklyn<br />

16 J.H.S. 57 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

P.S. 26 - Brooklyn Total: $9,412,578<br />

DSF0000731383 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

HEATING<br />

DSF0000733111 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000733112 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

859,493<br />

166,209<br />

1,333,461<br />

I.S. 35 - Brooklyn Total: $2,359,162<br />

DSF0000752846 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

<strong>14</strong>5,599<br />

P.S. 40 - Brooklyn Total: $<strong>14</strong>5,599<br />

DSF00006667<strong>14</strong> State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000666715 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

5,453,224<br />

575,664


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 P.S. 81 - Brooklyn<br />

16 P.S. 262 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000666716 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000666731 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>10</strong><br />

Waste System<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sewage / Waste Piping<br />

DSF0000731554 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

2,421,523<br />

1,201,677<br />

830,082<br />

J.H.S. 57 - Brooklyn Total: $<strong>10</strong>,482,170<br />

DSF0000712362 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000733702 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

2,855,438<br />

192,626<br />

P.S. 81 - Brooklyn Total: $3,048,065<br />

DSF0000669883 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

564,068


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 P.S. 308 - Brooklyn<br />

16 P.S. 309 - Brooklyn<br />

16 I.S. 324 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 262 - Brooklyn Total: $564,068<br />

DSF0000732422 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

72,791<br />

P.S. 308 - Brooklyn Total: $72,791<br />

DSF0000670657 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

703,833<br />

P.S. 309 - Brooklyn Total: $703,833<br />

DSF0000604997 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILLARY SIGNAL / BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000605001 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000605002 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000605003 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Walls<br />

766,902<br />

2,847,376<br />

3,064,252<br />

2,065,852


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

16 P.S. 335 - Brooklyn<br />

17 I.S. 2 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000622652 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000670792 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

3,529,592<br />

1,366,604<br />

I.S. 324 - Brooklyn Total: $13,640,577<br />

DSF0000737428 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000737430 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

3,894,708<br />

665,191<br />

P.S. 335 - Brooklyn Total: $4,559,899<br />

DSF0000775636 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 6 - Brooklyn<br />

17 P.S. 12 - Brooklyn<br />

17 I.S. 61 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DOMESTIC WATER SYSTEM<br />

I.S. 2 - Brooklyn Total: $684,932<br />

DSF0000665874 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000687157 State of Good Repair - Building Upgrade - Climate Control<br />

2012<br />

DSF00007<strong>10</strong>089 State of Good Repair - System Replacements - Roofs<br />

2011<br />

492,721<br />

2,703,332<br />

688,223<br />

P.S. 6 - Brooklyn Total: $3,884,277<br />

DSF0000752850 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

200,358<br />

P.S. 12 - Brooklyn Total: $200,358<br />

DSF0000666772 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000666777 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING PLANT:Boiler System<br />

DSF0000666780 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

1,761,319<br />

4,383,308<br />

247,817


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 91 - Brooklyn<br />

17 P.S. 92 - Brooklyn<br />

17 P.S. 138 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

I.S. 61 - Brooklyn Total: $6,392,444<br />

DSF0000712480 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2012<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

282,063<br />

P.S. 91 - Brooklyn Total: $282,063<br />

DSF0000667122 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000688411 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000756631 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

2,497,262<br />

318,769<br />

1,204,819<br />

P.S. 92 - Brooklyn Total: $4,020,851<br />

DSF0000667826 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF00007<strong>10</strong>085 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

1,771,827<br />

731,172


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 161 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Parapets<br />

DSF00007<strong>10</strong>086 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000713160 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - HID<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

INTERIOR:AUDITORIUM:Walls<br />

INTERIOR:AUDITORIUM:Window Curtains/Shades/Blinds<br />

1,192,061<br />

1,279,253<br />

P.S. 138 - Brooklyn Total: $4,974,312<br />

DSF0000602333 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

1,543,855


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 167 - Brooklyn<br />

17 P.S. 181 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000668155 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2011<br />

INTERIOR:Library:Floor Finish<br />

DSF0000687220 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000713454 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

222,738<br />

21,605<br />

338,773<br />

P.S. 161 - Brooklyn Total: $2,126,971<br />

DSF0000687178 State of Good Repair - Building Upgrade - Interior Spaces<br />

20<strong>10</strong><br />

DSF0000731518 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2013<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

3,715,539<br />

444,468<br />

P.S. 167 - Brooklyn Total: $4,160,007<br />

DSF00007<strong>10</strong><strong>10</strong>6 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

DSF0000735086 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000735087 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

702,267<br />

1,712,052<br />

5,182,431


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 189 - Brooklyn<br />

17 P.S. 191 - Brooklyn<br />

17 P.S. 221 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 181 - Brooklyn Total: $7,596,751<br />

DSF0000668579 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,<strong>14</strong>4,612<br />

P.S. 189 - Brooklyn Total: $1,<strong>14</strong>4,612<br />

DSF0000668627 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

585,874<br />

P.S. 191 - Brooklyn Total: $585,874<br />

DSF00007<strong>14</strong>484 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

DSF0000735778 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,403,118<br />

1,<strong>14</strong>0,684


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 I.S. 246 - Brooklyn<br />

17 P.S. 249 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 221 - Brooklyn Total: $2,543,802<br />

DSF0000693940 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000693942 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000693943 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

DSF00007<strong>10</strong>325 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF00007<strong>10</strong>326 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

169,809<br />

4,855,724<br />

372,404<br />

192,555<br />

609,397<br />

I.S. 246 - Brooklyn Total: $6,199,890<br />

DSF0000669619 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

1,887,772


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 289 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000669620 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000669621 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

2,071,589<br />

1,131,735<br />

P.S. 249 - Brooklyn Total: $5,091,095<br />

DSF0000670312 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000670316 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000670317 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000670318 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000670329 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

CAFETERIA:Local Sound System<br />

605,512<br />

334,662<br />

2,527,000<br />

1,482,599<br />

188,049


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 316 - Brooklyn<br />

17 P.S. 375 - Brooklyn<br />

17 I.S. 390 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Cafeteria:Ceiling<br />

DSF0000736900 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

<strong>10</strong>7,013<br />

P.S. 289 - Brooklyn Total: $5,244,834<br />

DSF0000695026 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

534,263<br />

P.S. 316 - Brooklyn Total: $534,263<br />

DSF0000670756 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000670758 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000670759 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

DSF0000670770 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

1,320,228<br />

922,632<br />

860,017<br />

435,075<br />

P.S. 375 - Brooklyn Total: $3,537,952


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 398 (UDC) - Brooklyn<br />

DSF0000671<strong>10</strong>7 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Elevators<br />

DSF0000671<strong>10</strong>8 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000671111 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000687168 State of Good Repair - Building Upgrade - Interior Spaces<br />

20<strong>10</strong><br />

DSF00007755<strong>10</strong> Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775511 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

307,212<br />

594,468<br />

3,578,846<br />

1,965,865<br />

208,000<br />

208,000<br />

I.S. 390 - Brooklyn Total: $6,862,391<br />

DSF0000687221 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

17 P.S. 241 MINISCHOOL - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Electrical Systems<br />

20,933<br />

P.S. 398 (UDC) - Brooklyn Total: $20,933<br />

DSF0000752836 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Air Conditioning Split System<br />

<strong>10</strong>1,736


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

17 P.S. 138 AX (CROWN HGTS ECC 1) - Brooklyn<br />

AIR CONDITIONING:DX SPLIT SYSTEM<br />

AIR CONDITIONING:REFRIGERANT PIPING<br />

P.S. 241 MINISCHOOL - Brooklyn Total: $<strong>10</strong>1,736<br />

DSF0000717629 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

DSF0000738842 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

17 I.S. 340 (OLD 249 AX) - Brooklyn<br />

FIRE ALARM SYSTEM<br />

234,315<br />

78,955<br />

P.S. 138 AX (CROWN HGTS ECC 1) - Brooklyn Total: $313,270<br />

DSF0000717650 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

17 P.S. 221 MINISCHOOL - Brooklyn<br />

18 P.S. 1<strong>14</strong> - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,079,676<br />

I.S. 340 (OLD 249 AX) - Brooklyn Total: $1,079,676<br />

DSF0000752837 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Air Conditioning Split System<br />

AIR CONDITIONING:DX SPLIT SYSTEM<br />

AIR CONDITIONING:REFRIGERANT PIPING<br />

<strong>14</strong>9,2<strong>14</strong><br />

P.S. 221 MINISCHOOL - Brooklyn Total: $<strong>14</strong>9,2<strong>14</strong><br />

DSF0000712839 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

2,498,853


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

18 P.S. 115 - Brooklyn<br />

18 P.S. 135 - Brooklyn<br />

18 P.S. 208 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

P.S. 1<strong>14</strong> - Brooklyn Total: $2,498,853<br />

DSF0000401261 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000667507 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000667508 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

3,837,905<br />

1,785,503<br />

1,152,028<br />

P.S. 115 - Brooklyn Total: $6,775,436<br />

DSF0000667762 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000667764 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000667765 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

902,520<br />

860,883<br />

920,735<br />

P.S. 135 - Brooklyn Total: $2,684,138


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

18 I.S. 211 - Brooklyn<br />

18 P.S. 219 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000668949 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>10</strong><br />

INTERIOR:Library:Floor Finish<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

DSF0000688263 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000758443 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>14</strong><br />

INTERIOR:GYMNASIUM:Floor Finish<br />

755,860<br />

15,571<br />

657,000<br />

P.S. 208 - Brooklyn Total: $1,428,431<br />

DSF00007<strong>14</strong>287 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF00007<strong>14</strong>292 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF00007<strong>14</strong>293 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

1,286,797<br />

2,662,688<br />

574,403<br />

I.S. 211 - Brooklyn Total: $4,523,888


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

18 I.S. 232 - Brooklyn<br />

18 P.S. 233 - Brooklyn<br />

18 P.S. 235 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000669<strong>14</strong>8 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000669<strong>14</strong>9 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000688200 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000758627 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

446,369<br />

3,312,933<br />

223,066<br />

1,204,819<br />

P.S. 219 - Brooklyn Total: $5,187,188<br />

DSF0000688161 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000753119 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

282,460<br />

331,262<br />

I.S. 232 - Brooklyn Total: $613,723<br />

DSF0000735988 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

CLIMATE CONTROL SYSTEM<br />

28,829<br />

P.S. 233 - Brooklyn Total: $28,829


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

18 P.S. 235 ANNEX - Brooklyn<br />

18 P.S. 244 - Brooklyn<br />

18 I.S. 285 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000402802 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000402816 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:GYMNASIUM:FLOORING<br />

DSF00007<strong>14</strong>725 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000736028 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

111,043<br />

440,322<br />

2,178,094<br />

1,284,249<br />

P.S. 235 - Brooklyn Total: $4,013,709<br />

DSF0000736<strong>14</strong>9 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

718,296<br />

P.S. 235 ANNEX - Brooklyn Total: $718,296<br />

DSF0000736190 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

62,876<br />

P.S. 244 - Brooklyn Total: $62,876<br />

DSF0000670230 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

1,227,713


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

18 P.S. 219 ANNEX - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000670237 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000736829 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF0000736831 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DSF0000775552 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

INTERIOR:CAFETERIA:Ceiling<br />

4,597,765<br />

1,<strong>14</strong>0,684<br />

615,557<br />

75,000<br />

I.S. 285 - Brooklyn Total: $7,656,720<br />

DSF0000672434 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000672456 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

CAFETERIA/MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Fluorescent<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Ceiling<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Floor Finish<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Stage and Fixed Equipment:Stage<br />

420,855<br />

1,526,355


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 13 - Brooklyn<br />

19 P.S. 72 - Brooklyn<br />

19 P.S. <strong>10</strong>8 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000752418 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

701,130<br />

P.S. 219 ANNEX - Brooklyn Total: $2,648,340<br />

DSF0000665987 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:Elevators<br />

DSF0000752845 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

760,694<br />

206,599<br />

P.S. 13 - Brooklyn Total: $967,293<br />

DSF0000733621 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,408,788<br />

P.S. 72 - Brooklyn Total: $1,408,788<br />

DSF0000734097 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

733,713


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 158 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Walls<br />

DSF0000734<strong>10</strong>1 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Floor Finish<br />

INTERIOR:CAFETERIA:Walls<br />

DSF0000756901 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000775637 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

589,552<br />

1,204,819<br />

684,932<br />

P.S. <strong>10</strong>8 - Brooklyn Total: $3,213,016<br />

DSF0000401705 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000602268 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000757554 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

4,238,074<br />

1,116,766<br />

1,204,819


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 I.S. 171 - Brooklyn<br />

19 P.S. 190 - Brooklyn<br />

19 P.S. 202 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 158 - Brooklyn Total: $6,559,659<br />

DSF0000668313 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF00006683<strong>14</strong> State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

DSF00007<strong>10</strong>963 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

SCA0000008889 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

686,406<br />

337,736<br />

117,136<br />

4,617,870<br />

I.S. 171 - Brooklyn Total: $5,759,<strong>14</strong>8<br />

DSF0000668599 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000668600 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000709427 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

1,942,8<strong>10</strong><br />

2,648,078<br />

2,884,179<br />

P.S. 190 - Brooklyn Total: $7,475,067


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 2<strong>14</strong> - Brooklyn<br />

19 P.S. 260 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000735437 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,191,984<br />

P.S. 202 - Brooklyn Total: $1,191,984<br />

DSF0000693404 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000693406 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000693407 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000693408 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Cornice<br />

DSF00007<strong>10</strong>270 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

844,209<br />

337,513<br />

2,008,223<br />

5,865,691<br />

253,761<br />

P.S. 2<strong>14</strong> - Brooklyn Total: $9,309,396<br />

DSF0000669837 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

771,085


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 273 - Brooklyn<br />

19 I.S. 292 - Brooklyn<br />

19 I.S. 302 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

P.S. 260 - Brooklyn Total: $771,085<br />

DSF0000670048 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000670049 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000670050 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

1,323,024<br />

2,183,170<br />

2,337,<strong>10</strong>0<br />

P.S. 273 - Brooklyn Total: $5,843,295<br />

DSF0000670376 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

5,094,335<br />

I.S. 292 - Brooklyn Total: $5,094,335<br />

DSF0000604716 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

418,740


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 306 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000604717 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000604718 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000604719 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

2,161,875<br />

3,999,175<br />

5,583,293<br />

I.S. 302 - Brooklyn Total: $12,163,085<br />

DSF0000670584 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Drinking Fountains<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Playgrounds:Pavement<br />

SITE:Playgrounds:Play Equipment<br />

SITE:Playgrounds:Safety Surfacing<br />

SITE:Playgrounds:Unpaved Area<br />

1,439,621<br />

P.S. 306 - Brooklyn Total: $1,439,621


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

19 P.S. 328 - Brooklyn<br />

19 P.S. 346 - Brooklyn<br />

20 P.S. 48 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000737380 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

616,780<br />

P.S. 328 - Brooklyn Total: $616,780<br />

DSF0000716220 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

DSF0000716223 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,261,467<br />

392,199<br />

P.S. 346 - Brooklyn Total: $1,653,667<br />

DSF0000666546 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000666547 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000666548 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

1,<strong>14</strong>8,691<br />

2,877,936<br />

2,058,<strong>14</strong>0


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 69 - Brooklyn<br />

20 P.S. <strong>10</strong>2 - Brooklyn<br />

20 P.S. <strong>10</strong>4 - Brooklyn<br />

20 P.S. <strong>10</strong>5 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

P.S. 48 - Brooklyn Total: $6,084,766<br />

DSF00007531<strong>14</strong> State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

517,953<br />

P.S. 69 - Brooklyn Total: $517,953<br />

DSF0000712672 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

3,845,764<br />

P.S. <strong>10</strong>2 - Brooklyn Total: $3,845,764<br />

SCA0000009611 State of Good Repair - System Replacements - Parapets<br />

2011<br />

493,613<br />

P.S. <strong>10</strong>4 - Brooklyn Total: $493,613<br />

DSF0000687223 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

31,546<br />

P.S. <strong>10</strong>5 - Brooklyn Total: $31,546


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 112 - Brooklyn<br />

20 P.S. 127 - Brooklyn<br />

20 P.S. 160 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000667453 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000667454 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000667455 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

664,679<br />

636,520<br />

845,4<strong>14</strong><br />

P.S. 112 - Brooklyn Total: $2,<strong>14</strong>6,613<br />

DSF00007<strong>10</strong>278 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000757166 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000775638 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

2,838,551<br />

1,204,819<br />

684,932<br />

P.S. 127 - Brooklyn Total: $4,728,302<br />

DSF0000732405 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

INTERIOR:CAFETERIA:Floor Finish<br />

239,442<br />

P.S. 160 - Brooklyn Total: $239,442


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 163 - Brooklyn<br />

20 P.S. 164 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000713495 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF000073<strong>10</strong>12 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000752833 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000752834 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

3,012,633<br />

536,763<br />

190,357<br />

204,285<br />

P.S. 163 - Brooklyn Total: $3,944,039<br />

DSF0000622564 Exterior Masonry<br />

2011<br />

EXTERIOR:CHIMNEY<br />

DSF0000731524 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000734828 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000753115 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

556,594<br />

650,940<br />

1,721,212<br />

750,985<br />

P.S. 164 - Brooklyn Total: $3,679,731


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 176 - Brooklyn<br />

20 P.S. 179 - Brooklyn<br />

20 P.S. 180 - Brooklyn<br />

20 P.S. 185 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000544340 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Code Compliance<br />

DSF0000688365 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

197,676<br />

742,265<br />

P.S. 176 - Brooklyn Total: $939,941<br />

DSF0000735052 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2013<br />

SITE:PAVING - STUDENT USE:Asphalt<br />

654,524<br />

P.S. 179 - Brooklyn Total: $654,524<br />

DSF0000487899 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000622673 State of Good Repair - System Replacements - Containerization<br />

20<strong>10</strong><br />

DSF0000668451 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000735062 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

<strong>14</strong>3,858<br />

192,001<br />

682,481<br />

699,423<br />

P.S. 180 - Brooklyn Total: $1,717,763<br />

DSF0000668523 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

809,728


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 186 - Brooklyn<br />

20 P.S. 192 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000713828 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000735139 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000735<strong>14</strong>0 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

2,317,159<br />

1,513,920<br />

3,168,781<br />

P.S. 185 - Brooklyn Total: $7,809,588<br />

DSF0000668548 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Toilet<br />

1,634,768<br />

P.S. 186 - Brooklyn Total: $1,634,768<br />

DSF0000668636 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000668637 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

174,152<br />

2,<strong>10</strong>2,356<br />

P.S. 192 - Brooklyn Total: $2,276,507


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 200 - Brooklyn<br />

20 I.S. 201 - Brooklyn<br />

20 P.S. 204 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000735401 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

2,342,<strong>14</strong>0<br />

P.S. 200 - Brooklyn Total: $2,342,<strong>14</strong>0<br />

DSF00007354<strong>14</strong> State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000735420 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000735421 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

747,958<br />

1,615,185<br />

11,055,233<br />

I.S. 201 - Brooklyn Total: $13,418,376<br />

DSF0000622221 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000622442 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

DSF0000735474 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

7<strong>14</strong>,550<br />

530,955<br />

1,139,701


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 205 - Brooklyn<br />

20 I.S. 220 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000735477 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000752878 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

3,769,299<br />

939,327<br />

P.S. 204 - Brooklyn Total: $7,093,832<br />

DSF0000668883 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

1,982,543<br />

P.S. 205 - Brooklyn Total: $1,982,543<br />

DSF0000687222 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000693521 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2011<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

DSF0000735771 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

25,027<br />

596,759<br />

665,384


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 I.S. 223 - Brooklyn<br />

20 I.S. 227 - Brooklyn<br />

20 P.S. 229 - Brooklyn<br />

20 P.S. 247 - Brooklyn<br />

20 I.S. 259 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

I.S. 220 - Brooklyn Total: $1,287,169<br />

DSF00007<strong>14</strong>516 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

3,249,485<br />

I.S. 223 - Brooklyn Total: $3,249,485<br />

DSF0000669301 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

624,408<br />

I.S. 227 - Brooklyn Total: $624,408<br />

DSF0000402725 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

DSF0000687248 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

<strong>14</strong>1,819<br />

1,606,194<br />

P.S. 229 - Brooklyn Total: $1,748,013<br />

DSF0000687224 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

169,007<br />

P.S. 247 - Brooklyn Total: $169,007


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

20 P.S. 3<strong>14</strong> - Brooklyn<br />

20 I.S. 187 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>016 Safety and Security - Safety and Security - Emergency Lighting and Fire Safety Retrofits<br />

2011<br />

271,779<br />

I.S. 259 - Brooklyn Total: $271,779<br />

DSF0000403791 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:DUMBWAITERS<br />

CONVEYING:ELEVATORS<br />

DSF0000737234 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>14</strong><br />

Ventilation<br />

VENTILATION:METAL DUCTWORK<br />

DSF0000752894 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

248,288<br />

281,699<br />

779,705<br />

P.S. 3<strong>14</strong> - Brooklyn Total: $1,309,692<br />

DSF0000695890 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000738079 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>14</strong><br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

513,061<br />

346,417<br />

I.S. 187 - Brooklyn Total: $859,479


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 I.S. 98 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000666470 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000666471 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000666472 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Louver<br />

DSF0000666482 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

EXTERIOR:Doors:Transom/side Light<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

DSF0000711880 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:GYMNASIUM:Door(s)<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

2,930,239<br />

442,596<br />

2,<strong>14</strong>8,298<br />

346,047<br />

627,625<br />

I.S. 98 - Brooklyn Total: $6,494,805


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 90 - Brooklyn<br />

21 P.S. 95 - Brooklyn<br />

21 I.S. 96 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000733789 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

864,603<br />

P.S. 90 - Brooklyn Total: $864,603<br />

DSF000040<strong>10</strong>27 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000667188 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

1,511,367<br />

2,779,673<br />

P.S. 95 - Brooklyn Total: $4,291,040<br />

DSF000040<strong>10</strong>41 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000601389 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

DSF0000622453 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

481,231<br />

1,255,377<br />

733,592


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 97 - Brooklyn<br />

21 P.S. 99 - Brooklyn<br />

21 P.S. <strong>10</strong>0 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

I.S. 96 - Brooklyn Total: $2,470,201<br />

DSF0000667232 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000731206 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000733924 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000733937 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Ventilation<br />

VENTILATION:SUPPLY FAN<br />

DSF0000754282 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

833,292<br />

8,393,951<br />

2,372,057<br />

157,419<br />

1,622,408<br />

P.S. 97 - Brooklyn Total: $13,379,127<br />

DSF0000691674 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

INTERIOR:Kitchen/Warming Pantry:Ceiling<br />

188,321<br />

P.S. 99 - Brooklyn Total: $188,321<br />

DSF0000667274 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

854,279


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 121 - Brooklyn<br />

21 P.S. 153 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

ELECTRIC SERVICE SWITCH<br />

PANEL BOARD<br />

SWITCHBOARD<br />

P.S. <strong>10</strong>0 - Brooklyn Total: $854,279<br />

DSF0000601788 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

SCA0000005245 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

793,908<br />

1,767,077<br />

P.S. 121 - Brooklyn Total: $2,560,984<br />

DSF0000713333 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000713336 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000734669 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

336,3<strong>14</strong><br />

2,698,436<br />

297,217


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 177 - Brooklyn<br />

21 P.S. 188 - Brooklyn<br />

21 P.S. 209 - Brooklyn<br />

21 P.S. 212 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 153 - Brooklyn Total: $3,331,967<br />

DSF0000735011 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

INTERIOR:AUDITORIUM:Window Curtains/Shades/Blinds<br />

1,1<strong>14</strong>,049<br />

P.S. 177 - Brooklyn Total: $1,1<strong>14</strong>,049<br />

DSF0000544<strong>14</strong>1 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

DSF0000709418 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

11,613,126<br />

4,904,<strong>14</strong>0<br />

P.S. 188 - Brooklyn Total: $16,517,266<br />

DSF0000687227 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

26,132<br />

P.S. 209 - Brooklyn Total: $26,132<br />

DSF0000687228 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

34,731


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 216 - Brooklyn<br />

21 P.S. 225 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Electrical Systems<br />

DSF00007<strong>14</strong>313 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,041,347<br />

P.S. 212 - Brooklyn Total: $1,076,078<br />

DSF00007<strong>14</strong>387 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF00007<strong>14</strong>388 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2012<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

INTERIOR:STRUCTURAL:ROOF STRUCTURE<br />

DSF0000753098 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753099 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

499,689<br />

117,273<br />

351,652<br />

657,<strong>10</strong>3<br />

P.S. 216 - Brooklyn Total: $1,625,718<br />

DSF0000693604 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF0000693611 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

555,376<br />

517,994


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 226 - Brooklyn<br />

21 I.S. 228 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000735855 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000735857 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

816,718<br />

2,878,160<br />

P.S. 225 - Brooklyn Total: $4,768,248<br />

DSF0000603480 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

TOILET ROOM - STUDENT:Lighting Fixture - Fluorescent<br />

DSF0000669283 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

1,631,238<br />

487,600<br />

P.S. 226 - Brooklyn Total: $2,118,838<br />

DSF00007<strong>10</strong>275 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

526,744


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 P.S. 238 - Brooklyn<br />

21 I.S. 239 - Brooklyn<br />

21 P.S. 253 - Brooklyn<br />

21 P.S. 288 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000735913 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

PUBLIC ADDRESS SYSTEM<br />

672,000<br />

I.S. 228 - Brooklyn Total: $1,198,744<br />

DSF0000544686 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

54,242<br />

P.S. 238 - Brooklyn Total: $54,242<br />

DSF0000669484 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

EXTERIOR:Doors:Transom/side Light<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

539,547<br />

I.S. 239 - Brooklyn Total: $539,547<br />

DSF0000669695 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000669700 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

HEATING PLANT:Boiler System<br />

587,413<br />

4,883,670<br />

P.S. 253 - Brooklyn Total: $5,471,084


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

21 I.S. 303 - Brooklyn<br />

21 P.S. 329 - Brooklyn<br />

22 I.S. <strong>14</strong> - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000604528 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

585,744<br />

P.S. 288 - Brooklyn Total: $585,744<br />

DSF0000403665 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:PAVING - VEHICULAR AREA<br />

1,548,488<br />

I.S. 303 - Brooklyn Total: $1,548,488<br />

DSF0000670864 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF00007<strong>10</strong>961 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

1,137,074<br />

4,297,194<br />

P.S. 329 - Brooklyn Total: $5,434,269<br />

DSF0000666011 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000666013 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000666020 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2011<br />

430,240<br />

1,236,844<br />

883,483


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 52 - Brooklyn<br />

22 I.S. 78 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000732757 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000732764 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000732772 State of Good Repair - System Replacements - Fencing<br />

2012<br />

SITE:FENCES<br />

DSF0000752860 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

1,2<strong>14</strong>,900<br />

3,130,160<br />

323,232<br />

1,666,909<br />

I.S. <strong>14</strong> - Brooklyn Total: $8,885,768<br />

DSF0000666636 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Sidewalks<br />

493,971<br />

P.S. 52 - Brooklyn Total: $493,971<br />

DSF0000666956 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

735,462


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 119 - Brooklyn<br />

22 P.S. 139 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000666958 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

1,727,046<br />

I.S. 78 - Brooklyn Total: $2,462,508<br />

DSF0000757056 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000757060 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

1,204,819<br />

684,932<br />

P.S. 119 - Brooklyn Total: $1,889,751<br />

DSF0000667845 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000713170 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000734499 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

962,850<br />

1,965,251<br />

2,862,198


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 152 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

P.S. 139 - Brooklyn Total: $5,790,300<br />

DSF0000401633 Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000731<strong>14</strong>4 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000734656 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2013<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

DSF0000753062 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000753063 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753064 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000757469 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

TBD<br />

2,579,512<br />

3,568,4<strong>14</strong><br />

239,594<br />

1,953,869<br />

466,616<br />

<strong>10</strong>5,<strong>10</strong>0


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 194 - Brooklyn<br />

22 P.S. 195 - Brooklyn<br />

22 P.S. 197 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 152 - Brooklyn Total: $8,913,<strong>10</strong>6<br />

DSF0000713973 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000713977 State of Good Repair - System Replacements - Toilets-Students<br />

2012<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

162,617<br />

1,375,463<br />

P.S. 194 - Brooklyn Total: $1,538,080<br />

DSF0000753118 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

354,992<br />

P.S. 195 - Brooklyn Total: $354,992<br />

DSF0000735341 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

1,277,227


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 198 - Brooklyn<br />

22 P.S. 203 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000753031 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754389 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

886,598<br />

83,888<br />

P.S. 197 - Brooklyn Total: $2,247,7<strong>14</strong><br />

DSF0000622441 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

SITE:PLAYGROUNDS:MATTING<br />

SITE:PLAYGROUNDS:PLAY EQUIPMENT<br />

395,0<strong>10</strong><br />

P.S. 198 - Brooklyn Total: $395,0<strong>10</strong><br />

DSF0000668848 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000668850 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000668851 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000668852 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Walls<br />

2,356,308<br />

1,053,900<br />

1,323,526<br />

2,036,029


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 206 - Brooklyn<br />

22 P.S. 207 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

P.S. 203 - Brooklyn Total: $6,769,762<br />

DSF0000732418 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000735507 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF00007355<strong>10</strong> State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000735512 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000753139 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

3,280,166<br />

1,<strong>14</strong>0,684<br />

1,163,924<br />

496,6<strong>14</strong><br />

889,032<br />

P.S. 206 - Brooklyn Total: $6,970,420<br />

DSF0000730984 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000731129 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

3,172,902<br />

95,958


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 217 - Brooklyn<br />

22 P.S. 222 - Brooklyn<br />

22 I.S. 234 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

HEATING<br />

DSF0000735529 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000735531 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000735532 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

131,721<br />

741,181<br />

136,351<br />

P.S. 207 - Brooklyn Total: $4,278,112<br />

DSF0000622443 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

518,775<br />

P.S. 217 - Brooklyn Total: $518,775<br />

DSF00007<strong>14</strong>499 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

DSF00007<strong>14</strong>500 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

1,337,739<br />

538,754<br />

P.S. 222 - Brooklyn Total: $1,876,494<br />

DSF00007<strong>14</strong>709 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

1,624,902


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 236 - Brooklyn<br />

22 I.S. 240 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF00007360<strong>10</strong> State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000736011 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000752424 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

1,746,371<br />

2,788,882<br />

2,268,629<br />

I.S. 234 - Brooklyn Total: $8,428,784<br />

DSF0000669441 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000669443 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

351,801<br />

1,480,096<br />

P.S. 236 - Brooklyn Total: $1,831,896<br />

DSF0000736<strong>10</strong>8 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF00007361<strong>10</strong> State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>14</strong><br />

1,162,243<br />

2,152,404


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 251 - Brooklyn<br />

22 P.S. 255 - Brooklyn<br />

22 I.S. 278 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000736111 State of Good Repair - System Replacements - Parapets<br />

20<strong>14</strong><br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

4,378,494<br />

I.S. 240 - Brooklyn Total: $7,693,<strong>14</strong>1<br />

DSF0000669662 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000759197 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

HEATING<br />

HEATING PLANT:BOILER SYSTEM<br />

9<strong>14</strong>,<strong>10</strong>0<br />

59,589<br />

P.S. 251 - Brooklyn Total: $973,689<br />

DSF0000669734 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

1,339,982<br />

P.S. 255 - Brooklyn Total: $1,339,982


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 312 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000670<strong>14</strong>3 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000670<strong>14</strong>4 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000670<strong>14</strong>5 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000688280 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

779,816<br />

3,683,323<br />

2,317,044<br />

255,020<br />

I.S. 278 - Brooklyn Total: $7,035,203<br />

DSF0000670666 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000670668 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000670669 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

186,990<br />

2,500,560<br />

949,516


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S./I.S. 395 - Brooklyn<br />

22 P.S. 245 - Brooklyn<br />

EXTERIOR:Exterior Walls<br />

P.S. 312 - Brooklyn Total: $3,637,065<br />

DSF0000709447 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:Structural:Foundation Walls<br />

194,037<br />

P.S./I.S. 395 - Brooklyn Total: $194,037<br />

DSF0000730706 State of Good Repair - System Replacements - Toilets-Students<br />

2012<br />

22 P.S. 134 MINISCHOOL - Brooklyn<br />

22 P.S. 134 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

1,338,441<br />

P.S. 245 - Brooklyn Total: $1,338,441<br />

DSF0000731191 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

PUBLIC ADDRESS SYSTEM<br />

<strong>10</strong>4,091<br />

P.S. 134 MINISCHOOL - Brooklyn Total: $<strong>10</strong>4,091<br />

DSF0000717501 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000738721 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

456,295<br />

643,644


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

22 P.S. 326 - Brooklyn<br />

22 P.S. 361 (OLD 89) - Brooklyn<br />

23 P.S. 41 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

P.S. 134 - Brooklyn Total: $1,099,939<br />

DSF00007<strong>10</strong>930 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

<strong>10</strong>7,215<br />

P.S. 326 - Brooklyn Total: $<strong>10</strong>7,215<br />

DSF0000761738 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 361 (OLD 89) - Brooklyn Total: $1,204,819<br />

DSF0000711849 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000755991 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000775583 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Room Conversions/Partitioning<br />

DSF00007758<strong>10</strong> State of Good Repair - System Replacements - Parapets<br />

2013<br />

3,290,362<br />

469,333<br />

500,000<br />

2,870,330


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 I.S. 55 - Brooklyn<br />

23 P.S. 73 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:PARAPETS<br />

P.S. 41 - Brooklyn Total: $7,130,025<br />

DSF0000687078 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000691120 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000691121 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000691133 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

EXTERIOR:Doors:Transom/side Light<br />

INTERCOM SYSTEM:Holding Area<br />

INTERIOR:Interior Window Guards<br />

LIFE SAFETY:F.D. Holding Area<br />

306,549<br />

2,813,836<br />

2,278,461<br />

361,130<br />

I.S. 55 - Brooklyn Total: $5,759,977<br />

DSF0000691354 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

354,547


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 P.S. 137 - Brooklyn<br />

23 P.S. 150 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000691356 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

DSF0000691357 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong><strong>10</strong>2 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000733640 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

459,578<br />

2,808,377<br />

<strong>14</strong>2,123<br />

652,400<br />

P.S. 73 - Brooklyn Total: $4,417,025<br />

DSF0000417553 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000688151 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

3,172,362<br />

633,782<br />

P.S. 137 - Brooklyn Total: $3,806,<strong>14</strong>4<br />

DSF0000667979 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>10</strong><br />

2,340,986


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 P.S. 165 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

AUDITORIUM:House Lighting:Lighting Fixture - Fluorescent<br />

AUDITORIUM:Projection System<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

INTERIOR:Auditorium:Door(s)<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

INTERIOR:Auditorium:Stage<br />

DSF0000667982 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Ventilation<br />

VENTILATION:Duct- Register / Diffuser<br />

VENTILATION:Metal Ductwork<br />

VENTILATION:Supply Fan<br />

DSF0000734631 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Fixed Equipment<br />

INTERIOR:CAFETERIA:Floor Finish<br />

558,724<br />

868,074<br />

P.S. 150 - Brooklyn Total: $3,767,784<br />

DSF0000668215 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

902,966


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 P.S. 178 - Brooklyn<br />

23 P.S. 183 - Brooklyn<br />

23 P.S. 184 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 165 - Brooklyn Total: $902,966<br />

DSF0000692781 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

999,399<br />

P.S. 178 - Brooklyn Total: $999,399<br />

DSF0000753117 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

383,640<br />

P.S. 183 - Brooklyn Total: $383,640<br />

DSF0000713807 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2013<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

INTERIOR:STRUCTURAL:ROOF STRUCTURE<br />

DSF0000735116 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000735132 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

INTERIOR:CAFETERIA:Floor Finish<br />

INTERIOR:MULTI-PURPOSE ROOM:Floor Finish<br />

INTERIOR:MULTI-PURPOSE ROOM:Walls<br />

MULTIPURPOSE ROOM:LIGHTING:Lighting Fixture - Fluorescent<br />

1,695,592<br />

118,364<br />

944,5<strong>14</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 P.S./I.S. 323 - Brooklyn<br />

23 I.S. 271 - Brooklyn<br />

23 I.S. 275 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000753<strong>10</strong>0 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

334,<strong>14</strong>7<br />

P.S. 184 - Brooklyn Total: $3,092,617<br />

DSF0000687332 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

333,769<br />

P.S./I.S. 323 - Brooklyn Total: $333,769<br />

DSF0000715339 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

DSF0000731133 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000731134 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

PANEL BOARD<br />

69,700<br />

<strong>10</strong>1,296<br />

279,637<br />

I.S. 271 - Brooklyn Total: $450,633<br />

DSF0000715419 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000753150 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>14</strong><br />

3,054,244<br />

238,203


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

23 P.S. 284 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Electrical Systems<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000754487 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000754488 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

200,254<br />

<strong>10</strong>0,254<br />

I.S. 275 - Brooklyn Total: $3,592,955<br />

DSF0000694568 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000715554 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

DSF0000731132 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000736821 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000759723 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

3,824,736<br />

43,689<br />

55,078<br />

1,678,847<br />

2,447,263


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

SCA0000007685 State of Good Repair - System Replacements - Parapets<br />

2011<br />

23 P.S. 327 (TANDEM K396-D75) - Brooklyn<br />

23 P.S. 332 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

3,013,040<br />

P.S. 284 - Brooklyn Total: $11,062,653<br />

DSF0000695<strong>14</strong>5 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

EMERGENCY GENERATOR<br />

EMERGENCY GENERATOR SET<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000737353 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000752854 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000775801 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

708,992<br />

4,875,469<br />

247,494<br />

391,938<br />

P.S. 327 (TANDEM K396-D75) - Brooklyn Total: $6,223,893


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000695207 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000775512 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

23 P.S. 178 AX (BED STUY ECC 1) - Brooklyn<br />

32 P.S. 75 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

2,<strong>14</strong>2,209<br />

312,000<br />

P.S. 332 - Brooklyn Total: $2,454,209<br />

DSF0000738777 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Ventilation<br />

MOTOR STARTER/CONTACTOR<br />

VENTILATION:EXHAUST FAN<br />

DSF0000752852 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

115,965<br />

267,665<br />

P.S. 178 AX (BED STUY ECC 1) - Brooklyn Total: $383,630<br />

DSF0000712325 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

667,405


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 P.S. 86 - Brooklyn<br />

32 P.S. <strong>10</strong>6 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000733667 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000733668 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000733669 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

305,442<br />

1,800,746<br />

572,874<br />

P.S. 75 - Brooklyn Total: $3,346,467<br />

DSF0000667038 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF000069<strong>14</strong>70 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000733750 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

968,086<br />

3,908,158<br />

1,1<strong>14</strong>,827<br />

P.S. 86 - Brooklyn Total: $5,991,071


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 I.S. 111 - Brooklyn<br />

32 P.S. 123 - Brooklyn<br />

32 P.S. <strong>14</strong>5 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000734065 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000775664 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

6,453,040<br />

336,383<br />

P.S. <strong>10</strong>6 - Brooklyn Total: $6,789,423<br />

DSF0000687<strong>14</strong>3 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

294,303<br />

I.S. 111 - Brooklyn Total: $294,303<br />

DSF0000757<strong>10</strong>4 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 123 - Brooklyn Total: $1,204,819<br />

DSF0000692285 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000692287 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000692288 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

418,570<br />

1,9<strong>10</strong>,838<br />

3,299,257


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 P.S. 151 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000692301 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

LIGHTING - EXTERIOR SECURITY<br />

DSF0000734547 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000734556 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

75,799<br />

1,382,597<br />

906,359<br />

P.S. <strong>14</strong>5 - Brooklyn Total: $7,993,421<br />

DSF0000757452 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 151 - Brooklyn Total: $684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 I.S. 291 - Brooklyn<br />

32 I.S. 296 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF00006225<strong>10</strong> State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

364,747<br />

I.S. 291 - Brooklyn Total: $364,747<br />

DSF0000715752 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

INTERIOR:GYMNASIUM:Door(s)<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

INTERIOR:GYMNASIUM:Sliding-folding Partition<br />

INTERIOR:LOCKER ROOM<br />

DSF0000775513 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF00007755<strong>14</strong> Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

DSF0000775559 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Technology<br />

1,<strong>10</strong>5,778<br />

<strong>10</strong>4,000<br />

<strong>10</strong>4,000<br />

<strong>10</strong>4,000<br />

I.S. 296 - Brooklyn Total: $1,417,778


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 I.S. 383 - Brooklyn<br />

32 P.S. 384 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000622508 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

DSF0000622653 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2011<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF000067<strong>10</strong>68 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000688<strong>14</strong>2 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000716347 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

643,491<br />

4,191,169<br />

1,634,703<br />

<strong>14</strong>7,956<br />

1,190,465<br />

I.S. 383 - Brooklyn Total: $7,807,784<br />

DSF0000404083 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:PLAYGROUNDS/PLAY EQUIPMENT<br />

405,513<br />

P.S. 384 - Brooklyn Total: $405,513


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

32 P.S. 45 AX (OLD BS RDGWD ECC1) - Brooklyn<br />

DSF0000606488 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000606489 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

32 SECOND OPPORTUNITY SCHOOL - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

<strong>10</strong>5,937<br />

737,660<br />

P.S. 45 AX (OLD BS RDGWD ECC1) - Brooklyn Total: $843,597<br />

DSF0000488422 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

DSF00007176<strong>10</strong> State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000738823 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000738825 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000752861 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

5,327,418<br />

9,231,741<br />

1,484,675<br />

1,621,111<br />

862,661<br />

SECOND OPPORTUNITY SCHOOL - Brooklyn Total: $18,527,606


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

33K DIV. COMPUTER INFO-DATA CENTER - Brooklyn<br />

DSF0000752395 Educational Enhancements - Educational Enhancements - Technology<br />

2013<br />

75K P.S. 373 (OLD P<strong>14</strong>8) - Brooklyn<br />

830,442<br />

DIV. COMPUTER INFO-DATA CENTER - Brooklyn Total: $830,442<br />

DSF0000667933 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

DSF0000713258 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2013<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

DSF0000757397 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000757400 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000757401 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

75K P.S. 811 (OLD P286) - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

509,963<br />

1,031,323<br />

64,128<br />

2,071,532<br />

1,771,888<br />

P.S. 373 (OLD P<strong>14</strong>8) - Brooklyn Total: $5,448,834<br />

DSF0000736850 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000736852 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000736853 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

1,397,662<br />

2,650,231<br />

1,618,273


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75K P.S. 369 (COY COX SCHOOL) - Brooklyn<br />

75K P.S. 370 - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

P.S. 811 (OLD P286) - Brooklyn Total: $5,666,166<br />

DSF0000716248 State of Good Repair - System Replacements - Toilets-Students<br />

2012<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Incandescent<br />

DSF0000716256 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:GYMNASIUM:Ceiling<br />

INTERIOR:GYMNASIUM:Stage:Stage Curtains<br />

DSF0000752455 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000775619 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,221,091<br />

370,759<br />

33,445<br />

1,190,213<br />

P.S. 369 (COY COX SCHOOL) - Brooklyn Total: $2,815,507<br />

DSF0000670987 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

446,396


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75K P.S. 371 (OLD 615) - Brooklyn<br />

75K P.S. 721 OTC - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000670988 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000670989 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000709415 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

DSF0000709416 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

2,043,594<br />

4,016,503<br />

570,341<br />

742,358<br />

P.S. 370 - Brooklyn Total: $7,819,192<br />

DSF0000737532 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

CAFETERIA:LOCAL SOUND SYSTEM<br />

INTERIOR:CAFETERIA:Ceiling<br />

INTERIOR:CAFETERIA:Floor Finish<br />

DSF0000760436 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

360,692<br />

599,368<br />

P.S. 371 (OLD 615) - Brooklyn Total: $960,060<br />

DSF0000622388 State of Good Repair - Building Upgrade - Air Conditioning Retrofit<br />

20<strong>10</strong><br />

682,989


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF00007<strong>10</strong>744 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

2011<br />

75K P.S. 372 (OUR LADY OF PEACE) - Brooklyn<br />

75K P.S. 77 ANNEX - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

260,765<br />

P.S. 721 OTC - Brooklyn Total: $943,754<br />

DSF000073<strong>14</strong>02 Safety and Security - Safety and Security - Code Compliance<br />

2013<br />

<strong>14</strong>8,262<br />

P.S. 372 (OUR LADY OF PEACE) - Brooklyn Total: $<strong>14</strong>8,262<br />

DSF0000717681 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000738908 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000738909 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000738911 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

SITE:Drainage System for Concrete<br />

DSF0000738916 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOOR HARDWARE<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

EXTERIOR:DOORS:LINTELS<br />

DSF0000775578 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

7,791,072<br />

3,086,074<br />

2,169,830<br />

1,326,308<br />

215,556<br />

1,982,134


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K TEACHERS PREP HS(OL REDIRECTION) - Brooklyn<br />

78K LAFAYETTE HS - Brooklyn<br />

78K MIDWOOD HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

P.S. 77 ANNEX - Brooklyn Total: $16,570,974<br />

DSF0000668365 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000668368 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000668369 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

EXTERIOR:Cornice<br />

EXTERIOR:Exterior Walls<br />

849,068<br />

682,922<br />

1,880,153<br />

TEACHERS PREP HS(OL REDIRECTION) - Brooklyn Total: $3,412,<strong>14</strong>3<br />

DSF0000404186 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000622209 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

DSF0000716489 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,863,320<br />

367,199<br />

1,734,438<br />

LAFAYETTE HS - Brooklyn Total: $3,964,956


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF00006885<strong>10</strong> State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

DSF0000737740 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

78K ABRAHAM LINCOLN HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

959,289<br />

63,545<br />

MIDWOOD HS - Brooklyn Total: $1,022,835<br />

DSF0000605449 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000605450 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

DSF0000605451 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

DSF0000605455 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000605457 State of Good Repair - System Replacements - Fencing<br />

20<strong>10</strong><br />

SITE:Fences<br />

DSF0000605466 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

CAFETERIA/MULTIPURPOSE ROOM:Local Sound System<br />

INTERIOR:Cafeteria:Ceiling<br />

2,660,422<br />

<strong>10</strong>,465,518<br />

1,024,243<br />

746,535<br />

817,150<br />

642,672


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

INTERIOR:Cafeteria:Floor Finish<br />

DSF0000737750 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000737753 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>14</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000737754 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

20<strong>14</strong><br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

INTERIOR:STRUCTURAL:ROOF STRUCTURE<br />

DSF0000737755 State of Good Repair - System Replacements - Windows<br />

20<strong>14</strong><br />

EXTERIOR:WINDOWS<br />

DSF0000737763 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>14</strong><br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

SECURITY:INTRUSION ALARM<br />

DSF0000754501 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

78K JAMES MADISON HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

1,<strong>14</strong>0,684<br />

479,252<br />

4,119,479<br />

9,166,172<br />

991,504<br />

132,918<br />

ABRAHAM LINCOLN HS - Brooklyn Total: $32,386,551<br />

DSF0000605524 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF00006956<strong>14</strong> State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

1,331,047<br />

746,533


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

FIRE ALARM SYSTEM<br />

DSF0000752896 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

78K BROOKLYN TECH HS - Brooklyn<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

1,054,533<br />

JAMES MADISON HS - Brooklyn Total: $3,132,113<br />

DSF0000688194 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000731519 State of Good Repair - System Replacements - Roofs<br />

2012<br />

78K THOMAS JEFFERSON HS - Brooklyn<br />

319,267<br />

186,988<br />

BROOKLYN TECH HS - Brooklyn Total: $506,255<br />

DSF0000754290 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78K PROSPECT HEIGHTS HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

219,713<br />

THOMAS JEFFERSON HS - Brooklyn Total: $219,713<br />

DSF0000671395 State of Good Repair - Rehabilitation of Physical Education Facilities - Swimming Pools<br />

20<strong>10</strong><br />

SWIMMING POOL<br />

DSF0000687<strong>14</strong>6 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

1,979,467<br />

1,972,203


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K NEW UTRECHT HS - Brooklyn<br />

Code Compliance<br />

PROSPECT HEIGHTS HS - Brooklyn Total: $3,951,670<br />

DSF0000695718 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

DSF0000716682 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000716685 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000716686 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

78K GRAND STREET CAMPUS (OLD E.D.HS) - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

5,291,350<br />

228,857<br />

2,926,205<br />

3,135,244<br />

NEW UTRECHT HS - Brooklyn Total: $11,581,656<br />

DSF0000404370 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF000067<strong>14</strong>43 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

736,968<br />

655,365


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K BOYS & GIRLS HS - Brooklyn<br />

78K BOYS HS (OLD) - Brooklyn<br />

78K JOHN JAY HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

DSF0000775794 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

150,000<br />

GRAND STREET CAMPUS (OLD E.D.HS) - Brooklyn Total: $1,542,334<br />

DSF00007<strong>10</strong>200 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2012<br />

DSF0000752342 State of Good Repair - Building Upgrade - Boiler Conversion<br />

2013<br />

HEATING PLANT:BOILER AUXILIARIES<br />

DSF0000752343 State of Good Repair - Building Upgrade - Climate Control<br />

2013<br />

DSF0000754562 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

691,111<br />

6,234,274<br />

3,899,811<br />

4<strong>10</strong>,222<br />

BOYS & GIRLS HS - Brooklyn Total: $11,235,418<br />

DSF0000737968 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Electrical Systems<br />

PANEL BOARD<br />

DSF0000737974 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>14</strong><br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:LIGHTING:Lighting Fixture - Fluorescent<br />

464,938<br />

667,3<strong>10</strong><br />

BOYS HS (OLD) - Brooklyn Total: $1,132,248


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

* Building scheduled for an Exterior Mod<br />

DSF0000404420 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

CONVEYING:SIDEWALK/ASH HOIST<br />

DSF0000404422 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

PANELBOARD:FUSED KNIFE SWITCH<br />

PANELBOARD:FUSED TOGGLE SWITCH<br />

PANELBOARD:MOLDED CASE CIRCUIT BREAKERS<br />

SWITCHBOARD:FUSED KNIFE SWITCH<br />

DSF0000404423 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

HEATING<br />

HEATING PLANT<br />

VENTILATION<br />

DSF0000622570 Safety and Security - Safety and Security - Code Compliance<br />

2013<br />

DSF0000688282 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000716770 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000716777 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Electrical Systems<br />

DSF0000731139 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

260,000<br />

1,245,616<br />

7,058,160<br />

184,173<br />

1,252,779<br />

42,<strong>14</strong>0<br />

2,386,913<br />

156,850


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000731166 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Accessibility<br />

DSF0000753084 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78K ERASMUS HALL CAMPUS - Brooklyn<br />

78K ERASMUS HALL AF - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Room Conversions/Partitioning<br />

5,<strong>14</strong>2,915<br />

915,821<br />

JOHN JAY HS - Brooklyn Total: $18,645,368<br />

DSF0000671527 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

3,181,407<br />

ERASMUS HALL CAMPUS - Brooklyn Total: $3,181,407<br />

DSF0000605737 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

20<strong>10</strong><br />

ATHLETIC FIELDS:Playing Surface<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Ceiling<br />

LIGHTING - EXTERIOR ATHLETIC FIELD<br />

LIGHTING - EXTERIOR SECURITY<br />

PUBLIC ADDRESS SYSTEM<br />

SCOREBOARD-ATHLETIC FIELD<br />

SITE:Fences<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

5,096,848


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K GEORGE W. WINGATE HS - Brooklyn<br />

78K BUSHWICK HS - Brooklyn<br />

SITE:Retaining Walls<br />

SITE:Sidewalks<br />

ERASMUS HALL AF - Brooklyn Total: $5,096,848<br />

DSF0000545286 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

339,364<br />

GEORGE W. WINGATE HS - Brooklyn Total: $339,364<br />

DSF0000687153 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

Code Compliance<br />

DSF0000752880 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

78K TELECOM. ARTS & TECH. - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

2,071,505<br />

1,<strong>14</strong>0,684<br />

BUSHWICK HS - Brooklyn Total: $3,212,189<br />

DSF0000622456 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000665737 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000731128 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

5,535,829<br />

2,073,813<br />

49,498


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000732417 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

DSF0000738056 State of Good Repair - System Replacements - Roofs<br />

2013<br />

78K FORT HAMILTON HS - Brooklyn<br />

EXTERIOR:PLAZA DECK<br />

EXTERIOR:ROOFING:Roofing<br />

73,579<br />

535,492<br />

TELECOM. ARTS & TECH. - Brooklyn Total: $8,268,211<br />

DSF00004045<strong>10</strong> State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

HEATING<br />

HEATING PLANT<br />

DSF0000545301 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000671618 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000738<strong>10</strong>0 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

DSF0000753033 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

78K SHEEPSHEAD BAY HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Room Conversions/Partitioning<br />

9,467,723<br />

138,721<br />

1,185,416<br />

98,855<br />

154,720<br />

FORT HAMILTON HS - Brooklyn Total: $11,045,434<br />

DSF0000716913 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

1,829,969


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K CANARSIE HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000716916 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:LOUVER<br />

DSF00007381<strong>14</strong> State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000753041 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

3,261,967<br />

4,889,405<br />

120,209<br />

SHEEPSHEAD BAY HS - Brooklyn Total: $<strong>10</strong>,<strong>10</strong>1,549<br />

DSF0000545287 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF00007<strong>10</strong>073 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000752392 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Gymnasium Upgrade<br />

262,072<br />

174,475<br />

713,715


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000752393 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

78K FRANKLIN D. ROOSEVELT HS - Brooklyn<br />

78K SOUTH SHORE HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

Room Conversions/Partitioning<br />

594,617<br />

CANARSIE HS - Brooklyn Total: $1,744,879<br />

DSF0000404554 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF0000738160 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

HEATING<br />

289,321<br />

34,1<strong>14</strong><br />

FRANKLIN D. ROOSEVELT HS - Brooklyn Total: $323,434<br />

DSF0000404568 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF0000622207 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

DSF00006717<strong>14</strong> State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000671716 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

579,039<br />

593,496<br />

3,876,301<br />

11,991,884


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000696000 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000716987 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

78K EDWARD R. MURROW HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

EMERGENCY GENERATOR<br />

4,316,877<br />

46,823<br />

SOUTH SHORE HS - Brooklyn Total: $21,404,420<br />

DSF0000622594 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Vehicular Area:Asphalt<br />

DSF0000671767 State of Good Repair - Building Upgrade - Interior Spaces<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Ceiling<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Door(s)<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Wall<br />

DSF0000738213 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000761157 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000775803 State of Good Repair - System Replacements - Roofs<br />

2013<br />

286,318<br />

2,770,398<br />

4,252,970<br />

271,120<br />

115,846


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K LEON GOLDSTEIN HS - Brooklyn<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

EDWARD R. MURROW HS - Brooklyn Total: $7,696,651<br />

DSF0000752830 Code Compliance<br />

2013<br />

78K GEORGE WESTINGHOUSE VOC HS - Brooklyn<br />

137,699<br />

LEON GOLDSTEIN HS - Brooklyn Total: $137,699<br />

DSF0000671789 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF0000688197 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF00007<strong>10</strong>932 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000775802 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78K MIDDLE COLLEGE HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

651,227<br />

511,707<br />

2,033,578<br />

200,000<br />

GEORGE WESTINGHOUSE VOC HS - Brooklyn Total: $3,396,512<br />

DSF0000622365 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

280,998<br />

MIDDLE COLLEGE HS - Brooklyn Total: $280,998


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78K CLARA BARTON HS - Brooklyn<br />

DSF0000761235 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2013<br />

CONVEYING:ELEVATORS<br />

INTERCOM SYSTEM:ELEVATOR<br />

DSF0000775573 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78K AUTOMOTIVE TRADES VOC HS - Brooklyn<br />

440,000<br />

5<strong>10</strong>,043<br />

CLARA BARTON HS - Brooklyn Total: $950,043<br />

DSF0000622548 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000688279 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000696126 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

78K E NY VOC HS OF TRANSIT TECH. - Brooklyn<br />

FIRE ALARM SYSTEM<br />

218,786<br />

541,580<br />

566,306<br />

AUTOMOTIVE TRADES VOC HS - Brooklyn Total: $1,326,672<br />

DSF0000717128 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

78K HARRY VANARSDALE VOC HS(WHITNEY) - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

995,332<br />

E NY VOC HS OF TRANSIT TECH. - Brooklyn Total: $995,332


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000545284 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

78K BKLYN HS OF THE ARTS (OL S J HL) - Brooklyn<br />

INTERCOM SYSTEM:ELEVATORS<br />

360,344<br />

HARRY VANARSDALE VOC HS(WHITNEY) - Brooklyn Total: $360,344<br />

DSF0000544650 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF00006222<strong>14</strong> Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000671935 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752882 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

78K BKLYN HS OF THE ARTS AX (S J HL) - Brooklyn<br />

54,784<br />

1,285,613<br />

895,018<br />

1,<strong>14</strong>0,684<br />

BKLYN HS OF THE ARTS (OL S J HL) - Brooklyn Total: $3,376,099<br />

DSF0000404744 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000488501 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

SCA0000017094 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

78K WILLIAM MAXWELL CTE HS - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

245,131<br />

32,860<br />

3,820,535<br />

BKLYN HS OF THE ARTS AX (S J HL) - Brooklyn Total: $4,098,526


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000738454 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>14</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000738455 State of Good Repair - System Replacements - Roofs<br />

20<strong>14</strong><br />

78K LIBERATION DIPLOMA PLUS H.S. - Brooklyn<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

204,504<br />

998,538<br />

WILLIAM MAXWELL CTE HS - Brooklyn Total: $1,203,042<br />

DSF0000488494 Electrical Systems<br />

20<strong>10</strong><br />

DSF0000544434 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>10</strong><br />

78K WEST BROOKLYN COMMUNITY HS - Brooklyn<br />

Science Lab Upgrades<br />

383,323<br />

783,587<br />

LIBERATION DIPLOMA PLUS H.S. - Brooklyn Total: $1,166,909<br />

DSF0000622590 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

78K COBBLE HILL SCL OF AMR STD (OL6) - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

<strong>10</strong>0,353<br />

WEST BROOKLYN COMMUNITY HS - Brooklyn Total: $<strong>10</strong>0,353<br />

DSF0000696371 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000696373 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

964,051<br />

2,641,193


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Exterior Walls<br />

78K WATER'S EDGE EDUCATIONAL COMPLEX - Brooklyn<br />

COBBLE HILL SCL OF AMR STD (OL6) - Brooklyn Total: $3,605,245<br />

DSF0000717378 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000731397 Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000738579 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000738580 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000738589 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

Fire System Sprinklers<br />

78K METROPOLITAN CORPORATE ACAD. - Brooklyn<br />

* Building scheduled for an Exterior Mod<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER HEAD<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER PIPING<br />

252,461<br />

2,952,747<br />

1,271,383<br />

<strong>10</strong>1,556<br />

282,392<br />

WATER'S EDGE EDUCATIONAL COMPLEX - Brooklyn Total: $4,860,539<br />

DSF00007<strong>10</strong>249 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

226,589


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

* Building scheduled for an Exterior Mod<br />

DSF000073<strong>14</strong>16 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

DSF0000738591 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

DSF0000738595 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753049 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Playground Redevelopment<br />

1,032,782<br />

1,293,036<br />

3,115,364<br />

793,230<br />

METROPOLITAN CORPORATE ACAD. - Brooklyn Total: $6,461,001


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Queens<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

0.00<br />

0.00<br />

0.01<br />

0.04<br />

0.00<br />

0.00<br />

4.46<br />

0.00<br />

0.00<br />

2.73<br />

1.06<br />

4.78<br />

0.98<br />

15.07<br />

0.13<br />

0.00<br />

0.40<br />

0.05<br />

5.30<br />

<strong>10</strong>.19<br />

0.02<br />

13.05<br />

17.04<br />

0.00<br />

<strong>10</strong>.17<br />

30.46<br />

4.62<br />

13.87<br />

0.16<br />

2.25<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.04<br />

0.00<br />

0.00<br />

2.48<br />

0.00<br />

0.00<br />

5.43<br />

2.02<br />

-0.59<br />

0.09<br />

8.34<br />

0.18<br />

0.00<br />

2.38<br />

0.39<br />

-0.12<br />

1.32<br />

0.00<br />

6.97<br />

9.16<br />

0.00<br />

6.68<br />

46.49<br />

2.82<br />

9.17<br />

0.12<br />

0.46<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.06<br />

0.00<br />

0.00<br />

0.65<br />

0.00<br />

0.00<br />

9.37<br />

2.47<br />

0.79<br />

0.54<br />

7.86<br />

0.01<br />

0.00<br />

0.97<br />

0.04<br />

0.02<br />

2.45<br />

0.00<br />

20.95<br />

25.64<br />

0.00<br />

5.46<br />

44.03<br />

6.40<br />

2.07<br />

0.09<br />

0.18<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.70<br />

0.20<br />

0.00<br />

0.00<br />

37.39<br />

30.08<br />

1.41<br />

0.09<br />

0.07<br />

<strong>10</strong>.03<br />

0.00<br />

2.06<br />

0.00<br />

5.41<br />

2.69<br />

0.00<br />

12.38<br />

8.33<br />

0.00<br />

13.20<br />

24.05<br />

24.78<br />

51.12<br />

6.23<br />

3.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.28<br />

22.17<br />

1.08<br />

0.00<br />

4.45<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

7.54<br />

0.00<br />

6.27<br />

<strong>10</strong>.22<br />

0.00<br />

2.40<br />

18.43<br />

0.50<br />

0.00<br />

2.27<br />

0.11<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.<strong>14</strong><br />

0.00<br />

0.70<br />

7.78<br />

0.00<br />

0.00<br />

63.20<br />

57.79<br />

7.47<br />

1.70<br />

35.79<br />

<strong>10</strong>.36<br />

0.00<br />

5.81<br />

0.48<br />

<strong>10</strong>.61<br />

24.20<br />

0.03<br />

59.63<br />

70.39<br />

0.00<br />

37.91<br />

163.46<br />

39.12<br />

76.23<br />

8.86<br />

6.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Queens<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

E. System Replacements<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

3.96<br />

1.87<br />

3.61<br />

0.50<br />

0.00<br />

0.02<br />

0.71<br />

1.32<br />

0.00<br />

0.00<br />

0.15<br />

1.<strong>10</strong><br />

0.16<br />

9.32<br />

0.08<br />

0.00<br />

0.01<br />

1.25<br />

0.27<br />

0.00<br />

0.00<br />

0.50<br />

0.66<br />

0.57<br />

3.03<br />

0.08<br />

0.00<br />

0.01<br />

3.54<br />

0.87<br />

0.00<br />

0.00<br />

3.37<br />

4.11<br />

2.06<br />

3.73<br />

0.15<br />

0.00<br />

0.00<br />

7.16<br />

0.04<br />

0.00<br />

0.00<br />

0.61<br />

I. State of Good Repair Total:<br />

1.00<br />

0.00<br />

6.94<br />

0.00<br />

0.00<br />

0.00<br />

0.93<br />

2.27<br />

0.00<br />

0.00<br />

0.00<br />

<strong>14</strong>8.96 116.52 <strong>14</strong>2.20 251.<strong>10</strong> 94.86<br />

80.78<br />

27.79<br />

0.00<br />

16.90<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

83.41<br />

7.71<br />

0.00<br />

3.67<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

345.78<br />

74.38<br />

0.00<br />

17.17<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

220.<strong>10</strong><br />

59.57<br />

0.00<br />

26.24<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

336.12<br />

<strong>14</strong>9.82<br />

0.00<br />

48.<strong>14</strong><br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

<strong>10</strong>.84<br />

4.67<br />

26.64<br />

0.80<br />

0.00<br />

0.03<br />

13.59<br />

4.77<br />

0.00<br />

0.00<br />

4.62<br />

753.64<br />

1,066.20<br />

319.27<br />

0.00<br />

112.11<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Queens<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

II. System Expansion<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

15.25<br />

18.40<br />

0.00<br />

0.06<br />

0.00<br />

18.66<br />

34.19<br />

0.00<br />

0.01<br />

0.00<br />

41.22<br />

6.70<br />

0.00<br />

9.36<br />

0.00<br />

30.00<br />

11.70<br />

0.00<br />

16.49<br />

0.00<br />

II. System Expansion Total:<br />

38.86<br />

40.49<br />

0.00<br />

16.98<br />

0.00<br />

159.17 <strong>14</strong>7.66 494.61 364.<strong>10</strong> 630.41<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

0.64<br />

0.00<br />

0.00<br />

0.00<br />

III. Educational Enhancements Total:<br />

0.26<br />

0.00<br />

0.00<br />

0.00<br />

0.18<br />

0.00<br />

0.00<br />

0.00<br />

0.33<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.64 0.26 0.18 0.33 0.00<br />

0.00<br />

0.00<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

V. Ancillary Facilities Total:<br />

<strong>14</strong>3.99<br />

111.48<br />

0.00<br />

42.89<br />

0.00<br />

1,795.95<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.42<br />

0.00<br />

0.00<br />

0.00<br />

1.42<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Queens<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

Yearly Totals for Queens<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.35<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.78<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.84<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.03<br />

0.00<br />

1.35 0.00 0.78 0.84 1.03<br />

VI. Emergency, Unspecified and Misc. Total:<br />

3<strong>10</strong>.13 264.45 637.77 616.38 726.29<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

4.01<br />

0.00<br />

4.01<br />

Queens Grand Total: $2,555.01


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Queens<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* 24 DSF0000417389 P.S. 87 ADDITION <strong>14</strong>0 Sep-<strong>10</strong> Apr-12 Sep-13 30.88<br />

0.13 30.75 0.00<br />

L 24 DSF0000752881 PROJECT #1 284 Apr-13 Jun-<strong>14</strong> Jun-16 25.75<br />

0.00 22.11 3.64<br />

* 24 DSF0000687097 P.S. 287 420 Apr-<strong>10</strong> Oct-11 Jun-13 57.22<br />

0.00 57.22 0.00<br />

* 24 DSF00007<strong>10</strong>030 P.S. 290 616 Mar-<strong>10</strong> Dec-11 Apr-<strong>14</strong> 76.02<br />

0.00 76.02 0.00<br />

* 24 DSF0000687098 P.S./ I.S. 298 796 Mar-<strong>10</strong> Jul-13 Jul-16 86.45<br />

0.00 77.17 9.29<br />

* 24 DSF0000687096 I.S. 311 785 Feb-<strong>10</strong> Jun-13 Jun-16 79.87<br />

0.03 73.48 6.36<br />

* 24 DSF00007<strong>10</strong>983 P.S. 313 432 Sep-<strong>10</strong> Jun-12 Jul-<strong>14</strong> 67.57<br />

0.00 67.57 0.00<br />

* 24 DSF0000690216 P.S. 315 1,1<strong>10</strong> Sep-<strong>10</strong> Jun-12 Mar-15 <strong>10</strong>5.50<br />

0.00 97.60 7.90<br />

* 24 DSF0000752883 P.S. 320 472 Apr-12 Jun-13 Jun-15 67.49<br />

0.00 62.37 5.12<br />

* L 24 DSF0000690227<br />

§ Phase 2<br />

P.S. 841 0 Dec-12 Jun-13 Sep-13 9.12<br />

0.00 9.12 0.00<br />

* L 24 DSF0000775581<br />

§ Phase 1<br />

P.S. 841 284 Apr-12 Jul-12 Sep-12 0.00<br />

0.00 0.00 0.00<br />

* 25 DSF0000488527 P.S. 29 232 Feb-09 Apr-<strong>10</strong> Sep-12 30.05<br />

0.61 29.44 0.00<br />

* 25 DSF0000752885 P.S. 163 ADDITION 350 Sep-12 Nov-13 Aug-16 44.83<br />

0.00 40.03 4.80<br />

25<br />

26<br />

DSF0000752884<br />

DSF0000417403<br />

Needed to<br />

Complete<br />

PROJECT #1 400 Apr-13 Jun-<strong>14</strong> Jun-16 50.72<br />

0.00 45.24 5.48<br />

PROJECT #1 416 Apr-13 Jun-<strong>14</strong> Jul-16 58.06<br />

0.07 51.80 6.19<br />

* 27 DSF0000423888 P.S. 316 444 Feb-11 Jun-12 Jun-<strong>14</strong> 58.58<br />

0.00 58.58 0.00<br />

27<br />

DSF0000417420<br />

PROJECT #4 416 Apr-13 Jul-<strong>14</strong> Jul-16 57.27<br />

4.35 4.09 48.82<br />

* 28 DSF0000752886 P.S. 50 ADDITION 350 Nov-12 Jan-<strong>14</strong> Jun-16 38.83<br />

0.00 34.59 4.24<br />

* 28 DSF0000417395 P.S./ I.S. 3<strong>14</strong> 833 Sep-<strong>10</strong> Jun-12 Mar-15 97.48<br />

0.18 90.38 6.93<br />

* 29 DSF0000752431 P.S. 35 ADDITION 352 May-12 Jun-13 Jan-16 36.47<br />

0.00 33.25 3.23<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Queens<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* 29 DSF0000752887 P.S. 176 ADDITION 372 Sep-12 Dec-13 Sep-16 45.55<br />

0.00 40.59 4.97<br />

* 29 DSF0000690225 P.S. 892 379 Nov-11 Apr-13 Apr-15 28.82<br />

0.00 27.23 1.59<br />

* 30 DSF0000775571 P.S. 11 ADDITION 350 Dec-12 Feb-<strong>14</strong> Jul-16 38.83<br />

0.01 34.55 4.26<br />

* 30 DSF0000687<strong>10</strong>1 P.S. 70 ADDITION 508 Feb-11 Jun-12 Aug-<strong>14</strong> 59.<strong>14</strong><br />

0.00 56.79 2.35<br />

* L 30 DSF0000688299<br />

§ Phase 1<br />

P.S. 280 199 Aug-09 Apr-<strong>10</strong> Sep-<strong>10</strong> 11.39<br />

0.04 11.34 0.00<br />

* L 30 DSF0000709439<br />

§ Phase 2<br />

P.S. 280 341 Aug-09 Jun-<strong>10</strong> May-11 9.60<br />

0.00 9.60 0.00<br />

* 30 DSF0000622501 I.S. 297 423 Apr-08 Feb-12 Apr-<strong>14</strong> 39.92<br />

4.08 35.84 0.00<br />

L 30 DSF0000775572 PROJECT #6 256 Mar-13 Apr-<strong>14</strong> Apr-15 25.09<br />

0.00 21.54 3.55<br />

30<br />

DSF0000752430<br />

Needed to<br />

Complete<br />

PROJECT #2 248 Mar-13 Jun-<strong>14</strong> Dec-16 31.92<br />

0.00 28.51 3.41<br />

* 30 DSF0000622568 PS/IS 312 578 May-08 Feb-11 Jun-13 66.84<br />

2.72 64.12 0.00<br />

* L 30 DSF0000687<strong>10</strong>2 P.S. 329 342 Aug-11 Sep-12 Jul-13 13.89<br />

0.00 13.89 0.00<br />

* 30 DSF0000687330 P.S. 339 472 Apr-12 Jul-13 Jul-15 63.35<br />

0.00 57.52 5.83<br />

* 78Q DSF0000622618 I.S./H.S. 404 1,071 Apr-09 Jul-<strong>10</strong> Jun-13 85.87<br />

0.12 85.75 0.00<br />

* L 78Q DSF00007<strong>10</strong>091 RICHMOND HILL HS ANNEX 402 May-<strong>10</strong> Nov-11 May-13 19.53<br />

0.04 19.49 0.00<br />

78Q<br />

DSF0000752888<br />

PROJECT #1 8<strong>10</strong> Apr-13 Jun-<strong>14</strong> Jun-17 57.37<br />

0.00 51.28 6.09<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Replacement Projects<br />

Borough of Queens<br />

(in millions)<br />

Actual /<br />

Funding<br />

Forecast Design Constr Est. Total Est. Previous Req'd Needed to<br />

District Project # School<br />

Capacity Start Start Compl Cost Appropriations FY<strong>10</strong>-<strong>14</strong> Complete<br />

* L 29 DSF0000752868 EAGLE ACADEMY Replacement Mar-12 Jun-12 Sep-12 17.60 0.00 17.60 0.00<br />

* L 29 DSF0000754449 EAGLE ACADEMY Replacement Jul-12 Jan-13 Sep-13 8.93 0.00 8.93 0.00<br />

* L 33Q DSF0000754388 ADULT BASIC EDUCATION Replacement Sep-12 Apr-13 Aug-13 8.25 0.00 8.25 0.00<br />

* 78Q DSF0000622665 MIDDLE COLLEGE CAMPUS<br />

Replacement Nov-09 Jun-<strong>10</strong> Sep-12 82.65 13.06 69.58 0.00<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 I.S. 5 - Queens<br />

24 P.S. 12 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000676066 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000676068 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000754568 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

Ventilation<br />

MOTOR STARTER/CONTACTOR<br />

VENTILATION:EXHAUST FAN<br />

1,<strong>10</strong>9,625<br />

1,653,984<br />

525,585<br />

I.S. 5 - Queens Total: $3,289,194<br />

DSF0000676177 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000676178 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000676179 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000690212 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

168,501<br />

468,943<br />

953,<strong>10</strong>4<br />

773,642<br />

P.S. 12 - Queens Total: $2,364,191


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S. 13 - Queens<br />

24 P.S. 19 - Queens<br />

24 I.S. 61 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000687250 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

1,795,776<br />

P.S. 13 - Queens Total: $1,795,776<br />

DSF0000699820 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000699822 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000699823 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>036 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000721<strong>10</strong>0 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

INTERIOR:CAFETERIA:Floor Finish<br />

1,905,322<br />

2,718,111<br />

23,628,264<br />

1,081,999<br />

323,055<br />

P.S. 19 - Queens Total: $29,656,751<br />

DSF0000409120 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

268,608


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S. 68 - Queens<br />

24 P.S. 71 - Queens<br />

24 I.S. 73 - Queens<br />

* Building scheduled for an Exterior Mod<br />

CONVEYING:SIDEWALK/ASH HOIST<br />

I.S. 61 - Queens Total: $268,608<br />

DSF0000677007 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000688<strong>14</strong>0 Safety and Security - Safety and Security - Code Compliance<br />

2012<br />

DSF00007<strong>10</strong>063 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000743071 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

527,359<br />

4,668,327<br />

1,571,685<br />

983,916<br />

P.S. 68 - Queens Total: $7,751,288<br />

DSF0000677048 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

661,081<br />

P.S. 71 - Queens Total: $661,081


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S. 81 - Queens<br />

24 P.S. 87 ADDITION - Queens<br />

24 P.S. 88 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000721890 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000721891 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

998,680<br />

252,433<br />

I.S. 73 - Queens Total: $1,251,113<br />

DSF0000677228 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000731169 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000731170 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2012<br />

INTERIOR:STRUCTURAL:COLUMNS/BEAMS/BEARING WALLS<br />

502,596<br />

760,043<br />

962,349<br />

P.S. 81 - Queens Total: $2,224,988<br />

DSF0000709450 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

94,049<br />

P.S. 87 ADDITION - Queens Total: $94,049<br />

DSF0000622223 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

1,537,022


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S. 89 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000743393 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

DSF0000743394 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000743398 State of Good Repair - System Replacements - Fencing<br />

2013<br />

SITE:FENCES<br />

DSF0000775582 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

805,809<br />

3,619,338<br />

93,843<br />

779,<strong>14</strong>7<br />

P.S. 88 - Queens Total: $6,835,159<br />

DSF0000544661 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Air Conditioning Split System<br />

AIR CONDITIONING:CHILLER, RECIPROCATING AIR COOLED<br />

DSF0000700817 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

DSF0000722125 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000722126 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

836,083<br />

2,906,288<br />

308,329<br />

789,994


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S. 91 - Queens<br />

24 I.S. 93 - Queens<br />

24 P.S./I.S. <strong>10</strong>2 - Queens<br />

24 I.S. 119 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000722127 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

1,897,927<br />

P.S. 89 - Queens Total: $6,738,622<br />

DSF0000611791 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Gymnasium:Door(s)<br />

INTERIOR:Gymnasium:Fixed Equipment<br />

INTERIOR:Gymnasium:Flooring<br />

INTERIOR:Gymnasium:Seating<br />

INTERIOR:Gymnasium:Walls<br />

704,320<br />

P.S. 91 - Queens Total: $704,320<br />

DSF0000722175 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,396,181<br />

I.S. 93 - Queens Total: $1,396,181<br />

DSF0000730986 Accessibility<br />

2012<br />

2,150,422<br />

P.S./I.S. <strong>10</strong>2 - Queens Total: $2,150,422<br />

DSF0000752849 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

168,579


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 I.S. 125 - Queens<br />

24 P.S. 153 - Queens<br />

24 P.S. 229 - Queens<br />

24 P.S. 239 - Queens<br />

* Building scheduled for an Exterior Mod<br />

I.S. 119 - Queens Total: $168,579<br />

DSF0000677937 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,230,861<br />

I.S. 125 - Queens Total: $1,230,861<br />

DSF0000688166 Safety and Security - Safety and Security - Code Compliance<br />

2012<br />

6,138,796<br />

P.S. 153 - Queens Total: $6,138,796<br />

DSF0000411<strong>14</strong>6 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:SIDEWALK/ASH HOIST<br />

DSF0000724288 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

SCA0000005451 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

300,000<br />

2,845,118<br />

1,735,708<br />

P.S. 229 - Queens Total: $4,880,825<br />

DSF0000686547 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

1,133,404


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 P.S./I.S. 269 - Queens<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Playgrounds:Pavement<br />

P.S. 239 - Queens Total: $1,133,404<br />

DSF0000752281 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000752284 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

SCA0000005560 State of Good Repair - System Replacements - Parapets<br />

2012<br />

24 P.S. 81 ANNEX (OLD 75) - Queens<br />

24 I.S. 77 - Queens<br />

* Building scheduled for an Exterior Mod<br />

335,849<br />

715,682<br />

919,213<br />

P.S./I.S. 269 - Queens Total: $1,970,744<br />

DSF0000703807 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000703808 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

482,911<br />

2,428,700<br />

P.S. 81 ANNEX (OLD 75) - Queens Total: $2,911,6<strong>10</strong><br />

DSF0000680583 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:House Lighting:Lighting Fixture - Fluorescent<br />

2,018,701


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

24 I.S. 73 MINISCHOOL - Queens<br />

25 P.S. 21 - Queens<br />

* Building scheduled for an Exterior Mod<br />

AUDITORIUM:House Lighting:Lighting Fixture - Incandescent<br />

AUDITORIUM:Local Sound System<br />

AUDITORIUM:Theater Lighting System:Dimming System<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

INTERIOR:Auditorium:Door(s)<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

INTERIOR:Auditorium:Stage<br />

INTERIOR:Auditorium:Stage Curtains<br />

I.S. 77 - Queens Total: $2,018,701<br />

DSF0000746528 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

1,087,457<br />

I.S. 73 MINISCHOOL - Queens Total: $1,087,457<br />

DSF0000742388 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000742389 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

2,188,019<br />

2,624,798


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 P.S. 24 - Queens<br />

25 J.H.S. 25 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000742396 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

EXTERIOR:DOORS:LINTELS<br />

LIGHTING - SECURITY LIGHTS<br />

SECURITY:INTRUSION ALARM<br />

DSF0000775759 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

746,923<br />

1,999,435<br />

P.S. 21 - Queens Total: $7,559,175<br />

DSF0000676347 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000721166 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SCA0000004797 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

3,615,679<br />

1,3<strong>14</strong>,536<br />

1,545,<strong>10</strong>1<br />

P.S. 24 - Queens Total: $6,475,315<br />

DSF00007<strong>10</strong>964 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:Roofing:Roofing<br />

2,272,964


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 P.S. 29 - Queens<br />

25 P.S. 79 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Specialties<br />

DSF00007<strong>10</strong>965 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Parapets<br />

SCA00000<strong>10</strong>474 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

2,664,645<br />

1,281,803<br />

J.H.S. 25 - Queens Total: $6,219,412<br />

DSF0000545329 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

72,928<br />

P.S. 29 - Queens Total: $72,928<br />

DSF0000700664 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF000073<strong>14</strong>07 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000743230 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000743231 State of Good Repair - System Replacements - Parapets<br />

2013<br />

343,395<br />

2,302,8<strong>14</strong><br />

374,490<br />

183,685


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 P.S. <strong>10</strong>7 - Queens<br />

25 P.S. 154 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:PARAPETS<br />

DSF0000743233 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000743236 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

443,031<br />

767,873<br />

P.S. 79 - Queens Total: $4,415,287<br />

DSF0000409632 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000677626 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

321,000<br />

1,769,496<br />

P.S. <strong>10</strong>7 - Queens Total: $2,090,496<br />

DSF0000678407 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

DSF0000701811 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

1,364,643<br />

421,694


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 P.S. 164 - Queens<br />

25 P.S. 165 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000723122 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000723124 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000723125 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

175,731<br />

797,152<br />

319,572<br />

P.S. 154 - Queens Total: $3,078,792<br />

DSF0000767574 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 164 - Queens Total: $1,204,819<br />

DSF0000723334 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

INTERIOR:AUDITORIUM:Walls<br />

629,240


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 J.H.S. 168 - Queens<br />

25 P.S. 184 - Queens<br />

25 J.H.S. 185 - Queens<br />

* Building scheduled for an Exterior Mod<br />

P.S. 165 - Queens Total: $629,240<br />

DSF0000678627 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING PLANT:Fuel Systems<br />

DSF0000687343 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000702020 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF00007<strong>10</strong>007 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF00007<strong>10</strong>933 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

5,228,113<br />

177,503<br />

965,202<br />

33,751<br />

1,335,448<br />

J.H.S. 168 - Queens Total: $7,740,015<br />

DSF0000744918 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

751,431<br />

P.S. 184 - Queens Total: $751,431<br />

DSF0000744934 State of Good Repair - System Replacements - Parapets<br />

2013<br />

2,663,169


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000744935 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000744945 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000744948 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

EXTERIOR:DOORS:TRANSOM/SIDE LIGHT<br />

LIGHTING - SECURITY LIGHTS<br />

SECURITY:INTRUSION ALARM<br />

DSF0000767874 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000767877 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

4,136,029<br />

212,294<br />

548,573<br />

600,894<br />

1,536,002<br />

J.H.S. 185 - Queens Total: $9,696,961


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 J.H.S. 189 - Queens<br />

25 P.S. 193 - Queens<br />

25 P.S. 200 - Queens<br />

25 P.S. 201 - Queens<br />

25 P.S. 2<strong>14</strong> - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000687232 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000723667 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

22,882<br />

542,318<br />

J.H.S. 189 - Queens Total: $565,199<br />

DSF0000723738 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

440,297<br />

P.S. 193 - Queens Total: $440,297<br />

DSF0000687237 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

17,330<br />

P.S. 200 - Queens Total: $17,330<br />

DSF0000745212 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

5,669,608<br />

P.S. 201 - Queens Total: $5,669,608


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

25 P.S. 219 - Queens<br />

25 J.H.S. 237 - Queens<br />

26 P.S. 18 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000745395 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

3,729,213<br />

P.S. 2<strong>14</strong> - Queens Total: $3,729,213<br />

DSF0000745480 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,<strong>14</strong>0,684<br />

P.S. 219 - Queens Total: $1,<strong>14</strong>0,684<br />

DSF0000745666 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

1,476,543<br />

J.H.S. 237 - Queens Total: $1,476,543<br />

DSF0000676257 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF000072<strong>10</strong>65 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

687,368<br />

1,660,267


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 P.S. 26 - Queens<br />

26 P.S. 31 - Queens<br />

26 P.S. 41 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF000072<strong>10</strong>66 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF000072<strong>10</strong>67 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:AWNINGS AND CANOPIES<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

701,767<br />

1,097,066<br />

P.S. 18 - Queens Total: $4,<strong>14</strong>6,469<br />

DSF0000699938 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000709511 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

840,091<br />

22,083<br />

P.S. 26 - Queens Total: $862,175<br />

DSF0000765477 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. 31 - Queens Total: $1,204,819


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 P.S. 46 - Queens<br />

26 P.S. 94 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000700<strong>14</strong>2 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

DSF0000700<strong>14</strong>4 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

2,783,076<br />

495,664<br />

P.S. 41 - Queens Total: $3,278,740<br />

DSF0000700213 State of Good Repair - Building Upgrade - Interior Spaces<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Ceiling<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Door(s)<br />

DSF000072<strong>14</strong>95 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000721502 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

482,725<br />

417,550<br />

939,112<br />

P.S. 46 - Queens Total: $1,839,387<br />

DSF0000722196 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000722198 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

965,480<br />

3,016,846


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 P.S. 98 - Queens<br />

26 P.S. 115 - Queens<br />

26 J.H.S. 172 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

P.S. 94 - Queens Total: $3,982,326<br />

DSF0000775651 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 98 - Queens Total: $684,932<br />

DSF0000677747 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000743792 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

965,063<br />

1,761,231<br />

P.S. 115 - Queens Total: $2,726,294<br />

DSF0000731555 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

982,592


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 P.S. 173 - Queens<br />

26 P.S. 186 - Queens<br />

26 P.S. 188 - Queens<br />

* Building scheduled for an Exterior Mod<br />

SWITCHBOARD<br />

J.H.S. 172 - Queens Total: $982,592<br />

DSF0000678706 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

1,565,850<br />

P.S. 173 - Queens Total: $1,565,850<br />

DSF0000702322 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000702325 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF00007<strong>10</strong>096 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

1,320,517<br />

485,434<br />

802,736<br />

P.S. 186 - Queens Total: $2,608,687<br />

DSF0000678956 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

769,897


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 P.S. 191 - Queens<br />

26 P.S. 203 - Queens<br />

26 P.S. 205 - Queens<br />

26 P.S. 213 - Queens<br />

* Building scheduled for an Exterior Mod<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

P.S. 188 - Queens Total: $769,897<br />

DSF0000731125 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

549,300<br />

P.S. 191 - Queens Total: $549,300<br />

DSF0000679250 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:Sprinkler Alarm Valve Assembly<br />

912,917<br />

P.S. 203 - Queens Total: $912,917<br />

DSF0000753126 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

603,022<br />

P.S. 205 - Queens Total: $603,022


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

26 J.H.S. 216 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000622343 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000745376 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000745377 State of Good Repair - System Replacements - Electrical Systems<br />

2013<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

DSF0000752895 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000754511 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

78,9<strong>10</strong><br />

341,366<br />

544,168<br />

2,895,306<br />

<strong>10</strong>9,064<br />

P.S. 213 - Queens Total: $3,968,8<strong>14</strong><br />

DSF000041<strong>10</strong>18 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

SITE:DRAINAGE SYSTEM<br />

DSF0000702801 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

704,009<br />

540,537


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 43 - Queens<br />

27 P.S. 45 - Queens<br />

27 P.S. 47 - Queens<br />

* Building scheduled for an Exterior Mod<br />

J.H.S. 216 - Queens Total: $1,244,546<br />

DSF00007<strong>10</strong>037 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

2,405,016<br />

P.S. 43 - Queens Total: $2,405,016<br />

DSF0000408946 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000425783 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:DRAINAGE SYSTEM<br />

DSF0000622408 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:PARAPETS<br />

DSF0000622409 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000622426 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:PLAYGROUNDS:MATTING<br />

SITE:PLAYGROUNDS:PLAY EQUIPMENT<br />

530,507<br />

1,025,433<br />

183,123<br />

458,797<br />

549,559<br />

P.S. 45 - Queens Total: $2,747,420<br />

DSF0000721511 State of Good Repair - System Replacements - Windows<br />

2012<br />

1,285,093


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 51 (ECC) - Queens<br />

EXTERIOR:WINDOWS<br />

DSF0000721512 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR SOFFITS<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF000073<strong>14</strong>51 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

177,046<br />

374,865<br />

P.S. 47 - Queens Total: $1,837,004<br />

DSF0000676761 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

27 P.S. 56 (OLD R HILL AX) - Queens<br />

27 P.S. 62 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

1,317,436<br />

P.S. 51 (ECC) - Queens Total: $1,317,436<br />

DSF0000753122 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

903,928<br />

P.S. 56 (OLD R HILL AX) - Queens Total: $903,928<br />

DSF0000688363 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

670,393<br />

P.S. 62 - Queens Total: $670,393


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 64 - Queens<br />

27 P.S. 66 - Queens<br />

27 P.S. 90 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF00006884<strong>14</strong> State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

SCA0000005968 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

1,842,027<br />

1,416,939<br />

P.S. 64 - Queens Total: $3,258,966<br />

DSF0000676964 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000676966 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

SWITCHBOARD<br />

DSF0000700458 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>260 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000775648 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

721,995<br />

798,798<br />

611,933<br />

321,282<br />

684,932<br />

P.S. 66 - Queens Total: $3,138,939


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 96 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000677357 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Cornice<br />

EXTERIOR:Exterior Soffits<br />

EXTERIOR:Exterior Walls<br />

DSF0000700837 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000700839 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

3,603,892<br />

856,429<br />

982,682<br />

P.S. 90 - Queens Total: $5,443,003<br />

DSF0000677448 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000677449 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000677450 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000677451 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

<strong>14</strong>7,404<br />

174,115<br />

2,586,226<br />

394,836


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 97 - Queens<br />

27 P.S. <strong>10</strong>0 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

P.S. 96 - Queens Total: $3,302,580<br />

DSF0000722247 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000722248 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000722252 Safety and Security - Safety and Security - Safety Systems<br />

2012<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

1,099,913<br />

2,916,433<br />

56,444<br />

P.S. 97 - Queens Total: $4,072,789<br />

DSF0000700991 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

INTERIOR:Structural:Vaults-Bunkers<br />

DSF0000700993 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000700994 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

384,506<br />

1,268,999<br />

2,428,463


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. <strong>10</strong>4 - Queens<br />

27 P.S. <strong>10</strong>5 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Exterior Walls<br />

DSF0000743582 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2013<br />

CONVEYING:ELEVATORS<br />

616,587<br />

P.S. <strong>10</strong>0 - Queens Total: $4,698,554<br />

DSF0000722333 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000722334 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000722335 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000722336 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

PANEL BOARD<br />

1,424,716<br />

3,006,526<br />

1,250,572<br />

354,787<br />

P.S. <strong>10</strong>4 - Queens Total: $6,036,600<br />

DSF000070<strong>10</strong>64 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

SCA0000009367 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

362,366<br />

1,023,748


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. <strong>10</strong>6 - Queens<br />

27 P.S. <strong>10</strong>8 - Queens<br />

27 P.S. 1<strong>14</strong> - Queens<br />

27 P.S. 124 - Queens<br />

* Building scheduled for an Exterior Mod<br />

P.S. <strong>10</strong>5 - Queens Total: $1,386,1<strong>14</strong><br />

DSF0000766605 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,204,819<br />

P.S. <strong>10</strong>6 - Queens Total: $1,204,819<br />

DSF0000701124 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2011<br />

CAFETERIA/MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Fluorescent<br />

CAFETERIA/MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Incandescent<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Floor Finish<br />

MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Fluorescent<br />

500,608<br />

P.S. <strong>10</strong>8 - Queens Total: $500,608<br />

DSF0000688288 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

87,321<br />

P.S. 1<strong>14</strong> - Queens Total: $87,321<br />

DSF00007<strong>10</strong>261 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:Exterior Walls<br />

DSF0000731126 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

1,758,812<br />

2,022,928


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. <strong>14</strong>6 - Queens<br />

27 P.S. 183 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:PARAPETS<br />

P.S. 124 - Queens Total: $3,781,740<br />

DSF0000744322 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2013<br />

CAFETERIA:LIGHTING:Lighting Fixture - Fluorescent<br />

INTERIOR:CAFETERIA:Floor Finish<br />

276,615<br />

P.S. <strong>14</strong>6 - Queens Total: $276,615<br />

DSF0000678869 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000678873 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000678874 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000678881 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Sidewalks<br />

SITE:Stairs/ramps: Exterior<br />

DSF0000678885 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>10</strong><br />

INTERIOR:Library:Floor Finish<br />

438,535<br />

1,937,542<br />

2,027,455<br />

1,467,332<br />

611,<strong>14</strong>3


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 I.S. 2<strong>10</strong> - Queens<br />

* Building scheduled for an Exterior Mod<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

LIBRARY:Raceway With Receptacles<br />

DSF0000678886 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

DSF0000678887 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Ventilation<br />

VENTILATION:Heating And Ventilating Unit<br />

DSF0000690217 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

275,365<br />

440,598<br />

2,684,840<br />

P.S. 183 - Queens Total: $9,882,8<strong>10</strong><br />

DSF0000745361 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000768278 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000768280 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

5,084,844<br />

4,948,054<br />

1,719,411<br />

I.S. 2<strong>10</strong> - Queens Total: $11,752,309


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 215 - Queens<br />

27 P.S. 223 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000724092 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000745409 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000745415 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000745416 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000745426 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

3,0<strong>10</strong>,367<br />

1,<strong>14</strong>0,684<br />

966,458<br />

1,001,307<br />

1,205,409<br />

P.S. 215 - Queens Total: $7,324,226<br />

DSF0000745537 State of Good Repair - System Replacements - Windows<br />

2013<br />

2,222,157


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

27 P.S. 225 - Queens<br />

27 I.S. 226 - Queens<br />

27 P.S. 232 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:WINDOWS<br />

DSF0000775633 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000775634 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

346,861<br />

1,033,487<br />

P.S. 223 - Queens Total: $3,602,505<br />

DSF0000752848 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

161,599<br />

P.S. 225 - Queens Total: $161,599<br />

DSF0000679579 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000679580 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000679589 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Gymnasium:Flooring<br />

INTERIOR:Gymnasium:Sliding-folding Partition<br />

3,519,780<br />

4,163,484<br />

768,304<br />

I.S. 226 - Queens Total: $8,451,568


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 J.H.S. 8 - Queens<br />

28 P.S. 30 - Queens<br />

28 P.S. 40 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000679658 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Playgrounds:Benches<br />

SITE:Playgrounds:Pavement<br />

SITE:Playgrounds:Play Equipment<br />

SITE:Playgrounds:Safety Surfacing<br />

1,123,020<br />

P.S. 232 - Queens Total: $1,123,020<br />

DSF0000742173 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

3,<strong>14</strong>0,701<br />

J.H.S. 8 - Queens Total: $3,<strong>14</strong>0,701<br />

DSF0000753121 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

859,207<br />

P.S. 30 - Queens Total: $859,207<br />

DSF0000408895 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:STUDENT<br />

1,449,2<strong>10</strong>


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 50 ADDITION - Queens<br />

* Building scheduled for an Exterior Mod<br />

TOILET ROOMS<br />

DSF0000545323 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:EXTERIOR WALLS<br />

DSF000061<strong>10</strong>34 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Playgrounds:Matting<br />

SITE:Playgrounds:Play Equipment<br />

DSF0000688519 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF000072<strong>14</strong>07 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

PANEL BOARD<br />

SWITCHBOARD<br />

SCA0000021393 State of Good Repair - System Replacements - Parapets<br />

2013<br />

3,036,269<br />

2,284,119<br />

1,206,267<br />

976,831<br />

1,152,3<strong>14</strong><br />

P.S. 40 - Queens Total: $<strong>10</strong>,<strong>10</strong>5,0<strong>10</strong><br />

DSF0000676744 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>018 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

2,273,972<br />

254,440


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 54 - Queens<br />

28 P.S. 55 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>024 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF00007<strong>10</strong><strong>10</strong>5 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

208,804<br />

734,242<br />

P.S. 50 ADDITION - Queens Total: $3,471,458<br />

DSF0000676820 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

20<strong>10</strong><br />

INTERIOR:Library:Floor Finish<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

LIBRARY:Raceway With Receptacles<br />

DSF0000721607 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000721608 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

341,587<br />

2,115,927<br />

2,633,259<br />

P.S. 54 - Queens Total: $5,090,773<br />

DSF0000688412 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

EXTERIOR:Cornice<br />

1,332,508


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 J.H.S. 72 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

DSF0000688413 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

2,327,432<br />

P.S. 55 - Queens Total: $3,659,940<br />

DSF0000677067 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000677068 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000677069 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000677070 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000721862 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

202,813<br />

3,782,048<br />

753,278<br />

2,285,569<br />

1,042,057<br />

J.H.S. 72 - Queens Total: $8,065,766


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 80 - Queens<br />

28 P.S. 82 - Queens<br />

28 P.S. <strong>10</strong>1 - Queens<br />

28 P.S. 117 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000721987 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

626,784<br />

P.S. 80 - Queens Total: $626,784<br />

DSF0000677244 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

1,551,761<br />

P.S. 82 - Queens Total: $1,551,761<br />

DSF000070<strong>10</strong>09 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

SCA0000006524 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

250,670<br />

779,173<br />

P.S. <strong>10</strong>1 - Queens Total: $1,029,843<br />

DSF0000612192 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

TOILET ROOM - STUDENT:Lighting Fixture - Fluorescent<br />

DSF0000722528 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

849,926<br />

604,307


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 121 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000722531 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

EXTERIOR:LOUVER<br />

DSF0000743828 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

2,362,900<br />

815,952<br />

P.S. 117 - Queens Total: $4,633,085<br />

DSF0000612256 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

DSF0000612258 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

20<strong>10</strong><br />

INTERIOR:Structural:Floor Structure<br />

DSF0000612263 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000612266 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000722586 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,084,5<strong>14</strong><br />

692,371<br />

3,881,824<br />

594,905<br />

553,386


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 139 - Queens<br />

28 P.S. <strong>14</strong>0 - Queens<br />

* Building scheduled for an Exterior Mod<br />

P.S. 121 - Queens Total: $6,806,999<br />

DSF0000722883 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000744174 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000744175 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

1,059,082<br />

1,272,296<br />

388,340<br />

P.S. 139 - Queens Total: $2,719,718<br />

DSF0000687161 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2013<br />

SITE:Drainage System for Asphalt<br />

DSF0000701591 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

1,523,265<br />

3,611,302


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 J.H.S. 157 - Queens<br />

* Building scheduled for an Exterior Mod<br />

P.S. <strong>14</strong>0 - Queens Total: $5,134,568<br />

DSF0000678461 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000678462 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000678463 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000678464 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Exterior Walls<br />

DSF0000678465 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000709412 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

DSF0000709413 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

DSF0000723183 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

247,326<br />

2,807,925<br />

938,154<br />

6,488,212<br />

2,756,924<br />

590,781<br />

2,9<strong>14</strong>,566<br />

1,005,178


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 160 - Queens<br />

28 P.S. 161 - Queens<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

SPRINKLERS, STANDPIPE, FIRE SYSTEM:SPRINKLER ALARM VALVE ASSEMBLY<br />

J.H.S. 157 - Queens Total: $17,749,066<br />

DSF0000744563 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000744566 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

816,944<br />

2,206,493<br />

P.S. 160 - Queens Total: $3,023,436<br />

DSF0000730537 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000730538 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:WINDOWS<br />

DSF0000731202 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000732442 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

138,856<br />

186,556<br />

1,029,519<br />

651,716


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 174 - Queens<br />

28 J.H.S. 190 - Queens<br />

28 P.S. 196 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000732443 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

832,493<br />

P.S. 161 - Queens Total: $2,839,139<br />

DSF0000767708 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000775652 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

1,204,819<br />

684,932<br />

P.S. 174 - Queens Total: $1,889,751<br />

DSF0000745020 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Fluorescent<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

1,167,<strong>14</strong>2<br />

J.H.S. 190 - Queens Total: $1,167,<strong>14</strong>2


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 P.S. 206 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000745118 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000745119 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000745120 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

1,281,620<br />

1,665,363<br />

6<strong>14</strong>,891<br />

P.S. 196 - Queens Total: $3,561,875<br />

DSF00004<strong>10</strong>905 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF00004<strong>10</strong>912 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

GROUNDING SYSTEM<br />

MOTOR STARTER/CONTACTOR<br />

PANELBOARD:FUSED KNIFE SWITCH<br />

PANELBOARD:FUSED TOGGLE SWITCH<br />

PANELBOARD:MOLDED CASE CIRCUIT BREAKERS<br />

SWITCHBOARD:FUSED DISCONNECT SWITCH<br />

SWITCHBOARD:FUSED KNIFE SWITCH<br />

598,011<br />

262,293


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

28 I.S. 217 - Queens<br />

DSF0000544433 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

DSF00006793<strong>14</strong> State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

911,965<br />

527,000<br />

P.S. 206 - Queens Total: $2,299,268<br />

DSF0000724<strong>14</strong>5 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2011<br />

28 P.S. 55 MINISCHOOL - Queens<br />

29 P.S. 15 - Queens<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:GYMNASIUM:Seating<br />

<strong>10</strong>0,447<br />

I.S. 217 - Queens Total: $<strong>10</strong>0,447<br />

DSF0000680599 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000680600 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000680601 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

1,115,412<br />

607,0<strong>14</strong><br />

371,774<br />

P.S. 55 MINISCHOOL - Queens Total: $2,094,200<br />

DSF0000687156 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

DSF000073<strong>14</strong>64 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

2,080,519<br />

1,449,533


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 P.S. 33 - Queens<br />

29 P.S. 37 - Queens<br />

29 P.S. 38 - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

P.S. 15 - Queens Total: $3,530,052<br />

DSF00007<strong>10</strong>020 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Playgrounds:Play Equipment<br />

SITE:Playgrounds:Safety Surfacing<br />

778,690<br />

P.S. 33 - Queens Total: $778,690<br />

DSF0000408859 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF00006<strong>10</strong>991 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

173,333<br />

5,700,289<br />

P.S. 37 - Queens Total: $5,873,622<br />

DSF0000742673 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>14</strong><br />

GYMNASIUM:LOCAL SOUND SYSTEM<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

450,228<br />

P.S. 38 - Queens Total: $450,228


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 I.S. 59 - Queens<br />

29 P.S. 118 - Queens<br />

29 P.S. 132 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>198 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

Library Upgrades<br />

DSF00007<strong>10</strong>248 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000731226 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2012<br />

Playground Redevelopment<br />

DSF0000752370 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

655,121<br />

241,951<br />

1,432,446<br />

259,071<br />

I.S. 59 - Queens Total: $2,588,589<br />

DSF0000753123 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

350,4<strong>14</strong><br />

P.S. 118 - Queens Total: $350,4<strong>14</strong><br />

DSF0000612476 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

20<strong>10</strong><br />

INTERIOR:Structural:Floor Structure<br />

DSF0000722781 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

201,758<br />

557,258


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 P.S. 134 - Queens<br />

29 P.S. 135 - Queens<br />

29 P.S. 136 - Queens<br />

* Building scheduled for an Exterior Mod<br />

PANEL BOARD<br />

SWITCHBOARD<br />

P.S. 132 - Queens Total: $759,016<br />

DSF0000678<strong>10</strong>1 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

FIXTURES:Student:Urinal<br />

TOILET ROOM - STUDENT:Lighting:Lighting Fixture - Incandescent<br />

694,875<br />

P.S. 134 - Queens Total: $694,875<br />

DSF00004<strong>10</strong>0<strong>14</strong> State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

CONVEYING:SIDEWALK/ASH HOIST<br />

DSF0000744124 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000744125 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

260,797<br />

197,190<br />

3,870,038<br />

P.S. 135 - Queens Total: $4,328,025


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 P.S. 138 - Queens<br />

29 P.S. <strong>14</strong>7 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000722846 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753137 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000753138 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

4,604,129<br />

695,325<br />

859,330<br />

P.S. 136 - Queens Total: $6,158,784<br />

DSF000073<strong>14</strong>01 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000744166 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

282,343<br />

1,274,339<br />

P.S. 138 - Queens Total: $1,556,682<br />

DSF0000701722 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000723030 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

936,561<br />

989,8<strong>14</strong><br />

P.S. <strong>14</strong>7 - Queens Total: $1,926,375


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 P.S. 156 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000487623 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000678440 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000678441 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000688521 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000723157 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000744487 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

INTERIOR:AUDITORIUM:Walls<br />

SCA0000005762 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

54,791<br />

208,242<br />

3,354,972<br />

2,241,827<br />

1,041,720<br />

1,2<strong>10</strong>,671<br />

2,863,637


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 I.S. 231 (TANDEM Q251) - Queens<br />

29 I.S. 238 - Queens<br />

P.S. 156 - Queens Total: $<strong>10</strong>,975,861<br />

DSF0000745629 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000752901 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtain Rigging<br />

INTERIOR:AUDITORIUM:Stage:Stage Curtains<br />

262,507<br />

511,240<br />

I.S. 231 (TANDEM Q251) - Queens Total: $773,747<br />

DSF0000724361 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>14</strong><br />

29 P.S. 251 (TANDEM Q231) - Queens<br />

* Building scheduled for an Exterior Mod<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SERVICE SWITCH<br />

SWITCHBOARD<br />

500,000<br />

I.S. 238 - Queens Total: $500,000<br />

DSF0000545288 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

DSF0000731351 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000731552 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

569,3<strong>14</strong><br />

365,556<br />

77,121


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

29 P.S. /I.S 295 - Queens<br />

30 I.S. <strong>10</strong> - Queens<br />

30 P.S. 69 - Queens<br />

* Building scheduled for an Exterior Mod<br />

P.S. 251 (TANDEM Q231) - Queens Total: $1,011,991<br />

DSF0000752823 Gymnasium Upgrade<br />

2012<br />

281,137<br />

P.S. /I.S 295 - Queens Total: $281,137<br />

DSF0000408533 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

PUMPS<br />

DSF0000742213 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000765188 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000765189 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000775683 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

INTERIOR:STRUCTURAL:VAULTS-BUNKERS<br />

SCA0000020074 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

1,235,119<br />

1,<strong>14</strong>0,684<br />

743,821<br />

2,183,615<br />

357,350<br />

934,491<br />

I.S. <strong>10</strong> - Queens Total: $6,595,081


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 76 - Queens<br />

30 P.S. 85 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000687238 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000700508 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Parapets<br />

24,964<br />

782,060<br />

P.S. 69 - Queens Total: $807,024<br />

DSF0000677164 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Playgrounds:Pavement<br />

SITE:Playgrounds:Play Equipment<br />

DSF0000677166 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Exterior Walls<br />

DSF0000700639 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

1,001,206<br />

1,607,704<br />

1,196,986<br />

P.S. 76 - Queens Total: $3,805,896<br />

DSF0000700748 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000700750 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

1,432,858<br />

513,794


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 111 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000700751 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>116 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000752879 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000775650 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

1,586,573<br />

223,437<br />

1,<strong>14</strong>0,684<br />

684,932<br />

P.S. 85 - Queens Total: $5,582,277<br />

DSF0000677676 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF0000677683 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

HEATING PLANT:Fuel Systems<br />

DSF0000688304 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

DSF0000766668 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,130,470<br />

3,933,040<br />

70,938<br />

1,204,819


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 112 - Queens<br />

30 P.S. 122 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000766679 State of Good Repair - System Replacements - Auditorium Upgrade<br />

20<strong>14</strong><br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

INTERIOR:AUDITORIUM:Walls<br />

876,000<br />

P.S. 111 - Queens Total: $7,215,267<br />

DSF0000677696 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000677697 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:Elevators<br />

CONVEYING:Sidewalk / Ash Hoist<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000722464 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000731192 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

490,385<br />

617,069<br />

569,173<br />

479,504<br />

P.S. 112 - Queens Total: $2,156,131


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 127 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000722631 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2012<br />

CAFETERIA:LIGHTING:Lighting Fixture - HID<br />

CAFETERIA:LOCAL SOUND SYSTEM<br />

INTERIOR:CAFETERIA:Floor Finish<br />

MULTIPURPOSE ROOM:LIGHTING:Lighting Fixture - HID<br />

378,287<br />

P.S. 122 - Queens Total: $378,287<br />

DSF0000409908 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000677990 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2011<br />

AUDITORIUM:House Lighting:Lighting Fixture - Incandescent<br />

AUDITORIUM:Projection System<br />

AUDITORIUM:Theater Lighting System:Theater Lighting<br />

INTERIOR:Auditorium:Door(s)<br />

INTERIOR:Auditorium:Fixed Seating<br />

INTERIOR:Auditorium:Floor Finish<br />

INTERIOR:Auditorium:Stage<br />

DSF0000677995 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2011<br />

CAFETERIA/MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Incandescent<br />

CAFETERIA/MULTIPURPOSE ROOM:Local Sound System<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Ceiling<br />

INTERIOR:Cafeteria/Multi-Purpose Room:Floor Finish<br />

636,889<br />

1,079,353<br />

247,753


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 I.S. <strong>14</strong>1 - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000722711 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000753074 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

4,206,324<br />

1,725,618<br />

P.S. 127 - Queens Total: $7,895,937<br />

DSF0000678200 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000678201 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

DSF0000678212 Safety and Security - Safety and Security - Safety Systems<br />

20<strong>10</strong><br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

SECURITY:Intrusion Alarm<br />

DSF0000687240 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000701615 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

2,411,234<br />

3,026,907<br />

294,931<br />

38,8<strong>10</strong><br />

2,848,222


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 I.S. <strong>14</strong>5 - Queens<br />

30 P.S. <strong>14</strong>8 - Queens<br />

30 P.S. 151 - Queens<br />

* Building scheduled for an Exterior Mod<br />

I.S. <strong>14</strong>1 - Queens Total: $8,620,<strong>10</strong>5<br />

DSF0000744296 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

1,782,373<br />

I.S. <strong>14</strong>5 - Queens Total: $1,782,373<br />

DSF0000744355 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

1,342,876<br />

P.S. <strong>14</strong>8 - Queens Total: $1,342,876<br />

DSF00004<strong>10</strong>223 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

DSF0000744399 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:HOUSE LIGHTING:Lighting Fixture - Incandescent<br />

528,313<br />

912,796


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 171 - Queens<br />

30 I.S. 204 - Queens<br />

* Building scheduled for an Exterior Mod<br />

AUDITORIUM:LOCAL SOUND SYSTEM<br />

AUDITORIUM:PROJECTION SYSTEM<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000753125 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

343,937<br />

P.S. 151 - Queens Total: $1,785,047<br />

DSF0000767652 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

SCA0000020933 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

3,183,801<br />

2,600,386<br />

P.S. 171 - Queens Total: $5,784,187<br />

DSF0000687239 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000688196 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000723951 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:LOCAL SOUND SYSTEM<br />

GYMNASIUM:SCOREBOARD<br />

29,920<br />

522,672<br />

866,737


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 P.S. 212 - Queens<br />

30 I.S. 227 - Queens<br />

30 I.S. 230 - Queens<br />

30 P.S. 92 - Queens<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

INTERIOR:GYMNASIUM:Seating<br />

INTERIOR:GYMNASIUM:Sliding-folding Partition<br />

I.S. 204 - Queens Total: $1,419,329<br />

DSF0000687079 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

90,128<br />

P.S. 212 - Queens Total: $90,128<br />

DSF0000724278 Auditorium Upgrade<br />

2012<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

286,154<br />

I.S. 227 - Queens Total: $286,154<br />

DSF0000687261 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

1,165,277<br />

I.S. 230 - Queens Total: $1,165,277<br />

DSF0000679734 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:Site Walls (not Retaining Walls)<br />

DSF0000687134 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

527,901<br />

1,116,611


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

30 PS 150 ANNEX - Queens<br />

DSF0000688415 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000732191 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000745712 State of Good Repair - System Replacements - Windows<br />

20<strong>14</strong><br />

EXTERIOR:WINDOWS<br />

239,127<br />

1,722,094<br />

2,495,636<br />

P.S. 92 - Queens Total: $6,<strong>10</strong>1,369<br />

DSF0000775418 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

33Q DOE ADMINISTRATIVE / STUDENT SERVICES - Queens<br />

33Q OSSS / DSF - Queens<br />

* Building scheduled for an Exterior Mod<br />

1,204,819<br />

PS 150 ANNEX - Queens Total: $1,204,819<br />

DSF0000622345 State of Good Repair - Building Upgrade - Air Conditioning Retrofit<br />

20<strong>10</strong><br />

<strong>10</strong>,490,123<br />

DOE ADMINISTRATIVE / STUDENT SERVICES - Queens Total: $<strong>10</strong>,490,123<br />

DSF0000411715 Ancillary Facilities - Administrative Support - Administrative Support<br />

20<strong>10</strong><br />

Elevators and Escalators<br />

CONVEYING:ELEVATORS<br />

DSF0000623263 Ancillary Facilities - Administrative Support - Administrative Support<br />

20<strong>10</strong><br />

Electrical Systems<br />

4,397,909<br />

4,441,440


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000688160 Safety and Security - Safety and Security - School Safety<br />

2012<br />

Room Conversions/Partitioning<br />

DSF000073<strong>14</strong>66 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000752835 State of Good Repair - System Replacements - Parapets<br />

2012<br />

75Q P.S. 9 (W REED SCHOOL) - Queens<br />

EXTERIOR:PARAPETS<br />

1,739,208<br />

4,072,519<br />

742,091<br />

OSSS / DSF - Queens Total: $15,393,166<br />

DSF0000687230 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF00007<strong>10</strong>332 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

DSF0000720930 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000720933 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000720934 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

75Q P.S. 75 (R PEARY SCHOOL) - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:EXTERIOR WALLS<br />

15,326<br />

620,764<br />

713,870<br />

1,727,131<br />

3,800,944<br />

P.S. 9 (W REED SCHOOL) - Queens Total: $6,878,035


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75Q P.S. 752 (OLD J<strong>14</strong>2) - Queens<br />

75Q P.S. 177 - Queens<br />

75Q P.S. 721 (OTC) - Queens<br />

75Q P.S. 811 (OLD 187) - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000611559 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Exterior Walls<br />

654,817<br />

P.S. 75 (R PEARY SCHOOL) - Queens Total: $654,817<br />

DSF0000709464 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

DSF0000732190 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

211,392<br />

411,055<br />

P.S. 752 (OLD J<strong>14</strong>2) - Queens Total: $622,448<br />

DSF0000613194 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

1,001,484<br />

P.S. 177 - Queens Total: $1,001,484<br />

DSF0000775654 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 721 (OTC) - Queens Total: $684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75Q P.S. 256 ANNEX - Queens<br />

* Building scheduled for an Exterior Mod<br />

DSF0000411790 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

DSF0000680484 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

20<strong>10</strong><br />

SITE:Playgrounds:Pavement<br />

SITE:Playgrounds:Play Equipment<br />

794,815<br />

805,826<br />

P.S. 811 (OLD 187) - Queens Total: $1,600,641<br />

DSF0000622675 Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000622676 Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000680530 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

2012<br />

INTERIOR:Multi-Purpose Room:Ceiling<br />

INTERIOR:Multi-Purpose Room:Door(s)<br />

INTERIOR:Multi-Purpose Room:Floor Finish<br />

INTERIOR:Multi-Purpose Room:Stage and Fixed Equipment:Stage<br />

INTERIOR:Multi-Purpose Room:Wall<br />

MULTIPURPOSE ROOM:Lighting:Lighting Fixture - Incandescent<br />

MULTIPURPOSE ROOM:Theater Lighting System:Theater Lighting<br />

DSF0000703783 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

6,428,441<br />

1,215,365<br />

2,895,<strong>10</strong>4<br />

611,895


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75Q P.S. 233 MINISCHOOL2 (OLD P752) - Queens<br />

P.S. 256 ANNEX - Queens Total: $11,150,805<br />

DSF0000746533 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000752421 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000769476 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000775632 State of Good Repair - System Replacements - Windows<br />

2013<br />

78Q FRANKLIN K. LANE HS - Queens<br />

EXTERIOR:WINDOWS<br />

151,396<br />

2,646,728<br />

2,275,359<br />

421,805<br />

P.S. 233 MINISCHOOL2 (OLD P752) - Queens Total: $5,495,289<br />

DSF00007<strong>10</strong>072 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

78Q QUEENS ACADEMY HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

250,489<br />

FRANKLIN K. LANE HS - Queens Total: $250,489<br />

DSF00006<strong>10</strong>756 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000742419 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

560,705<br />

1,321,338


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q AUGUST MARTIN HS - Queens<br />

78Q AUGUST MARTIN AF - Queens<br />

* Building scheduled for an Exterior Mod<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Incandescent<br />

QUEENS ACADEMY HS - Queens Total: $1,882,043<br />

DSF0000745728 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000745729 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

DSF0000745730 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

6,380,528<br />

6,385,529<br />

2,588,212<br />

AUGUST MARTIN HS - Queens Total: $15,354,270<br />

DSF0000679744 State of Good Repair - Building Upgrade - Reinforcing Support Elements<br />

2011<br />

INTERIOR:Structural:Columns/beams/bearing Walls<br />

INTERIOR:Structural:Roof Structure<br />

2,063,367<br />

AUGUST MARTIN AF - Queens Total: $2,063,367


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q BAYSIDE HS - Queens<br />

DSF0000411254 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000544552 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000687333 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000724424 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

FIRE ALARM SYSTEM<br />

DSF0000745750 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>14</strong><br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000745753 State of Good Repair - System Replacements - Roofs<br />

20<strong>14</strong><br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000745754 State of Good Repair - System Replacements - Parapets<br />

20<strong>14</strong><br />

78Q BEACH CHANNEL HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:COPING<br />

EXTERIOR:PARAPETS<br />

371,911<br />

43,364<br />

<strong>14</strong>4,436<br />

881,091<br />

995,047<br />

5,797,284<br />

9,356,961<br />

BAYSIDE HS - Queens Total: $17,590,093<br />

DSF0000545289 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000745774 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

794,526<br />

2,762,011


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q JOHN BOWNE HS - Queens<br />

78Q FRANCIS LEWIS HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

BEACH CHANNEL HS - Queens Total: $3,556,536<br />

DSF0000425048 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000622674 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2011<br />

FIRE ALARM SYSTEM<br />

330,440<br />

1,036,963<br />

JOHN BOWNE HS - Queens Total: $1,367,403<br />

DSF0000679887 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000679895 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

EXTERIOR:Loading Dock<br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Sidewalks<br />

DSF0000679896 State of Good Repair - System Replacements - Fencing<br />

20<strong>10</strong><br />

SITE:Fences<br />

1,323,450<br />

1,592,034<br />

691,987<br />

FRANCIS LEWIS HS - Queens Total: $3,607,471


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q MARTIN VAN BUREN HS - Queens<br />

78Q FOREST HILLS HS - Queens<br />

78Q FOREST HILLS AF - Queens<br />

DSF0000745890 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>14</strong><br />

FIRE ALARM SYSTEM<br />

1,<strong>14</strong>0,684<br />

MARTIN VAN BUREN HS - Queens Total: $1,<strong>14</strong>0,684<br />

DSF00006<strong>14</strong>358 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Paving - Vehicular Area:Concrete<br />

5,071,516<br />

FOREST HILLS HS - Queens Total: $5,071,516<br />

SCA0000019773 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

78Q WILLIAM C. BRYANT HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

SITE:RETAINING WALLS<br />

6,079,816<br />

FOREST HILLS AF - Queens Total: $6,079,816<br />

DSF00007246<strong>10</strong> State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000745945 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000745947 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

4,940,892<br />

2,690,855<br />

4,445,428


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000768845 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

78Q NEWCOMERS HIGH SCHOOL (OLD LIC) - Queens<br />

1,204,819<br />

WILLIAM C. BRYANT HS - Queens Total: $13,281,994<br />

DSF0000687241 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

DSF0000703317 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000703319 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Coping<br />

EXTERIOR:Parapets<br />

DSF0000703320 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

78Q LONG ISLAND CITY HS (NEW) - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

21,212<br />

1,009,337<br />

690,735<br />

<strong>14</strong>,564,992<br />

NEWCOMERS HIGH SCHOOL (OLD LIC) - Queens Total: $16,286,275<br />

DSF0000680016 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

628,136


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000753<strong>10</strong>1 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

78Q LONG ISLAND CITY AF - Queens<br />

78Q NEWTOWN HS - Queens<br />

EXTERIOR:EXTERIOR WALLS<br />

458,851<br />

LONG ISLAND CITY HS (NEW) - Queens Total: $1,086,988<br />

DSF0000751972 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

2013<br />

ATHLETIC FIELDS:PLAYING SURFACE<br />

3,579,001<br />

LONG ISLAND CITY AF - Queens Total: $3,579,001<br />

DSF0000680042 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000724672 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

2012<br />

78Q HS FOR ARTS AND BUS. (OL NUTN X) - Queens<br />

INTERIOR:STRUCTURAL:FLOOR STRUCTURE<br />

3,650,244<br />

642,937<br />

NEWTOWN HS - Queens Total: $4,293,181<br />

DSF00007<strong>10</strong>1<strong>14</strong> State of Good Repair - System Replacements - Windows<br />

2011<br />

78Q FLUSHING AF (LEVITTS FIELD) - Queens<br />

* Building scheduled for an Exterior Mod<br />

1,179,999<br />

HS FOR ARTS AND BUS. (OL NUTN X) - Queens Total: $1,179,999<br />

DSF00006<strong>14</strong>511 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

20<strong>10</strong><br />

5,472,154


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

* Building scheduled for an Exterior Mod<br />

ATHLETIC FIELDS:Fixed Equipment<br />

ATHLETIC FIELDS:Playing Surface<br />

ATHLETIC FIELDS:Running Track<br />

CLASSROOMS/CORRIDORS/ADMIN SPACES:Lighting Fixture - Incandescent<br />

CLIMATE CONTROL SYSTEM<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:House Trap<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Interior Floor Drain<br />

ELECTRIC SERVICE SWITCH<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Doors:Doors and Frames<br />

EXTERIOR:Exterior Walls<br />

FIXTURES:Student:Drinking Fountain<br />

GAS FIRED FURNACE<br />

GAS SERVICE:Gas Distribution Piping<br />

GROUNDING SYSTEM<br />

LIGHTING - EXTERIOR ATHLETIC FIELD<br />

LIGHTING - EXTERIOR SECURITY<br />

PANELBOARD<br />

SITE:Drainage System for Concrete<br />

SITE:Fences<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Paving - Vehicular Area:Asphalt<br />

SITE:Sidewalks


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q FAR ROCKAWAY HS - Queens<br />

78Q JAMAICA HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

SITE:Site Structures<br />

TOILET ROOM - STUDENT:Lighting Fixture - Fluorescent<br />

FLUSHING AF (LEVITTS FIELD) - Queens Total: $5,472,154<br />

DSF000041<strong>14</strong>82 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

DSF0000746081 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2013<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Dimming System<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Floor Finish<br />

INTERIOR:AUDITORIUM:Stage:Stage<br />

285,000<br />

2,089,2<strong>10</strong><br />

FAR ROCKAWAY HS - Queens Total: $2,374,2<strong>10</strong><br />

DSF00006<strong>14</strong>531 State of Good Repair - Building Upgrade - Climate Control<br />

20<strong>10</strong><br />

CLIMATE CONTROL SYSTEM<br />

DSF00006<strong>14</strong>539 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

GAS SERVICE:Gas Distribution Piping<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

3,<strong>10</strong>6,091<br />

6,953,029


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q JAMAICA AF - Queens<br />

78Q RICHMOND HILL HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

HEATING PLANT:Fuel Systems<br />

DSF0000746096 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000752390 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2013<br />

Library Upgrades<br />

DSF0000753065 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

4,857,347<br />

857,839<br />

544,275<br />

JAMAICA HS - Queens Total: $16,318,582<br />

DSF0000752423 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

1,927,804<br />

JAMAICA AF - Queens Total: $1,927,804<br />

DSF0000680157 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000680158 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Cornice<br />

EXTERIOR:Exterior Walls<br />

4,569,623<br />

4,475,542


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q JOHN ADAMS HS - Queens<br />

EXTERIOR:Louver<br />

DSF00007<strong>10</strong>017 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

1,430,938<br />

RICHMOND HILL HS - Queens Total: $<strong>10</strong>,476,<strong>10</strong>3<br />

DSF0000411546 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000680189 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

SITE:Drainage System for Concrete<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Paving - Vehicular Area:Concrete<br />

SITE:Retaining Walls<br />

SITE:Sidewalks<br />

DSF0000688175 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:Parapets<br />

DSF0000775809 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

78Q GROVER CLEVELAND HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

1,932,903<br />

1,408,442<br />

389,844<br />

500,000<br />

JOHN ADAMS HS - Queens Total: $4,231,189<br />

DSF0000703528 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

5,670,944


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF00007<strong>10</strong>120 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

78Q CAMPUS MAGNET HS (JACKSON) - Queens<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Stairs/ramps: Exterior<br />

1,<strong>14</strong>3,889<br />

GROVER CLEVELAND HS - Queens Total: $6,8<strong>14</strong>,832<br />

DSF0000680243 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

DSF00007<strong>10</strong>271 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

2011<br />

DSF0000730932 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000730941 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000769<strong>10</strong>2 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000769<strong>10</strong>4 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000769<strong>10</strong>5 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

SCA0000021733 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

162,219<br />

767,451<br />

42,455<br />

96,029<br />

266,280<br />

1,074,857<br />

6,371,995<br />

4,009,349<br />

CAMPUS MAGNET HS (JACKSON) - Queens Total: $12,790,635


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78Q HILLCREST HS - Queens<br />

DSF0000732192 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

78Q TOWNSEND HARRIS HS - Queens<br />

FIRE ALARM SYSTEM<br />

1,577,249<br />

HILLCREST HS - Queens Total: $1,577,249<br />

DSF0000754558 State of Good Repair - Building Upgrade - Air Conditioning Retrofit<br />

2013<br />

78Q QNS HS OF TEACH., LIB. ARTS&SCI - Queens<br />

78Q QUEENS VOC HS - Queens<br />

78Q AVIATION HS - Queens<br />

91,304<br />

TOWNSEND HARRIS HS - Queens Total: $91,304<br />

DSF0000687170 Paved Area-Concrete<br />

20<strong>10</strong><br />

DSF0000731331 State of Good Repair - System Replacements - Electrical Systems<br />

2012<br />

12,0<strong>14</strong>,<strong>14</strong>7<br />

1,078,681<br />

QNS HS OF TEACH., LIB. ARTS&SCI - Queens Total: $13,092,828<br />

DSF0000731152 Exterior Masonry<br />

2013<br />

1,843,044<br />

QUEENS VOC HS - Queens Total: $1,843,044<br />

DSF0000411644 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

78Q THOMAS A. EDISON VOC HS - Queens<br />

* Building scheduled for an Exterior Mod<br />

304,775<br />

AVIATION HS - Queens Total: $304,775<br />

DSF0000724990 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

238,961


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

SITE:RETAINING WALLS<br />

DSF0000769215 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

78Q R. F. KENNEDY COMM. MIDDLE/HS - Queens<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

THOMAS A. EDISON VOC HS - Queens Total: $923,892<br />

DSF0000687233 State of Good Repair - System Replacements - Kitchen Areas<br />

2011<br />

Electrical Systems<br />

78Q ELMHURST EDUCATIONAL CAMPUS - Queens<br />

17,517<br />

R. F. KENNEDY COMM. MIDDLE/HS - Queens Total: $17,517<br />

DSF0000688295 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

78Q NORTH QUEENS COMMUNITY HS - Queens<br />

1,028,812<br />

ELMHURST EDUCATIONAL CAMPUS - Queens Total: $1,028,812<br />

DSF0000775471 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

78Q R. F. WAGNER SEC SCL ARTS & TECH - Queens<br />

* Building scheduled for an Exterior Mod<br />

1,204,819<br />

NORTH QUEENS COMMUNITY HS - Queens Total: $1,204,819<br />

DSF0000731522 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

352,848<br />

R. F. WAGNER SEC SCL ARTS & TECH - Queens Total: $352,848


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Staten Island<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

A. New Construction<br />

1. Building Replacement<br />

B. Major Modernizations and Rehabilitations<br />

1. Full Modernizations<br />

2. Interior Modernizations<br />

3. Exterior Modernizations<br />

C. Building Upgrade<br />

1. Asbestos<br />

2. Boiler Conversion<br />

3. Climate Control<br />

4. Indoor Air Pollution Abatement<br />

5. Kitchen Conversions<br />

6. Low-Voltage Electrical Systems<br />

7. Lighting Fixtures<br />

8. Elevators and Escalators<br />

9. Reinforcing Cinder Concrete Slabs<br />

<strong>10</strong>. Flood Elimination<br />

11. Air Conditioning Retrofit<br />

12. Lead Paint Abatement<br />

13. Reinforcing Support Elements<br />

<strong>14</strong>. Interior Spaces<br />

D. Rehabilitation of Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playground Redevelopment<br />

3. Swimming Pools<br />

E. System Replacements<br />

1. Roofs<br />

2. Parapets<br />

3. Painting & Plastering<br />

4. Windows<br />

5. Exterior Masonry<br />

6. Electrical Systems<br />

7. Heating Plant Upgrade<br />

8. Domestic Piping<br />

9. Toilets-Students<br />

<strong>10</strong>. Toilets-Staff<br />

0.00<br />

0.00<br />

0.00<br />

0.03<br />

0.00<br />

0.28<br />

0.08<br />

0.00<br />

0.00<br />

2.98<br />

0.89<br />

0.47<br />

0.57<br />

1.19<br />

0.00<br />

0.00<br />

0.13<br />

0.00<br />

1.58<br />

0.00<br />

0.08<br />

2.<strong>10</strong><br />

2.58<br />

0.00<br />

6.97<br />

7.87<br />

0.70<br />

0.45<br />

0.03<br />

1.40<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

0.19<br />

0.53<br />

0.00<br />

0.00<br />

0.25<br />

0.48<br />

1.69<br />

0.01<br />

1.28<br />

0.00<br />

0.00<br />

0.06<br />

0.00<br />

0.44<br />

0.81<br />

0.12<br />

6.05<br />

4.92<br />

0.00<br />

<strong>10</strong>.26<br />

3.34<br />

0.85<br />

6.76<br />

0.02<br />

1.62<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.06<br />

0.00<br />

0.00<br />

2.75<br />

0.35<br />

1.67<br />

0.00<br />

0.42<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

0.04<br />

0.85<br />

0.13<br />

3.13<br />

4.61<br />

0.00<br />

3.25<br />

3.95<br />

0.07<br />

0.89<br />

0.03<br />

0.55<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.35<br />

0.02<br />

0.00<br />

0.00<br />

7.82<br />

9.46<br />

1.33<br />

0.00<br />

6.61<br />

2.06<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.46<br />

0.01<br />

7.35<br />

2.08<br />

0.00<br />

5.<strong>14</strong><br />

2.75<br />

3.05<br />

7.26<br />

2.43<br />

2.12<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

9.33<br />

1.20<br />

0.00<br />

1.87<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.07<br />

0.00<br />

0.20<br />

0.03<br />

0.00<br />

8.06<br />

0.19<br />

0.00<br />

0.00<br />

1.45<br />

0.07<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.06<br />

0.00<br />

0.82<br />

0.68<br />

0.00<br />

0.00<br />

13.81<br />

20.51<br />

6.35<br />

0.59<br />

11.37<br />

2.06<br />

0.00<br />

0.21<br />

0.00<br />

2.06<br />

3.19<br />

0.34<br />

18.84<br />

<strong>14</strong>.23<br />

0.00<br />

33.69<br />

18.<strong>10</strong><br />

4.66<br />

15.36<br />

3.96<br />

5.77<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Staten Island<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

I. State of Good Repair<br />

E. System Replacements<br />

11. Floors<br />

12. Paved Area-Blacktop<br />

13. Paved Area-Concrete<br />

<strong>14</strong>. Fencing<br />

15. Kitchen Areas<br />

16. Containerization<br />

17. Auditorium Upgrade<br />

18. Gymnasium Upgrade<br />

19. Asset Management Program<br />

20. CIP Response<br />

21. Cafeteria / Multipurpose Room Upgrade<br />

I. State of Good Repair Yearly Totals:<br />

II. System Expansion<br />

A. New Construction-Additional Capacity<br />

1. New Schools<br />

2. Building Additions<br />

2a. Building Additions/Modernizations<br />

3. Leased Facility Improvements<br />

4. Transportables<br />

5. Modular Classrooms<br />

7. Capacity - Interior Modernization<br />

B. New Construction-Common-Facilities-Additions<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

C. New Physical Education Facilities<br />

1. Athletic Fields<br />

2. Playgrounds<br />

D. New Const-Common Facil-Bldg Add/Mod<br />

1. Lunchrooms<br />

2. Auditoriums<br />

3. Gymnasiums<br />

4. Swimming Pools<br />

1.90<br />

3.36<br />

0.72<br />

0.32<br />

0.00<br />

0.00<br />

0.24<br />

0.37<br />

0.00<br />

0.00<br />

0.64<br />

1.45<br />

0.44<br />

0.26<br />

0.96<br />

0.00<br />

0.00<br />

0.29<br />

0.02<br />

0.00<br />

0.00<br />

0.<strong>10</strong><br />

0.05<br />

1.50<br />

0.64<br />

0.13<br />

0.00<br />

0.00<br />

1.30<br />

1.50<br />

0.00<br />

0.00<br />

0.09<br />

1.33<br />

0.05<br />

1.51<br />

0.08<br />

0.00<br />

0.00<br />

0.<strong>10</strong><br />

0.74<br />

0.00<br />

0.00<br />

0.01<br />

I. State of Good Repair Total:<br />

1.00<br />

0.00<br />

0.62<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.50<br />

0.00<br />

0.00<br />

0.00<br />

37.93 43.22 28.00 64.<strong>14</strong> 26.59<br />

9.82<br />

0.39<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

56.95<br />

0.30<br />

0.00<br />

0.12<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

79.66<br />

0.24<br />

0.00<br />

12.58<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

20.07<br />

0.05<br />

0.00<br />

2.23<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

12.39<br />

0.00<br />

0.00<br />

4.68<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

5.72<br />

5.35<br />

3.75<br />

1.49<br />

0.00<br />

0.00<br />

1.93<br />

4.<strong>14</strong><br />

0.00<br />

0.00<br />

0.84<br />

199.88<br />

178.90<br />

0.98<br />

0.00<br />

19.62<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Staten Island<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

II. System Expansion<br />

E. Site Acquisition<br />

1. Site Acquisition<br />

F. Replacements<br />

1. Replacements - New<br />

2. Replacements - Addition<br />

3. Replacements - Leases<br />

4. Replacements - Capacity - Interior Mod<br />

II. System Expansion Yearly Totals:<br />

III. Educational Enhancements<br />

A. Educational Enhancements<br />

1. Technology<br />

2. Room Conversions/Partitioning<br />

3. Accessibility<br />

4. School Improvement and Restructuring<br />

5. Science Lab Upgrades<br />

6. Library Upgrades<br />

7. Charter/Innovative Schools<br />

III. Educational Enhancements Yearly Totals:<br />

IV. Safety and Security<br />

A. Safety and Security<br />

1. Safety Systems<br />

1a. School Safety<br />

2. Emergency Lighting and Fire Safety Retrofits<br />

3. Code Compliance<br />

IV. Safety and Security Yearly Totals:<br />

V. Ancillary Facilities<br />

A. Administrative Support<br />

1. Administrative Support<br />

V. Ancillary Facilities Yearly Totals:<br />

6.15<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.47<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.24<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

II. System Expansion Total:<br />

0.00<br />

0.00<br />

0.00<br />

1.54<br />

0.00<br />

16.37 58.85 92.72 22.37 18.60<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

0.07<br />

0.00<br />

0.00<br />

0.00<br />

III. Educational Enhancements Total:<br />

0.39<br />

0.00<br />

0.00<br />

0.00<br />

0.01<br />

0.00<br />

0.00<br />

0.00<br />

0.02<br />

0.00<br />

0.00<br />

0.00<br />

0.04<br />

0.00<br />

0.00<br />

0.00<br />

0.07 0.39 0.01 0.02 0.04<br />

0.00<br />

0.00<br />

IV. Safety and Security Total:<br />

0.00<br />

0.00<br />

0.00<br />

0.00 0.00 0.00 0.00 0.00<br />

V. Ancillary Facilities Total:<br />

7.88<br />

0.00<br />

0.00<br />

1.54<br />

0.00<br />

208.90<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.54<br />

0.00<br />

0.00<br />

0.00<br />

0.54<br />

0.00<br />

0.00


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Borough of Staten Island<br />

(in millions)<br />

Category FY<strong>10</strong> FY11 FY12 FY13 FY<strong>14</strong> Total<br />

VI. Emergency, Unspecified and Misc.<br />

A. Research and Development<br />

1. Building Condition Surveys<br />

C. DOE Administration<br />

1. DOE Administration<br />

D. Wrap-Up Insurance<br />

1. Wrap-Up Insurance<br />

E. Emergency Unspecified<br />

1. Emergency Unspecified<br />

2. Emergency Stabilization<br />

3. Emergency Response<br />

F. Prior Plan Completion Cost<br />

1. Prior Plan Completion Cost<br />

G. Resolution A<br />

1. City Council<br />

2. Borough President<br />

H. Mayor/Council Program<br />

1. Mayor/Council Program<br />

VI. Emergency, Unspecified and Misc. Yearly Totals:<br />

Yearly Totals for Staten Island<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.55<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

2.07<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.50<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

2.35<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

1.53<br />

0.00<br />

0.55 2.07 1.50 2.35 1.53<br />

VI. Emergency, Unspecified and Misc. Total:<br />

54.93 <strong>10</strong>4.52 122.23 88.88 46.76<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

0.00<br />

8.00<br />

0.00<br />

8.00<br />

Staten Island Grand Total: $417.32


District Project #<br />

School<br />

New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

Capacity Projects<br />

Borough of Staten Island<br />

(in millions)<br />

Forecast<br />

Capacity<br />

Design<br />

Start<br />

Constr<br />

Start<br />

Actual /<br />

Est.<br />

Compl<br />

Total Est.<br />

Cost<br />

Previous<br />

Appropriations<br />

Funding<br />

Req'd<br />

FY <strong>10</strong>-<strong>14</strong><br />

* L 31 DSF0000687<strong>10</strong>4 P.S. 59 372 May-11 Jun-12 Jun-13 15.67<br />

0.00 15.67 0.00<br />

* 31 DSF0000687<strong>10</strong>5 P.S. 62 444 Jan-11 Jul-12 May-15 <strong>10</strong>0.08<br />

0.00 91.68 8.39<br />

* 31 DSF0000417400 P.S. 71 (PS 48) 844 Oct-09 Jun-11 Jun-13 86.63<br />

0.25 86.38 0.00<br />

L 31 DSF0000732426 PROJECT #1 44 Mar-13 Apr-<strong>14</strong> Jul-15 4.33<br />

0.00 3.72 0.61<br />

* School with existing site identified. Total Estimated Cost includes site acquisition costs when applicable.<br />

L Proposed Leased Facility<br />

Needed to<br />

Complete


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 I.S. 2 - Staten Island<br />

31 P.S. 3 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF00007<strong>10</strong>967 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000725264 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

DSF0000752899 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2013<br />

GYMNASIUM:LIGHTING:Lighting Fixture - Fluorescent<br />

GYMNASIUM:LOCAL SOUND SYSTEM<br />

GYMNASIUM:SCOREBOARD<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

DSF0000753030 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

993,357<br />

736,247<br />

721,289<br />

1,022,639<br />

I.S. 2 - Staten Island Total: $3,473,532<br />

DSF0000680733 State of Good Repair - System Replacements - Windows<br />

2012<br />

EXTERIOR:Windows<br />

DSF0000725284 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000731180 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

DSF0000752367 State of Good Repair - System Replacements - Roofs<br />

2012<br />

2,746,913<br />

465,311<br />

2<strong>14</strong>,420<br />

2,184,495


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 4 - Staten Island<br />

31 I.S. 7 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000754374 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2013<br />

90,446<br />

P.S. 3 - Staten Island Total: $5,701,586<br />

DSF0000412207 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF0000622596 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000680751 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000746636 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000746647 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

EXTERIOR:DOORS:TRANSOM/SIDE LIGHT<br />

LIGHTING - SECURITY LIGHTS<br />

255,880<br />

703,<strong>14</strong>4<br />

790,966<br />

2,247,2<strong>10</strong><br />

66,194<br />

P.S. 4 - Staten Island Total: $4,063,394


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 8 - Staten Island<br />

31 P.S. 11 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000680790 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000746669 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

430,458<br />

2,856,894<br />

I.S. 7 - Staten Island Total: $3,287,352<br />

DSF0000704006 State of Good Repair - System Replacements - Electrical Systems<br />

2011<br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANEL BOARD<br />

SWITCHBOARD<br />

DSF0000775655 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

959,722<br />

684,932<br />

P.S. 8 - Staten Island Total: $1,644,654<br />

DSF0000680835 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000680836 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Exterior Walls<br />

DSF0000688276 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

387,827<br />

1,367,400<br />

117,525


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 13 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000688277 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000731181 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

DSF0000746716 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Incandescent<br />

118,166<br />

186,280<br />

1,426,758<br />

P.S. 11 - Staten Island Total: $3,603,956<br />

DSF0000680852 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:Elevators<br />

DSF0000680856 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

SITE:Playgrounds:Pavement<br />

DSF0000680858 State of Good Repair - System Replacements - Fencing<br />

20<strong>10</strong><br />

SITE:Fences<br />

807,342<br />

1,185,255<br />

3<strong>14</strong>,934


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. <strong>14</strong> - Staten Island<br />

31 P.S. 18 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

P.S. 13 - Staten Island Total: $2,307,531<br />

DSF0000680864 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

DSF0000680865 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000680866 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Stair Railings<br />

EXTERIOR:Areaway:Areaway Stairs<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF0000680869 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000680876 Safety and Security - Safety and Security - Safety Systems<br />

2011<br />

EXTERIOR:Doors:Doors and Frames<br />

LIGHTING - EXTERIOR SECURITY<br />

1,932,028<br />

411,876<br />

279,576<br />

866,955<br />

445,323<br />

P.S. <strong>14</strong> - Staten Island Total: $3,935,759<br />

DSF0000544162 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

DSF0000704089 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

792,012<br />

4,511,622


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 19 - Staten Island<br />

31 P.S. 20 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

HEATING<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

P.S. 18 - Staten Island Total: $5,303,634<br />

DSF0000746802 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SUMP PUMP<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000746804 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000769746 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

820,578<br />

1,955,060<br />

1,204,819<br />

P.S. 19 - Staten Island Total: $3,980,457<br />

DSF0000680943 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

DSF0000680945 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000680946 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Chimney<br />

EXTERIOR:Cornice<br />

1,092,481<br />

1,196,189<br />

1,791,235


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 21 - Staten Island<br />

31 P.S. 22 - Staten Island<br />

31 P.S. 23 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Exterior Walls<br />

P.S. 20 - Staten Island Total: $4,079,905<br />

DSF0000704151 State of Good Repair - System Replacements - Floors<br />

2011<br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

639,392<br />

P.S. 21 - Staten Island Total: $639,392<br />

DSF0000615544 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

20<strong>10</strong><br />

INTERIOR:Structural:Floor Structure<br />

DSF0000615554 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000680993 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2011<br />

LIBRARY:Lighting:Lighting Fixture - Fluorescent<br />

LIBRARY:Raceway With Receptacles<br />

322,354<br />

480,971<br />

940,<strong>10</strong>4<br />

P.S. 22 - Staten Island Total: $1,743,429<br />

DSF000068<strong>10</strong>09 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Drainage System for Asphalt<br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

DSF0000752851 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

800,218<br />

127,180


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 I.S. 24 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

P.S. 23 - Staten Island Total: $927,398<br />

DSF0000704213 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2011<br />

INTERIOR:Auditorium:Floor Finish<br />

DSF0000725561 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000725563 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:ASH HOIST<br />

CONVEYING:ELEVATORS<br />

INTERCOM SYSTEM:ELEVATOR<br />

DSF0000725579 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

2012<br />

FIXTURES:STUDENT:Locker Room Shower<br />

GYMNASIUM:LIGHTING:Lighting Fixture - HID<br />

GYMNASIUM:LOCAL SOUND SYSTEM<br />

GYMNASIUM:SCOREBOARD<br />

INTERIOR:GYMNASIUM:Floor Finish<br />

INTERIOR:GYMNASIUM:Walls<br />

DSF0000732427 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2013<br />

186,954<br />

1,387,596<br />

8<strong>14</strong>,608<br />

1,552,0<strong>10</strong><br />

499,196<br />

I.S. 24 - Staten Island Total: $4,440,363


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 I.S. 27 - Staten Island<br />

31 P.S. 29 - Staten Island<br />

31 P.S. 30 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000746942 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

28,763<br />

I.S. 27 - Staten Island Total: $28,763<br />

DSF0000704276 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000704277 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Drain<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Chimney<br />

EXTERIOR:Exterior Walls<br />

DSF00007<strong>10</strong>321 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000746965 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2012<br />

HEATING<br />

2,709,217<br />

1,192,444<br />

617,801<br />

55,000<br />

P.S. 29 - Staten Island Total: $4,574,462<br />

DSF0000681119 State of Good Repair - System Replacements - Toilets-Students<br />

20<strong>10</strong><br />

FIXTURES:Student:Lavatory/Sink<br />

FIXTURES:Student:Toilet<br />

2,007,759


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 32 - Staten Island<br />

31 P.S. 35 - Staten Island<br />

31 P.S. 36 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

TOILET ROOM - STUDENT:Lighting:Lighting Fixture - Fluorescent<br />

DSF0000775657 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

684,932<br />

P.S. 30 - Staten Island Total: $2,692,691<br />

DSF0000615728 State of Good Repair - System Replacements - Gymnasium Upgrade<br />

20<strong>10</strong><br />

GYMNASIUM:Lighting Fixture - HID<br />

GYMNASIUM:Local Sound System<br />

INTERIOR:Gymnasium:Ceiling<br />

INTERIOR:Gymnasium:Flooring<br />

INTERIOR:Gymnasium:Sliding-folding Partition<br />

442,131<br />

P.S. 32 - Staten Island Total: $442,131<br />

DSF0000681201 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000747070 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2013<br />

HEATING PLANT:BOILER AUXILIARIES<br />

362,353<br />

26,756<br />

P.S. 35 - Staten Island Total: $389,<strong>10</strong>9


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 44 - Staten Island<br />

31 P.S. 45 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000704394 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

908,851<br />

P.S. 36 - Staten Island Total: $908,851<br />

DSF0000681324 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

1,035,525<br />

P.S. 44 - Staten Island Total: $1,035,525<br />

DSF0000412783 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

DSF0000704519 State of Good Repair - Building Upgrade - Flood Elimination<br />

2011<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:Sump Pump<br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000704524 State of Good Repair - System Replacements - Toilets-Students<br />

2011<br />

FIXTURES:Student:Urinal<br />

INTERIOR:Toilet Rooms - Students<br />

DSF0000725899 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Ceiling<br />

INTERIOR:AUDITORIUM:Door(s)<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

DSF0000747226 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

<strong>14</strong>8,094<br />

817,486<br />

1,492,270<br />

782,489<br />

646,793


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 46 - Staten Island<br />

31 I.S. 49 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

P.S. 45 - Staten Island Total: $3,887,132<br />

DSF0000681365 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000681366 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000681367 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

DSF0000725924 State of Good Repair - System Replacements - Auditorium Upgrade<br />

2012<br />

AUDITORIUM:THEATER LIGHTING SYSTEM:Theater Lighting<br />

INTERIOR:AUDITORIUM:Fixed Seating<br />

INTERIOR:AUDITORIUM:Walls<br />

DSF0000770181 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

1,239,852<br />

2,684,590<br />

1,318,336<br />

626,725<br />

1,204,819<br />

P.S. 46 - Staten Island Total: $7,074,322<br />

DSF000068<strong>14</strong>06 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

20<strong>10</strong><br />

SITE:Paving - Non-vehicular Area:Asphalt<br />

820,118


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 50 - Staten Island<br />

31 I.S. 51 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000753029 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2012<br />

999,561<br />

I.S. 49 - Staten Island Total: $1,819,680<br />

DSF0000704596 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

2011<br />

HEATING<br />

HEATING PLANT:Boiler Auxiliaries<br />

HEATING PLANT:Boiler System<br />

DSF00007<strong>10</strong>940 State of Good Repair - Building Upgrade - Climate Control<br />

2011<br />

CLIMATE CONTROL SYSTEM<br />

3,558,461<br />

528,593<br />

P.S. 50 - Staten Island Total: $4,087,054<br />

DSF000068<strong>14</strong>42 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2012<br />

CONVEYING:Elevators<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000725989 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2012<br />

AUXILIARY SIGNAL/BELL SYSTEM<br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000775659 State of Good Repair - System Replacements - Domestic Piping<br />

20<strong>14</strong><br />

DOMESTIC WATER SYSTEM<br />

925,831<br />

1,249,574<br />

684,932


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 52 - Staten Island<br />

31 P.S. 53 - Staten Island<br />

31 P.S. 54 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

I.S. 51 - Staten Island Total: $2,860,337<br />

DSF0000412893 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

291,307<br />

P.S. 52 - Staten Island Total: $291,307<br />

DSF0000704659 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2011<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Sidewalks<br />

DSF0000704660 State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

SITE:Playgrounds:Fencing<br />

DSF0000747361 Educational Enhancements - Educational Enhancements - Library Upgrades<br />

2013<br />

INTERIOR:LIBRARY:Floor Finish<br />

LIBRARY:RACEWAY WITH RECEPTACLES<br />

275,085<br />

844,331<br />

646,653<br />

P.S. 53 - Staten Island Total: $1,766,069<br />

DSF0000681501 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000681502 State of Good Repair - System Replacements - Parapets<br />

2011<br />

2,150,202<br />

1,736,283


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 55 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Parapets<br />

DSF0000681503 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

DSF0000681504 State of Good Repair - System Replacements - Exterior Masonry<br />

2011<br />

EXTERIOR:Areaway:Areaway Walls<br />

EXTERIOR:Awnings And Canopies<br />

EXTERIOR:Chimney<br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

DSF0000752847 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

942,281<br />

1,727,556<br />

233,829<br />

P.S. 54 - Staten Island Total: $6,790,150<br />

DSF0000412948 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:ELEVATORS<br />

DSF0000681521 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000681522 State of Good Repair - System Replacements - Roofs<br />

20<strong>10</strong><br />

EXTERIOR:Roofing:Roofing<br />

EXTERIOR:Roofing:Specialties<br />

DSF0000681523 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

301,711<br />

124,909<br />

597,<strong>14</strong>8<br />

289,804


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 56 - Staten Island<br />

31 P.S. 57 - Staten Island<br />

31 P.S. 58 - Staten Island<br />

31 P.S. 60 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:Parapets<br />

DSF0000681525 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Exterior Walls<br />

DSF0000747392 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

PUBLIC ADDRESS SYSTEM<br />

1,344,633<br />

697,751<br />

P.S. 55 - Staten Island Total: $3,355,956<br />

DSF0000726093 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

SITE:Drainage System for Asphalt<br />

SITE:PAVING - STUDENT USE:Asphalt<br />

1,033,334<br />

P.S. 56 - Staten Island Total: $1,033,334<br />

DSF0000412979 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2011<br />

SITE:PLAYGROUNDS/PLAY EQUIPMENT<br />

846,132<br />

P.S. 57 - Staten Island Total: $846,132<br />

DSF0000687166 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

<strong>14</strong>0,802<br />

P.S. 58 - Staten Island Total: $<strong>14</strong>0,802


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 I.S. 61 - Staten Island<br />

31 P.S. 69 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000681585 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Air Conditioning Split System<br />

AIR CONDITIONING:Chilled Water System:Air Cooled Condenser<br />

138,624<br />

P.S. 60 - Staten Island Total: $138,624<br />

DSF0000681593 State of Good Repair - Building Upgrade - Flood Elimination<br />

20<strong>10</strong><br />

INTERIOR:Structural:Foundation Walls<br />

DSF0000681596 State of Good Repair - System Replacements - Parapets<br />

20<strong>10</strong><br />

EXTERIOR:Parapets<br />

DSF0000681597 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Coping<br />

EXTERIOR:Exterior Walls<br />

DSF0000747470 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

287,645<br />

616,546<br />

809,643<br />

724,449<br />

I.S. 61 - Staten Island Total: $2,438,283<br />

DSF0000704789 State of Good Repair - System Replacements - Fencing<br />

2011<br />

SITE:Fences<br />

DSF0000775660 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

329,937<br />

684,932<br />

P.S. 69 - Staten Island Total: $1,0<strong>14</strong>,869


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 I.S. 72 - Staten Island<br />

31 I.S. 75 - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

DSF0000681637 Safety and Security - Safety and Security - Code Compliance<br />

20<strong>10</strong><br />

Low-Voltage Electrical Systems<br />

FIRE ALARM SYSTEM<br />

DSF0000681638 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

2011<br />

CONVEYING:Elevators<br />

INTERCOM SYSTEM:Elevator<br />

DSF0000681641 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000681658 State of Good Repair - System Replacements - Heating Plant Upgrade<br />

20<strong>10</strong><br />

Air Conditioning Split System<br />

AIR CONDITIONING:Chilled Water System:Air Cooled Condenser<br />

DSF000073<strong>14</strong>54 State of Good Repair - System Replacements - Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

745,493<br />

1,089,658<br />

1,275,965<br />

91,345<br />

853,212<br />

I.S. 72 - Staten Island Total: $4,055,673<br />

DSF0000753127 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

DOMESTIC WATER SYSTEM<br />

DSF0000770470 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

2013<br />

FIRE ALARM SYSTEM<br />

898,228<br />

1,204,819


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000775787 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>14</strong><br />

31 REGION 7/ ROC F - Staten Island<br />

200,000<br />

I.S. 75 - Staten Island Total: $2,303,047<br />

DSF0000688183 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

DSF0000732194 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2013<br />

31 P.S. 38 TRANSPORTABLE - Staten Island<br />

1,176,588<br />

1,403,829<br />

REGION 7/ ROC F - Staten Island Total: $2,580,417<br />

DSF0000775746 Electrical Systems<br />

20<strong>14</strong><br />

SERVICE SWITCH<br />

DSF0000775747 Floors<br />

20<strong>14</strong><br />

31 ARTHUR D. PHILLIPS SCHOOL - Staten Island<br />

31 P.S. 16 ANNEX - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:CLASSROOMS/CORRIDORS/ADMIN SPACES:Floor Finish<br />

23,973<br />

23,973<br />

P.S. 38 TRANSPORTABLE - Staten Island Total: $47,945<br />

DSF00007<strong>10</strong>034 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:ROOFING:ROOFING<br />

EXTERIOR:ROOFING:SPECIALTIES<br />

670,986<br />

ARTHUR D. PHILLIPS SCHOOL - Staten Island Total: $670,986


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

31 P.S. 36 ANNEX - Staten Island<br />

DSF0000616547 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

311,113<br />

P.S. 16 ANNEX - Staten Island Total: $311,113<br />

DSF0000747854 State of Good Repair - System Replacements - Toilets-Students<br />

2013<br />

31 P.S. 80 (PETR COMPL-BLDG B) - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

FIXTURES:STUDENT:Lavatory/Sink<br />

FIXTURES:STUDENT:Toilet<br />

FIXTURES:STUDENT:Urinal<br />

INTERIOR:TOILET ROOMS - STUDENTS<br />

TOILET ROOM - STUDENT:LIGHTING:Lighting Fixture - Fluorescent<br />

840,332<br />

P.S. 36 ANNEX - Staten Island Total: $840,332<br />

DSF0000682032 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:Windows<br />

DSF0000682033 State of Good Repair - System Replacements - Exterior Masonry<br />

20<strong>10</strong><br />

EXTERIOR:Areaway:Areaway Gratings<br />

EXTERIOR:Areaway:Areaway Slab<br />

EXTERIOR:Areaway:Areaway Stair Railings<br />

EXTERIOR:Exterior Soffits<br />

2,443,641<br />

1,528,534


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

EXTERIOR:Exterior Walls<br />

EXTERIOR:Louver<br />

31 P.S. 80 AX(PETR COMPL-BLDG D) - Staten Island<br />

P.S. 80 (PETR COMPL-BLDG B) - Staten Island Total: $3,972,176<br />

DSF0000730931 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000747885 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>14</strong><br />

75R P.S. 373 (OLD P40) - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:LOADING DOCK<br />

SITE:PAVING - STUDENT USE:Concrete<br />

SITE:SIDEWALKS:Site Sidewalk and Walkways<br />

138,734<br />

683,192<br />

P.S. 80 AX(PETR COMPL-BLDG D) - Staten Island Total: $821,927<br />

DSF0000412713 State of Good Repair - System Replacements - Paved Area-Concrete<br />

20<strong>10</strong><br />

SITE:RETAINING WALLS<br />

DSF0000615834 State of Good Repair - System Replacements - Electrical Systems<br />

20<strong>10</strong><br />

ELECTRIC SERVICE SWITCH<br />

GROUNDING SYSTEM<br />

PANELBOARD<br />

SWITCHBOARD<br />

DSF0000704445 State of Good Repair - System Replacements - Roofs<br />

2011<br />

EXTERIOR:Roofing:Roofing<br />

735,1<strong>10</strong><br />

462,177<br />

1,026,166


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

75R P.S. 722 (OTC) - Staten Island<br />

DSF0000704446 State of Good Repair - System Replacements - Parapets<br />

2011<br />

EXTERIOR:Parapets<br />

DSF0000752853 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground<br />

Redevelopment<br />

2012<br />

87,902<br />

301,229<br />

P.S. 373 (OLD P40) - Staten Island Total: $2,612,584<br />

DSF0000681893 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000726448 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000726449 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

75R P.S. 37 ( OLD I24X) - Staten Island<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

602,560<br />

820,807<br />

1,<strong>14</strong>6,262<br />

P.S. 722 (OTC) - Staten Island Total: $2,569,630<br />

DSF0000543947 State of Good Repair - System Replacements - Windows<br />

20<strong>10</strong><br />

EXTERIOR:WINDOWS<br />

78R STATEN ISLAND TECHNICAL HS - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

432,012<br />

P.S. 37 ( OLD I24X) - Staten Island Total: $432,012<br />

DSF0000726277 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

1,283,259


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000726278 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:AREAWAY<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000731333 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

2011<br />

DSF0000747597 State of Good Repair - Building Upgrade - Flood Elimination<br />

2012<br />

78R PORT RICHMOND HS - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

1,583,<strong>14</strong>6<br />

45,401<br />

60,393<br />

STATEN ISLAND TECHNICAL HS - Staten Island Total: $2,972,199<br />

DSF0000616324 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs<br />

20<strong>10</strong><br />

INTERIOR:Structural:Floor Structure<br />

DSF0000616331 State of Good Repair - System Replacements - Floors<br />

20<strong>10</strong><br />

INTERIOR:Classrooms/Corridors/Admin Spaces:Floor Finish<br />

DSF0000726304 Roofs<br />

2012<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

DSF0000747626 State of Good Repair - System Replacements - Parapets<br />

2012<br />

EXTERIOR:PARAPETS<br />

DSF0000747627 State of Good Repair - System Replacements - Exterior Masonry<br />

2012<br />

EXTERIOR:CHIMNEY<br />

EXTERIOR:EXTERIOR WALLS<br />

340,550<br />

1,<strong>14</strong>3,344<br />

1,571,618<br />

1,754,099<br />

280,547


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

78R CURTIS HS - Staten Island<br />

PORT RICHMOND HS - Staten Island Total: $5,090,158<br />

DSF0000690211 Educational Enhancements - Educational Enhancements - Room<br />

Conversions/Partitioning<br />

20<strong>10</strong><br />

DSF0000770587 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

DSF0000770588 State of Good Repair - System Replacements - Parapets<br />

2013<br />

EXTERIOR:PARAPETS<br />

DSF0000770606 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

Waste System<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SEWAGE / WASTE PIPING<br />

DSF0000775631 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

SCA0000020373 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

78R TOTTENVILLE HS - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

151,375<br />

4,281,282<br />

1<strong>14</strong>,587<br />

195,853<br />

1,780,809<br />

4,516,385<br />

CURTIS HS - Staten Island Total: $11,040,291<br />

DSF0000545280 State of Good Repair - Building Upgrade - Elevators and Escalators<br />

20<strong>10</strong><br />

CONVEYING:ELEVATORS<br />

INTERCOM SYSTEM:ELEVATORS<br />

DSF0000704965 State of Good Repair - System Replacements - Windows<br />

2011<br />

EXTERIOR:Windows<br />

245,850<br />

16,851,687


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

DSF0000747695 State of Good Repair - System Replacements - Domestic Piping<br />

2013<br />

Waste System<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SEWAGE / WASTE PIPING<br />

DRAIN/WASTE/VENT AND STORM SYSTEM:SEWAGE EJECTOR PUMP<br />

DSF0000753129 Educational Enhancements - Educational Enhancements - School Improvement and<br />

Restructuring<br />

20<strong>14</strong><br />

78R TOTTENVILLE AF - Staten Island<br />

Room Conversions/Partitioning<br />

56,187<br />

1,008,746<br />

TOTTENVILLE HS - Staten Island Total: $18,162,471<br />

DSF0000681817 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields<br />

20<strong>10</strong><br />

78R SUSAN E. WAGNER HS - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

1,661,752<br />

TOTTENVILLE AF - Staten Island Total: $1,661,752<br />

DSF0000681854 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade<br />

20<strong>10</strong><br />

INTERIOR:Cafeteria:Ceiling<br />

INTERIOR:Cafeteria:Door(s)<br />

INTERIOR:Cafeteria:Floor Finish<br />

INTERIOR:Cafeteria:Sliding-folding Partition<br />

DSF0000704999 State of Good Repair - System Replacements - Paved Area-Concrete<br />

2012<br />

SITE:Paving - Non-vehicular Area:Concrete<br />

SITE:Sidewalks<br />

DSF0000726392 State of Good Repair - System Replacements - Paved Area-Blacktop<br />

2012<br />

811,391<br />

585,767<br />

637,004


New York City Department of Education<br />

Proposed Five-Year Capital Plan Amendment<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Years 20<strong>10</strong> - 20<strong>14</strong><br />

District School Project # Description FY<br />

Total<br />

SITE:PAVING - STUDENT USE:Asphalt<br />

DSF0000747719 Safety and Security - Safety and Security - Safety Systems<br />

2013<br />

78R CONCORD HS (OLD 12) - Staten Island<br />

* Building scheduled for an Exterior Mod<br />

EXTERIOR:DOORS:DOORS AND FRAMES<br />

502,234<br />

SUSAN E. WAGNER HS - Staten Island Total: $2,536,397<br />

DSF0000681857 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems<br />

20<strong>10</strong><br />

FIRE ALARM SYSTEM<br />

PUBLIC ADDRESS SYSTEM<br />

DSF0000747730 State of Good Repair - System Replacements - Windows<br />

2013<br />

EXTERIOR:WINDOWS<br />

DSF0000747731 State of Good Repair - System Replacements - Exterior Masonry<br />

2013<br />

EXTERIOR:CORNICE<br />

EXTERIOR:EXTERIOR WALLS<br />

DSF0000770667 State of Good Repair - Building Upgrade - Flood Elimination<br />

2013<br />

INTERIOR:STRUCTURAL:FOUNDATION WALLS<br />

DSF0000770668 State of Good Repair - System Replacements - Roofs<br />

2013<br />

EXTERIOR:ROOFING:Roofing<br />

EXTERIOR:ROOFING:Specialties<br />

690,418<br />

2,028,904<br />

1,574,575<br />

182,815<br />

131,962<br />

CONCORD HS (OLD 12) - Staten Island Total: $4,608,675


Department of Education<br />

FY2015 – 2019 Five Year Capital Plan<br />

Preliminary view<br />

The draft FY2015 – 2019 Five Year Capital Plan will be issued in November 2013. This plan<br />

will continue to build on the successes of the FY2005 – 2009 and FY20<strong>10</strong> – 20<strong>14</strong> Capital Plans.<br />

The capital needs of our schools continue to grow, and the resources available are limited. As a<br />

result, the 2015 – 2019 Capital Plan must balance the fundamental need to provide students with<br />

seats in safe, comfortable, and well-maintained buildings along with the required capital<br />

resources which support our instructional programs and Children First Initiatives.<br />

The final amendment to the 20<strong>10</strong>-20<strong>14</strong> Capital Plan includes some of the proposed, basic<br />

elements of the first year of the 2015 - 2019 Capital Plan. These basic elements are included to<br />

provide a sense of direction as we transition between the two plans. As envisioned, the next plan<br />

will maintain the two key components contained in the current plan:<br />

New Capacity<br />

In the current Plan, over 34,000 seats are being created to reduce both current and projected<br />

overcrowding throughout the City. These 34,000 seats will build on the 55,000 created in the<br />

2005 – 2009 Capital Plan and also allow the Department to initiate the transition from temporary<br />

classroom space to permanent educational facilities for all students. Under the next Plan, spaces<br />

occupied by temporary facilities will continue to be converted into recreational facilities for<br />

school and community use.<br />

The seat need identified in the Adopted FY20<strong>10</strong> – 20<strong>14</strong> Capital Plan was based on a multidimensional<br />

review and analysis of localized capacity and enrollment patterns within each<br />

district. The result is a set of recommendations for each district that takes into account the needs<br />

within each district area. The analysis allows the Department to monitor trends within the<br />

districts and identify potential needs that are otherwise masked by overall district patterns. We<br />

will continue the same level of analysis in the next plan and the resulting recommendations will<br />

be reviewed annually based on updated enrollment projections, capacity changes and housing<br />

information.<br />

The current plan reflects a demand for new seats that exceeds available funding. Several factors<br />

are contributing to an ongoing demand for capacity in some areas. Factors include significant<br />

housing growth (stimulated in part by the City’s rezoning initiatives), continued overcrowding in<br />

specific high achieving schools, and lowered targets for classroom capacity. We are monitoring<br />

growth especially in districts 15, 24 and 30 and will continue to track both enrollment trends and<br />

the housing market to ensure that emerging capacity needs are identified and addressed in the<br />

next plan. The potential need to replace expiring leased space and enhance the learning<br />

environments for Special Education students will also increase the demand for capacity in some<br />

areas.<br />

This next plan will seek to meet the anticipated demand for additional seats in a variety of ways.<br />

Strengthening and expanding our charter/partnership program, partnering with developers to site


schools, funding individual overcrowding reduction plans, and strategically converting<br />

administrative space are some of the ways we will meet the demand for additional seats.<br />

Investing in Existing Assets<br />

Over $6 billion is being spent in the current Capital Plan on investments in our existing assets.<br />

This includes capital improvements and other programs/needs for our current inventory of assets.<br />

These needs include ensuring that our buildings are watertight, replacing safety and electrical<br />

systems in need of upgrades, and upgrading elevators/escalators and heating plants. By the<br />

completion of this plan we will have performed capital improvement work in more than 800<br />

school buildings. Of these 800 schools, over 300 will have exterior work performed to eliminate<br />

water infiltration. Under the current plan, the SCA continues to implement more comprehensive<br />

solutions to the problems rather than repairing/replacing only the specific item (area) identified.<br />

For example, instead of repairing several areas of a school’s roof, the entire roof is being<br />

replaced. As a result, the work is under warrantee, there is less chance of future leaks and the<br />

school does not face additional disruption. In addition, we are examining the condition of all<br />

exterior elements when we identify a serious condition in one element. If other elements are<br />

deteriorated and causing water infiltration, they are included in the scope of the project. Over<br />

200 of the 300 schools with exterior projects include more than one component (i.e. roofs,<br />

windows, exterior masonry, parapets, etc.) This approach is being applied when it is<br />

programmatically and financially feasible and serves to begin stabilizing the condition of our<br />

inventory. Given the age of our current inventory and the magnitude of needs, the next Capital<br />

Plan will continue to address the most urgent needs of our school buildings.<br />

Under the current plan, the “Investing in Existing Assets” category also includes facility and<br />

programmatic enhancements implemented through the Children First initiatives. These<br />

initiatives encompass three main areas: Technology, Safety Enhancements and Facility<br />

Enhancements. Technology enhancements include expansion of the wireless network,<br />

bandwidth connectivity, school and classroom-based hardware incorporation and upgrades, and<br />

implementation of a robust learning management system and platforms. The enhancements are<br />

critical to building and expanding key initiatives that harness the power of technology to<br />

personalize learning. The Innovation Zone, which includes an online learning platform for<br />

students, teachers, and administrators, and the online Partnership for Assessment of Readiness<br />

for College and Careers system for ELA and Math (PARCC) depend on schools having the<br />

infrastructure and capacity to support technology-rich learning models and assessments. The<br />

Safety Enhancements Program continues to implement a comprehensive strategy to promote and<br />

sustain a climate of safety in all New York City public schools. Facility Enhancements expand<br />

the large campus restructuring, Pre-Kindergarten and science lab programs as well as provide<br />

funding for new initiatives related to the creation of space for alternative learning programs and<br />

school based health clinics. In addition, the “Investing in Existing Assets” category includes<br />

upgraded physical fitness spaces, expanded health facilities and accessibility in schools and<br />

upgrades for libraries and auditoriums. It is anticipated the FY2015 – 2019 Plan will continue<br />

work in the above mentioned areas.<br />

In the coming year, the Department will be identifying specific programs and needs to be<br />

addressed in the next Capital Plan. This process will include interfacing with all major<br />

departments within DOE, working with the Community Education Councils to understand their<br />

priorities, and meeting with elected officials to gather constituent concerns. In addition, we will<br />

continue working with other City Departments to ensure we are aware of any policy changes that


could potentially impact next capital plan. The next plan must build on the success of the current<br />

plan by developing new and innovative ways to address further class size reduction, maximizing<br />

the use of underutilized buildings, and providing improvements to our aging inventory of assets.<br />

In anticipation of the first year of the 2015 – 2019 Capital Plan, the following pages identify<br />

some of the most urgent capital improvement needs proposed to be initiated in FY 2015. These<br />

needs are based on the latest BCAS surveys and an evaluation of projects deferred from the<br />

current plan.


District School Project #<br />

13 P.S. 11 - Brooklyn<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000755509 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

13 I.S. 265 - Brooklyn<br />

DSF0000759461 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

<strong>14</strong> P.S. 17 - Brooklyn<br />

DSF0000755629 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000755630 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

<strong>14</strong> P.S. <strong>14</strong>7 - Brooklyn<br />

DSF0000757385 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000757386 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

<strong>14</strong> P.S. 157 - Brooklyn<br />

DSF0000757541 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

DSF0000757542 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

15 P.S. <strong>10</strong> - Brooklyn<br />

DSF0000755492 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000755493 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

15 P.S. 27 - Brooklyn<br />

DSF0000755805 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000755806 State of Good Repair - System Replacements - Exterior Masonry 2015


District School Project #<br />

16 P.S. 25 - Brooklyn<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000755759 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000755761 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000755762 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000755763 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

16 I.S. 35 - Brooklyn<br />

DSF0000755920 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000755922 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000755923 State of Good Repair - System Replacements - Parapets 2015<br />

17 P.S. 161 - Brooklyn<br />

DSF00007576<strong>14</strong> State of Good Repair - System Replacements - Floors 2015<br />

17 P.S. 191 - Brooklyn<br />

DSF0000758099 State of Good Repair - System Replacements - Floors 2015<br />

17 I.S. 340 (OLD 249 AX) - Brooklyn<br />

DSF0000761821 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

18 P.S. 219 - Brooklyn<br />

DSF0000758631 State of Good Repair - Building Upgrade - Reinforcing Support Elements 2015<br />

18 P.S. 272 - Brooklyn


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000759549 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000759550 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000759551 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000759552 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

18 I.S. 285 - Brooklyn<br />

DSF0000759749 State of Good Repair - System Replacements - Floors 2015<br />

20 P.S. <strong>10</strong>2 - Brooklyn<br />

DSF0000756818 State of Good Repair - System Replacements - Paved Area-Blacktop 2015<br />

20 P.S. 164 - Brooklyn<br />

DSF0000757673 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000757674 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

20 P.S. 200 - Brooklyn<br />

DSF0000758279 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000758280 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

21 P.S. 95 - Brooklyn<br />

DSF0000756695 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems 2015<br />

21 P.S. <strong>10</strong>0 - Brooklyn<br />

DSF0000756772 State of Good Repair - Building Upgrade - Climate Control 2015<br />

DSF0000775618 State of Good Repair - Building Upgrade - Boiler Conversion 2015


District School Project #<br />

21 P.S. 188 - Brooklyn<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000758034 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000758036 State of Good Repair - System Replacements - Parapets 2015<br />

22 P.S. 52 - Brooklyn<br />

DSF0000756169 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000756170 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000756171 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

22 P.S. 152 - Brooklyn<br />

DSF0000757477 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

22 P.S. 198 - Brooklyn<br />

DSF0000758235 State of Good Repair - System Replacements - Windows 2015<br />

DSF0000758236 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

22 P.S. 251 - Brooklyn<br />

DSF0000759193 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000759194 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000759195 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

22 P.S. 361 MINISCHOOL - Brooklyn<br />

DSF0000761796 State of Good Repair - Building Upgrade - Flood Elimination 2015


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000761797 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000761798 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

23 P.S. 155 - Brooklyn<br />

DSF0000757523 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

23 P.S. 183 - Brooklyn<br />

DSF0000757959 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000757961 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

23 P.S. 298 - Brooklyn<br />

DSF0000759944 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

32 P.S. 75 - Brooklyn<br />

DSF0000756476 State of Good Repair - System Replacements - Floors 2015<br />

32 P.S. <strong>14</strong>5 - Brooklyn<br />

DSF0000757359 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

32 I.S. 162 - Brooklyn<br />

DSF0000757634 State of Good Repair - System Replacements - Floors 2015<br />

32 P.S. 377 - Brooklyn<br />

DSF0000760476 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

75K P.S. 373 (OLD P<strong>14</strong>8) - Brooklyn


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Brooklyn<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000757411 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

78K LAFAYETTE HS - Brooklyn<br />

DSF0000760616 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

78K BOYS HS (OLD) - Brooklyn<br />

DSF0000760905 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

DSF0000760912 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

78K JOHN JAY HS - Brooklyn<br />

DSF0000760920 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000760923 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000760924 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

78K CLARA BARTON HS - Brooklyn<br />

DSF0000761252 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

78K ADULT LRNG CTR (OLD GRLS HS) - Brooklyn<br />

DSF000076<strong>14</strong>65 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF000076<strong>14</strong>66 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

78K HIGH SCHOOL SUSPENSION CENTER - Brooklyn<br />

DSF0000761926 Ancillary Facilities - Administrative Support - Administrative Support 2015


District School Project #<br />

02 P.S. 158 - Manhattan<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000763741 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

DSF0000763742 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

02 P.S. 290 - Manhattan<br />

DSF0000764025 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

03 P.S. 87 - Manhattan<br />

DSF0000762902 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

03 P.S. 208 (TANDEM M185) - Manhattan<br />

DSF0000764201 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000764202 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000764203 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

04 P.S. 72 - Manhattan<br />

DSF0000762771 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000762772 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000762773 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

DSF0000762786 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

04 P.S. 83 - Manhattan<br />

DSF0000762856 State of Good Repair - Building Upgrade - Climate Control 2015<br />

DSF0000775611 State of Good Repair - Building Upgrade - Boiler Conversion 2015


District School Project #<br />

04 J.H.S. 117 - Manhattan<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000763209 State of Good Repair - System Replacements - Roofs 2015<br />

DSF00007632<strong>10</strong> State of Good Repair - System Replacements - Parapets 2015<br />

05 P.S. 133 - Manhattan<br />

DSF0000775612 State of Good Repair - Building Upgrade - Boiler Conversion 2015<br />

DSF0000775613 State of Good Repair - Building Upgrade - Climate Control 2015<br />

05 P.S. 197 - Manhattan<br />

DSF0000764122 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

06 P.S. 132 - Manhattan<br />

DSF0000763449 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

06 P.S. 128 MINISCHOOL - Manhattan<br />

DSF0000764903 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems 2015<br />

78M LOUIS D. BRANDEIS HS - Manhattan<br />

DSF0000764415 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

78M HEALTH PROFESSIONS HS (OL STY) - Manhattan<br />

DSF0000764436 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

78M FORSYTH HS (AUXSVC-OLD 91) - Manhattan<br />

DSF0000764600 State of Good Repair - System Replacements - Toilets-Students 2015


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Manhattan<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000764601 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

78M HS OF GRAPHIC COMMUNICATION ARTS - Manhattan<br />

DSF0000752354 State of Good Repair - Building Upgrade - Climate Control 2015<br />

DSF0000752355 State of Good Repair - Building Upgrade - Boiler Conversion 2015<br />

78M HARLEM RENAISSANCE HS (OLD M24) - Manhattan<br />

DSF0000765094 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000765095 State of Good Repair - System Replacements - Toilets-Staff 2015


District School Project #<br />

24 P.S. <strong>14</strong> - Queens<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000765244 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000765245 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000765246 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

24 P.S. 71 - Queens<br />

DSF0000766068 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000766069 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

DSF0000766070 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000766071 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

24 P.S. <strong>14</strong>3 - Queens<br />

DSF0000767213 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

25 P.S. 130 - Queens<br />

DSF0000766962 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000766964 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000766965 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000766966 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

26 P.S. 26 - Queens<br />

DSF0000765423 State of Good Repair - Building Upgrade - Low-Voltage Electrical Systems 2015<br />

DSF0000765435 State of Good Repair - System Replacements - Auditorium Upgrade 2015


District School Project #<br />

26 P.S. 94 - Queens<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000766436 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

27 P.S. 45 - Queens<br />

DSF0000765701 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000765702 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

27 P.S. 56 (OLD R HILL AX) - Queens<br />

DSF0000765864 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000765865 State of Good Repair - System Replacements - Parapets 2015<br />

27 P.S. <strong>10</strong>5 - Queens<br />

DSF0000766591 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

27 P.S. 183 - Queens<br />

DSF0000767847 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

27 P.S. 215 - Queens<br />

DSF0000768333 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

27 P.S. 232 - Queens<br />

DSF0000768558 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

28 P.S. <strong>10</strong>1 - Queens<br />

DSF0000766552 State of Good Repair - System Replacements - Auditorium Upgrade 2015


District School Project #<br />

28 P.S. 117 - Queens<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000766767 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

28 P.S. 121 - Queens<br />

DSF0000766832 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

28 P.S. 175 - Queens<br />

DSF0000767726 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000767727 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000767728 State of Good Repair - System Replacements - Windows 2015<br />

30 P.S. 84 - Queens<br />

DSF0000766254 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

30 P.S. 122 - Queens<br />

DSF0000766857 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

30 P.S. 222 (ECC) - Queens<br />

DSF0000774929 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

30 P.S. 234 - Queens<br />

DSF0000774950 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

78Q HILLCREST AF - Queens<br />

DSF0000769<strong>14</strong>5 State of Good Repair - Rehabilitation of Physical Education Facilities - Athletic Fields 2015


District School Project #<br />

78Q AVIATION HS - Queens<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Queens<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000769187 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000769189 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000769190 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000769191 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

DSF0000769202 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

78Q THOMAS A. EDISON VOC HS - Queens<br />

DSF0000769211 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000769212 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

78Q HS FOR LAW ENFORCEMENT - Queens<br />

DSF0000774997 State of Good Repair - System Replacements - Auditorium Upgrade 2015


District School Project #<br />

31 I.S. 2 - Staten Island<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000769534 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

31 P.S. 19 - Staten Island<br />

DSF0000769764 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

31 P.S. 22 - Staten Island<br />

DSF00007698<strong>14</strong> State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000769815 State of Good Repair - System Replacements - Toilets-Staff 2015<br />

31 P.S. 36 - Staten Island<br />

DSF0000770036 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000770037 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000770039 State of Good Repair - System Replacements - Windows 2015<br />

DSF0000770040 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

31 P.S. 39 - Staten Island<br />

DSF0000770068 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

31 P.S. 45 - Staten Island<br />

DSF0000770165 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000770166 State of Good Repair - System Replacements - Parapets 2015<br />

31 P.S. 53 - Staten Island<br />

DSF0000770299 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015


District School Project #<br />

31 PETRIDES COMPLEX - (BLDG H) - Staten Island<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Staten Island<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000770821 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000770822 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000770823 State of Good Repair - System Replacements - Windows 2015<br />

DSF0000770824 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

DSF0000770834 State of Good Repair - Building Upgrade - Interior Spaces 2015<br />

31 P.S. 80 AX(PETR COMPL-BLDG E) - Staten Island<br />

DSF0000770899 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015


District School Project #<br />

07 P.S. 277 - Bronx<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000771324 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000771334 Educational Enhancements - Educational Enhancements - Library Upgrades 2015<br />

DSF0000771338 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

08 P.S. 48 - Bronx<br />

DSF0000771654 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

08 P.S. 72 - Bronx<br />

DSF0000772<strong>10</strong>5 State of Good Repair - System Replacements - Gymnasium Upgrade 2015<br />

08 P.S. 93 - Bronx<br />

DSF0000772502 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

08 P.S. <strong>10</strong>0 - Bronx<br />

DSF0000772613 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF00007726<strong>14</strong> State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000772615 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000772616 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

08 I.S. 123 - Bronx<br />

DSF0000773043 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

08 P.S. 182 - Bronx<br />

DSF0000773935 State of Good Repair - System Replacements - Gymnasium Upgrade 2015


District School Project #<br />

08 P.S. 48 AX (HNTS PNT ECC1) - Bronx<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000774687 State of Good Repair - System Replacements - Parapets 2015<br />

DSF0000774688 State of Good Repair - System Replacements - Windows 2015<br />

DSF0000774689 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

09 P.S. 35 - Bronx<br />

DSF000077<strong>14</strong>39 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF000077<strong>14</strong>41 State of Good Repair - System Replacements - Roofs 2015<br />

DSF000077<strong>14</strong>42 State of Good Repair - System Replacements - Parapets 2015<br />

DSF000077<strong>14</strong>43 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

09 P.S. 55 - Bronx<br />

DSF0000771766 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

09 I.S. 232 - Bronx<br />

DSF0000772302 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

09 P.S. 1<strong>10</strong> - Bronx<br />

DSF0000772813 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

<strong>10</strong> P.S. 7 - Bronx<br />

DSF000077<strong>10</strong>24 State of Good Repair - System Replacements - Cafeteria / Multipurpose Room Upgrade 2015<br />

<strong>10</strong> P.S. 396 - Bronx


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000771297 State of Good Repair - Building Upgrade - Climate Control 2015<br />

DSF0000775616 State of Good Repair - Building Upgrade - Boiler Conversion 2015<br />

<strong>10</strong> I.S. 45 - Bronx<br />

DSF0000771595 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

<strong>10</strong> P.S. 46 - Bronx<br />

DSF0000771626 State of Good Repair - System Replacements - Auditorium Upgrade 2015<br />

<strong>10</strong> P.S. 85 - Bronx<br />

DSF0000772341 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000772343 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000772344 State of Good Repair - System Replacements - Parapets 2015<br />

<strong>10</strong> P.S. 209 - Bronx<br />

DSF0000774093 State of Good Repair - Rehabilitation of Physical Education Facilities - Playground Redevelopment 2015<br />

<strong>10</strong> P.S. 86 MINISCHOOL - Bronx<br />

DSF0000774737 State of Good Repair - System Replacements - Roofs 2015<br />

12 P.S. 47 - Bronx<br />

DSF0000771635 State of Good Repair - Building Upgrade - Reinforcing Cinder Concrete Slabs 2015<br />

DSF0000771636 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000771637 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000771638 State of Good Repair - System Replacements - Parapets 2015


District School Project #<br />

New York City Department of Education<br />

Preliminary FY 2015 - 2019 Capital Plan<br />

School Based Program<br />

Borough of Bronx<br />

Fiscal Year 2015<br />

Description FY<br />

DSF0000771639 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

12 P.S. 92 - Bronx<br />

DSF0000772483 State of Good Repair - Building Upgrade - Flood Elimination 2015<br />

DSF0000772485 State of Good Repair - System Replacements - Roofs 2015<br />

DSF0000772486 State of Good Repair - System Replacements - Exterior Masonry 2015<br />

12 I.S. 98 - Bronx<br />

DSF0000772598 State of Good Repair - System Replacements - Toilets-Students 2015<br />

DSF0000772599 State of Good Repair - System Replacements - Toilets-Staff 2015