Operation manual Track System TRUMPF 95 - Gerriets
Operation manual Track System TRUMPF 95 - Gerriets
Operation manual Track System TRUMPF 95 - Gerriets
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2 <strong>System</strong> Installation<br />
2.3.1 <strong>TRUMPF</strong> <strong>95</strong>: Side Cord <strong>Operation</strong> / <strong>System</strong> Parts Mounting<br />
Art-No 3115 8041<br />
Side Cord <strong>Track</strong> Suspension Bracket<br />
Camlock mounting (included in standard delivery) every 1-2 m,<br />
depending on weight load.<br />
With hole to accept M12 bolt for structure or hook clamp<br />
3100 8011 mounting or 2 Ø 7 mm holes for structure<br />
mounting.<br />
• Weight: 135 g.<br />
• Load capacity: a / b / c. *<br />
For defining the distance between suspension points, use<br />
table in chapter 1.4.<br />
<strong>Operation</strong> Manual / <strong>TRUMPF</strong> <strong>95</strong><br />
64,5<br />
41<br />
80,7<br />
*<br />
The load capacity of a suspension<br />
point depends on the mounting nut<br />
type:<br />
a = Standard camlock nut: 45 kg<br />
b = Adjustable nut: 60 kg<br />
c = HD adjustable nut: 80 kg<br />
19