Operation manual Track System TRUMPF 95 - Gerriets
Operation manual Track System TRUMPF 95 - Gerriets
Operation manual Track System TRUMPF 95 - Gerriets
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2 <strong>System</strong> Installation<br />
2.3.1 <strong>TRUMPF</strong> <strong>95</strong>: <strong>System</strong> Parts Mounting<br />
Art-No 3115 0091<br />
8<br />
Camlock Nut<br />
For accessories mounting. Premounted to all accessories<br />
(M8 x 20 mm screw).<br />
• Weight: 10 g.<br />
• Load capacity in the groove: 45 kg.<br />
• Place the camlock nut where needed in the track groove.<br />
• Loosen screw until almost removed.<br />
• Tighten screw until noticeable resistance. Keep on tightening.<br />
The camlock nut should turn 90° and securely fit into the top<br />
groove of the track.<br />
• Double-check if camlock nut is turned 90° in the<br />
groove of track.<br />
• If the camlock nut is not in the required position<br />
(compare image) repeat the steps above.<br />
<strong>Operation</strong> Manual / <strong>TRUMPF</strong> <strong>95</strong>