10.02.2013 Views

Practical experience with a multi-utility smart meter - Amiando

Practical experience with a multi-utility smart meter - Amiando

Practical experience with a multi-utility smart meter - Amiando

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Facts and figures of the pilot project<br />

The <strong>smart</strong> <strong>meter</strong>ing project in Forst is triggered by the local grid operator and<br />

aims at gathering <strong>experience</strong>s in rolling out the infrastructure as well as<br />

implementing the required IT systems.<br />

Figures:<br />

� Roll-out of ca. 2.000 <strong>meter</strong>s (including all <strong>utility</strong> sectors)<br />

� About 1.600 voluntary households are participating<br />

� Duration of the project is 2 years (incl. infrastructure set-up as well as<br />

operation phase)<br />

� Implementation of <strong>smart</strong> <strong>meter</strong>s <strong>with</strong> an integrated communication interface for<br />

measuring and transferring <strong>meter</strong> data<br />

The technologies involved are:<br />

� AMIS solution (Automated Metering and Information Systems) of Siemens (ca.<br />

1600 <strong>meter</strong>s)<br />

� Multi Utility Communication (MUC) standard of EMH (ca. 500 <strong>meter</strong>s)<br />

Pilot areas comprise diverse types of construction and architecture:<br />

� Prefabricated <strong>multi</strong>-storey dwellings<br />

� Detached houses<br />

� Historical buildings<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!