Practical experience with a multi-utility smart meter - Amiando
Practical experience with a multi-utility smart meter - Amiando
Practical experience with a multi-utility smart meter - Amiando
- TAGS
- meter
- amiando
- de.amiando.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Smart Metering @ Forst (Lausitz)<br />
Better Practice Exchange 2011<br />
Frank Elstermann, umetriq Metering Services GmbH<br />
Potsdam, May 30, 2011
Agenda<br />
1. About us<br />
2. Smart <strong>meter</strong>ing @ Forst (Lausitz) – our pilot project<br />
3. Energy efficiency due to transparency of consumption<br />
4. Technical vision and evolution of <strong>smart</strong> <strong>meter</strong>ing<br />
2
Company Profile of umetriq<br />
umetriq Metering Services GmbH:<br />
• Established: 05/2010<br />
• Operating company and sales organisation<br />
GASAG and her<br />
subsidiaries<br />
umetriq Entwicklungs-GmbH & Co. KG<br />
• Established: 11/2008<br />
• System development and license marketing<br />
3
Smart Metering at a Glance<br />
We do cover the complete value chain of <strong>smart</strong> <strong>meter</strong>ing from <strong>meter</strong> to back<br />
office integration – end to end.<br />
4
Services and Products of umetriq<br />
Smart <strong>meter</strong>ing enables development and offering of new energy-efficient<br />
products.<br />
5
Key Contents<br />
General Project Approach of umetriq<br />
Our roll-out <strong>experience</strong> of <strong>smart</strong> <strong>meter</strong> technology led to the definition of key<br />
contents <strong>with</strong>in the project phases as well as necessary milestones.<br />
Initializing Phase Planning Phase Executing Phase Closing Phase<br />
� Define your project goal<br />
� Outline your project setup<br />
� Select the technology in<br />
scope<br />
� Define the location/ area<br />
for your <strong>smart</strong> <strong>meter</strong> rollout<br />
� Identify your<br />
stakeholders and take<br />
down their communication<br />
needs<br />
� Go for management<br />
support<br />
� Get project approval<br />
Project kick-off Sign-off of project<br />
specification<br />
� Detail project scope and<br />
define milestones<br />
� Plan project<br />
� Plan resources<br />
� Perform detailed analysis<br />
on site incl. e.g. analysis<br />
of the network<br />
� Plan and initiate hardware<br />
procurements<br />
� Plan extensive communication<br />
activities<br />
focussing customer<br />
information<br />
� Set up project<br />
infrastructure<br />
� Perform project activities<br />
and tasks according to the<br />
plan incl.:<br />
�Roll-out of <strong>meter</strong><br />
infrastructure<br />
�Technical set-up and<br />
interfaces to the<br />
related IT-systems<br />
�Customer<br />
communication<br />
�Product<br />
development for<br />
<strong>smart</strong> <strong>meter</strong>ing<br />
Hand-over to<br />
operations<br />
� Perform post go-live<br />
support<br />
� Collect and document<br />
lessons learned<br />
� Finalize the project<br />
documentation<br />
� Close project<br />
6
Example of Project Set-up<br />
Standard work packages of the project are mapped to the project phases whereas<br />
communications and product development continue in daily operations.<br />
Initializing<br />
Phase<br />
Planning<br />
Phase<br />
Prepare<br />
roll-out<br />
Executing Phase<br />
Perform roll-out<br />
Set up IT systems incl. required interfaces<br />
Perform customer communication activities<br />
Define processes for<br />
<strong>smart</strong> <strong>meter</strong>ing operations<br />
Develop <strong>smart</strong> products<br />
Perform project management<br />
Closing<br />
Phase
Agenda<br />
1. About us<br />
2. Smart <strong>meter</strong>ing @ Forst (Lausitz) – our pilot project<br />
3. Energy efficiency due to transparency of consumption<br />
4. Technical vision and evolution of <strong>smart</strong> <strong>meter</strong>ing<br />
8
Objectives of the project<br />
Technological<br />
feasibility<br />
� Performance test of<br />
technology in the field<br />
� Test of <strong>multi</strong>-<strong>utility</strong><br />
<strong>meter</strong> reading<br />
� Connection of different<br />
technologies to the IT<br />
systems of umetriq<br />
� Possibility of the<br />
technological expansion<br />
to <strong>smart</strong> grid solutions<br />
Gathering <strong>experience</strong> in the provision of <strong>multi</strong>-<strong>utility</strong> <strong>smart</strong><br />
<strong>meter</strong>ing in designated areas of a small town.<br />
Regulatory<br />
compliance<br />
� Adhere to legal<br />
regulations regarding<br />
data protection and<br />
calibration<br />
� Conformity <strong>with</strong> the<br />
processes of the<br />
BNetzA (Federal<br />
Network Agency) e.g.<br />
<strong>meter</strong> reading<br />
� Implementation of<br />
requirements of a power<br />
grid provider<br />
Customer<br />
acceptance<br />
� Testing customer<br />
acceptance on<br />
technology and future<br />
products<br />
� Set-up of a <strong>multi</strong>-<strong>utility</strong><br />
<strong>smart</strong> <strong>meter</strong>ing<br />
reference<br />
� Supporting a positive<br />
image as proactive and<br />
innovative power grid<br />
provider<br />
Implementation<br />
know-how<br />
� Build-up know-how<br />
regarding <strong>smart</strong><br />
<strong>meter</strong>ing implementation<br />
and operation<br />
� Develop a general<br />
approach for future<br />
projects <strong>with</strong> municipal<br />
utilities<br />
9
Facts and figures of the pilot project<br />
The <strong>smart</strong> <strong>meter</strong>ing project in Forst is triggered by the local grid operator and<br />
aims at gathering <strong>experience</strong>s in rolling out the infrastructure as well as<br />
implementing the required IT systems.<br />
Figures:<br />
� Roll-out of ca. 2.000 <strong>meter</strong>s (including all <strong>utility</strong> sectors)<br />
� About 1.600 voluntary households are participating<br />
� Duration of the project is 2 years (incl. infrastructure set-up as well as<br />
operation phase)<br />
� Implementation of <strong>smart</strong> <strong>meter</strong>s <strong>with</strong> an integrated communication interface for<br />
measuring and transferring <strong>meter</strong> data<br />
The technologies involved are:<br />
� AMIS solution (Automated Metering and Information Systems) of Siemens (ca.<br />
1600 <strong>meter</strong>s)<br />
� Multi Utility Communication (MUC) standard of EMH (ca. 500 <strong>meter</strong>s)<br />
Pilot areas comprise diverse types of construction and architecture:<br />
� Prefabricated <strong>multi</strong>-storey dwellings<br />
� Detached houses<br />
� Historical buildings<br />
10
Project Phases and Activities<br />
Currently the pilot project is in the major implementation and operation phase<br />
which includes the roll-out of the <strong>smart</strong> <strong>meter</strong>ing infrastructure and valuable<br />
expereinces <strong>with</strong> the technologies involved.<br />
Preparation phase<br />
Technology selection<br />
Definition of pilot areas<br />
Communication concept<br />
Mailing<br />
City festival<br />
Individual form of address<br />
Customer acqusition<br />
phase<br />
Public relations<br />
Roll-out of AMIS technology<br />
Implementation and<br />
operation phase<br />
Go-live of energy portal<br />
Set-up of customer accounts<br />
on the energy portal<br />
Roll-out of MUC technology<br />
Operation phase till Oct. 2012<br />
Upgrade of portal functionality<br />
today<br />
Closing phase<br />
Lessons learned<br />
Planning further action<br />
Defining next steps<br />
11
Legend:<br />
AMIS Technology<br />
MUC Technology<br />
Pilot Project Areas in Forst (Lausitz)<br />
12
Agenda<br />
1. About us<br />
2. Smart <strong>meter</strong>ing @ Forst (Lausitz) – our pilot project<br />
3. Energy efficiency due to transparency of consumption<br />
4. Technical vision and evolution of <strong>smart</strong> <strong>meter</strong>ing<br />
13
Screenshot of data visualization for customers<br />
14
iPhone App for Visualisation Purposes<br />
An iPhone is available for participants of the pilot project to also have their<br />
power consumption at hand and in the pocket.<br />
Overview and consumption<br />
analysis<br />
View monthly statistics<br />
View daily, weekly, monthly or<br />
annual consumption<br />
15
Agenda<br />
1. About us<br />
2. Smart <strong>meter</strong>ing @ Forst (Lausitz) – our pilot project<br />
3. Energy efficiency due to transparency of consumption<br />
4. Technical vision and evolution of <strong>smart</strong> <strong>meter</strong>ing<br />
16
The Path to Smart Home<br />
Smart <strong>meter</strong>ing builds the basis for further developments of <strong>smart</strong> solutions for<br />
homes.<br />
Foundation for home automation<br />
�<br />
�<br />
Bi-directional link will allow active control of<br />
building services, heating systems and<br />
thermostats<br />
Energy storage (refrigerator, electric mobility,<br />
thermal, etc.<br />
� Household appliances <strong>with</strong> energy cost control<br />
Basis for security and automation<br />
for example:<br />
�<br />
�<br />
�<br />
�<br />
Video surveillance<br />
Fire detection<br />
Emergency activation<br />
Remote-controlled ventilation<br />
for vacant apartments and<br />
homes<br />
17
Evolution of Smart Metering<br />
� Electronic readings<br />
� Visualisation of energy consumption<br />
� Invoicing of energy consumption on a<br />
monthly basis<br />
� Fulfilment of the legal requirements<br />
� Energy consulting<br />
2011/12 < 5 Years > 10 Years<br />
� Load‐dependent tariffs<br />
� Prepayment<br />
� Own power generation<br />
(micro CHP, photovoltaic systems)<br />
�<br />
�<br />
Automated grid and<br />
communication management<br />
(from wind turbine to end device)<br />
Automated peak‐load management<br />
(shutdown of equipment in case of over<br />
utilization)<br />
� Home automation<br />
� Household appliances <strong>with</strong><br />
energy cost control<br />
� Energy storage<br />
� Automated time control for<br />
heating, cooling, lighting, blinds<br />
and window control, etc.<br />
18
Smart Grid<br />
Smart grids manage the storage, supply and demand of power; <strong>smart</strong> <strong>meter</strong>ing<br />
acts here as an important component and enabler of <strong>smart</strong> grid solutions.<br />
19
Thank you.<br />
umetriq Metering Services GmbH<br />
Frankfurter Allee 73c<br />
10247 Berlin<br />
Tel. 0800-8638747<br />
info@umetriq.com