08.11.2017 Views

Rio Lempa | Riqueza y Majestuosidad

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

La planta potabilizadora de Las Pavas fue construida<br />

entre 1988 y 1993. Se estima que su producción ideal<br />

podría alcanzar los 500,000 metros cúbicos diarios.<br />

The water treatment plant of Las Pavas was built<br />

between 1988 and 1993. Its daily production potencial<br />

could reach around 500,000 cubic meters.<br />

108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!