SAFETY SECURITY - PIKT-O-NORM
SAFETY SECURITY - PIKT-O-NORM
SAFETY SECURITY - PIKT-O-NORM
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
master lock services ®<br />
Lock-out/Tag-out procedures can be complex to address and are<br />
sometimes incomplete or badly managed.<br />
Master Lock ® can assist you throughout the process of analysis,<br />
planning and implementation of these procedures through the<br />
Master Lock Services ® Programme.<br />
Step I: Preparation<br />
Master Lock ® meets with customers to define the scope of the project.<br />
diagnostic<br />
sÉcuritÉ<br />
e x p e r t i s e<br />
Step II: Development of the program<br />
This phase involves assessment of the equipment, procedures, status<br />
and operator skills to develop a comprehensive lock-out procedure<br />
and practice.<br />
• Collection of current documents related to Safety and Security<br />
at work<br />
• Analysis of the practices, processes and existing measures<br />
• Detailed site visit<br />
Les procédures de consignation / signalisation parfois lourdes<br />
et complexes peuvent se révéler incomplètes ou mal gérées.<br />
C’est pourquoi, Master Lock ® vous accompagne tout au long du<br />
processus d’analyse, de planification et de mise en place de ces<br />
procédures sur vos sites de production à travers son programme<br />
Master Lock Services ® .<br />
Etape I : Préparation<br />
Master Lock ® rencontre ses clients pour définir l’étendue<br />
du programme.<br />
Etape II : Développement du programme<br />
Cette phase implique l’état des lieux des installations techniques, le<br />
statut des procédures de consignation et la capacité des opérateurs<br />
à suivre et à pratiquer des procédures de consignation maîtrisées<br />
et durables.<br />
• Examen de la documentation existante relative à la mise en sécurité<br />
des intervenants<br />
• Analyse des pratiques, des processus et des dispositions existantes<br />
• Visite approfondie du site<br />
> Development of a bespoke lock-out procedure and a timetable for<br />
its implementation.<br />
Step III: Implementation<br />
Master Lock ® assists the customer in the process of implementation.<br />
• Training of client on lock-out procedures<br />
• Supply of equipment for the program<br />
• Training of client in the operational aspects of the program<br />
Step IV: System Review<br />
This stage, based on the principle of the continuous improvement, is<br />
essential to the implementation of a successful lock-out procedure.<br />
Objectives<br />
• Assessment of the efficiency of the process of lock-out/tag-out<br />
• Identification of gaps and appropriate corrective actions<br />
Master Lock ® passes on statutory and technical skills in terms of<br />
lock-out procedure and provides training and process support in<br />
order to explain and illustrate the requirements of the procedures,<br />
and ensure effective implementation.<br />
> Elaboration d’une procédure de consignation adaptée et d’un<br />
calendrier de mise en place.<br />
Étape III : Mise en œuvre<br />
Master Lock ® accompagne le client dans le processus de mise<br />
en place.<br />
• Formation du client sur les procédures de consignation<br />
• Livraison du matériel de consignation<br />
• Formation du client dans les aspects opérationnels du programme<br />
safety<br />
diagnostic<br />
e x p e r t i s e<br />
Etape IV : Audit de Suivi<br />
Cette étape, basée sur le principe de l’amélioration continue, est une<br />
étape clé de la mise en place de la procédure de consignation.<br />
Les Objectifs<br />
• Vérifier l’efficacité du processus de consignation / signalisation<br />
• Apporter des actions correctives suite aux écarts éventuels mis en<br />
évidence lors de l’audit de suivi<br />
Master Lock ® transmet des compétences réglementaires et<br />
techniques en termes de consignation et apporte un soutien<br />
pédagogique et méthodologique afin d’expliquer et illustrer les<br />
exigences des procédures, et d’assurer leur mise en place effective.<br />
12