Teknobiologi Vol. II No.1 : 85 – 90<br />

ISSN: 2087 - 5428<br />

Bulan R E<br />

mm ton. M/ha. Cm<br />

Januari 278.54 6106.95<br />

Februari 209.71 4501.03<br />

Maret 240.41 5213.27<br />

April 204.54 4381.98<br />

Mei 245.56 5333.25<br />

Juni 100.83 2048.47<br />

Juli 109.48 2237.98<br />

Agustus 121.00 2492.14<br />

September 207.22 4443.70<br />

Oktober 196.18 4189.65<br />

November 252.99 5507.05<br />

Desember 278.50 6106.11<br />

Rata-rata 203.75 4380.13<br />

Total 2444.96 52561.59<br />

Sumber : Perhitungan<br />

f. Laju Erosi Potensial (E pot )<br />

E pot = E × K × LS × A<br />

= 4.380,13 × 0,252 × 0,18 × 4,22<br />

= 242,13 ton/ha/th<br />

g. Laju Erosi Aktual (E akt )<br />

E akt<br />

= E pot x CP<br />

= 242,13 x 0,02<br />

= 4,84 ton/ha/th<br />

h. Laju <strong><strong>Sedimen</strong>tasi</strong> Potensial<br />

1 0,8683 , <br />

0,08683 <br />

2 50 <br />

,<br />

%,,, <br />

0,08683 <br />

% ,<br />

64,92 , 0,82<br />

i. <strong><strong>Sedimen</strong>tasi</strong> potensial yang terjadi adalah<br />

S pot = E-Akt x SDR<br />

= 4,84 x 0,82<br />

= 3,98 ton/tahun<br />

Jadi besar volume sedimentasi adalah 0,13 mm/tahun.<br />

Rekapitulasi perhitungan dengan metode USLE dapat<br />

dilihat pada Tabel 5.<br />

4. Kesimpulan<br />

Hasil analisa laju sedimentasi pada <strong>Sungai</strong> Kapur Kecil<br />

menghasilkan beberapa kesimpulan sebagai berikut:<br />

1. Dari metode USLE yang digunakan untuk menentukan<br />

No.<br />

Elevasi<br />

Panjang<br />

Lereng<br />

Tabel 5. Rekapitulasi Perhitungan <strong><strong>Sedimen</strong>tasi</strong> Metode USLE<br />

Erosi<br />

Erosi<br />

Slope Luas LS Potensial CP<br />

Aktual<br />

(E-pot)<br />

SDR<br />

<strong>Sedimen</strong>t<br />

asi<br />

(m) (%) (km2) (Ha) (ton/th) (ton/th)<br />

1 1050-1000 75.83 72.76 0.04 4.22 0.05 242.13 0.02 4.84 0.82 3.98<br />

2 1000-950 80.84 98.61 0.13 12.74 0.07 994.98 0.02 19.90 0.76 15.04<br />

3 950-900 338.01 54.96 0.19 18.77 0.05 1026.86 0.02 20.54 0.73 15.02<br />

4 900-850 139.18 49.23 0.44 43.56 0.04 1909.61 0.02 38.19 0.69 26.38<br />

5 850-800 267.00 49.54 0.52 52.13 0.04 2432.54 0.02 48.65 0.68 33.24<br />

6 800-750 154.07 44.26 0.74 74.19 0.04 2922.35 0.02 58.45 0.67 39.02<br />

7 750-700 124.91 53.99 1.08 108.49 0.04 4942.51 0.02 98.85 0.66 64.87<br />

8 700-650 202.97 48.00 1.27 126.81 0.04 5797.24 0.02 115.94 0.65 75.26<br />

9 650-600 521.79 37.45 1.79 178.91 0.04 7027.62 0.02 140.55 0.63 89.04<br />

10 600-550 412.20 38.36 2.19 219.12 0.03 8356.32 0.02 167.13 0.63 104.86<br />

11 550-500 603.21 37.48 2.86 286.03 0.04 11320.41 0.02 226.41 0.62 140.12<br />

12 500-450 971.24 17.65 4.33 433.27 0.29 139099.42 0.02 2781.99 0.59 1630.16<br />

13 450-400 466.00 18.29 5.52 552.29 0.28 169731.33 0.02 3394.63 0.58 1970.63<br />

14 400-350 716.64 17.02 6.25 625.33 0.30 205569.02 0.02 4111.38 0.57 2361.54<br />

15 350-300 917.51 14.09 6.73 672.82 0.32 240540.36 0.02 4810.81 0.56 2715.29<br />

16 300-250 1220.89 11.72 8.45 844.85 0.34 314255.16 0.02 6285.10 0.55 3452.58<br />

17 250-200 1406.32 8.03 12.38 1237.90 0.40 551322.67 0.02 11026.45 0.52 5697.72<br />