12.09.2013 Views

AD224 - RS 100 R - Oertli

AD224 - RS 100 R - Oertli

AD224 - RS 100 R - Oertli

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2 Connecting the box<br />

2.1 GMR <strong>100</strong>0 Condens / GMR <strong>100</strong>0 CS Condens<br />

Switch off the mains electricity supply before carrying out<br />

any work. Electrical connections must be made by a<br />

qualified professional.<br />

<br />

Tilt the flap on the control panel.<br />

Open the protective hood.<br />

Connect the connector from the transmitter/receiver box to the terminals marked S.AMB..<br />

2.2 GVX <strong>100</strong>-24 CONDENS / GVX 124 SUN Condens<br />

Lift the flap.<br />

Turn the screw on the front panel of the command box.<br />

Tilt the control panel forward.<br />

Connect the connector from the transmitter/receiver box to the<br />

terminals marked BUS.<br />

Leave the TAM connector in place.<br />

<br />

20/04/09 - 300010273-001-B<br />

<br />

<br />

The remote control/boiler liaison cable must be separated by<br />

at least 10 cm from cables carrying 230 V.<br />

<br />

<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!