12.07.2015 Views

Widening CSD Al Mahaar - Vuyk Engineering Rotterdam bv

Widening CSD Al Mahaar - Vuyk Engineering Rotterdam bv

Widening CSD Al Mahaar - Vuyk Engineering Rotterdam bv

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Widening</strong><strong>CSD</strong>ALMAHAARVER scope of workThe VER scope of work included:• Studying several options to reduce dredger's draft to enable dredging in moreshallow water, including design report.• Cost estimate for the construction of the side pontoons .• Technical specification for the construction of the side pontoons• Dry-docking specification of the '<strong>Al</strong> <strong>Mahaar</strong>'• Midship Section and construction drawings of side pontoons• Assembly drawing of dredger with side pontoons• Piping, valves and sea inlet chests in side pontoons , complete withconnections to main pontoon• General Arrangement Plan, Mooring Plan, Deck Arrangement, Docking Plan,Cathodic Protection Plan, Railing Arrangement• Draft survey of '<strong>Al</strong> <strong>Mahaar</strong>' at Qatar before widening• Calculations of bending moments, longitudinal strength, stability, etc.<strong>Vuyk</strong> <strong>Engineering</strong> <strong>Rotterdam</strong> B.V.Naval architects. Marine engineers. ConsultantsP.O. Box 1. De Linie 72900 AA Capelle aan den IJsselPhone +31 (0)10 450 25 00Fax +31 (0)10 458 72 45Email vuyk@vuykrotterdam.comWebsite www.vuykrotterdam.comVER project 04.040Values are for presentation only

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!