11.07.2015 Views

TSHD Charles Darwin - Vuyk Engineering Rotterdam bv

TSHD Charles Darwin - Vuyk Engineering Rotterdam bv

TSHD Charles Darwin - Vuyk Engineering Rotterdam bv

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

30 500 m 3trailing suctionhopper dredgerCHARLESDARWINGeneralIn July 2007, Jan de Nul Group and La Naval Shipyard in Bilbao, Spain, signed anagreement for the construction of a 30 500 m 3 hopper dredger.The new vessel is specially designed for operation in shallow or confined waters,having a design draught of 11 m and a length of only 161.5 m. In the design muchattention has been given to efficient use of the installed power, resulting in low fuelconsumption and lower emissions. Two suction pipes, diameter 1 200 mm, equippedwith submerged dredge pumps of each 3 400 kW are installed. Double walledelectrically driven shore discharging dredge pumps with a total power of 15 000 kWwill enable discharging the load at a high rate, over long distances.Principal DimensionsLength over allLength between perpendicularsBreadth, mouldedDraught, internationalDredging draughtHopper capacityDeadweight183.20161.5040.0010.0013.0030 50054 141mmmmmm 3tonMaximum dredging depthSuction pipe diameterSpeedAccommodation93.501 20016.0042mmmknpMachineryPump power (trailing)Pump power (discharging)Propulsion powerTotal installed diesel power2x 3 40015 0002x 10 80023 600kWkWkWkW<strong>Vuyk</strong> <strong>Engineering</strong> <strong>Rotterdam</strong> B.V.Consultants, Naval architects, Marine engineersP.O. Box 1, De Linie 72900 AA Capelle aan den IJsselPhone +31 (0)10 450 25 00Fax +31 (0)10 458 72 45Email vuyk@vuykrotterdam.comWebsite www.vuykrotterdam.comVER project 07.195Values are for presentation only


30 500 m 3trailing suctionhopper dredgerCHARLESDARWINScope of work VERJan de Nul awarded the contract for the main part of the basic design to <strong>Vuyk</strong><strong>Engineering</strong> <strong>Rotterdam</strong> (VER), comprising the following scope of work:• Main construction drawings of the hull and superstructures, including allfoundations for the dredging equipment.• FEM global hull strength analysis.• Arrangement drawings (i.e. engine room).<strong>Vuyk</strong> <strong>Engineering</strong> <strong>Rotterdam</strong> B.V.Consultants, Naval architects, Marine engineersP.O. Box 1, De Linie 72900 AA Capelle aan den IJsselPhone +31 (0)10 450 25 00Fax +31 (0)10 458 72 45Email vuyk@vuykrotterdam.comWebsite www.vuykrotterdam.comVER project 07.195Values are for presentation only

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!