23.01.2015 Aufrufe

Die Vereinten Nationen in Bonn

UN BONN - Die Vereinten Nationen in Bonn; Autor: Rüdiger Strempel

UN BONN - Die Vereinten Nationen in Bonn;
Autor: Rüdiger Strempel

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

The United Nations <strong>in</strong> <strong>Bonn</strong><br />

33<br />

Much like Rome, the UN Campus was not built <strong>in</strong> a day. Given<br />

their historical importance, both build<strong>in</strong>gs are protected monuments,<br />

impos<strong>in</strong>g certa<strong>in</strong> constra<strong>in</strong>ts. Their refurbishment and<br />

modernization needed to reconcile the practical needs of over a<br />

dozen UN agencies with the requirements of German build<strong>in</strong>g<br />

law and regulations govern<strong>in</strong>g the protection of historic build<strong>in</strong>gs,<br />

a task that occasionally seemed tantamount to squar<strong>in</strong>g<br />

the circle. The United Nations Agencies established a UN Campus<br />

Task force, whose members spent months por<strong>in</strong>g over architectural<br />

plans and budget documents, regularly discussed the<br />

way forward regard<strong>in</strong>g UN Campus issues, and also met and<br />

deliberated with representatives of the competent German M<strong>in</strong>istry<br />

for the Environment, other Federal and Land authorities<br />

and others.<br />

© Stefan Lippert Architekt, Berl<strong>in</strong><br />

The revitalization of the Langer Eugen build<strong>in</strong>g took several years,<br />

but the outcome is conv<strong>in</strong>c<strong>in</strong>g. Modern technology was <strong>in</strong>stalled<br />

where necessary, but wherever possible, orig<strong>in</strong>al elements were<br />

reta<strong>in</strong>ed or reconstructed. This <strong>in</strong>cludes details such as the<br />

doorknobs, banisters, the wall clocks used by the Bundestag<br />

and even the wall to wall carpet <strong>in</strong> the build<strong>in</strong>g’s 29th fl oor cafeteria.<br />

The orig<strong>in</strong>al carpet was so worn that it needed to be replaced,<br />

but it proved diffi cult to a company that could reproduce<br />

the orig<strong>in</strong>al. F<strong>in</strong>ally, the replacement was specially manufactured<br />

by carpet weavers <strong>in</strong> the United K<strong>in</strong>gdom. Given the cafeteria’s<br />

spectacular view – on good days it is possible to make<br />

out the Cologne Cathedral on the horizon – it is doubtful, however,<br />

whether the cafeteria’s patrons pay much attention to the<br />

beige and brown tartan design underfoot.<br />

In refurbish<strong>in</strong>g the build<strong>in</strong>g, care was also taken to ma<strong>in</strong>ta<strong>in</strong> the<br />

numerous works of art found across the build<strong>in</strong>g. Eleven such<br />

pieces, represent<strong>in</strong>g various art forms and created by major<br />

20th century German artists such as HAP Grieshaber, Fritz Koenig,<br />

Hans Kaiser or Günther Uecker turn the build<strong>in</strong>g <strong>in</strong>to someth<strong>in</strong>g<br />

of a gallery of post-war German art. All th<strong>in</strong>gs considered,<br />

the Neues Abgeordnetenhochhaus, re<strong>in</strong>augurated and handed<br />

over to the UN on July 11, 2006, now presents a congenial fusion<br />

of 1960s design and new millennium technology.<br />

Phase II of the UN Campus concerned the older of the two build<strong>in</strong>gs,<br />

the Altes Abgeordnetenhochhaus. This phase should orig<strong>in</strong>ally<br />

have been concluded roughly one year after the <strong>in</strong>auguration<br />

of the fi rst build<strong>in</strong>g. In fact, there was a considerable hiatus, caused<br />

by the fact that the Bundestag Budget Committee’s took several<br />

years to make the necessary funds available. Only <strong>in</strong> 2009 did<br />

the actual construction work on this part of the Campus beg<strong>in</strong>.<br />

Interest<strong>in</strong>gly, while this build<strong>in</strong>g is considerably smaller than its<br />

neighbor, the challenges <strong>in</strong>volved were not. S<strong>in</strong>ce the complex effectively<br />

consisted of several parts with a very heterogenous structure,<br />

different approaches were needed <strong>in</strong> various parts of the<br />

build<strong>in</strong>g. To add to the challenge, the various parts of the build<strong>in</strong>g<br />

were constructed at different levels. This has now been compensated<br />

for, putt<strong>in</strong>g all sections of the complex on the same level.<br />

Moreover, <strong>in</strong> accordance with the mandate of the future tenant of<br />

the build<strong>in</strong>g, the Climate Change Secretariat UNFCCC), the environmental<br />

and energy efficiency standards were extremely str<strong>in</strong>gent.<br />

Newly constructed parts were constructed to passive house<br />

standards, refurbished sections received strong thermal <strong>in</strong>sulation.<br />

Renewable energy plays an important role <strong>in</strong> this build<strong>in</strong>g.<br />

Heat exchangers us<strong>in</strong>g Rh<strong>in</strong>e water fi ltrate are used to heat and<br />

cool the build<strong>in</strong>g, which generates its own electricity through photovoltaic<br />

panels. Reconstruction was governed by the specifi cations<br />

for eco-friendly build<strong>in</strong>g developed by the Federal M<strong>in</strong>istry<br />

for the Environment. The Federal Office for Build<strong>in</strong>g and Regional<br />

Plann<strong>in</strong>g (BBR), which was tasked with the refurbishment, stresses<br />

that the Altes Abgeordnetenhochhaus was <strong>in</strong>tended to demonstrate<br />

that even a refurbished build<strong>in</strong>g can be very climate friendly by<br />

reduc<strong>in</strong>g the use of fossil fuels and us<strong>in</strong>g ecological build<strong>in</strong>g<br />

materials and elements. State-of-the-art technology and modern<br />

energy supplies notwithstand<strong>in</strong>g, many architectural features of the<br />

orig<strong>in</strong>al build<strong>in</strong>g were reta<strong>in</strong>ed or restored to their orig<strong>in</strong>al status.

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!