18.02.2013 Views

Systeme für Signaltechnik

Systeme für Signaltechnik

Systeme für Signaltechnik

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Efficient and<br />

future-proof<br />

solutions<br />

for<br />

level crossings and interlockings<br />

Dipl.- Ing. Heinz Laumen<br />

Managing Director – Systems for signalling<br />

E-Mail: Laumen.Heinz@Scheidt-Bachmann.de<br />

1<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Scheidt & Bachmann headquarters<br />

in Mönchengladbach<br />

Scheidt & Bachmann has always<br />

faced the demand of the market<br />

and, more than that turned towards<br />

to implement visions into leading<br />

marketing highlights of permanent<br />

enterprise future orientation. As<br />

the result, the former production<br />

company has turned to a system<br />

provider of international reputation.<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Product Lines<br />

Systems for Railways<br />

Systems for Petrol Stations<br />

Systems for Fare Collections<br />

Systems for Parking and Leisure Facilities<br />

Capabilities<br />

� Research and Development<br />

� Production<br />

� Project Management<br />

� Sales and Service Network Worldwide<br />

Human Ressources<br />

� > 2000 employees<br />

� more than 550 employees with university degrees<br />

� more than 350 personnel with over 25 years service<br />

� more than 100 trainees<br />

Turnover<br />

� more than € 250m pa<br />

Quality Certifcate<br />

ISO 9001 (since 1993)<br />

2<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Company presentation<br />

�Scheidt & Bachmann GmbH is a familyowned<br />

company in the fifth generation and<br />

has a reputation as a worldwide leading<br />

supplier of its kind of products. In its<br />

business divisions, it has formed its general<br />

origin of products and thereby set<br />

standards.<br />

3<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Specifics of regional lines each km<br />

LX- infrastructure IL – infrastructure<br />

LX 0,7 IL 0,12<br />

strike in/out 2,4 Axel counters 1,7<br />

Train supervising<br />

signals<br />

Barriers<br />

Lights<br />

1,1 Main signals 0,9<br />

2,7<br />

5,8<br />

4<br />

Points<br />

0,22<br />

There is a functional point along the line each 250 m<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

BUES 2000, universal technological platform for all applications<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

5<br />

Administration level<br />

Main level<br />

Field level<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Identical platform for all interlocking applications ZSB 2000<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

6<br />

Dispatching and Diagnostic level<br />

Main level<br />

Field level<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Regional operating centre<br />

7<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Communication structure, ESTW ZSB2000<br />

ESTW<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

TCP/IP<br />

8<br />

Operation centre<br />

ESTW ESTW<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Section, process secured:<br />

� Fail safe signalling principle realized by a process secured user interface for<br />

Control Operation System incl. Diagnosis<br />

� Using of a process secured user interface architecture for implementation of<br />

market components<br />

Section with technical safety responsibility:<br />

� Fail safe signalling principle realized technically fail safe for Train Route<br />

logic, Track clear detection, LX-Dependencies<br />

� Using of market standards for communication network (CAN (LAN) TCP/IP<br />

(WAN))<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

9<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

F<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

IL architecture with intelligent axle counter<br />

N2<br />

N1<br />

Bf A-Dorf<br />

km 77.810<br />

P<br />

EK 1<br />

A<br />

EK 2<br />

10<br />

CAN<br />

ZSB 2000<br />

F<br />

N<br />

Bf B-Dorf<br />

km 33.500<br />

P<br />

A<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany<br />

a


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Line Management, integrated Diagnostic system<br />

Dispatcher desk<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

local LCS<br />

local ILS<br />

Available LCS<br />

Neighbour ILS<br />

Maintanance/Service Info Speaker /<br />

Emergency call<br />

Voice over IP<br />

Sation lightning controll<br />

technical optimized communication via standard media<br />

11<br />

Train number<br />

information<br />

Customer information<br />

system<br />

Switch point heating<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Rail Flange Cable<br />

Crossover of rail<br />

flange cable into<br />

individual cabling of<br />

field elements<br />

4 x 1 x 2,5 mm 2 Power 60V, Main/Advance Signal<br />

1 x 4 x 0,7 mm 2 Track Network (STRENET), (Block, LC – Dependences)<br />

1 x 4 x 0,7 mm 2 Control Operation System (LBS), Diagnosis<br />

1 x 4 x 0,7 mm 2 free for LC – Switching Points<br />

1 x 4 x 0,7 mm 2 local CAN-BUS; Main/Advance Signal, Axle Counter<br />

12<br />

Rail Flange<br />

Cable<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Components of<br />

BUES 2000 and ZSB 2000<br />

13<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Axle counters with serial bus connections for strike in/out at<br />

level crossings and track occupation at interlockings<br />

F<br />

N2<br />

N1<br />

Bf A-Dorf<br />

km 77.810<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

P<br />

EK 1<br />

A<br />

EK 2<br />

14<br />

F<br />

N<br />

Bf B-Dorf<br />

km 33.500<br />

P<br />

A<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany<br />

a


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Universal use of Hardware<br />

15<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

univeral hardware functions<br />

matrix display<br />

16<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Identical components for IL and LX<br />

The largest part of the hardware<br />

is already in BUES 2000 level crossing technique available and<br />

will be used in ZSB 2000 interlocking technique as well.<br />

Some Softwareparts are identical ( e.g. OP ACS)<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

17<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Green Efficiency<br />

Diagnostics, energy and obsolescence<br />

18<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

LCC, Energy Consumption Values, Basic Loads<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Indoor control system 60 W<br />

Axle counter 2 W<br />

Main/advance signal 18 W<br />

ZS 3 (auxiliary signal) 4 W<br />

Point control system 1,5 W<br />

Dispatcher desk 400 W<br />

1 IL (12 Sig, 20 AC, 4 P) ca. 350 W<br />

Air Condition/ Heating 0 W<br />

19<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

Processor generations fit in form and function<br />

Renewal cyclus of technical components takes ca. 5-<br />

8 years, not usable for longtime infracstructure<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

20<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

FPGA/VHDL provides a System,- Communication- and<br />

Softwarearchitecture for a long time<br />

Lifetime by Scheidt & Bachmann signalling technique is not<br />

dedicated from the process generation<br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

21<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany


© 2012<br />

<strong>Systeme</strong> <strong>für</strong> <strong>Signaltechnik</strong><br />

www.scheidt-bachmann.de<br />

www.scheidt-bachmann.at<br />

Thank you very much for<br />

your attention!<br />

22<br />

Scheidt & Bachmann GmbH<br />

Mönchengladbach, Germany

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!