20.02.2013 Views

AuV - Uni Standard P2 - Layher

AuV - Uni Standard P2 - Layher

AuV - Uni Standard P2 - Layher

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Insert diagonal braces 18 and an access deck 23. The diagonal<br />

braces must be installed in a tower-like (zig-zag) form on both sides.<br />

5. Climb up to the next level and fit additional rear guardrails 15 to the<br />

second rung above the platform surface.<br />

14<br />

Completion of working platform<br />

All tower models<br />

1. To complete the working platform, attach toe boards with claw 28<br />

and end toe boards 29.<br />

If an intermediate platform is also to be used as a working<br />

platform, attach toe boards here too.<br />

Operating the castors<br />

During assembly and while working, keep<br />

the castors locked by pressing down the<br />

brake lever labelled STOP.<br />

When the brake is locked, the lever<br />

labelled STOP is in the down position.<br />

For movement, unlock the castors by<br />

pushing the opposite lever down.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!