20.02.2013 Views

AuV - Uni Standard P2 - Layher

AuV - Uni Standard P2 - Layher

AuV - Uni Standard P2 - Layher

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

} 4. TOWER MODELS<br />

In the case of assembly outdoors, do not exceed the height limit!<br />

Tower models<br />

1401101 – 1401111<br />

Working height<br />

Scaffolding<br />

height<br />

Platform<br />

height<br />

1401101 1401102 1401103 1401104<br />

1401105 1401106 1401107 1401108 1401109 1401110 1401111<br />

Tower model 1401101 1401102 1401103 1401104 1401105 1401106 1401107 1401108 1401109 1401110 1401111<br />

Working height [m] 3.5 4.5 5.5 6.5 7.5 8.5 9.6 10.6 11.6 12.6 13.6<br />

Scaffolding height [m] 2.6 3.75 4.75 5.75 6.75 7.75 8.79 9.79 10.79 11.79 12.79<br />

Platform height [m] 1.5 2.5 3.5 4.5 5.5 6.5 7.6 8.6 9.6 10.6 11.6<br />

Weight [kg] (without ballast)<br />

Ballasting<br />

Indoors<br />

85.6 184.0 218.9 245.8 280.7 307.6 393.7 420.6 455.5 482.4 517.3<br />

Assembly central l2 r2 0 0 0 0 0 0 0 0 0 0<br />

Assembly off-set X 0 0 L0 R4 L0 R4 L0 R6 L0 R4 L0 R6 L0 R6 L0 R8 L0 R10<br />

Assembly off-set with wall bracing X 0 0 0 0 0 0 0 0 0 0<br />

Assembly central with 1 bracket X 0 0 L0 R2 L0 R4 L0 R6 0 0 0 0 0<br />

Assembly central with 2 brackets<br />

Outdoors<br />

X 0 0 0 0 0 0 0 0 0 0<br />

Assembly central l2 r2 0 l1 r1 l5 r5 l9 r9 l15 r15 l2 r2 X X X X<br />

Assembly off-set X L0 R2 L0 R6 L0 R10 L4 R16 L10 R22 L0 R18 X X X X<br />

Assembly off-set with wall bracing X 0 0 0 L4 R0 L10 R0 0 X X X X<br />

Assembly central with 1 bracket X L0 R4 L0 R8 L0 R2 L0 R16 L12 R12 X X X X X<br />

Assembly central with 2 brackets X l2 r2 l5 r5 l8 r8 X X X X X X X<br />

When assembling with adjustable mobile beam, it must be fully extended. X = not permissible / possible 0 = no ballast required Table gives the number of ballast weights each of 10 kg.<br />

For ballasting, use <strong>Layher</strong> ballast weights, Ref. No. 1249.000, 10 kg each. These are fastened quickly and securely at the right place using the star handle coupling.<br />

Liquid or granular ballast materials must not be used. The ballast weights must be distributed evenly to all ballast fixing points (see pages 20 – 23).<br />

Example: l2, r2 � 2 ballast weights of 10 kg each must be fastened to the left-hand side of the ladder frame, and 2 ballast weights of 10 kg each to its right-hand side<br />

L6, R16 � 6 ballast weights of 10 kg each must be fastened to the left-hand side of the mobile beam, and 16 ballast weights of 10 kg each to its right-hand side<br />

8<br />

r and R always relate, in the case of off-centre assembly, to that side facing away from the scaffolding; l and L relate to the side facing the scaffolding (see also Section 9, Ballasting, on pages 20 – 23)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!