<strong>Notice</strong> <strong>of</strong> <strong>Preparation</strong><br />

Of a Joint Environmental Impact Report/Environmental Impact Statement<br />

And<br />

Request for Scoping Comments<br />

On the <strong>Preparation</strong> <strong>of</strong> an Environmental Impact Report/Environmental Impact Statement<br />

TO: All Interested Parties<br />

Subject<br />

For the<br />

<strong>Rising</strong> <strong>Tree</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Project</strong><br />

July 15, 2011<br />

<strong>Kern</strong> <strong>County</strong> and the U.S. Bureau <strong>of</strong> Land Management (BLM) will direct the preparation <strong>of</strong> a joint<br />

Environmental Impact Report (EIR) and an Environmental Impact Statement (EIS), referred to as an<br />

EIR/EIS, for the <strong>Rising</strong> <strong>Tree</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Project</strong> proposed by <strong>Rising</strong> <strong>Tree</strong> <strong>Wind</strong> <strong>Farm</strong>, LLC (<strong>Project</strong><br />

Proponent). <strong>Kern</strong> <strong>County</strong>, as the lead agency under California law, and the BLM, as the federal lead<br />

agency, will jointly prepare a Draft and Final EIR/EIS to comply with the California Environmental<br />

Quality Act (CEQA) and the National Environmental Policy Act (NEPA).<br />

Summary <strong>of</strong> the Proposed <strong>Project</strong><br />

The proposed <strong>Rising</strong> <strong>Tree</strong> <strong>Wind</strong> <strong>Farm</strong> <strong>Project</strong> would generate up to 285 megawatts (MW) <strong>of</strong> electricity<br />

through wind power, installing up to 95 wind turbine generators (WTGs), a substation, transmission<br />

interconnection to the Southern California Edison (SCE) <strong>Wind</strong>hub Substation, access roads, and ancillary<br />

facilities. The proposed project area comprises 3,302 acres, 528 acres <strong>of</strong> which are on public land under<br />

the jurisdiction <strong>of</strong> the BLM. The project site is approximately three miles west <strong>of</strong> the unincorporated town<br />

<strong>of</strong> Mojave in southeastern <strong>Kern</strong> <strong>County</strong>, California. Please refer to the attached Initial Study for a more<br />

detailed description <strong>of</strong> the proposed project and maps <strong>of</strong> the proposed project area.<br />

Because <strong>of</strong> potentially significant impacts on the environment, as identified in the attached Initial Study,<br />

<strong>Kern</strong> <strong>County</strong> and BLM will prepare an EIR/EIS addressing the full range <strong>of</strong> environmental issues. Note<br />

that this <strong>Notice</strong> <strong>of</strong> <strong>Preparation</strong> (NOP), attached Initial Study (IS), and all future project-related documents<br />

are available for review at the following location:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!