PUBLIC SERVICES<br />

a. Would the project result in substantial adverse<br />

physical impacts associated with the provision<br />

<strong>of</strong> new or physically altered governmental<br />

facilities, need for new or physically altered<br />

governmental facilities, the construction <strong>of</strong><br />

which could cause significant environmental<br />

impacts, in order to maintain acceptable service<br />

ratios, response times, or to other performance<br />

objectives for any <strong>of</strong> the public services:<br />

i) Fire protection?<br />

ii) Police protection?<br />

iii) Schools?<br />

iv) Parks?<br />

v) Other public facilities?<br />

Discussion:<br />

KERN COUNTY PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT<br />

RISING TREE WIND ENERGY PROJECT<br />

Potentially<br />

Significant<br />

Impact<br />

Potentially<br />

Significant<br />

Impact<br />

Unless<br />

Mitigated<br />

Less Than<br />

Significant<br />

Impact<br />

No<br />

Impact<br />

(a) The <strong>Kern</strong> <strong>County</strong> Fire Department provides fire suppression and emergency medical services to<br />

the <strong>Project</strong> area. The Mojave Station, located three (3) miles east <strong>of</strong> the <strong>Project</strong> site at 1953 SR 58<br />

in Mojave, would be the primary fire station to service the <strong>Project</strong>. The <strong>Project</strong> site is within a<br />

State Responsibility Area (SRA), and CAL FIRE implements wildfire planning and protection for<br />

the SRA. Construction and operation activities may result in increased risk <strong>of</strong> wildfire, which<br />

could impact firefighting capacity in the area. The potential impact on fire services from<br />

construction in an SRA area and operation <strong>of</strong> the <strong>Project</strong> is therefore potentially significant and<br />

will be evaluated in the EIR/EIS.<br />

The <strong>Kern</strong> <strong>County</strong> Sheriff’s Department provides police protection services to the <strong>Project</strong> area.<br />

The Mojave Substation, located three (3) miles east <strong>of</strong> the <strong>Project</strong> site at 1771 SR 58 in Mojave,<br />

would be the primary police substation to service the <strong>Project</strong> area. During construction, on-site<br />

security would be provided. In addition, temporary construction fencing with gated site access<br />

would be installed in accordance with <strong>County</strong> regulations to assure security and personnel safety<br />

during construction. Where appropriate, fencing and would be constructed to meet standards for<br />

permanent installations. While security and fencing would minimize the need for police<br />

surveillance and response, the <strong>Project</strong>’s impacts on sheriff services and existing capacities will be<br />

evaluated in the EIR/EIS.<br />

Construction <strong>of</strong> the <strong>Project</strong> is expected to require 200 to 300 to workers whose numbers will vary<br />

depending on the stage <strong>of</strong> construction. Construction workers are expected to travel to the site<br />

from various locations throughout southern California, and the number <strong>of</strong> workers relocating to<br />

the surrounding area is not expected to be substantial. Operation <strong>of</strong> the <strong>Project</strong> would also require<br />

up to eight (8) to 16 full-time or part-time staff. The EIR/EIS will analyze the potential for<br />

population increase related to the construction and operation <strong>of</strong> the <strong>Project</strong> that could result in<br />

additional demand for school facilities.<br />

July 2011 42 Initial Study/<strong>Notice</strong> <strong>of</strong> <strong>Preparation</strong>