KERN COUNTY PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT<br />

RISING TREE WIND ENERGY PROJECT<br />

Potentially<br />

Significant<br />

Impact<br />

POPULATION AND HOUSING. Would the project:<br />

a. Induce substantial population growth in an area,<br />

either directly (for example, by proposing new<br />

homes and businesses) or indirectly (for<br />

example, through extension <strong>of</strong> roads or other<br />

infrastructure)?<br />

b. Displace substantial numbers <strong>of</strong> existing<br />

housing, necessitating the construction <strong>of</strong><br />

replacement housing elsewhere?<br />

c. Displace substantial numbers <strong>of</strong> people,<br />

necessitating the construction <strong>of</strong> replacement<br />

housing elsewhere?<br />

Discussion:<br />

Potentially<br />

Significant<br />

Impact<br />

Unless<br />

Mitigated<br />

Less Than<br />

Significant<br />

Impact<br />

No<br />

Impact<br />

(a) Typical established local thresholds <strong>of</strong> significance for housing and population growth pursuant<br />

to the State CEQA Guidelines, Section 15064.7 include effects that would induce substantial<br />

growth or concentration <strong>of</strong> a population beyond <strong>County</strong> projections, alter the location, distribution,<br />

density, or growth rate <strong>of</strong> the population beyond that projected in the Housing Element,<br />

result in a substantial increase in demand for additional housing, or create a development that<br />

significantly reduces the ability <strong>of</strong> the <strong>County</strong> to meet housing objectives set forth in the General<br />

Plan Housing Element.<br />

Construction <strong>of</strong> the <strong>Project</strong> is expected to require 200 to 300 workers whose numbers would vary<br />

depending on the stage <strong>of</strong> construction. Construction would occur over the ten to 12 month<br />

period. Construction workers are expected to travel to the site from various locations throughout<br />

southern California, and the number <strong>of</strong> workers relocating to the surrounding area is not expected<br />

to be substantial. Operation <strong>of</strong> the <strong>Project</strong> would also require eight (8) to 16 full-time or part-time<br />

staff. The EIR/EIS will address the <strong>Project</strong>’s potential to directly or indirectly induce additional<br />

population or the development <strong>of</strong> housing or businesses.<br />

Although the <strong>Project</strong> would produce energy, it is intended to meet the demand for energy that is<br />

already projected based on growth in communities around California. While the <strong>Project</strong>’s energy<br />

would replace energy generated by fossil fuels, thereby contributing to California’s renewable<br />

energy goals, the production <strong>of</strong> additional energy may indirectly be growth inducing. These<br />

issues will be analyzed within the EIR/EIS.<br />

(b-c) Although not anticipated, impacts to identified residential buildings potentially requiring<br />

relocation will be analyzed in the EIR/EIS. Should any occupied buildings need to be relocated,<br />

appropriate mitigation will be identified. Also, the <strong>Project</strong>’s potential for displacement <strong>of</strong> any<br />

persons will be evaluated in the EIR/EIS.<br />

July 2011 41 Initial Study/<strong>Notice</strong> <strong>of</strong> <strong>Preparation</strong>