42. Whom the contact for<br />

restoration of damages from<br />

the natural calamities.<br />

43. What is the procedure to<br />

pay development charges for<br />

getting PPA approval /<br />

44. What is the procedure to<br />

get NOC to sell / purchase a<br />

plot or house<br />

45. How to get permission for<br />

stacking building materials<br />

temporarily<br />

days of publication, Tender will be opened by the<br />

commissioner in the presence of tenderer. Tender<br />

schedules will be issued to the registered<br />

contractors from the date of publication by<br />

submitting EMD. After Scrutiny of tender, work<br />

orders will be issued to the selected contractors.<br />

2. Under URS<br />

In this, tenders will be conducted for works costing<br />

below Rs5/- lakhs. Willingness are obtained from<br />

the registered contractors under URS. Their names<br />

are included in the lots. A contractor is selected from<br />

the drawl of lots in the presence of the contractors on<br />

the spot.<br />

To bail out water from low lying areas, and to<br />

remove the trees fallen during natural calamities,<br />

Executive Engineer / Commissioner has to be<br />

contacted to provide safe shelter, for getting food<br />

packets etc Revenue official has to be contacted.<br />

The layout, documents forwarded by the<br />

Pondicherry Planning Authority are checked and the<br />

layout to be verified by Deputy Surveyor whether<br />

there is any encroachment of Government /<br />

municipal land . After verification, estimate for<br />

development works are to be prepared by the<br />

concern Junior Engineer and from the estimate<br />

individual development charges will be calculated.<br />

After getting approval of the Special Officer the<br />

individual development charges will be<br />

communicated to the applicant. The development<br />

charges has to be remitted by way of Fixed Deposit.<br />

Vacant Land Tax also to be paid by the applicant.<br />

After collecting development charges and vacant<br />

land tax NOC will be issued.<br />

Application to be made along with document and<br />

layout copy. Site will be inspected by the Deputy<br />

Surveyor of this Municipality. If there is no<br />

encroachment of the Government land in the<br />

layout. NOC will be issued.<br />

Application to be made for stacking building<br />

materials temporarily mentioning for how many<br />

days permission is required. Site will be inspected<br />

and charges @ Rs.15/- per Sqm per day will be<br />

collected and permission will be issued for only the<br />

specified time of the materials are not removed by<br />

the individuals after specified time. Appropriate<br />

action will be taken against the individual