<strong>CODE</strong> <strong>OF</strong> <strong>PRACTICE</strong> <strong>FOR</strong> <strong>METAL</strong> <strong>SCAFFOLDING</strong> <strong>SAFETY</strong><br />

5.3.2 Plane frame scaffolds<br />

(a) This type of scaffolds is commonly used for access to ceiling,<br />

soffits, walls and columns for carrying out light work, for<br />

examples, plastering, painting, conduit installation, cleaning and<br />

similar operations. Each scaffold comprises an arrangement of<br />

vertical frames and bracings supporting closely boarded working<br />

platforms at required levels.<br />

(b) The design and loading of plane frame scaffolds should be in<br />

accordance with Section 5.1 of this Code. The height of a<br />

vertical frame is normally 1.7m to 2m (depending on the type of the<br />

frame used) to give adequate headroom for passage. The height<br />

limits of the free-standing plane frame scaffolds and tied plane frame<br />

scaffolds should follow professional engineer’s design.<br />

(c) A plane frame scaffold system mainly consists of the following<br />

components:<br />

(i) Ties<br />

- It is essential for all plane frame scaffolds to be<br />

securely tied either to surrounding walls, columns<br />

or such similar structures throughout the length<br />

and height to prevent the scaffolds from movement,<br />

tipping into or away from the wall and structure.<br />

- The ties should be located not more than one bay<br />

from the ends of the scaffold and thereafter at<br />

intermediate spacing of not more than 3 bays or 7.5m<br />

apart, whichever is the lesser. The ties should be as far<br />

as practicable be fixed at staggered positions at every two<br />

lifts.<br />

- The ties should be perpendicular to the<br />

longitudinal plane of the scaffold and where it is<br />

not practicable, the deviation from the perpendicular<br />

should not exceed 15 o . Every tie should be capable of<br />

withstanding tensile or compression force applied along<br />

the length of the tie.<br />