A metal separation between the PV plant and the public<br />

network shall be guaranteed in order not to feed direct<br />

currents into the grid. For <strong>plants</strong> with total generated<br />

power not higher than 20kW such separation can be<br />

replaced by a protection (generally inside the electronic<br />

control and setting system of the inverter) which makes<br />

the interface (or generator) device open in case of values<br />

of total direct component exceeding 0.5% of the<br />

r.m.s. value of the fundamental component of the total<br />

maximum current coming out from the converters. For<br />

<strong>plants</strong> with total generation power exceeding 20kW<br />

and with inverters without metal separation between<br />

the direct and alternating current parts, the insertion of<br />

a LV/lv at industrial frequency is necessary (Guide CEI<br />

82-25, II ed.).<br />

Figure 4.2 shows a single-line diagram typical of a PV plant<br />

connected to the LV grid in the presence of a user’s plant.<br />

Figure 4.2<br />

LV users not enabled<br />

for “stand-alone” operation<br />

Public LV network<br />

<strong>Photovoltaic</strong><br />

generator (PV)<br />

kWh<br />

kvarh<br />

Inverter<br />

PV installations can deliver active energy with a power<br />

factor (Guide CEI 82-25, II ed.) 3 :<br />

• not lower than 0.8 delayed (absorption of reactive<br />

power), when the supplied active power ranges from<br />

20% to 100% of the installed total power;<br />

• unitary;<br />

• in advance, when they deliver a total reactive power<br />

not exceeding the minimum value between 1kvar and<br />

(0.05+P/20)kvar (where P is the installed total power<br />

expressed in kW).<br />

2 A high frequency transformer is not suitable since it has output direct current components<br />

exceeding the allowed limits; moreover only a separation transformer is admitted<br />

for more inverters.<br />

3 Referred to the fundamental component.<br />

Measure of the<br />

energy taken from<br />

and fed into the grid<br />

Main<br />

circuit-breaker<br />

(DG)<br />

Interface<br />

device (DDI)<br />

Circuit-breaker<br />

of the generator<br />

(DDG)<br />

Distributor<br />

User’s plant<br />

kWh<br />

27 - 59 - 81<br />

Measurement of<br />

produced energy<br />

Interface<br />

protection (PI)<br />

Circuit-breaker<br />

of the generator<br />

(DDG)<br />

<strong>Photovoltaic</strong> <strong>plants</strong><br />

35<br />

4 Connection to the grid and measure of the energy