A metal separation between the PV plant and the public<br />
network shall be guaranteed in order not to feed direct<br />
currents into the grid. For <strong>plants</strong> with total generated<br />
power not higher than 20kW such separation can be<br />
replaced by a protection (generally inside the electronic<br />
control and setting system of the inverter) which makes<br />
the interface (or generator) device open in case of values<br />
of total direct component exceeding 0.5% of the<br />
r.m.s. value of the fundamental component of the total<br />
maximum current coming out from the converters. For<br />
<strong>plants</strong> with total generation power exceeding 20kW<br />
and with inverters without metal separation between<br />
the direct and alternating current parts, the insertion of<br />
a LV/lv at industrial frequency is necessary (Guide CEI<br />
82-25, II ed.).<br />
Figure 4.2 shows a single-line diagram typical of a PV plant<br />
connected to the LV grid in the presence of a user’s plant.<br />
Figure 4.2<br />
LV users not enabled<br />
for “stand-alone” operation<br />
Public LV network<br />
<strong>Photovoltaic</strong><br />
generator (PV)<br />
kWh<br />
kvarh<br />
Inverter<br />
PV installations can deliver active energy with a power<br />
factor (Guide CEI 82-25, II ed.) 3 :<br />
• not lower than 0.8 delayed (absorption of reactive<br />
power), when the supplied active power ranges from<br />
20% to 100% of the installed total power;<br />
• unitary;<br />
• in advance, when they deliver a total reactive power<br />
not exceeding the minimum value between 1kvar and<br />
(0.05+P/20)kvar (where P is the installed total power<br />
expressed in kW).<br />
2 A high frequency transformer is not suitable since it has output direct current components<br />
exceeding the allowed limits; moreover only a separation transformer is admitted<br />
for more inverters.<br />
3 Referred to the fundamental component.<br />
Measure of the<br />
energy taken from<br />
and fed into the grid<br />
Main<br />
circuit-breaker<br />
(DG)<br />
Interface<br />
device (DDI)<br />
Circuit-breaker<br />
of the generator<br />
(DDG)<br />
Distributor<br />
User’s plant<br />
kWh<br />
27 - 59 - 81<br />
Measurement of<br />
produced energy<br />
Interface<br />
protection (PI)<br />
Circuit-breaker<br />
of the generator<br />
(DDG)<br />
<strong>Photovoltaic</strong> <strong>plants</strong><br />
35<br />
4 Connection to the grid and measure of the energy