Figure 4.3<br />

Figure 4.4<br />

LV users not enabled<br />

for “stand-alone” operation<br />

LV users not enabled<br />

for “stand-alone” operation<br />

Main<br />

circuit-breaker<br />

(DG)<br />

<strong>Photovoltaic</strong><br />

generator (PV)<br />

Main<br />

circuit-breaker<br />

(DG)<br />

Circuit-breaker<br />

of the generator<br />

(DDG)<br />

Three-phase<br />

inverter<br />

Interface<br />

device (DDI)<br />

MV network<br />

Inverter<br />

MV network<br />

kWh<br />

kWh<br />

kvarh<br />

50-51 - 51N - (67N) Main protection PG<br />

Interface<br />

device<br />

(DDI)<br />

kWh<br />

Circuit-breaker<br />

of the generator<br />

(DDG)<br />

kWh<br />

kvarh<br />

50-51 - 51N - (67N)<br />

< U 27 - 59 - 81<br />

Three-phase<br />

inverter<br />

< U<br />

Measurement of<br />

produced energy<br />

Distributor<br />

User’s plant<br />

27 - 59 - 81<br />

Main protection PG<br />

Interface<br />

protection (PI)<br />

kWh<br />

Interface<br />

device (DDI)<br />

Circuit-breaker<br />

of the generator<br />

(DDG)<br />

Distributor<br />

User’s plant<br />

<strong>Photovoltaic</strong> <strong>plants</strong><br />

37<br />

4 Connection to the grid and measure of the energy