Technical Application Papers No.10 Photovoltaic plants - ABB
Technical Application Papers No.10 Photovoltaic plants - ABB
Technical Application Papers No.10 Photovoltaic plants - ABB
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 4.3<br />
Figure 4.4<br />
LV users not enabled<br />
for “stand-alone” operation<br />
LV users not enabled<br />
for “stand-alone” operation<br />
Main<br />
circuit-breaker<br />
(DG)<br />
<strong>Photovoltaic</strong><br />
generator (PV)<br />
Main<br />
circuit-breaker<br />
(DG)<br />
Circuit-breaker<br />
of the generator<br />
(DDG)<br />
Three-phase<br />
inverter<br />
Interface<br />
device (DDI)<br />
MV network<br />
Inverter<br />
MV network<br />
kWh<br />
kWh<br />
kvarh<br />
50-51 - 51N - (67N) Main protection PG<br />
Interface<br />
device<br />
(DDI)<br />
kWh<br />
Circuit-breaker<br />
of the generator<br />
(DDG)<br />
kWh<br />
kvarh<br />
50-51 - 51N - (67N)<br />
< U 27 - 59 - 81<br />
Three-phase<br />
inverter<br />
< U<br />
Measurement of<br />
produced energy<br />
Distributor<br />
User’s plant<br />
27 - 59 - 81<br />
Main protection PG<br />
Interface<br />
protection (PI)<br />
kWh<br />
Interface<br />
device (DDI)<br />
Circuit-breaker<br />
of the generator<br />
(DDG)<br />
Distributor<br />
User’s plant<br />
<strong>Photovoltaic</strong> <strong>plants</strong><br />
37<br />
4 Connection to the grid and measure of the energy