28.03.2013 Views

Remediation of RCC Dam Seepage Upper Stillwater Dam ...

Remediation of RCC Dam Seepage Upper Stillwater Dam ...

Remediation of RCC Dam Seepage Upper Stillwater Dam ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Nicholson Construction Company<br />

12 McClane Street<br />

Cuddy, PA 15031<br />

Telephone: 412-221-4500<br />

Facsimile: 412-221-3127<br />

<strong>Remediation</strong> <strong>of</strong> <strong>RCC</strong> <strong>Dam</strong> <strong>Seepage</strong><br />

<strong>Upper</strong> <strong>Stillwater</strong> <strong>Dam</strong> Rehabilitation – Phase 1<br />

by<br />

Ron F. Hall<br />

Nicholson Construction Company, Salt Lake City, Utah<br />

Paul Krumm<br />

Nicholson Construction Company, Salt Lake City, Utah<br />

Jeff C. Allen<br />

ASI-<strong>RCC</strong>, Inc., Buena Vista, California<br />

Presented at:<br />

USSD Annual Meeting<br />

Salt Lake City, Utah<br />

June 6-10, 2005<br />

05-04-146


REMEDIATION OF <strong>RCC</strong> DAM SEEPAGE<br />

UPPER STILLWATER DAM REHABILITATION – PHASE I<br />

!"#$%&$'()) * $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$+,--$.&$/)),# 0 $$<br />

1(2)$34255 6 $$<br />

ABSTRACT<br />

78#9,$:;,$:85,$"-$8#8:8()$9"#,)"@,?$:;4"2A;$:;,$B@@,4$<br />

7:8))C(:,4$D(5$


A()),48,


Technical Plan for Design and Construction<br />

$<br />

$<br />

H;,$]24,(2$"-$!,9)(5(:8"#$8


())"C8#A$:;,$8#I,9:,?$A4"2:$G"?F$:"$C8:;,5,#:$8#$:;,$?(5$<br />


."#


D4(8#$'"),$1(::,4#$<br />

Ref. Contract Dwg. No 66-D-3410<br />

$<br />

$<br />

)(:,4()$5">,5,#:$8#$,8:;,4$,E@(#


9"#9,4#$8#$:;,$?,98


."#


Z,5G4(#,$\#


5,5G4(#,$:"$;":$(

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!