05.04.2013 Views

Basel Convention on the Control of Transboundary Movements

Basel Convention on the Control of Transboundary Movements

Basel Convention on the Control of Transboundary Movements

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A Committee for Administering <strong>the</strong> Mechanism for Promoting<br />

Implementati<strong>on</strong> and Compliance was established at COP 6 in Geneva<br />

in 2002. The objective <strong>of</strong> this mechanism is to assist Parties to comply<br />

with <strong>the</strong>ir obligati<strong>on</strong>s under <strong>the</strong> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g> and to facilitate, promote,<br />

m<strong>on</strong>itor and aim to secure <strong>the</strong> implementati<strong>on</strong> <strong>of</strong>, and compliance with,<br />

<strong>the</strong> obligati<strong>on</strong>s under <strong>the</strong> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g>. The mechanism is n<strong>on</strong>-c<strong>on</strong>fr<strong>on</strong>tati<strong>on</strong>al,<br />

transparent, cost-effective and preventive in nature, simple, flexible,<br />

n<strong>on</strong>-binding and oriented in <strong>the</strong> directi<strong>on</strong> <strong>of</strong> helping P arties to implement<br />

<strong>the</strong> provisi<strong>on</strong>s <strong>of</strong> <strong>the</strong> <str<strong>on</strong>g>Basel</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g>.<br />

One <strong>of</strong> <strong>the</strong> most important c<strong>on</strong>tributi<strong>on</strong>s <strong>of</strong> <strong>the</strong> <str<strong>on</strong>g>Basel</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g><br />

over <strong>the</strong> past 20 years is <strong>the</strong> elaborati<strong>on</strong> <strong>of</strong> a significant number <strong>of</strong> policy<br />

instruments with n<strong>on</strong>-binding character. Within <strong>the</strong> framework <strong>of</strong> <strong>the</strong><br />

<str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g>, a large body <strong>of</strong> technical guidelines <strong>on</strong> <strong>the</strong> management<br />

<strong>of</strong> specific waste streams has been developed by technical government<br />

expert groups and approved by <strong>the</strong> COP. These n<strong>on</strong>-binding instruments<br />

have been designed for <strong>the</strong> use <strong>of</strong> Governments at all levels, as well as<br />

o<strong>the</strong>r stakeholders, to provide practical guidance and thus facilitate <strong>the</strong><br />

management <strong>of</strong> <strong>the</strong> relevant waste streams.<br />

In 2002, COP 6 adopted <strong>the</strong> Strategic Plan for <strong>the</strong> implementati<strong>on</strong> <strong>of</strong><br />

<strong>the</strong> <str<strong>on</strong>g>Basel</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g> for <strong>the</strong> period 2002 to 2010, to assist developing<br />

countries and countries with ec<strong>on</strong>omies in transiti<strong>on</strong> in implementing <strong>the</strong><br />

provisi<strong>on</strong>s <strong>of</strong> <strong>the</strong> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g>. Numerous nati<strong>on</strong>al and regi<strong>on</strong>al capacity<br />

building and training projects have since been implemented under <strong>the</strong><br />

umbrella <strong>of</strong> <strong>the</strong> Strategic Plan, with <strong>the</strong> assistance <strong>of</strong> <strong>the</strong> Secretariat and<br />

<strong>the</strong> <str<strong>on</strong>g>Basel</str<strong>on</strong>g> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g> Regi<strong>on</strong>al Centres. COP 10 in October 2011 is<br />

expected to adopt a new strategic framework for <strong>the</strong> period 2011 to<br />

2021, defining <strong>the</strong> fundamental aims and priorities <strong>of</strong> <strong>the</strong> <str<strong>on</strong>g>C<strong>on</strong>venti<strong>on</strong></str<strong>on</strong>g><br />

for <strong>the</strong> relevant decade while taking into account changes that have<br />

occurred since its adopti<strong>on</strong>.<br />

| 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!