Easy read version - Transport for Greater Manchester
Easy read version - Transport for Greater Manchester
Easy read version - Transport for Greater Manchester
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
What we are doing<br />
Guided busway between Leigh and Ellenbrook<br />
• Local consultation on stop location at Higher Folds /<br />
Tyldesley West<br />
• 4.5 mile guided busway to be built, so that buses can<br />
avoid busy traffic<br />
• Seven fully accessible bus stops along guided busway,<br />
with bus shelters and CCTV<br />
• Path to run alongside busway that can be used by<br />
walkers, cyclists and horse riders<br />
In Atherton and Leigh<br />
• Local consultation on scheme detail<br />
• Working with Wigan Council to improve the route<br />
between Atherton and Tyldesley<br />
• Local consultation<br />
• Bus lane along Spinning Jenny Way, Leigh<br />
• Park & Ride sites at East Bond Street, Tyldesley<br />
Interchange and the M60/A580 junction<br />
When<br />
2012<br />
2013 planned<br />
start of work<br />
2013 planned<br />
start of work<br />
2013 planned<br />
start of work<br />
2012<br />
2013 planned<br />
start of work<br />
2012<br />
2013 planned<br />
start of work<br />
2014 planned<br />
start of work<br />
Page 12