07.04.2013 Views

download - BG Group

download - BG Group

download - BG Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Algeria<br />

<strong>BG</strong> <strong>Group</strong> has a 36.75% interest in, and is<br />

operator of, the Hassi Ba Hamou (HBH)<br />

block. <strong>BG</strong> <strong>Group</strong> was successful in the first<br />

Algerian licence round held under the new<br />

hydrocarbon law, securing the Guern el<br />

Guessa (GEG) permit north-west of HBH.<br />

Areas of operation<br />

MOROCCO<br />

Guern el Guessa<br />

PROPOSED<br />

GR5 PIPELINE<br />

MEDITERRANEAN SEA<br />

ALGIERS<br />

Hassi Ba Hamou<br />

A L G E R I A<br />

A L G E R I A<br />

ALGERIA<br />

Key to operations<br />

TUNISIA<br />

TUNISIA<br />

LIBYA LIBYA<br />

Gas<br />

Proposed<br />

Oil<br />

gas pipeline<br />

Gas pipeline<br />

<strong>BG</strong> <strong>Group</strong>operated<br />

Oil pipeline<br />

block<br />

0 500km<br />

<strong>BG</strong> <strong>Group</strong> entered Algeria through an agreement with Gulf Keystone<br />

in 2006 to acquire a 36.75% interest in the HBH permit. The permit,<br />

in central Algeria, consists of four blocks (317b, 347b, 348 and 349b),<br />

covers approximately 12 833 square kilometres and contains the<br />

HBH gas discovery. Under the first phase drilling programme,<br />

three appraisal and three exploration wells were drilled. The RM-1<br />

exploration well was a new gas discovery, in addition to the existing<br />

HBH discovery appraised by three appraisal wells. The first exploration<br />

phase on the HBH Perimeter was completed and <strong>BG</strong> <strong>Group</strong> and<br />

partners entered the two-year second exploration period and<br />

relinquished 30% of the original block area. Since entering this<br />

second phase, the RM-1 discovery has been appraised and <strong>BG</strong> <strong>Group</strong><br />

is now looking to commercialise both HBH and RM-1 discoveries with<br />

evacuation through the new proposed GR5 pipeline.<br />

<strong>BG</strong> <strong>Group</strong> holds 49%, and is operator of, the GEG permit which<br />

contains two blocks (316a and 317a). Sonatrach holds a 51% interest.<br />

The contract for the GEG permit became effective in May 2009 and<br />

the first exploration phase will run for three years. The award of this<br />

new permit represented a significant step for the <strong>Group</strong> in building<br />

a material business in Algeria.<br />

Libya<br />

In 2005, <strong>BG</strong> <strong>Group</strong> acquired a mix of<br />

acreage in both an established basin<br />

and a frontier area, in Libya’s second<br />

licensing round.<br />

Areas of operation<br />

R I A<br />

A L G E R I A<br />

TUNISIA<br />

N I G E R<br />

TRIPOLI<br />

LIBYA<br />

CHAD<br />

Key to operations<br />

Gas<br />

Oil pipeline<br />

Oil<br />

<strong>BG</strong> <strong>Group</strong>-<br />

Gas and Oil/<br />

Condensate<br />

operated<br />

block<br />

Gas pipeline<br />

<strong>BG</strong> <strong>Group</strong><br />

non-operated<br />

block<br />

0 600km<br />

Area 123<br />

Block 1<br />

Area 171<br />

Blocks 1,2,3,4<br />

Area 123<br />

Block 2<br />

EGYPT<br />

<strong>BG</strong> <strong>Group</strong> was awarded a 100% interest in, and operatorship<br />

of, Area 123 (Blocks 1 and 2), covering 4 900 square kilometres in<br />

Libya’s onshore Sirt Basin. 3D seismic operations were completed<br />

for both areas in 2007 and two exploration wells were drilled in<br />

2008, both of which were dry. <strong>BG</strong> <strong>Group</strong> has served a notice to<br />

relinquish both areas.<br />

<strong>BG</strong> <strong>Group</strong> was awarded a 50% non-operated interest in Area 171,<br />

containing Blocks 1, 2, 3 and 4, covering 11 300 square kilometres<br />

onshore in the frontier Kufra Basin. Initial 2D seismic operations were<br />

completed in 2007. A well was drilled in late 2008 which was dry.<br />

E G<br />

<strong>BG</strong> <strong>Group</strong> Data Book 2009<br />

21<br />

AFRICA, MIDDLE EAST AND ASIA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!