Americas and Global LNG<br />

Trinidad and Tobago<br />

<strong>BG</strong> <strong>Group</strong> has been operating in Trinidad and Tobago<br />

since 1989, and is a key gas producer in the country.<br />

<strong>BG</strong> <strong>Group</strong> currently supplies gas to the domestic market<br />

and to Atlantic LNG. In 2008, approximately two thirds<br />

of production was exported as LNG with the remainder<br />

going to the domestic market.<br />

Areas of operation<br />

Key to operations<br />

Gas<br />

Oil pipeline<br />

Gas pipeline<br />

<strong>BG</strong> <strong>Group</strong>-operated<br />

block<br />

0 100km<br />

Petrotrin Refinery Pointe-à-Pierre<br />

New information<br />

NCMA Unit Area<br />

Poinsettia<br />

Chaconia<br />

Hibiscus<br />

Ixora<br />

GULF OFF<br />

PARIA<br />

Atlantic LNG<br />

POINT<br />

FORTIN<br />

VENEZUELA<br />

• Assumed operatorship of Block 5(c)<br />

and increased stake by 45% to 75%<br />

• First gas from Poinsettia<br />

• New 220 mmscfd contract to supply<br />

NGC commenced<br />

• Endeavour well on Block 5(c) successful<br />

ATLANTIC OCEAN<br />

CARIBBEAN SEA<br />

PORT OF SPAIN<br />

TRINIDAD<br />

PHOENIX PARK<br />

Central Block<br />

BEACHFIELD<br />

TRINIDAD<br />

VENEZUELA<br />

Key dates<br />

TOBAGO<br />

Starfish<br />

Block E<br />

Block 6(b)<br />

Block 5(a)<br />

Dolphin<br />

ECMA<br />

Endeavour<br />

Bounty<br />

Loran/<br />

Manatee<br />

Block 6(d)<br />

Block 5(c)<br />

Victory<br />

Dolphin Deep<br />

1996 First Dolphin production<br />

1999 Atlantic LNG Train 1 start-up<br />

2002 Atlantic LNG Train 2 start-up<br />

2003 Atlantic LNG Train 3 start-up<br />

2004 Acquisition of Central Block<br />

2005 Manatee-1 discovery<br />

Atlantic LNG Train 4 start-up<br />

2006 Dolphin Deep onstream<br />

2007 Signed farm-in to Block 5(c) and<br />

began drilling programme<br />

2008 Victory and Bounty wells on<br />

Block 5(c) successful<br />

Trinidad andTobago: <strong>BG</strong> <strong>Group</strong> 3 year production<br />

Total production mmboe(net)<br />

30<br />

20<br />

10<br />

0<br />

Oil & liquids<br />

Gas<br />

22.6<br />

2006<br />

23.0<br />

2007<br />

EAST COAST MARINE AREA (ECMA)<br />

The <strong>BG</strong> <strong>Group</strong>-operated Dolphin gas<br />

field, located 83 kilometres off the east<br />

coast of Trinidad in Block 6(b), commenced<br />

production in 1996. The asset is contracted<br />

to supply 250 mmscfd gas to the National<br />

Gas Company (NGC) under a 20-year supply<br />

contract together with 100 mmscfd to<br />

Atlantic Train 3 and 120 mmscfd to Atlantic<br />

Train 4. A new production contract to supply<br />

220 mmscfd of gas to NGC for up to 15 years<br />

commenced in July 2009. To enable delivery<br />

of this new supply, the drilling of five further<br />

development wells in the Dolphin field was<br />

completed in April 2009.<br />

The gas is produced under a Combined<br />

Development Plan for the fields in Blocks 5(a),<br />

6 and E. Production is currently delivered<br />

from the Dolphin field through 13 platform<br />

wells and the Dolphin Deep field from two<br />

sub-sea wells. These wells were the first<br />

sub-sea completions in Trinidad and Tobago.<br />

The Dolphin Deep sub-sea facilities are tied<br />

back to facilities on the Dolphin platform.<br />

ECMA gas is delivered to NGC via a pipeline<br />

to the Poui platform where it connects<br />

to the domestic network. Gas is delivered<br />

to Atlantic LNG through a second offshore<br />

pipeline bringing gas from the Dolphin<br />

platform to shore at the Beachfield<br />

receiving terminal. It then connects to<br />

NGC’s 76 kilometre onshore Cross Island<br />

Pipeline extending from Beachfield to<br />

Atlantic LNG at Point Fortin.<br />

26.1<br />

2008<br />

In 2005, <strong>BG</strong> <strong>Group</strong> and partner completed<br />

the Manatee-1 well in Block 6(d) in the ECMA,<br />

which indicated gross reserves of 1.8 tcf. This<br />

discovery demonstrated the extension of the<br />

Loran field from Venezuela into Block 6(d) in<br />

<strong>BG</strong> <strong>Group</strong> Data Book 2009<br />

25<br />

AMERICAS AND GLOBAL LNG