<strong>BG</strong> <strong>Group</strong> currently supplies 20 mmscfd gas<br />

and approximately 1 000 bopd condensate<br />

to Petrotrin, for use in its refinery at<br />

Pointe-à-Pierre. Gas is transported via a<br />

12 kilometre pipeline that connects to the<br />

NGC network.<br />

A new gas plant with a capacity of<br />

approximately 65 mmscfd was commissioned<br />

in 2007, near the existing production site<br />

at Carapal Ridge. This increased capacity<br />

supplies approximately 23 mmscfd to<br />

<strong>BG</strong> <strong>Group</strong>’s capacity in Atlantic LNG Train 4,<br />

in addition to the supply to Petrotrin’s refinery.<br />

Pre-sanction studies are currently ongoing<br />

for compression and the development of<br />

the Baraka and Baraka East discoveries.<br />

ATLANTIC LNG<br />

The Atlantic LNG Company of Trinidad and<br />

Tobago, in which <strong>BG</strong> <strong>Group</strong> is a shareholder,<br />

constructed its LNG plant at Point Fortin,<br />

NCMA, ECMA, Central Block and Atlantic LNG: integrated upstream and downstream<br />

TRAIN 1<br />

Start date 1999<br />

TRAIN 2<br />

Start date 2002<br />

TRAIN 3<br />

Start date 2003<br />

TRAIN 4<br />

Start date 2006<br />

south-west Trinidad, which began operating<br />

in 1999.<br />

The first train has a productive capacity of<br />

3.1 mtpa LNG. Train 2 commenced production<br />

in 2002 and Train 3 in 2003, these additional<br />

two trains having a productive capacity of<br />

approximately 6.6 mtpa.<br />

With the completion of the 5.2 mtpa Train 4<br />

in December 2005, the total LNG production<br />

capacity of Atlantic LNG is approximately<br />

15 mtpa.<br />

The LNG produced from gas supplied to<br />

Trains 2 and 3 by <strong>BG</strong> <strong>Group</strong> and its partners is<br />

sold to <strong>BG</strong> Gas Marketing (<strong>BG</strong>GM), a wholly<br />

owned <strong>BG</strong> <strong>Group</strong> subsidiary, under a longterm<br />

contract for import into the Elba Island<br />

LNG receiving terminal in Georgia, USA.<br />

LNG produced from the <strong>BG</strong> <strong>Group</strong><br />

liquefaction capacity in Train 4 is sold under<br />

a long-term contract to <strong>BG</strong>GM for delivery<br />

into the US market via the Lake Charles<br />

import terminal in Louisiana.<br />

Atlantic LNG Trains 2, 3 and 4 represent fully<br />

integrated projects for <strong>BG</strong> <strong>Group</strong>, involving<br />

the production and liquefaction of gas in<br />

Trinidad and Tobago, the shipping of LNG to<br />

the USA and the subsequent regasification<br />

for onward sale into the US market.<br />

GAS SUPPLY LIQUEFACTION OUTPUT LNG PURCHASE<br />

c520 mmscfd (non-<strong>BG</strong> <strong>Group</strong> supply)<br />

Train 1 – 3.1 mtpa<br />

Gas Merchant plant<br />

LNG<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

Repsol<br />

26%<br />

34%<br />

20%<br />

GDF SUEZ<br />

Gas Natural<br />

60%<br />

40%<br />

GDF SUEZ 10%<br />

NGC 10%<br />

c560 mmscfd<br />

Train 2 – 3.3 mtpa<br />

Gas Tolling plant<br />

LNG<br />

<strong>BG</strong> <strong>Group</strong> and<br />

upstream partners 50%<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

Repsol<br />

32.5%<br />

42.5%<br />

25.0%<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

50%<br />

50%<br />

c560 mmscfd<br />

Train 3 – 3.3 mtpa<br />

Gas Tolling plant<br />

LNG<br />

<strong>BG</strong> <strong>Group</strong> and<br />

upstream partners 25%<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

Repsol<br />

32.5%<br />

42.5%<br />

25.0%<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

25%<br />

75%<br />

c800 mmscfd<br />

Train 4 – 5.2 mtpa<br />

Gas Tolling plant<br />

LNG<br />

<strong>BG</strong> <strong>Group</strong> and<br />

upstream partners 28.9%<br />

<strong>BG</strong> <strong>Group</strong><br />

BP<br />

Repsol<br />

NGC<br />

28.89%<br />

37.78%<br />

22.22%<br />

11.11%<br />

<strong>BG</strong> <strong>Group</strong> 28.89%<br />

Other Train 4 partners<br />

off-take equity entitlement 71.11%<br />

UPSTREAM LIQUEFACTION OUTPUT DOWNSTREAM<br />

<strong>BG</strong> <strong>Group</strong> Data Book 2009<br />

27<br />

AMERICAS AND GLOBAL LNG